Minimizing the makespan in job shop scheduling under conflict graph constraints

Nour Elhouda Tellache, Abdenour Azerine

NOUR ELHOUDA TELLACHE AND ABDENOUR AZERINE

ABSTRACT. We study the job shop scheduling problem with a conflict graph (JSC), in which adjacent jobs in the conflict graph cannot be processed simultaneously on different machines, with the objective of minimizing the makespan. The problem models settings where jobs share additional resources while retaining their individual machine routings. We first investigate its computational complexity and establish a polynomial equivalence between JSC and a variant of the resource-constrained job shop problem with unit-capacity resources. Although the general problem on two machines is NP-hard, we identify a polynomially solvable special case. For the general problem, we develop precedence-based and time-indexed mixed-integer linear formulations, along with lower bounds on the makespan. We also propose a genetic algorithm using permutation-with-repetition encoding and active, non-delay, and hybrid schedule evaluation procedures. Computational experiments on instances derived from the Lawrence and Taillard benchmarks, as well as randomly generated generalized job shop instances, are conducted to evaluate the performance of the proposed formulations, lower bounds, and genetic algorithm.

1. INTRODUCTION

The job shop scheduling problem is a fundamental problem in machine scheduling and ranks among the hardest combinatorial optimization problems. It involves assigning jobs to machines, where each job consists of an ordered sequence of operations, each requiring a specific machine. The goal is to optimize one or more objective functions while adhering to various constraints [1]. This problem has numerous applications in industries such as semiconductor manufacturing, machine manufacturing, automobile production, supply chains, and metallurgy (see [2] for more details). Each application imposes different requirements, which translate into specific scheduling constraints. In this paper, we focus on a particular class of constraints known as conflict constraints, which naturally arise when certain jobs cannot be processed simultaneously—for instance, when they share resources. We study the problem where these constraints are represented by a simple undirected graph, referred to as the conflict graph.

Formally, the Job Shop scheduling problem with Conflict graph (JSC) consists of scheduling a set of jobs J={J1,…,Jn}J = \{J_1, \ldots, J_n\} on mm dedicated machines M={M1,…,Mm}M = \{M_1, \ldots, M_m\}. Each job JjJ_j comprises mjm_j operations OijO_{ij} (i=1,…,mji = 1, \ldots, m_j), such that OijO_{ij} has to be processed on a specified machine μij∈M\mu_{ij} \in M for pij∈N∗p_{ij} \in \mathbb{N}^* time units. Each job JjJ_j has a predetermined processing order through the machines O1j→O2j→…→OmjjO_{1j} \to O_{2j} \to \ldots \to O_{m_j j}. We assume that any two consecutive operations of the same job are to be performed on different machines. Furthermore, each machine can handle at most one operation at a time and each job is processed on at most one machine at a time. The processing of the jobs is subject to conflict constraints given by a simple undirected graph G=(V,E)G = (V, E) called the conflict graph. Each vertex represents a job and two jobs that are adjacent in GG are in conflict, i.e. they cannot be processed at the same time on different machines.

Key words and phrases. Job shop; conflict graph; makespan; complexity theory; lower bounds; mixed-integer linear programming; genetic algorithms.

Likewise, we define conflicts between two operations: two operations are in conflict if they belong to the same job, require the same machine, or are of two conflicting jobs. The objective is to find a feasible schedule that minimizes the maximum completion time also called the makespan and denoted CmaxC_{max}. According to the three field classification α∣β∣γ\alpha|\beta|\gamma of Graham et al. [3], we denote our scheduling problem by Jm∣ConfG=(V,E)∣CmaxJm|ConfG = (V,E)|C_{max}, where ConfG=(V,E)ConfG = (V,E) indicates the presence of a conflict graph G=(V,E)G = (V,E) over the jobs.

The JSC problem is related to the Job Shop problem under Resource Constraints (JSRC), where the jobs may require, besides the machines, some additional resources for their processing (see Blazewicz et al. [4]). In such problems, conflicts arise when resource requirements exceed available capacities. These conflicts can occur at the operation level when different operations within a job have varying resource requirements. Alternatively, if all operations within a job have the same resource requirements, conflicts can be represented at the job level instead. Generally, conflicts in the JSRC problem are modeled using a conflict hypergraph. However, in some particular cases, a simple graph suffices, such as when only two machines are available or when each resource is limited to a single unit (see Section 3).

Blazewicz et al. [5] expanded the three field classification, α∣β∣γ\alpha|\beta|\gamma, to cover the resource-constrained scheduling problems. Parameter β\beta denotes the job and resource characteristics. The presence of additional resources is specified by resλσδres\lambda\sigma\delta, where λ\lambda, σ\sigma, δ∈{.,k}\delta \in \{.,k\} represent respectively the number of resource types, resource availabilities and resource requirements. A dot “:” indicates that the corresponding parameter can take any integer value, whereas a positive integer kk indicates that the number of resource types is equal to kk, each resource is available in the amount of kk units and the resource requirements of each operation are equal to at most kk units. We denote by restλσδres^t\lambda\sigma\delta the special case where all operations within a job have the same requirements of each resource, and let Rs(Jj)R_s(J_j) be the resource requirement of job JjJ_j for resource RsR_s. Note that the scheduling problem α∣restλσδ∣γ\alpha|res^t\lambda\sigma\delta|\gamma is a subproblem of α∣resλσδ∣γ\alpha|res\lambda\sigma\delta|\gamma.

The remainder of this paper is structured as follows. Section 2 reviews the related literature. Section 3 discusses the complexity of the JSC problem. Section 4 presents mathematical models, followed by lower bounds in Section 5. Section 6 describes genetic algorithms. The computational experiments are detailed in Section 7.