Manuscript Offprint
arXiv:2608.14421Estimating the growth in emissions from AI data centres
Abstract.
The advent of agentic AI is driving an unprecedented growth in data centre expansion. Using state-of-the-art life cycle assessment models for operational and embodied emissions from AI servers, we estimate the ensuing growth in the overall CO2 emissions of AI data centres. The main contribution of this work is a rigorous quantification of emissions arising from projected AI data centre expansion using scenarios by the IEA and McKinsey & Company. We show that the scenarios promoted by the AI industry would result in a dramatic rise in overall emissions and that the embodied carbon component is considerable.
1. Introduction
Climate change is an environmental problem. But our environment is what allows our society to thrive. The damage from climate change is therefore societal and economical as well as ecological, e.g. (Trust et al., 2023) predicts a 50% drop in GDP at 2.5°C. The only way to minimise this damage is to reduce global CO2 emissions. Even keeping them at the current level will cause catastrophic warming. All this is explained in detail in the 2024 UNEP Emissions Gap Report (UN Environment Programme, 2024).
The current push for generative AI in general and “agentic” AI in particular is deeply problematic in many ways. In this paper we focus on CO2 emissions arising not only from the use of AI technology (operational emissions) but also the emissions resulting from the building of the data centres and the manufacturing of the servers, the so-called embodied or embedded emissions.
The main technical contribution of this paper is the incorporation into the LCA model of the trends of the contributions to the embodied emissions of the servers. In this way our work improves on the state of the art (Wadenstein and Vanderbauwhede, 2025) where the values of embodied emissions of the servers are static.
The main contribution of the paper to the “AI” debate is a rigorous scenario-based quantification of emissions arising from AI data centre expansion.
- The hype creates an expectation of huge growth in demand for AI. “Agentic” AI is the latest manifestation of this hype, and it requires thousands times more resources than chatbot-style generative AI. This growth in data centre capacity is seen as a good thing, and of course the AI companies do not mention the concomitant emissions. Data centre companies have to start building capacity before the demand is realised. As a result, data centre capacity is being built up right now at an unprecedented scale.
- This requires electricity generators to provision capacity for those future data centres. It also requires provisioning of semiconductor fab capacity.
- Without strong growth in demand, electricity generators would phase out fossil fuel generation because generating electricity from renewable sources is more cost-effective. Because of the AI hype, they are no longer phasing out fossil fuel generation as they want to maximise generation capacity to maximise future profits. New fossil fuel powered electricity plants are being developed as a result (Chu and Smyth, 2025) and existing ones are kept open for longer (Skidmore, 2024).
- As electricity generators of course want to optimise current profits as well, they want to sell all the electricity they can generate, rather than let plants idle. For the same reason, if semiconductor fab capacity is increased, more semiconductor wafers must be produced and therefore sold.
- And so global emissions from electricity generation are not decreasing at all, and are even expected to rise in the near future. This comes at a time when we need to reduce global emissions urgently and drastically. Embodied emissions from semiconductor manufacturing are increasing with the increased volume. The extent of this increase depends on the trend in embodied emissions.
Because of this very real effect of the AI hype on global emissions, it is important to quantify the emissions arising from the projected growth in AI use, both embodied and operational.
3. Breakdown of data centre emissions
The greenhouse gas emissions from a data centre can be broken down into a few main components, based on when and where the emissions are incurred:
(1) Emissions incurred while building the data centre infrastructure (mainly the building itself and the cooling system). This is a minority share yet constitutes an important contribution to the overall embodied carbon. (2) Emissions incurred while manufacturing the servers used in the data centre. The part of server manufacturing that produces by far the most emissions is the chip production. Our model includes the carbon costs of the packaging, enclosures etc. as well. (3) Emissions incurred while producing the electricity to run the servers. This is called the carbon intensity of electricity generation and depends on the location of the data centre. As AI data centres are globally distributed, we will consider the global average emissions of electricity production.
We call (1) and (2) the “embodied (carbon) emissions” and (3) the “operational (carbon) emissions”.
The global carbon intensity of electricity generation is decreasing at a rate of about 2.5% per year. Unfortunately, this has not resulted in a decrease in emissions, which are still rising by 2.3% per year: what we see currently is that renewables are installed in addition to fossil fuel generation, rather than replacing them. Power generation CO2 emissions are plateauing rather than reducing steeply (Çam et al., 2025).
4. An estimate of the growth in emissions
We have created a model for the evolution of data centre emissions over time, which takes into account both the embodied carbon and the emissions from use. This model does also take into account the embodied carbon emissions from creating the actual data centres infrastructure but not the supporting infrastructure (electricity supplies, networking, roads, water supplies).
4.1. Data centre LCA model
Our LCA model for data centres was published in (Wadenstein and Vanderbauwhede, 2025). We refer to that work for full details but present here a summary of the model construction.
The total carbon footprint for a given capacity over time t is the sum of the embodied carbon of the hardware (including manufacturing, transport and end-of-life disposal) and the operational emissions (Eq. 1). In all following equations, .
4.1.1. Site parameters
The emissions depend on the site in various ways. The factors taken into account are:
- yearly site expansion factor,
- yearly average site load factor,
- site power usage effectiveness, PUE
- site node lifetime, (years)
- #nodes in data centre,
- node embodied carbon, ECnode (kgCO2e)
- node power consumption, (W)
- node idle power consumption factor,
- location electricity carbon intensity (kgCO2e/kWh)
The node energy consumption per year, (kWh/year), takes into account the load and the idle power consumption:
The node embodied carbon is discussed in Section 4.1.4.
4.1.2. Data centre expansion and server replacement
In practice, the data centre will periodically renew its hardware and also expand its capacity. This has an effect on the embodied and operational emissions as replacing hardware increases the embodied carbon; but though the newer generation hardware is more energy efficient, it does no lead to reductions in operational emissions because the data centre is power-capped. Our model includes a correction for the energy efficiency of computation (Koomey’s law (Koomey et al., 2011)), but in this paper we therefore omit it.
We model the expansion as
The replacement is conceptually modelled using a generic step function with the replacement period:
(This function returns for all values in the period.)
4.1.3. Operational emissions
The operational emissions depend in first order on the electricity consumption of the hardware, the power usage effectiveness (PUE) of the data centre and the electricity carbon intensity (amount of CO2 emitted per unit of electricity produced) of the electricity generation.
Furthermore, carbon intensity should improve over time and depends on the geographical area where the centre is located.
The function expressing this is (Eq. 5):
So that
With these assumptions, the expression for the data centre operational emissions per year becomes (Eq. 7):
\displaystyle\mathtt{operational\_emissions\_year}(t)=\penalty\ \penalty\Cumulative emissions from electricity consumption are obtained by summing the yearly emissions (Eq. 8):
\displaystyle\mathtt{operational\_emissions}(t)\penalty\ =\penalty\4.1.4. Embodied emissions
For the embodied emissions of the site, we accumulate the embodied carbon of the new replacement cycle to the total embodied carbon at the time. As we replace all servers after a lifetime , and we have a yearly cluster expansion, we get a combination between a stepwise replacement and the gradual replacement due to yearly expansion. The resulting expression for the embodied emissions over time is a recursive function. The model is constructed as follows:
- is the number of nodes installed in a given year. This is the initial number multiplied with the expansion factor year by year, in other words the expansion is exponential. (9)
- is the new servers installed in a given year. This is made up of the additional nodes due to the yearly cluster expansion plus the retired nodes that have to be replaced. (10)
- is the number of retired server nodes in a given year. This is equal to the number of server nodes installed years before. (11)
The equation for the embodied emissions is shown in Eq. 12. The embodied carbon corresponds to the new nodes, so we have
\displaystyle\mathtt{embodied\_emissions\_year}(t,\Delta t,EC_{node})\penalty\ =\penalty\The trend in embodied carbon with every new hardware generation, , is the main contribution of this paper, and discussed in detail in Section 4.3.
The final cumulative embodied carbon model (Eq. 13) includes two more factors to account for the data centre infrastructure, which is the per-node portion of the embodied carbon of the construction of the data centre, and which is the per-node portion of the yearly additional embodied carbon arising from infrastructure maintenance. The values are based on (Lin et al., 2023).
\displaystyle\mathtt{embodied\_emissions}(t)\penalty\ =\penalty\4.2. Embodied carbon model
Our model for the embodied carbon of servers and as data centre infrastructure is also part of our work (Wadenstein and Vanderbauwhede, 2025). We present here a summary of the model construction, so that it is clear where the contribution of this paper fits in.
The factor for the contribution of the embodied carbon of the hardware in Eq. 12 needs to be calculated separately. The data available for embedded carbon in a compute node that comes from manufacturing, transport, and end-of-life disposal is available for a few select server models from hardware vendor reports. None of these servers are typical compute nodes for scientific computing.
To compute the embodied carbon of server manufacturing, we have re-implemented the model by Boavizta (Lorenzini, 2021). This model is very comprehensive but as it was published in 2021 and has not been updated since, we looked for more up-to-date estimates for various parameters. Beside estimates for the chips, the model also includes contributions from packaging, power supply, server enclosure and rack enclosure.
In particular for the various chips used in the server (CPU, RAM, SSD) we use the ACT methodology (Architectural Carbon modelling Tool) (Gupta et al., 2022). This tool uses the electricity consumption of the manufacturing process, the embodied carbon for the materials, and the greenhouse gas potential for the various gases used in production, and combines this with the die size to obtain an estimate for the embodied carbon of the chip. We updated some of the parameters (those that were included without reference in the ACT paper) using data from (Tannu and Nair, 2023), (Garcia Bardon et al., 2020) and (Shilov, 2019). We also extended the model to include non-integrated GPUs.
The model is based on the die size of the various chips in a server (CPU, GPU, RAM, SSD). The embodied emissions are calculated using process-specific data (embodied emissions for the materials and gases used, amount of electricity used, process yield) and the CI of the electricity used by the fab. For example, for the CPU we have Eq. 14. The first line are the emissions from production of the die, which consist of emissions from the electricity used , embodied emissions from the materials used in production and embodied as well as incurred emissions from the gases used in production (many of which have a much higher GWP than CO2), corrected by the wafer yield. The second line takes into account the number of cores and units in the CPU packages, as well as the embodied carbon of the base and of the package including the packaging overhead .
Similar equations are used for RAM, SSD and GPU. The model further includes the embodied carbon of the power supplies, motherboard and enclosure and emissions from assembly. The model also takes into account the embodied emissions of the infrastructure and of the networking infrastructure, based on estimates worked out in (Lin et al., 2023): for a 1MW data centre, infrastructure embodied carbon is estimated at 1,829 tCO2e on construction, increasing to 2,400 tCO2e after 20 years due to maintenance and replacement of parts of the infrastructure; networking equipment embodied carbon is estimated at 6% of the total server embodied carbon. We relate this through the individual nodes by scaling with the power consumption of the node, corrected by the data centre PUE. For full details, we refer to the source code and model documentation (Vanderbauwhede and Wadenstein, 2025).
4.3. Embodied carbon trends
The main addition to the model for this paper is the incorporation of trends for the evolution of the constituents of the embodied carbon as presented above.
Consecutive semiconductor process nodes follow an exponential trend, reflected by Moore’s law for the circuit density (Schaller, 2002) and Koomey’s law for the energy efficiency (Koomey et al., 2011). The semiconductor industry aims to keep alignment with those laws, and therefore the trends in the contributing factors to the embodied emissions all follow a power laws. For our model, we need trends for the following parameters:
- Server thermal design power (TDP)
- Process node embodied carbon per unit area, which gives us trends for CPU and GPU
- Solid State Drive (SSD) embodied carbon trend also requires – SSD number of layers trend – SSD density trend – SSD capacity trend
- DRAM embodied carbon trend also requires – DRAM capacity trend – DRAM density trend
For each of these parameters, we perform a non-linear Levenberg-Marquardt least-squares fit (Levenberg, 1944; Marquardt, 1963). We use a 95% confidence interval (). The fit is judged on the basis of the sum of the squared differences or ’residuals’ between the input data points and the function values, evaluated at the same places (SSR, a.k.a. ).
As we are focusing mainly on generative AI data centres, we use the NVIDIA DGX range of servers, which are widely used both for inference and training. We use the vendor data sheets from 2013 to 2025 complemented with other databases and sources (listing all source would make the paper too long).
Our ultimate aim is to obtain estimates for the CO2 emissions of data centres. These emissions are dominated by integrated circuits. The increase in capacity of a data centre is expressed in terms of power. For every consecutive semiconductor process node, not only the embodied carbon but also the power consumption per unit area changes. We therefore normalise the embodied carbon to the power consumption. We also derive separate trends for embodied carbon of SSDs and DRAM, as their manufacturing processes are different from ICs.
Using the trends for the above parameters, the actual embodied carbon estimate over time for every constituent of the server is given by
where
is the generalised compound growth equation. The power consumption trend is likewise
The final expression for the server embodied carbon trend becomes:
Although it is possible to calculate the variance of simple linear expressions using the well-known laws of uncertainty propagation, this is not valid for a complex time dependent model such as Eq. 18 because the exponential growth curve skews the distributions. Therefore, we apply a sampling technique to obtain the 5th, 50th and 95th percentiles. We construct a normal distribution for each of the constituents and sample the compound expression.
5. AI data centre growth scenarios
5.1. International Energy Agency Scenarios
The International Energy Agency (IEA) has published a report with four scenarios for the growth in global data centre electricity consumption (in TWh/y) between 2025 and 2035, using historical data from 2020 to 2025 (International Energy Agency, 2025). These scenarios assume logistic growth. The ensuing CO2 emissions calculated using our model are shown in Fig. 1. We assume a server lifetime of 3 years. This is conservative as GPU servers are replaced within 1.5 to 2 years.
Figure 1. Growth in emissions for global AI data centre expansion under IEA scenarios, 3-year server lifetime
The main observations are that (1) the “Lift-Off” scenario would cause and additional 0.8 GtCO2e/y in operational emissions by 2035; (2) the embodied carbon contribution is significant even for median values, 25% or 0.2 GtCO2e/y; (3) With the 95th percentile estimate for the embodied carbon contribution, the total emissions would be 1.3 GtCO2e/y, i.e embodied emissions make up 40% of the total. The high spread on the embodied carbon estimate is a result of the exponential growth trends for the constituents.
5.2. McKinsey Scenarios
The CEO of Dell has said that AI would “drive data centre demand up by 100 over the next 10 years” (Yadav, 2024). The CEO of OpenAI has said that the world needs 100 more semiconductor production capacity (Vanderbauwhede, 2024), which amounts to the same. To show how bad things could get if the industry projections would materialise, we use the McKinsey “Upper-range” scenario which project 27% compound average growth rate (CAGR) in global data centre capacity between 2023 and 2030 (McKinsey & Company, 2024). We assume a utilisation of 80% and server lifetime of 3 years. We use 25.9% CAGR rather than 27% because this translates to 10 growth in capacity in ten years and 100 in 20 years. Fig. 2 shows the resulting emissions. The worst-case estimate yields emissions of about 3 GtCO2e/y by 2035 and more that 30 GtCO2e/y by 2045.
Figure 2. Growth in global emissions at 25.9% CAGR in AI data centre expansion, 3-year server lifetime
If this growth was indeed sustained until 2035, it would be already be quite problematic: the total global CO2 budget for 2035 is 22 GtCO2e/y according to the UNEP Emissions Gap Report 2024 (UN Environment Programme, 2024). Global emissions from electricity generation were 14 GtCO2e in 2023 and projected to rise to 15 GtCO2e by 2035 without the growth in AI. The projected increase would consume 14% to the global emissions budget. But if this trend would persist for 20 years, then emissions from AI data centres alone would exceed the global emissions budget. As we can see from the figure, the worst-case embodied emissions alone would consume that budget.
6. Conclusion
We have presented a detailed model of the operational and embodied emissions of AI data centres and have used it to model emissions for the growth scenarios from the IEA and McKinsey. There are two main observations: (1) The embodied carbon contribution is significant in all cases, making up 20% of total emissions in the median case and up to 40% in the worst case. The spread is large because the embodied carbon trends follow a power law so small deviations have large effects. (2) Even the emissions under conservative, bounded growth IAE scenarios are of the order of 1 GtCO2e/y and unacceptable in terms of the global CO2 budget. Under the unlimited growth scenarios from McKinsey, which reflect the ambitions of the AI industry, emissions from AI data centres would be downright catastrophic, consuming the entire planetary carbon budget.
References
E. Çam, M. Casanovas, and J. Moloney Emissions: Power generation CO2 emissions are plateauing . External Links: Link Cited by: §3.
A. Chu and J. Smyth AI set to fuel surge in new US gas power plants. Finanical Times. External Links: Link Cited by: 3rd item.
O. Dedehayir and M. Steinert The hype cycle model: a review and future directions. Technological Forecasting and Social Change 108, pp. 28–41. External Links: ISSN 0040-1625, Document, Link Cited by: §2.
M. Garcia Bardon, P. Wuytens, L.-A. Ragnarsson, G. Mirabelli, D. Jang, G. Willems, A. Mallik, A. Spessot, J. Ryckaert, and B. Parvais DTCO including sustainability: power-performance-area-cost-environmental score (ppace) analysis for logic technologies. In 2020 IEEE International Electron Devices Meeting (IEDM), Vol. , pp. 41.4.1–41.4.4. External Links: Document Cited by: §4.2.
U. Gupta, M. Elgamal, G. Hills, G. Wei, H. S. Lee, D. Brooks, and C. Wu ACT: designing sustainable computer systems with an architectural carbon modeling tool. In Proceedings of the 49th Annual International Symposium on Computer Architecture, ISCA ’22, New York, NY, USA, pp. 784–799. External Links: ISBN 9781450386104, Document Cited by: §4.2.
International Energy Agency Energy and AI. Technical report International Energy Agency. External Links: Link Cited by: §5.1.
J. G. Koomey, S. Berard, M. Sanchez, and H. Wong Web extra appendix: implications of historical trends in the electrical efficiency of computing. IEEE Annals of the History of Computing 33 (3), pp. S1–S30. Cited by: §4.1.2, §4.3.
K. Levenberg A method for the solution of certain non-linear problems in least squares. Quarterly of applied mathematics 2 (2), pp. 164–168. Cited by: §4.3.
P. Lin, R. Bunger, and V. Avelar Quantifying Data Center Scope 3 GHG Emissions to Prioritize Reduction Efforts. External Links: Link Cited by: §4.1.4, §4.2.
R. Lorenzini Digital & environment: how to evaluate server manufacturing footprint, beyond greenhouse gas emissions?. Boavizta. External Links: Link Cited by: §4.2.
D. W. Marquardt An algorithm for least-squares estimation of nonlinear parameters. Journal of the Society for Industrial and Applied Mathematics 11 (2), pp. 431–441. External Links: Document Cited by: §4.3.
McKinsey & Company AI power: Expanding data center capacity to meet growing demand. External Links: Link Cited by: §5.2.
J. Rady, D. Townsend, R. Hunt, and J. Simpson The expectations game: the contingent value of hype as a rhetorical strategy in resource mobilization processes among ai startups. Journal of Business Venturing 40 (4), pp. 106499. External Links: ISSN 0883-9026, Document, Link Cited by: §2.
R. R. Schaller Moore’s law: past, present and future. IEEE spectrum 34 (6), pp. 52–59. Cited by: §4.3.
A. Shilov SK Hynix Details DDR5-6400. External Links: Link Cited by: §4.2.
Z. Skidmore IEA: Global coal power use reaches all time high, driven by increased electricity demand. External Links: Link Cited by: 3rd item.
S. Tannu and P. J. Nair The dirty secret of ssds: embodied carbon. SIGENERGY Energy Inform. Rev. 3 (3), pp. 4–9. External Links: Link, Document Cited by: §4.2.
S. Trust, S. Joshi, T. Lenton, and J. Oliver Emperor’s new climate scenarios – a warning for financial services. Technical report Institute and Faculty of Actuaries . External Links: Link Cited by: §1.
UN Environment Programme Emissions Gap Report 2024. External Links: Link Cited by: §1, §5.2.
W. Vanderbauwhede and M. Wadenstein LCA model for servers in a data centre. External Links: Link Cited by: §4.2.
W. Vanderbauwhede The insatiable hunger of (Open)AI. External Links: Link Cited by: §5.2.
M. Wadenstein and W. Vanderbauwhede Life cycle analysis for emissions of scientific computing centres. The European Physical Journal C 85 (8), pp. 913. Cited by: §1, §4.1, §4.2.
N. Yadav Michael Dell: AI to drive data center demand up 100x over next 10 years. External Links: Link Cited by: §5.2.