Manuscript Offprint
arXiv:2609.10267Optimal Non-Adaptive Vantage Point Selection
Abstract
We study the vantage point selection problem, introduced by Ashvinkumar, Chowdhury, Gao, Goswami, Mitchell, and Polishchuk [WADS'25] to model the problem of estimating bottleneck capacities on the Internet. The input is a weighted undirected graph with unique shortest paths where every edge has a distinct unknown capacity. When the algorithm queries a vertex , it reveals the minimum-capacity edge on the shortest path from to every other vertex reachable from . The goal is to maximize the total number of revealed edges. The quality of an algorithm is measured by its competitive ratio against an optimal algorithm that knows all edge capacities a priori.
We first consider the foundational single-query setting, where both the algorithm and the optimal algorithm are restricted to a single query. There is a trivial upper bound of on the competitive ratio and the best known lower bound was . We provide an algorithm and matching lower bound (up to polylogarithmic factors) showing that the best possible competitive ratio is .
Furthermore, we extend our results to the general setting where the optimal algorithm is allowed queries and our algorithm is allowed queries for . We present a randomized non-adaptive algorithm and matching lower bound (up to polylogarithmic factors) showing that the best possible expected competitive ratio for non-adaptive algorithms is the following surprisingly complex bound:
- jg1555@cs.rutgers.edu. Gao would like to acknowledge NSF support through IIS-2229876, DMS-2220271, CNS-2515159, DMS-2311064, and CCF-2118953.
† nswein@umich.edu. Supported by NSF CAREER award 2541910.
‡ wu-c24@mails.tsinghua.edu.cn.
1 Introduction
We study the vantage point selection problem, introduced by Ashvinkumar, Chowdhury, Gao, Goswami, Mitchell, and Polishchuk [2]. The input is a weighted undirected graph where the shortest path between each pair of vertices (if it exists) is unique. Additionally, every edge has a distinct capacity that is unknown to the algorithm. The algorithm can perform queries on vertices, where query(v) reveals the minimum-capacity edge on the shortest path from v to every other vertex reachable from v. The goal of the algorithm is to maximize the total number of revealed edges. The quality of an algorithm is measured by its competitive ratio against an optimal algorithm that knows all edge capacities a priori. We consider the general version of the problem where the optimal algorithm is allowed k queries, and our algorithm is allowed queries for some . That is, for both algorithms get the same number of queries, and for , our algorithm is permitted some resource augmentation in the number of queries. We study the non-adaptive setting, where our algorithm cannot use the information gained from previous queries to inform future queries.
Motivation Inferring network topology and parameters from end-to-end measurements has been an active research topic in network tomography and Internet measurement [16, 6, 7]. In a network, the capacity of an edge is the maximum bit rate that can be delivered along it. The maximum data rate along a path is determined by the minimum edge capacity, also known as the bottleneck edge. Estimating edge capacities and bottleneck edges is important for many applications, especially those that are real-time, throughput-sensitive (e.g., video conferencing, multiplayer gaming, and VR/AR applications) [1, 8, 3, 9]. Existing methods rely on the central idea of measuring round-trip time through probing messages [15, 12, 14]. For example, a TRACEROUTE probing message issued from a source s to a destination t returns, for each intermediate node along the shortest path, the round-trip time (RTT). Therefore, the RTT at a vertex right after a bottleneck edge shows a big jump compared to the previous vertex. This can be used to identify the bottleneck edge on the path and estimate its capacity. However, issuing such probing messages from a vertex/node in the network is not easy and requires gaining access to the system at that node, which has non-trivial logistical costs [13]. Thus, multiple prior works have discussed how to choose vantage points – the vertices where probing messages are issued [4, 5, 11].
This scenario motivated the authors in [2] to define the vantage point selection problem. In particular, querying a vertex v corresponds to issuing a probing message from v to all other vertices to identify the corresponding bottleneck edges. In this view, the vantage point selection problem captures the goal of issuing probing messages from only a limited number of vertices to identify the maximum number of bottleneck edges. The non-adaptive version is particularly relevant, as the algorithm must depend solely on the structure of the graph, and is oblivious to edge capacities and throughput, which can be dynamic due to real-time traffic.
In addition to the practical motivation, this problem is theoretically interesting in its own right. We believe that our techniques contribute to a broader understanding of how to extract structure from systems of shortest paths that exhibit varying levels of congestion, expansion, and connectivity.
As a baseline, achieving competitive ratio for an -vertex graph is trivial for the following reason. Any query can only reveal at most edges (one edge per shortest path from the queried vertex to the other vertices), and the algorithm can always guarantee revealing at least one edge if the graph is not empty (querying a vertex reveals each of 's incident edges that constitute the shortest path to one of 's neighbors). For deterministic algorithms, there is an asymptotically matching lower bound of , where the rough intuition is that hard instances become easier to construct when one can place the minimum-capacity edges incident to the algorithm's deterministic queries [2]. Thus, the interesting regime of the problem is for randomized algorithms. Before the current paper, no non-trivial randomized algorithm was known.
However, algorithms were known for some special classes of graphs: competitive ratio was known for trees, and for planar graphs [2].
From the lower bounds side, prior work [2] provided a simple lower bound of , that works even for trees ( hides polylogarithmic factors). The construction is simply disjoint paths of length each. The capacities on one randomly chosen path are decreasing along the path, while the capacities on the edges of the rest of the paths are chosen randomly. (Note that this is sufficient for specifying the capacities since only their relative values matter, not their absolute values.) The optimal algorithm knows the capacities and can thus choose to query the first vertex of . This reveals all of the edges on since the minimum-capacity edge of the shortest path from to any vertex on is the last edge on that path. Thus, OPT = . On the other hand, since the algorithm does not know the capacities, it views all of the paths as indistinguishable. So, the idea is that the algorithm cannot do better than picking a path at random and querying its first vertex (without loss of generality up to constant factors). With probability the algorithm chooses and reveals edges. Otherwise, the algorithm chooses a path with randomly chosen capacities. The number of revealed edges is the number of record-breaking capacities along that path (i.e., capacities that are smaller than all previous capacities along the path), which is in expectation. Thus, the algorithm reveals edges in expectation, yielding a competitive ratio of .
In summary, for the single-query setting, there is a large gap between the known bounds, both of which are very simple to prove, leaving the question:
Question: Can we get any non-trivial (sublinear competitive ratio) single-query algorithm for vantage point selection? How close to the lower bound of can we get?
General multi-query setting. Now we consider the general setting where the optimal algorithm gets queries and our algorithm gets queries for . When , the algorithm gets queries, so the competitive ratio is trivially 1. Beyond such trivial types of analysis, no upper bounds were known for general graphs.
However, it was known that the single-query algorithms for trees and planar graphs extend to the general multi-query setting. In particular, for trees the competitive ratio is , and for planar graphs it is [2]. Additionally, an extension of the single-query lower bound provides a general lower bound of , which works even for trees and matches the upper bound for trees up to polylogarithmic factors [2].
In summary, for the general multi-query setting there is a large gap between the known bounds, leaving the question:
Question: Can we get any non-trivial algorithm for vantage point selection? How close to the lower bound of can we get?
Related settings. Prior work [2] studies several related settings. They consider the case where shortest paths can be non-unique, and ties can be broken differently for different shortest-path trees. In this case, they show a prohibitive competitive ratio lower bound of for any constant .
They also consider the stochastic setting in which all capacities are chosen randomly, and the goal is to maximize the expected number of revealed edges. They show that this setting admits much better bounds than the adversarial setting, and obtain an algorithm with a constant competitive ratio for any with .
Lastly, they consider the computational complexity of the problem of finding the optimal queries when the capacities are known. They provide a simple proof that the problem is NP-hard by reduction from vertex cover.
1.1 Our Results
We answer both questions by obtaining the first algorithm with non-trivial competitive ratio for both the single-query and multi-query settings with and without resource augmentation. We also provide lower bounds for non-adaptive algorithms that are tight up to polylogarithmic factors for the entire range of parameters.
Although our result in the multi-query setting is a strict generalization of our single-query result, we first present our single-query result for the sake of simplicity:
Theorem 1. Given a weighted n-vertex m-edge graph with unique shortest paths between reachable pairs, the best possible expected competitive ratio for the single-query () vantage point selection problem is
There is a randomized algorithm achieving this competitive ratio that runs in time .
Recall that for the single-query setting it was previously known that the correct answer is somewhere between and ; Theorem 1 shows that it is in fact .
For the general multi-query setting we show that the correct answer is surprisingly complex, with three different cases for different parameter regimes. We use to denote the number of edges revealed by an optimal algorithm with queries, and to denote the number of edges revealed by our algorithm with queries. Our main theorem is as follows.
Theorem 2. Given a weighted n-vertex m-edge graph with unique shortest paths between reachable pairs, for any positive integers with , the best possible expected competitive ratio for the vantage point selection problem in the non-adaptive setting is
There is a randomized non-adaptive algorithm achieving this competitive ratio that runs in time .
This is both the first non-trivial algorithm for this problem on general graphs, and it is tight (up to polylogarithmic factors) for the entire range of parameters.
We remark that the running time of our algorithm means that the algorithm provides no additional overhead (up to polylogarithmic factors) beyond computing all-pairs shortest paths.
To help interpret the rather complicated bound of Theorem 2, we provide two plots in Figure 1. The right plot visualizes the entire parameter regime in three dimensions, while the left plot visualizes the case where the optimal algorithm gets a single query ().
Optimal Competitive Ratio for k = 1

3D Surface for Optimal Competitive Ratio

Figure 1: Optimal expected competitive ratio for non-adaptive vantage point selection, with polylogarithmic factors suppressed. Left: The case k = 1, showing our tight bound together with the previous upper and lower bounds. The y-intercept at corresponds to the single-query setting of Theorem 1, while the x-intercept corresponds to the trivial regime in which the algorithm gets n queries and the competitive ratio is 1. Right: The three-dimensional surface over the parameter space for the tight bound.
We leave as an open problem whether our lower bounds can be extended to the adaptive setting, or if there is an adaptive algorithm that surpasses our non-adaptive lower bound.
2 Technical Overview
2.1 Algorithm
For simplicity, in this overview we will focus on the single-query setting. Recall that in this setting, our algorithm achieves competitive ratio . We will start by outlining a simpler algorithm with competitive ratio for the class of graphs with hop-diameter . After that, we will describe some ideas for improving the algorithm to for general graphs.
-competitive algorithm for low hop-diameter graphs. Let be the vertex queried by the optimal algorithm. A natural idea is to query a vertex incident to an edge with high betweenness centrality, i.e. an edge on many shortest paths. Intuitively, one may hope that such a vertex hits many of the shortest paths from . Indeed, this is one ingredient of the algorithm: With probability 1/3, we uniformly sample a vertex from the set of vertices incident to an edge with high betweenness centrality. Here, “high” means at least . It will be useful to note that , which is true for the following reason. The hop-diameter is , so the total number of pairs of the form (shortest path , edge on ) in the entire graph is , and each edge of high betweenness centrality contributes to this total.
It turns out that this type of query only provides competitive ratio when the graph structure and capacity assignment have certain properties. This is why we perform this query with only probability 1/3, and later we will establish the other types of queries needed. First, we will describe the scenario in which the above query is effective. The important property is:
In other words, we say that the residual degree of a vertex with respect to is the number of reachable vertices for which the shortest -path avoids . Using this terminology, the above property says that has residual degree .
If this property holds, we are done for the following reason. First, since the shortest path from to a fixed vertex only reveals one bottleneck edge, the shortest paths from that avoid can only reveal edges. Furthermore, if then we are done because any algorithm that reveals at least one edge is already -competitive. Combining these two observations, at least half of the edges revealed by are on shortest paths from that are hit by . For each edge on such a shortest path hit by , querying the vertex in on also reveals , since is the bottleneck edge for the entire path . Thus, if we queried all vertices in , we would reveal a constant fraction of the edges revealed by . So, if we pick one randomly, as desired.
Now we need to consider the case when the residual degree of with respect to is more than . We will condition on the number of other vertices in the graph that also have high () residual degree with respect to . If this number is at most , then we claim we are done by simply randomly sampling such a vertex. This is because we would query itself with probability , so as desired. That is, the second step of the algorithm is to sample, with 1/3 probability, from the set of vertices with high residual degree with respect to .
The last remaining case is when “many” () vertices in the graph have “high” () residual degree with respect to . Let be the set of ordered pairs of vertices where has a high residual degree, and the shortest -path avoids . There are such pairs. By the definition of , every edge on a shortest path between a pair of vertices in has betweenness centrality at most . We will use these observations to argue that, for the remaining 1/3 probability, it suffices for the algorithm to take a uniform random sample from all vertices in the graph. Our goal is to show that the total sum over all vertices of the number of edges reveals is , which implies that a uniformly random vertex reveals edges in expectation, yielding competitive ratio .
For each edge on some path in , let denote the set of vertex pairs in whose bottleneck edge is . The betweenness centrality constraint on such edges means that . For all , any query vertex that is an endpoint of a pair in reveals , and the number of such endpoint vertices is at least . Thus, is a lower bound on the quantity we wish to bound: the total sum over all vertices of the number of edges reveals. Since there are pairs in , and each pair belongs to exactly one set , we have . To minimize subject to the constraints and , take of the values to be . For these values, , so , as desired.
In summary, the algorithm samples uniformly from the following three sets with probability 1/3 each:
-
the set of vertices incident to an edge with high betweenness centrality,
-
the set of vertices with high residual degree with respect to ,
-
the set of all vertices in the graph.
Improving to for general graphs. The framework is similar to the previous algorithm: we would like to identify a “small” set of vertices so that if we consider the set of ordered pairs of reachable vertices whose shortest paths avoid and has high residual degree, at least one of two objectives is satisfied:
-
is in “few” pairs in (i.e. has “low” residual degree with respect to ), OR
-
all edges in the graph have “low” betweenness centrality with respect to .
Objective 1 is analogous to the initial “important property” of the previous algorithm, and objective 2 is analogous to the last case of the previous algorithm which handles the pairs containing only edges of low residual betweenness centrality.
In the previous algorithm, we had fixed thresholds for “low” residual degree and “low” betweenness centrality. The key development in the improved algorithm is to replace these fixed thresholds with parameters that are iteratively adjusted over the course of the algorithm, as the set is gradually built. This adds intricacy to the algorithm because the iteratively adjusted parameters are interdependent; changing one parameter changes the others. To achieve the right balance, the final algorithm has several nested subroutines that each adjust different parameters.
We begin by considering the subroutine for building . Since should be built with objective 2 in mind, we would intuitively like to add to vertices of high betweenness centrality with respect to the current so that we are ultimately left with all edges only having low betweenness centrality with respect to . The algorithm does this in a greedy manner: roughly speaking, it iteratively adds to the vertex of highest betweenness centrality with respect to the current .
This greedy subroutine is executed in phases, and after a phase of adding a subset of vertices to , the algorithm checks if the maximum residual degree in the graph has decreased by a lot; this is our proxy for the residual degree of in objective 1, since we cannot calculate that directly without knowing . (The final algorithm actually checks a slightly different quantity, but this is the intuition.) If the maximum residual degree has decreased by a lot, then we are intuitively in good shape with respect to objective 1. In this case, we proceed to the next phase of adding vertices to , and if the maximum residual degree continues to decrease by a lot at each phase, we can bound the number of phases until is only in a constant number of pairs in .
On the other hand, if the maximum residual degree does not decrease by a lot, then we claim that we are intuitively in good shape with respect to objective 2. This is because the maximum residual degree not decreasing much is intuitively aligned with not decreasing much, which means that the vertices with highest betweenness centrality with respect to that we greedily added to actually had low residual betweenness centrality with respect to , in line with objective 2.
A key challenge in designing the algorithm is the interdependence of the parameters: adding more vertices to decreases three quantities: the size of , the maximum residual degree, and the betweenness centrality with respect to . In the above analysis of the original algorithm, the calculations get more favorable as increases, as the maximum residual degree decreases, and as the betweenness centrality with respect to decreases.
Due to this interdependence, the final algorithm has multiple nested iterative procedures. In the outer loop, we run the entire algorithm with geometrically decreasing thresholds for the maximum residual degree. Within that, we perform the previously described procedure, which iteratively adds vertices to and checks if we have achieved objective 1 or 2. Finally, within that we perform the iterative procedure to greedily add vertices to one-by-one.
These are the main ideas behind the single-query version of the algorithm. For the multi-query version, we need a generalization of the algorithm in which the parameters and are incorporated into the above framework and balanced with the other parameters.
Implementation: It turns out there is a straightforward implementation of our algorithm that runs in time . To reduce this to , we require additional data structures.
2.2 Lower Bound
Since the full construction is rather involved, we present two simpler constructions that capture the main ideas behind the lower bound. The first construction is for the regime of large , , while the second is for the single-query case . The full construction can be viewed as combining these two ideas, and its details are presented in Section 5.
2.2.1 Case 1: Large-parameter regime

Figure 2: The lower-bound construction for the large-parameter regime.
In this section, we will provide the ideas for a lower bound of
This reaches the optimal competitive ratio in the regime . The construction underlying this lower bound is illustrated in Figure 2.
We begin with the main intuition. First, it is useful to build large parts of the graph that are highly symmetric, in the sense that many vertices are indistinguishable from the algorithm's perspective. This allows us to hide the optimal vantage points among many candidate vertices: the hidden capacities can be chosen to favor a small subset of these candidates, while a non-adaptive algorithm cannot reliably distinguish this subset from the others.
Second, the optimal vantage points need to reveal many edges. A natural way to achieve this is to make the shortest-path trees rooted at the optimal vantage points exhibit expansion, i.e. to make them look more like balanced binary trees than long paths.
Butterfly graphs are useful for this purpose: they provide both symmetry and expansion. Thus, the starting point of the construction is a collection of butterfly graphs, each of which contains one hidden optimal vantage point in its top layer.
This alone is not sufficient, because querying a non-optimal vertex in a butterfly may also reveal many edges. To overcome this issue, we further exploit the fact that each edge can be revealed only once. The goal is to make it so that the edges revealed by the k optimal queries are almost disjoint, whereas the edges revealed by the non-optimal queries overlap heavily.
We realize this idea by introducing filler edges and shortcuts incident to the bottom of the butterflies. The filler edges are the many nearly unique edges revealed by the optimal queries, and their structure can be viewed as a collection of stars whose leaves are bottom butterfly vertices. The shortcuts form low-weight shortcut structures near the bottom of the butterflies, and their purpose is to isolate the filler edges from most non-optimal queries, preventing such queries from revealing too many filler edges.
By tuning the butterfly sizes and the number of filler edges, this construction gives the desired lower bound in the large-parameter regime.
Lastly, we note that this lower bound crucially only works in the non-adaptive setting. In the adaptive setting, querying a non-optimal butterfly vertex could reveal information about the location of the optimal query within that butterfly.
2.2.2 Case 2:

Figure 3: The lower bound construction for the single-query case with .
In the single-query case, our goal is to prove an lower bound. The construction underlying this lower bound is illustrated in Figure 3.
Here, we need to hide the optimal vantage point among candidate points, while still ensuring that querying the optimal vantage point reveals nearly linearly many edges. At the same time, a capacity-unaware query should reveal only edges.
The main issue is that the butterfly-based construction above no longer gives the right balance. Suppose we continue using butterflies, each of size . If , then there are not enough candidate points to hide the optimum well enough. On the other hand, if , then a random query inside the butterfly may reveal too many edges. We therefore replace the butterfly with a two-phase expansion.
Fix an integer parameter . Let , where , be the candidate optimal vantage points. These vertices form the candidate layer. We also introduce three layers with the same index set: an -layer, an -layer, and a -layer. Finally, as in the previous construction, we add a filler layer that supplies the many edges revealed by the hidden optimal query. For the moment, we focus on the non-filler part of the construction.
In the first phase, each is connected to for every , forming the candidate- edges. Between the -layer and the -layer, the edges are one-to-one: is connected to . In the second phase, each is connected to for every , forming the edges. Consequently, after two phases, every candidate optimal point can reach every vertex in the -layer. From the perspective of the shortest-path trees rooted at the candidate points, we have replaced balanced binary trees with perfect -ary trees of height two.
We must still prevent arbitrary queries in this structure from revealing too many edges. To do this, we introduce shortcut structures on the -layer and the -layer, referred to as upper shortcuts and lower shortcuts, respectively. Each shortcut structure is itself a perfect -ary tree of height two. The point is that, for a fixed query vertex, most shortest paths that use a shortcut pass through the top level of such a shortcut tree, which contains only edges. We set the capacities of these top-level shortcut edges to be small, so that they become the bottleneck edges on these paths. This bounds the number of distinct edges that such a query can reveal through the shortcut structures.
The remaining important paths are those from the candidate layer to the -layer, which are arranged not to use the shortcut structures. We set the capacities of the edges to be smaller than those of the other layer-to-layer edges on these paths, so that the contribution of all such candidate-to- paths is also bounded. The filler layer is then attached beyond the -layer so that the hidden optimal candidate can still reveal nearly linearly many distinct filler edges, while non-optimal queries remain limited by the shortcut and two-phase-expansion structure described above.
3 Preliminaries
Let be an undirected weighted graph with . We assume throughout this paper that the shortest path between every pair of vertices (if it exists) is unique. For vertices , write if and lie in the same connected component. Let
be the set of reachable ordered pairs. For , let and denote, respectively, the set of vertices (including and ) and the set of edges on the unique shortest path from to .
Each edge is associated with a capacity value . The capacities are fixed but unknown to the algorithm. We further assume that all capacities are distinct. Hence, for every ordered pair , the shortest path from to contains a unique edge with minimum capacity. We denote this edge by
and refer to it as the bottleneck edge of the pair .
Query model. A query consists of selecting a vertex as a vantage point. Querying reveals the bottleneck edge on the shortest path from to every other vertex in the same connected component. Formally, define
Thus, is the set of edges revealed by querying .
If the algorithm outputs an ordered list of vantage points , then the total set of revealed edges is
Objective. The algorithm is given the graph structure, edge weights, and hence the shortest-path system of , but it does not know the capacities . Its goal is to choose a small number of vantage points so as to reveal as many bottleneck edges as possible.
For a positive integer , define as the maximum number of edges that can be revealed by choosing vantage points, assuming full knowledge of the hidden capacities, i.e.,
If an algorithm outputs vantage points , we write
for the number of edges revealed by the algorithm. When the algorithm is randomized, is a random variable, and guarantees are understood in expectation unless stated otherwise.
Competitiveness with an augmented query budget. We compare an algorithm that is allowed to make queries against the benchmark optimum that uses only queries, where is an augmentation factor. This bicriteria viewpoint is the one studied throughout the paper: the algorithm is given a larger (or equal) query budget, and must compete with the optimal capacity-aware choice of only vantage points. Note that our results also cover the non-augmented version where .
Non-adaptivity. The focus of this paper is the non-adaptive setting. A non-adaptive algorithm must choose all of its vantage points before seeing any capacity information or any revealed bottleneck edges. Equivalently, its output distribution may depend on the graph and the shortest-path structure, but not on the hidden capacity assignment.
4 Upper Bound
In this section we prove the upper bound part of Theorem 2, which we restate here:
Theorem 3. Given a weighted -vertex -edge graph with unique shortest paths between reachable pairs, for any positive integers with , there is a randomized non-adaptive algorithm with running time and competitive ratio
The algorithm is built from 4 subroutines. We will first outline how each subroutine corresponds to the following description of the structure of the algorithm from the technical overview (Section 2): “The final algorithm has multiple nested iterative procedures. In the outer loop, we run the entire algorithm with geometrically decreasing thresholds for the maximum residual degree. Within that, we perform the previously described procedure, which iteratively adds vertices to and checks if we have achieved objective 1 or 2. Finally, within that we perform an iterative procedure to greedily add vertices to one-by-one.”
Algorithm 5 is the shell of the final algorithm, which sets the parameters, calls Algorithm 4, and makes the final selection of vantage points to query. Algorithm 4 is the “outer loop” from the previous paragraph, which iteratively calls Algorithm 3. Algorithm 3 is the procedure that iteratively adds vertices to and checks if we have achieved objective 1 or 2: to add to , it calls Algorithm 1, and if it ever achieves objective 2, it calls Algorithm 2 to select the appropriate vantage points.
4.1 The Algorithm
In this subsection, we present the algorithm and the main lemmas proved in the analysis. We first introduce the notation used throughout the remainder of this section.
Recall that denotes the set of all reachable ordered pairs, i.e.,
For any , let be the set of pairs in whose shortest paths are hit by :
Thus, for any pair family , the residual pairs not hit by are .
For any and , we denote by the number of pairs in whose first endpoint is , called the degree of with respect to :
In particular, for any , define the residual degree of with respect to by
For any and , let denote the betweenness centrality of an edge , i.e., the number of shortest paths induced by pairs in that traverse :
Similarly, we also define the betweenness centrality of a vertex v with respect to shortest paths of pairs in P:
For any , we write
for the residual betweenness centrality of an edge e and a vertex v with respect to S.
Finally, let
denote the maximum edge betweenness centrality with respect to . For any , we also write
for the maximum residual edge betweenness centrality with respect to . Clearly, is at most the maximum vertex betweenness centrality with respect to .
Although the graph is undirected, we work with ordered pairs for notational convenience, as the ordering will be useful when specifying which vertices to query.
Throughout the algorithms below, the graph and the parameters and k are fixed globally. For notational simplicity, we do not list them explicitly as inputs to the subroutines.
4.1.1 Finding Vertices of High Residual Betweenness Centrality
We begin with the subroutine in Algorithm 1. Given a set of ordered pairs and an integer , the goal is to find a set with such that the maximum residual edge betweenness centrality is not greater than . Specifically, we use a greedy process: we initialize to the empty set, and at each iteration we add to the vertex with the highest betweenness centrality among shortest paths that avoid existing vertices in . This procedure stops when we have vertices in . We also return the value , defined as the maximum residual edge betweenness centrality with respect to .
Algorithm 1 HIGH-RESIDUAL-BC(P,I): selecting vertices of high residual betweenness centrality.
Input: A set of ordered pairs; a positive integer .
Output: A set with and a value .
1:
2:
3: for to do
4: for each vertex do
5: Compute
6: end for
7: Let
8:
9:
10: end for
11:
12: return
We restate the main lemma of Algorithm 1 for reference from the analysis.
Lemma 4.1. Let . Then
4.1.2 Querying Subroutine for Low Betweenness Centrality Regime
Suppose now that we are given a set and a set of ordered pairs such that the maximum edge betweenness centrality with respect to is at most . The querying procedure in Algorithm 2 is designed to handle this case: for each query vertex, with probability we query a vertex sampled uniformly at random from , and otherwise we query a vertex sampled uniformly at random from .
Algorithm 2 REVEALWITHRESTRICTEDBC(T)
Input: A set .
Output: vantage points .
1: for to do
2: With probability , sample .
3: Otherwise, sample .
4: end for
5: return
Using the intuition from the technical overview, when all edges have bounded betweenness centrality, random queries from and have a good chance to reveal edges that are competitive with the optimal choice. In the analysis, we will prove that Algorithm 2 gives the following lower bound on the expected number of revealed edges.
Lemma 4.2. Consider a set of ordered pairs with . Let be the query vertices produced by REVEALWITHRESTRICTEDBC(T). Then
4.1.3 Reducing the Maximum Residual Degree or Revealing Many Edges
With the two modules we have introduced so far, one natural idea is to apply Algorithm 1 to add vertices of high betweenness centrality to , so that the remaining pairs have maximum edge betweenness centrality , and then invoke Algorithm 2. However, as suggested by the technical overview, controlling residual betweenness centrality alone is not enough: the guarantee of Algorithm 2 also depends on how many residual pairs remain and on the number of vertices from which these pairs originate. We therefore also keep track of residual degrees.
To make Algorithm 2 effective, we restrict attention to vertices of large residual degree. More precisely, for a threshold , we let be the set of vertices whose degree with respect to is at least , and we let be the set of residual pairs in whose first endpoint lies in . The subroutine in Algorithm 3 either drives all residual degrees below , or finds a stage at which still contains many pairs while the greedy step has already made the maximum edge betweenness centrality of small. In the latter case, the low-betweenness querying subroutine Algorithm 2 can be applied to and yields a good revealing strategy.
One subtlety is that after applying Algorithm 1 to gather more vertices of high betweenness centrality into , the residual pair set changes, thereby altering both the high-degree vertex set and the pair family . For this reason, Algorithm 3 uses an iterative procedure. In each iteration, it forms the current high-degree set and the corresponding pair family , applies Algorithm 1 to , and then updates , , and . If both and remain large after the update, then the instance has not shrunk much, while the new residual betweenness centrality bound is low enough for Algorithm 2 to be effective. Otherwise, at least one of or shrinks by a constant factor, so this can happen only logarithmically many times before no high-degree vertices remain.
Algorithm 3 REDUCEORREVEAL()
Input: A set of ordered pairs; a positive real number ; a positive integer .
Output: A set with and vantage points .
1:
2:
3:
4: while do
5:
6:
7: ,
8:
9:
10: if and then
11:
12: return
13: end if
14: end while
15: Sample independently for all . // dummy vertices
16: return
In the analysis, we will prove the following guarantee for Algorithm 3: one of the following two conditions holds. Note that the first condition is satisfied when the algorithm reaches line 15, so the vertices sampled there are merely dummy vertices.
Lemma 4.3. Let . Then , and one of the following two conclusions holds:
-
For all , ; or
-
.
Note that after calling this subroutine, we can determine which conclusion holds without knowing the capacities, simply by checking whether .
4.1.4 Iterative Residual Degree Reduction
We now iterate the previous subroutine over geometrically decreasing residual degree thresholds. Specifically, we maintain an upper bound on the maximum residual degree in the current pair family, and define the next threshold as a function of and a parameter . The parameter will later be chosen to match the target competitive ratio, and it controls the tradeoff between how quickly the residual degree bound decreases and how strong the revealing guarantee is.
After applying Algorithm 3, either the maximum residual degree drops below , in which case we update the degree upper bound from to and proceed to the next iteration, or the procedure already reveals many edges and we terminate. If is chosen to be too large, then the reduction from to is too mild; if is too small, then the revealing guarantee becomes too weak. We therefore choose carefully to balance these two outcomes.
Algorithm 4 ITERATIVEREDUCE()
Input: A real number ; a positive integer .
Output: A set with and vantage points .
1:
2:
3:
4: while do
5:
6:
7:
8: if then
9: return
10: end if
11:
12: end while
13: Sample independently for all . // dummy vertices
14: return
In the analysis, we will prove the following guarantee for Algorithm 4.
Lemma 4.4. Suppose that
Let and . Then
, and
4.1.5 The Final Algorithm
We now combine the three cases handled by the previous components. The first case is when many edges in the optimum can already be revealed by vertices in the hitting set S. The second case is when the remaining residual instance is handled by Lemma 4.4. The third case is when sampling uniformly from all of V is already sufficient because the query budget is large.
Before stating the algorithm, we choose a parameter that will later correspond to the competitive ratio. In the analysis, we will verify that this choice of satisfies the conditions required by Lemma 4.4.
Algorithm 5 A randomized non-adaptive -competitive algorithm.
Input: The globally fixed graph with unique shortest paths and globally fixed parameters with .
Output: vantage points .
1: Choose of order
large enough that, after setting , we have
2: 3: Draw uniformly at random. 4: if then 5: if then 6: Sample independently for all . 7: else 8: Sample independently for all . 9: end if 10: else if then 11: Set for all . 12: else 13: Sample independently for all . 14: end if 15: return
We will show that Algorithm 5 achieves the competitive ratio claimed in Theorem 2.
4.2 Competitive Ratio Analysis
4.2.1 Proof of Lemma 4.1
Lemma 4.1. Let . Then
Proof. If , then Algorithm 1 selects all vertices, so and hence . Therefore, , and the claim is trivially true. We may thus assume that .
For , let be the set maintained by HIGH-RESIDUAL-BC after iterations. Thus , for , and . Also let
and for define
Since for every , the sequence is non-increasing. Moreover, when we add to , the pairs in whose shortest path contains do not appear in . Hence
Summing over all iterations yields
Because the sequence is non-increasing, we obtain
Now take an edge on the shortest path of a pair . Let be an endpoint of . Then also lies on . Since , we have , and therefore . It follows that
Taking the maximum over all edges gives
4.2.2 Proof of Lemma 4.2
Lemma 4.2. Consider a set of ordered pairs with . Let be the query vertices produced by REVEALWITHRESTRICTEDBC(T). Then
Proof. Since , we may assume without loss of generality that . Replacing by only strengthens the claimed lower bound.
Now consider the fixed edge capacities. For each edge , let be the set of pairs in whose bottleneck edge is :
Since every pair in has on its shortest path and lies on at most shortest paths induced by pairs in , we have
Define
Clearly, , and we have . Combining this with , we get
Therefore,
where the last step applies the Cauchy–Schwarz inequality. Rearranging gives
Define . Hence either
Now consider one query generated by Algorithm 2. For a fixed edge , the edge is revealed by a query at if the query either lands in when sampling uniformly from or lands in when sampling uniformly from . Thus
Summing over all edges and applying the inequalities above, we have
The analysis so far shows that one query node using Algorithm 2 reveals a good number of edges in expectation. Next, we consider multiple query nodes. Specifically, we apply the same idea not only to the original pair set , but also to the residual pairs whose bottleneck edges have not yet been revealed.
For , let be the set of edges revealed so far by query vertices .
Define as the set of residual pairs after removing the pairs whose bottleneck edge has been revealed in :
Conditioned on the first query vertices, we can apply the same one-query analysis to and obtain
Next, since each revealed edge can be the bottleneck of at most pairs from , we have
Therefore
Taking total expectation and writing , we obtain
Let
Then the recurrence becomes
or equivalently,
Iterating yields
and hence
Since , we have . Therefore
Substituting the definitions of and gives
Since , this proves the lemma.
4.2.3 Proof of Lemma 4.3
Lemma 4.3. Let . Then , and one of the following two conclusions holds:
- For all , ; or
Proof. Consider one iteration of Algorithm 3. Let and be the values stored in line 7, and let be the output of HIGH-RESIDUAL-BC( ). By Lemma 4.1,
After updating in line 6, the algorithm recomputes and in lines 8 and 9. Since residual degrees can only decrease when grows, the new set is contained in . Moreover, by the definition of in line 9, every pair in the new is a residual pair after deleting the pairs hit by . Hence
Therefore, every edge lies on at most shortest paths induced by pairs in .
Algorithm 3 has two possible exits. If we run out of high-degree vertices, then , which means
Then the first conclusion is true.
Otherwise, the algorithm returns through the if-branch in line 10. Thus, in that iteration, and , and the query vertices are produced by the call to Algorithm 2 immediately following this line. Applying Lemma 4.2 to the pair family Q with betweenness centrality at most B yields
In particular, the first term satisfies
Moreover, every has , and contains exactly the pairs in whose first endpoint lies in . Hence
Therefore, the second term can be simplified as
This proves Conclusion 2.
Next, we bound the number of iterations. Whenever an iteration does not return, the condition in line 10 is false. Therefore at least one of or drops by a factor of 2. Since initially and , this can happen only times. In each iteration, we add at most new vertices. Thus, .
4.2.4 Proof of Lemma 4.4
Lemma 4.4. Suppose that
Let and . Then , and
Proof. For each iteration index , let be the cumulative set of vertices added to so far by the REDUCEORREVEAL step. We maintain an upper bound on
starting from and .
At the -th iteration, following lines 5 and 6, define
and call
After the update in line 7, if the test in line 8 is true, i.e.,
then Conclusion 1 of Lemma 4.3 fails, and hence Conclusion 2 must hold. Therefore the returned tuple satisfies
By the choice of ,
Since and (from the assumption), we have
Thus, the lower bound simplifies to
Residual degrees can only decrease as grows, so if denotes the final set returned by the algorithm, then
Hence, the returned tuple reveals
edges in expectation, as desired.
Otherwise, by Conclusion 1 of Lemma 4.3, after augmenting by the returned set , every residual degree is below . In this case, following lines 7 and 11, set
Then we have
So the invariant
is preserved.
Finally, by the first hypothesis and the fact that , we have
Hence the sequence decreases geometrically. After iterations we must have , and since all residual degrees are integers this implies
In that case, the desired lower bound is trivial because and .
Moreover, by Lemma 4.3, each call to REDUCEORREVEAL adds vertices to S. Since the number of calls is , the final set satisfies
Thus, the claim is true in all cases.
4.2.5 Final Analysis
Recall the bound we aim to prove:
We first state a simple sampling lemma.
Lemma 4.5. Let and let . Suppose that for every , there exists a vertex such that . If are sampled uniformly at random from , then
Proof. For each edge , fix a witness such that . Let be the indicator of the event that is revealed by at least one of the samples. If one of the samples equals , then is certainly revealed. Therefore
By linearity of expectation,
Now we are ready to proceed with the proof of the final bound. Let be an optimal choice of k vantage points, and define
Then . Take an edge . Since , there exist an index and a vertex with such that is the bottleneck edge on the shortest path from to , that is,
Now define as the set of edges in that would also be revealed by vertices in S, i.e.,
and let be the remaining edges:
We first verify the assumptions of Lemma 4.4 for the parameter choice of I and in Algorithm 5. Recall that
and
By choosing the hidden constant in the definition of sufficiently large, we have
because , and
because . Therefore Lemma 4.4 yields
We now analyze the three branches of Algorithm 5: Branch 1 is the case X = 1 in line 4, Branch 2 is the case X = 2 in line 10, and Branch 3 is the case X = 3 in line 12.
Branch 1: sampling from . Let , and let
By definition, . Pick any vertex . Since , the unique shortest path from to is the concatenation of the two shortest subpaths from to and from to , so the edge lies on at least one of the two edge sets and . Suppose first that . Since is the unique minimum-capacity edge among the edges in , it is also the unique minimum-capacity edge among the edges in . Hence
and therefore . The case is similar and gives . Thus every edge can be revealed by a vertex in , called its witness. Since , Lemma 4.5 with gives the following bound. Recall that . Then
Branch 2: using the vantage points returned by Algorithm 4. If , then by definition
For each fixed , the number of residual edges revealed by is at most . Consequently,
Using the guarantee from Lemma 4.4, we obtain
Branch 3: sampling from . Every edge in can be revealed by a query at one of its witnesses . Hence Lemma 4.5 with yields
where the last equality uses .
Since each branch is chosen with probability , combining the three estimates gives
Because and , this simplifies to
Equivalently, the competitive ratio is
as claimed.
4.3 Running Time Analysis
We describe an implementation of Algorithm 5 with running time .
First, for every vertex , compute the shortest-path tree rooted at and spanning the connected component containing . Since shortest paths are unique, the path is exactly the root-to- path in . For every rooted tree , compute one Euler tour and for each vertex store , , which refer to the interval endpoints for the subtree. Thus if and only if lies in the subtree of in , equivalently . The shortest-path tree computations take time by running a standard single-source shortest-path algorithm from every source.
The entire algorithm makes several calls to Algorithm 1. Inside each call of Algorithm 1, a current pair family is maintained, and we will simply write P instead of in the following for the sake of simplicity. Define the target set of a source s with respect to P by
We maintain in the order induced by the Euler tour of . More concretely, for each , we store the values in a balanced binary search tree. Here this means a balanced binary search tree with height that supports listing all targets in an interval and deleting all targets in an interval, each in time, where is the number of targets in the interval. It also gives in time. Such a data structure is given in Section 2.1.4 of [10].
We next explain how to implement Algorithm 1. At the beginning of one call with pair family , compute all values and as follows. For each source , a postorder traversal of gives, for every vertex , the number of targets both in and in the subtree of in . This number is added to and, if , to , where and is the parent of in . Over all roots , this takes time. We store the current values in a max-heap supporting extraction of a maximum key and key decreases in time.
Now suppose that Algorithm 1 selects a vertex in line 7. The pairs deleted from the current pair family are
Using the Euler intervals, for every source we find exactly these deleted targets by listing and deleting all targets of whose Euler-tour values lie in the interval of . During this deletion, for each vertex , we compute
The total time for this process is . Here the term accounts for the deleted targets, and the term comes from making one interval query for each of the sources, even when the corresponding interval contains no target.
We will use and to update the residual betweenness centrality values. Put weight
on each vertex of the shortest-path tree , and let be the total weight in the subtree of in . These values are computed by one postorder traversal of . For every vertex , decrease by , and decrease by . For every parent edge in , decrease by , where is the parent of in . These updates are correct because, for every deleted pair , the unique shortest path from to contains , and hence is the union of the two shortest paths from to and from to . Therefore a vertex , or an edge with child endpoint in , lies on the shortest -path, respectively -path, exactly when , respectively , lies in the subtree of in .
In one call to Algorithm 1, each ordered pair of is deleted at most once, and at most vertices are selected. Hence the total time for all interval deletions, all postorder traversals, and all heap updates in this call is .
By Lemmas 4.3 and 4.4, Algorithm 5 makes only calls to Algorithm 1. We now account for the remaining operations. Each line of Algorithm 5 takes at most linear time, except for calling Algorithm 4. In Algorithm 4, the while loop has iterations by Lemma 4.4. In each iteration, the call to Algorithm 3 is the only non-linear operation. The maximum residual degree is computed by scanning all vertices and using the maintained values , which takes time. In Algorithm 3, the while loop has iterations by Lemma 4.3. Each iteration forms by scanning all vertices and forms by scanning the currently maintained pair family, taking time, and then makes one call to Algorithm 1. Finally, Algorithm 2 only samples the required query vertices, and hence takes linear time. Since one call to Algorithm 1 takes time as proved above, and there are only such calls, the total time after the shortest-path preprocessing is . Thus the total running time is
whose bottleneck is the shortest-path tree computation.
5 Lower Bound
In this section we prove the lower bound part of Theorem 2, which we restate here:
Theorem 4. For any positive integers with , and for every randomized non-adaptive algorithm, there exists an -vertex weighted graph with unique shortest paths between reachable pairs, together with a capacity assignment, such that when the algorithm is run on this instance, it has an expected competitive ratio of
5.1 Construction
The construction is illustrated in Figure 4.
The graph has parts. In each part, the index labels one of copies. For each copy index , we add a butterfly graph and the associated - and -vertices defined below. The filler vertices are connected to the -layers of all parts and therefore do not belong to any single part. The graph also has two shortcut structures: an upper shortcut structure, which is part-specific, and a lower shortcut structure, which is shared across parts.
All edge weights below are first specified as base weights. After all base weights have been assigned, we add distinct positive infinitesimal perturbations to the weights, chosen small enough that every strict base-weight comparison used in the proof remains unchanged. These perturbations make all shortest paths unique. The perturbations are fixed deterministically and are not part of the probability space used in the analysis.

Figure 4: The lower-bound construction for the general multi-query setting.
Butterflies. For each part and each copy index , we add a width- butterfly graph with levels, where . The parameters are set later. The butterfly vertices are
We refer to as the level, to as the address, and to as the copy index. The vertices with are the top-level butterfly vertices, and the vertices with are the bottom-level butterfly vertices.
Recall that a butterfly graph is defined as follows. For every with , add the two butterfly edges
each with base weight 1. Here denotes bitwise XOR on the binary representations of the zero-based addresses.
For every top-level vertex and every bottom address , there is a unique canonical downward path in the butterfly from to : at level , the path takes the XOR edge exactly when the -th bit of is 1. The reverse of such a path is called a canonical upward path.
For later use, let be the set of butterfly vertices that lie on a canonical downward path from to for some . We call this the downward sub-butterfly rooted at . Let be the set of butterfly edges on these paths. For every butterfly vertex , let be the set of top-level vertices whose canonical downward paths can reach , and let be the set of bottom-level vertices reachable from by canonical downward suffixes. Thus
x-layer, y-layer, and filler vertices. For each part, there are two layers in addition to the butterfly vertices: the x-layer and the y-layer. Moreover, the cross-part filler vertices are connected to the y-layer vertices in every part.
As with the butterfly vertices, all these vertices have an address and a copy index. We say that two vertices have the same address if their p-coordinates are equal, and have the same copy index if their q-coordinates are equal.
For the x-layer, add vertices
Here p is the address and q is the copy index. For every , add the v-x edge
with base weight 1. These edges form a matching between the x-layer and the bottom-level butterfly vertices.
For the y-layer, add vertices
For every , add the x-y edge
with base weight 1.
Finally, for the filler vertices, introduce a parameter , which is set later, and add vertices
Here t is the filler index. For every filler vertex , add the filler edge
with base weight 1.
Shortcut structures. There are two shortcut structures in the graph: an upper shortcut structure and a lower shortcut structure.
The upper shortcut structure is built on the bottom level of the butterflies and is independent for each part. The upper shortcut vertices are
and
For every , add upper shortcut edges
with base weight . For every , add upper shortcut edges
with base weight . Here and are fixed constants satisfying
The lower shortcut structure is built on the y-layer and is shared across parts through the vertex . The lower shortcut vertices are
and
For every , add lower shortcut edges
For every , add lower shortcut edges
and add the lower shortcut edge
All these lower shortcut edges have base weight .
Capacity distribution. For each part , choose independently and uniformly at random
The hidden optimal query vertex in part will be the top-level butterfly vertex . Given , we first designate the following edges as high:
-
the butterfly edges in for all ;
-
the edges for all and ;
-
the edges for all , , and .
Base capacities are then assigned according to the following table.
| base capacity | edges |
|---|---|
| 1 | |
| 2 | |
| 3 | |
| 4 | all non-high edges |
| all non-high butterfly edges between butterfly levels and , for | |
| 6 | all non-high edges |
| 7 | all filler edges |
| 8 | high edges |
| 9 | high butterfly edges and high edges |
Within each base-capacity class, we add distinct infinitesimal perturbations to make all capacities distinct, small enough that all comparisons between different base capacities remain unchanged. These perturbations are fixed deterministically after is chosen.
Size and padding. We first define the parameters. Let
and
Since , we have .
Choose with a sufficiently large hidden constant and set
Let be a power of two satisfying
provided that is at least a sufficiently large constant. If is smaller than this constant, then the target lower bound is only polylogarithmic: a direct check from the definition of gives
Hence, for the rest of the proof we assume is sufficiently large and use the construction above.
We now check the number of vertices before padding. The filler vertices contribute vertices. The butterflies contain vertices, and the remaining non-filler vertices contribute vertices. Since , the non-filler vertices together have size . Therefore the total number of vertices is
Taking the constant in large enough makes this graph have at most vertices.
To reach exactly vertices, we add the required number of isolated vertices. Since no reachable ordered pair contains isolated vertices, they do not affect the competitive-ratio lower bound. We therefore analyze the original graph below.
5.2 Analysis
Upper bound on . Fix a deterministic query set with before the random vector is chosen. We will show that
where the expectation is only over .
Let be the set of edges with base capacity 1 or 2. Let be the set of edges and filler edges. Let be the set of remaining edges. (These names refer to the sizes of the sets, rather than to the capacities of the edges they contain.) Then
In the regime this follows from ; in the regime , the condition implies and the regime condition gives ; and in the regime the condition can occur only when . In that case, a star on vertices with distinct edge capacities already gives a constant worst-case ratio, which is enough for the claimed bound.
and
Here we use and . To see the latter, note that , since . By the definition of , at least one of and holds. In the first case, ; in the second case, . Hence .
We will prove the following single-query bound.
Lemma 5.1. For every fixed query vertex ,
Before proving the lemma, we show that it implies the claimed bound of . Since is counted globally, and since can be bounded either globally or by summing the single-query bound, we have
It remains to bound the middle term. Since , we have . If , then , and hence
If instead , then
and hence . Therefore
Proof of Lemma 5.1. We do a case analysis over the type of the query vertex and the type of the target vertex. The vertex types are butterfly vertices, -layer vertices, -layer vertices, filler vertices, upper shortcut vertices, lower shortcut vertices, and the shared vertex . Since there are only constantly many ordered pairs of types, it suffices to fix the query vertex , fix the target type, and bound the number of possible bottleneck edges obtained as the target ranges over all vertices of that type.
Case 1: two endpoints inside one part. Fix a part and suppose first that both endpoints are non-filler vertices associated with this part, not including .
- Suppose the two endpoints are both butterfly vertices, or one endpoint is a butterfly vertex and the other is an -layer vertex.
– If the two endpoints lie in the same copy , the entire shortest path uses only butterfly edges, edges, and upper shortcut edges incident to . It never enters the -layer, because doing so would add at least one extra base-weight-1 edge, while the shortcut through connects bottom-level addresses at cost . For a fixed query vertex, the possible bottleneck edges of this form are contained in one width- butterfly copy, the matching edges, and the incident bottom shortcut edges. This gives possible edges in and no contribution to .
– Otherwise, the shortest path goes through and hence has bottleneck in .
- Suppose the two endpoints both lie in the union of the -layer and the -layer.
– If the two endpoints have the same address, then for a fixed query vertex there are only relevant targets with that address. Thus these paths contribute possible bottlenecks.
– Otherwise, using the lower shortcut through adds only beyond the necessary incident edges, while any path avoiding must use an upper shortcut or additional base-weight-1 edges. Hence the bottleneck lies in .
- Suppose one endpoint is a butterfly vertex and the other endpoint is a -layer vertex .
– If , the shortest path changes addresses through , so the bottleneck lies in .
– Otherwise, the shortest path is
-
If , then the edge is non-high and has base capacity 4, while all butterfly and edges on this path have base capacity at least 5. Hence the bottleneck is this edge.
-
If and , then the butterfly and edges have base capacity 9, while the edge has base capacity 8, so again the bottleneck is the edge.
-
Otherwise, the bottleneck edge is a deepest non-high butterfly edge on the butterfly suffix of the path.
Hence in all cases, the bottleneck edge belongs to . If the query vertex is the butterfly endpoint, all such bottlenecks are contained in one butterfly copy together with the relevant edges, so there are possibilities. If the query vertex is the -layer endpoint, then the address is fixed: the non-hidden copies contribute only the possible edges with that address, and the hidden copy contributes at most butterfly edges. Thus this subcase contributes edges in .
-
Suppose one endpoint is an upper shortcut vertex, namely or , and the other endpoint is not a lower shortcut vertex. Then the shortest path does not enter the lower shortcut structure. Its bottleneck is either in or is incident to the upper shortcut endpoint. For a fixed query vertex, this gives possible edges in .
-
Suppose one endpoint is a lower shortcut vertex, namely or . Then the bottleneck is either in or is incident to a lower shortcut vertex. For a fixed query vertex, this gives possible edges in .
Case 2: at least one filler endpoint. We next consider the cases in which at least one endpoint is a filler vertex.
Suppose first that both endpoints are filler vertices, say and .
-
If and , then for a fixed query vertex there are only such targets, so these paths contribute at most possible bottleneck edges.
-
If and , then the shortest path uses the lower shortcut vertex for the part chosen by the infinitesimal weight perturbations:
This path adds only shortcut weight beyond the two necessary filler edges, whereas any path that changes addresses or uses the upper shortcut structure is strictly longer in base weight. Its bottleneck edge is one of the base-capacity-3 edges incident to . As and the copy index vary, there are only such edges.
- If , then the shortest path changes addresses through for the part chosen by the infinitesimal weight perturbations. The path has a base-capacity-2 edge incident to , and hence its bottleneck lies in .
Now suppose that one endpoint is the filler vertex , and the other endpoint is associated with part . The shortest path in this case is similar to the case where both endpoints are in part and one of them is in the -layer.
- If the other endpoint is a butterfly vertex , then:
-
If , then their shortest path goes through , and the bottleneck edge is incident to .
-
Otherwise, the shortest path is
(a) If , then the edge is non-high and has base capacity 4, while all butterfly, , and filler edges on this path have base capacity at least 5. Hence the bottleneck is this edge.
(b) If and , then the butterfly and edges have base capacity 9, the edge has base capacity 8, and the filler edge has base capacity 7. Hence the bottleneck is the filler edge .
(c) Otherwise, the bottleneck edge is a deepest non-high butterfly edge on the butterfly suffix. Suppose it is . Then , and and .
For a fixed query vertex , subcases (a) and (c) reveal only edges in . For subcase (b), the event has probability , and the number of addresses with is . Together with the choices of , the expected contribution is
For a fixed filler query vertex , subcase (a) contributes edges and subcase (b) contributes edges. For subcase (c), fix a part and a level . There are vertices such that . For each such vertex, the event occurs with probability . The number of revealed edges is at most the sum of the numbers of butterfly edges entering these vertices, which is at most twice the number of such vertices. Thus each fixed part and level contributes at most
Summing over all parts and levels gives .
- If the other endpoint is an -layer vertex , then different addresses are handled by the lower shortcut through , so the bottleneck lies in . If , the shortest path is
The bottleneck is the edge when , and is the filler edge when . For a fixed filler query this gives at most possible bottlenecks over all parts and copies. For a fixed -layer query, the case gives at most possible bottlenecks, while the event has probability and then gives at most filler-edge bottlenecks. The expected contribution is therefore .
- If the other endpoint is a -layer vertex , then different addresses again lead to a bottleneck in . If and , the path is the single filler edge .
If and , the shortest path goes through and its bottleneck is a base-capacity-3 edge incident to . Thus a fixed filler query sees possible filler-edge bottlenecks and possible bottlenecks from -layer targets. Conversely, a fixed -layer query sees at most filler-edge bottlenecks and possible bottlenecks.
-
If the other endpoint is an upper shortcut vertex, then contributes only bottlenecks because every path from uses an incident base-capacity-2 shortcut edge. For an endpoint , the shortest path to goes through the bottom-level vertex and then through and ; its bottleneck is the base-capacity-3 edge . Hence a fixed filler query obtains possible bottlenecks from such targets, while a fixed query at obtains at most such bottlenecks as the filler address varies.
-
If the other endpoint is a lower shortcut vertex or , then addresses and the vertex give bottlenecks in . For , the bottleneck is one of the base-capacity-3 edges incident to , giving possible bottlenecks for a fixed filler query and for a fixed lower-shortcut query.
Case 3: endpoints in different parts, or one endpoint is . Let the two endpoints be non-filler vertices associated with different parts. The shortest path uses the shared lower shortcut structure and passes through : any path through a filler vertex would use at least two filler edges of base weight 1, whereas using the lower shortcut adds only shortcut weight once the path reaches the appropriate y-layers. Therefore the bottleneck is the base-capacity-1 edge incident to , which lies in . The same conclusion holds when one endpoint is , including the case where the other endpoint is a filler vertex.
The case analysis above gives, for every fixed query vertex u,
This proves Lemma 5.1.
We now extend the fixed-query-set upper bound to randomized non-adaptive algorithms. Fix an arbitrary randomized non-adaptive algorithm that makes at most queries. Because is non-adaptive, its random query set is independent of . Equivalently, we may decompose into deterministic non-adaptive algorithms, that is, fixed query sets with , chosen with probabilities . Then, by the fixed-query-set upper bound,
Therefore, by averaging, there exists a fixed vector such that on the corresponding fixed capacity assignment,
Lower bound on and conclusion. Fix the vector obtained above, and write . We show that is large by considering the following queries:
Fix a part . For every , , and , the shortest path from to is the path through part :
The butterfly edges and the x-y edge on this path are high edges with base capacity 9, and the v-x edge is a high edge with base capacity 8. The final filler edge has base capacity 7. Since the infinitesimal perturbations preserve all comparisons between different base capacities, the bottleneck edge on this path is
Thus, the query reveals all filler edges incident to the -layer of part . As ranges over , these sets of filler edges are edge-disjoint, because the endpoint in the -layer carries the part index , even though the filler vertices themselves are shared across parts. Hence
By the choice of P in the size-and-padding step,
and since with , we have . Therefore
Combining this with the upper bound for on the capacity assignment corresponding to gives
Finally, by the definition of ,
This proves the lower bound part of Theorem 2.
AI disclosure. We used ChatGPT 5.5 Thinking to assist with verifying the case-by-case analysis in Section 5. The tool helped identify several flaws in earlier drafts of the argument. The substantive argument in the final write-up was developed by the authors.
References
[1] Mark Allman and Vern Paxson. On estimating end-to-end network path properties. SIGCOMM Comput. Commun. Rev., 29(4):263–274, August 1999.
[2] Vikrant Ashvinkumar, Rezaul Chowdhury, Jie Gao, Mayank Goswami, Joseph S B Mitchell, and Valentin Polishchuk. Vantage point selection algorithms for bottleneck capacity estimation. In Proceedings of the 19th International Symposium on Algorithms and Data Structures Symposium (WADS'25), pages 6:1–6:19, August 2025.
[3] S Banerjee and A K Agrawala. Estimating available capacity of a network connection. In Proceedings IEEE International Conference on Networks 2000 (ICON 2000). Networking Trends and Challenges in the New Millennium, pages 131–138, September 2000.
[4] Jan Böttger. Understanding benefits of different vantage points in today's Internet. PhD thesis, Technische Universität Berlin, 2017.
[5] Valentin Burger, Matthias Hirth, Christian Schwartz, Tobias Hoßfeld, and Phuoc Tran-Gia. Increasing the coverage of vantage points in distributed active network measurements by crowdsourcing. In Measurement, Modelling, and Evaluation of Computing Systems and Dependability and Fault Tolerance, pages 151–161. Springer International Publishing, 2014.
[6] Rui Castro, Mark Coates, Gang Liang, Robert Nowak, and Bin Yu. Network Tomography: Recent Developments. Statistical Science, 19(3):499 – 517, 2004. doi:10.1214/088342304000000422.
[7] A Coates, A O Hero, III, R Nowak, and Bin Yu. Internet tomography. IEEE Signal Process. Mag., 19(3):47–65, May 2002.
[8] Cesar D Guerrero and Miguel A Labrador. On the applicability of available bandwidth estimation techniques and tools. Comput. Commun., 33(1):11–22, January 2010.
[9] K Harfoush, A Bestavros, and J Byers. Measuring bottleneck bandwidth of targeted path segments. In IEEE INFOCOM 2003. Twenty-second Annual Joint Conference of the IEEE Computer and Communications Societies (IEEE Cat. No.03CH37428), volume 3, pages 2079–2089 vol.3, March 2003.
[10] Monika R Henzinger and Valerie King. Randomized fully dynamic graph algorithms with polylogarithmic time per operation. Journal of the ACM (JACM), 46(4):502–516, 1999.
[11] Thomas Holterbach, Emile Aben, Cristel Pelsser, Randy Bush, and Laurent Vanbever. Measurement vantage point selection using a similarity metric. In Proceedings of the Applied Networking Research Workshop, ANRW '17, pages 1–3, New York, NY, USA, July 2017. Association for Computing Machinery.
[12] Yuchen Huang, Michael Rabinovich, and Rami Al-Dalky. FlashRoute: Efficient tracer-oute on a massive scale. In Proceedings of the ACM Internet Measurement Conference, IMC '20, pages 443–455, New York, NY, USA, October 2020. Association for Computing Machinery.
[13] Jordan Jueckstock, Shaown Sarker, Peter Snyder, Panagiotis Papadopoulos, Matteo Varvello, Benjamin Livshits, and Alexandros Kapravelos. The blind men and the internet: Multi-Vantage point web measurements. May 2019. arXiv:1905.08767.
[14] R Prasad, C Dovrolis, M Murray, and K Claffy. Bandwidth estimation: metrics, measurement techniques, and tools. IEEE Netw., 17(6):27–35, November 2003.
[15] Dixon Salcedo, Cesar D. Guerrero, and Roberto Martinez. Available bandwidth estimation tools metrics, approaches and performance. International J. Commun. Netw. Inf. Secur., December 2018.
[16] Y Vardi. Network tomography: Estimating source-destination traffic intensities from link data. J. Am. Stat. Assoc., 91(433):365–377, March 1996.