AI for AI: Optimizing Additional Infrastructure Build-out to Power Artificial Intelligence Data Centers

Alexander Crosier, Kyle Onghai, Ronnie Sircar

Abstract

The twenty-first century’s transformative technology, artificial intelligence, is increasingly constrained by the twentieth century’s transformative technology, the electricity grid. Rapid growth in electricity demand from data centers is leading to higher electricity prices, without a compensating supply-side response. We develop a framework linking data-center load growth, available generation capacity, and market-clearing prices to understand this phenomenon. We first analyze a deterministic model to show how differing estimates of demand and supply growth rates affect prices. We then model the expansion of new data centers and their associated electricity demand, together with build-outs of new electricity supply, as stochastic processes, resulting in probabilistic distributions of supply, demand, and prices rather than a single forecast. Finally, we formulate generation expansion as a stochastic control problem in which a revenue-maximizing investor dynamically chooses the intensity of supply-side investments. The analysis highlights a central challenge of the data-center build-out: even when rapid demand growth increases the need for new generation, the uncertainties related to load forecasts, development execution risks, and value cannibalization from overbuilding capacity may weaken incentives to invest at the pace required to keep electricity prices stable.

1 Introduction

The artificial intelligence era has sparked a rapid increase in electricity demand from data centers. From 2018 to 2025, electricity demand from data centers alone increased from 76 TWh (1.9% of U.S. total demand) to more than 200 TWh (4.8% of U.S. total demand) [22]. Forecasts for future demand from AI data centers vary widely, though grid operators and utilities across the Midwest, Southeast, Southwest, and Texas expect these facilities to increase peak demand by 20% to 40% or more over the next decade. In 2025, ERCOT, Texas’s primary power grid, forecasted 33 GW of new demand from data centers for artificial

*Formerly Princeton University

†ORFE Department, Princeton University

‡ORFE Department, Bendheim Center for Finance and Andlinger Center for Energy & the Environment, Princeton University intelligence and cryptocurrency mining by 2031, equivalent to a 36% increase relative to its all-time system peak of 91 GW [9]. According to [24], “Texas alone accounts for roughly 100 GW of planned data center capacity, more than the next two states, Virginia and Utah, combined.”

These projections expose a fundamental tension between the rapid development of artificial intelligence and the much slower expansion of the infrastructure required to power data centers. In this sense, one of the twenty-first century’s most transformative technologies, artificial intelligence, is increasingly constrained by one of the twentieth century’s most transformative technologies, the electricity grid.