arXiv:2609.08888cs.GTSep 2026

Manuscript Offprint

arXiv:2609.08888

Strengthening Proportionality in Participatory Budgeting with Additive Utilities

Tzeh Yuan Neoh, Nicholas Teh

Abstract

Proportional representation is a central goal in participatory budgeting, where voters select public projects subject to a shared budget. Full justified representation (FJR) accounts for groups whose members may value different projects, but computing an FJR outcome is strongly NP-hard for additive utilities. We show that FJR up to one project can be achieved in polynomial time for arbitrary nonnegative additive utilities and project costs. Our approach extends Residual-Budget Greedy and satisfies a stronger fractional axiom that can also be verified in polynomial time. For approval utilities, this axiom coincides with FJR+, providing exact FJR in that setting. We further show that every feasible completion of the algorithm's selected set preserves the representation guarantee, providing flexibility in allocating the remaining budget. In particular, we give a completion that ensures priceability at the original budget. For unit-cost projects, we strengthen the representation guarantee to the Droop quota and combine it with priceability whenever there are enough positively valued projects to fill the budget.

1 Introduction

Participatory budgeting (PB) is a process that allows residents to select public projects subject to a common budget. In New York City, for example, residents vote on improvements to schools, parks, libraries, and streets using PB. A central concern in this setting is whether sufficiently large groups are represented proportionally. Approval utilities, in which voters indicate only which projects they approve, capture many PB settings well and have supported a substantial literature on proportional representation. In practice, however, projects can differ substantially in how much voters value them: a family may value a playground more than a library renovation, while another resident has the opposite preference. Additive utilities provide a richer model by allowing voters to express both which projects they value and how much they value them. They also make proportional representation more subtle. Consider a neighbourhood whose residents value different local improvements. Its proportional share of the budget might fund a set that gives every member substantial total utility, although no single project is valuable to everyone. A representation guarantee should account for such groups by considering each member's utility for the whole proposed set.

Full justified representation (FJR), addresses precisely this distinction. Suppose that a group can afford a set of projects with its proportional share of the budget, and that every member obtains utility at least β\beta from that set. FJR requires that at least one member obtain utility at least β\beta from the selected outcome. The requirement applies to every such group and set. In contrast, extended justified representation (EJR) uses common lower bounds on the utility of each individual project. The difference is between the minimum of the members' total utilities and the sum of their project-by-project minimum utilities. The former can be substantially larger.

There is a computational distinction as well. The Method of Equal Shares (MES) is computable in polynomial time and its outcome satisfies EJR up to one project for additive utilities [Peters et al.,

2021]. FJR can be satisfied by the Greedy Cohesive Rule, but that rule searches over voter groups and proposed sets. More recently, for approval utilities and unit costs, Frank and Peters [2026] obtain FJR by modifying the Greedy Justified Candidate Rule, while Ai [2026] give a descending-budget rule. Thus, in the approval setting, strong FJR guarantees can be achieved efficiently.

What remains unclear is whether comparable guarantees are possible for general additive utilities. Exact FJR is computationally difficult: Baharav et al. [2026] prove that finding an FJR outcome is strongly NP-hard, even for for unit costs and integer utilities bounded by a fixed constant. Under their definition, no sequential rule satisfies EJR even with unit costs and utilities in {0,1,2,3}\{0, 1, 2, 3\} [Baharav et al., 2026, Theorem 6.1]; since FJR implies EJR, this also rules out FJR for that class of rules. Moreover, checking whether an arbitrary approval committee satisfies FJR is coNP-complete [Kalayci et al., 2025].

We therefore ask whether the one-project relaxation can be extended from EJR to FJR for additive utilities while retaining polynomial-time computation and verification. We answer the computation question posed by Frank and Peters [2026, Section 4] and also give polynomial-time verification. The qualification “up to one project” is the same strict one used for additive EJR: either a group member attains the required utility, or adding a project from the group’s proposed set takes that member strictly above it. Thus the loss is less than the value of one of the group’s own projects.

References (48)