Eventually Optimal and Scalable Multi-Agent Planning for Block Cave Mining

Christopher Leet, Paolo Forte, Uwe Köckemann, Henrik Andreasson, Sven Koenig

Christopher Leet¹, Paolo Forte², Uwe Köckemann², Henrik Andreasson², Sven Koenig¹,²

Abstract—Automation in underground mining has the potential to significantly enhance safety, operational efficiency, and sustainability. However, effectively coordinating fleets of autonomous vehicles in dynamic mine environments introduces substantial challenges in both optimization and motion planning. To address these challenges, we introduce and formalize the Block Cave Mining (BCM) problem, which focuses on computing a transport plan that maximizes ore throughput while satisfying draw ratio constraints. To solve this problem, we propose SAMM, an eventually optimal anytime solver that jointly integrates task assignment, scheduling, and path planning via a mixed-integer linear programming formulation. To improve scalability, we also introduce SAMMS, a variant of SAMM that trades optimality guarantees for efficiency by decomposing the problem into shorter planning subcycles. Experimental evaluations using realistic industrial mine scenarios demonstrate that SAMMS achieves near-optimal throughput and scales effectively to larger fleets and mine layouts.

I. INTRODUCTION

Autonomous material transport systems are becoming increasingly important to mining [1], as they can improve efficiency, safety, and reduce costs [2]. Among the mining methods that benefit from automation is block cave mining (see Fig. 1), a mining technique used to extract large volumes of ore from underground mines [3]. It begins with the excavation of an undercut layer ① and extraction tunnels ② beneath an ore body. Vertical drawbells ③ connect the undercut layer to the extraction tunnels. The undercut layer is then blasted ④ causing the base of the ore body to fracture and collapse. The ore is transported from the drawbells to crushers which pulverize it and deposit it into containers for removal. As ore is extracted, a hollow ⑤ forms at the base of the ore body. This loss of support causes the remainder of the ore body to slowly crumble under its own weight and fall into the drawbells for collection.

To automate the ore collection process, a block cave mine operator must generate a plan that specifies how autonomous agents transport ore to crushers. This production plan is to alleviate stress level build up in the mine as well as

Figure

Fig. 1. A side view of the block cave mining process. Top: building the infrastructure. Bottom: extracting ore.

fragmentation of the ore, the amount of material drawn from each drawbell is important to keep within bounds and changes slowly over time [4]. In this work we assume the rate at which ore is extracted is a fixed percentage of the total extraction rate (if the rates are updated we treat it as a new problem). These percentages vary between drawbells, for example, one drawbell might contribute 7% of the extracted ore while another might only contribute 1%. We define the task of finding a transport plan which maximizes the overall extraction rate as the Block Cave Mining (BCM) problem. The BCM problem presents three challenges. First, since agents must haul ore for an indefinite amount of time, a solver must construct an arbitrarily long plan. Second, the BCM problem is composed of three, tightly coupled, components: task assignment (which drawbell to visit), scheduling (when to visit) and path planning (how to get there). Finally, BCM agents have heavy restrictions on their movement. Most prior work on Multi-Agent Path Finding (MAPF) models the environment as a 2D grid graph with holes and assumes that agents can move in any cardinal direction in constant time. BCM agents, however, are bulky, center articulated vehicles only slightly narrower than the mine's tunnels. Even basic actions such as turning around require a complex series of maneuvers at a junction, complicating path planning.

To the best of our knowledge, no optimal solution to the BCM problem exists. Current solutions use heuristics such as statically assigning agents to fixed subsets of drawbells, which limits optimality. To bridge this gap, we introduce SAMM (Simple Anytime Mine MAPF), an eventually optimal method designed to meet the challenges above. SAMM achieves continuous operation by producing cyclic plans, plans that can be looped because they start and end with the team of agents in the same configuration. It avoids the pitfalls of decomposition by casting task assignment, scheduling and path planning into a single Mixed Integer Linear Program (MILP) which captures their inter-dependencies and decides the optimal number of agents for a given cycle

This work was partially supported by the European Union's Horizon Europe Framework Programme under grant agreement No 101070596 (euROBIN). (Corresponding author: Christopher Leet)

© 2026 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, in any current or future media, including reprinting/republishing this material for advertising or promotional purposes, creating new collective works, for resale or redistribution to servers or lists, or reuse of any copyrighted component of this work in other works.

¹University of Southern California Los Angeles, California, USA {cjleet,skoenig}@usc.edu

²Centre for Applied Autonomous Sensor Systems, Örebro University, Örebro, Sweden <name>.<surname>@oru.se length. Finally, to model maneuvering in confined tunnels, SAMM constructs a state graph over discrete poses (position–orientation pairs), where transitions encode feasible motion primitives executable in constant time. The industrial applicability of MILP approaches, such as SAMM, to MAPF is limited since they typically do not scale well.

Therefore, we propose an additional, scalable solver, SAMMS (SAMM with Subcycles). The difficulty of generating a cyclic plan using a ILP grows exponentially with the plan's length. Instead of generating one long cycle which services every drawbell, SAMMS generates a sequence of subcycles, each of which services a subset of drawbells. Each subcycle starts and ends in the same state, allowing them to be seamlessly concatenated. SAMMS constructs a transport plan online by concatenating these subcycles. Whenever a subcycle completes, SAMMS selects a new subcycle to execute. We prove that SAMMS is always asymptotically feasible and converges rapidly. The longer it runs, the closer it approximates each drawbell's targeted draw rate.

We evaluate SAMM and SAMMS on benchmark scenarios derived from real-world mine layouts and demonstrate their ability to solve industrial scale BCM instances.