Scheduling to Maximize Weighted Throughput with an Active-Time Budget

Susanne Albers, G. Wessel van der Heijden

Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.

Abstract

We study the active-time scheduling problem with weighted throughput maximization. In this setting, a set of nn jobs JJ arrive at integer release times, each with an integer processing time and integer deadline. Jobs may be preempted at integer time slot boundaries. A schedule assigns jobs to time slots, with at most mm jobs assigned to the same time slot. A slot is called active if at least one job is scheduled in it. Instead of scheduling all jobs to minimize the number of active time slots, we consider the more general variant of weighted throughput with an active-time budget KK, where each job j∈Jj \in J has a weight wjw_j. The objective is to maximize the total weight of completed jobs using at most KK active time slots. This means that partially scheduled jobs do not count towards the objective. The classical active-time minimization problem is recovered by asking whether all jobs can be completed within a given active-time budget. We give hardness, approximation, and exact algorithmic results. For general intervals with unbounded parallelism, we prove NP-hardness, rule out an FPTAS unless P=NP\mathrm{P} = \mathrm{NP}, and give a pseudo-polynomial time Ω(1/log⁡K)\Omega(1/\log K)-approximation. For proper intervals, we prove a canonical structural lemma and obtain an exact (nK)O(m)(nK)^{O(m)}-time algorithm. For laminar intervals, we give an exact f(K,m)⋅nO(1)f(K, m) \cdot n^{O(1)}-time algorithm.

1 Introduction

Scheduling for parallel machines is a fundamental problem in computer science and operations research. Energy consumption is an important objective in scheduling and has been studied extensively [1]. In energy sensitive environments such as data centers and cloud platforms, a basic way to reduce cost is to reduce the amount of time that a machine is active. Some models penalize processor activation with explicit startup costs [8], which gives algorithms that avoid idle gaps. In contrast, in cloud-computing settings the cost of a rented machine is often closely related to the active usage time. This naturally leads to scheduling problems with an active-time budget. Given a limited amount of machine active-time, complete a subset of the jobs. We study this question in the active-time scheduling model introduced by Chang et al. [4]. Unlike the classical objective of completing all jobs while minimizing active time, we are given an active-time budget and the objective is to maximize the total weight of completed jobs.

We consider the following scheduling problem. We are given a set of nn jobs J={1,…,n}J = \{1, \ldots, n\}. Each job j∈Jj \in J has an integer release time rjr_j, an integer deadline djd_j, an integer processing time pjp_j, and a nonnegative weight wjw_j. Time is partitioned into discrete integer time slots and jobs may be preempted at time slot boundaries. In each slot, at most mm jobs can be processed simultaneously. We say a time slot tt is active when at least one job unit is assigned to time slot tt. The schedule may use at most KK active time slots. A job jj is completed if it receives pjp_j units of processing in time slots contained in its window Wj=[rj,dj]W_j = [r_j, d_j]. The objective is the total weight of completed jobs, also called the weighted throughput. If a job is only partially scheduled, it does not count towards the objective. Any processing assigned to an uncompleted job can be deleted without hurting the objective or violating feasibility. Throughout the paper, we assume w.l.o.g. that every processed job is completed. As in much of the active-time scheduling literature, we use the discrete-time model and state running times that are polynomial in numeric parameters such as KK and the time horizon. These running times are pseudo-polynomial under binary encoding and are comparable to the standard time-expanded flow formulations used to check feasibility for active-time minimization [5, 10, 3, 2].

Scheduling with an active-time budget to maximize weighted throughput contains the feasibility version of the active-time scheduling model introduced by Chang et al. [4]. In the original active-time minimization problem,

*susanne.albers@tum.de.Technical University of Munich, Germany; TUM School of Computation, Information and Technology, Department of Computer Science

†^{\dagger}wessel.heijden@tum.de. Technical University of Munich, Germany; TUM School of Computation, Information and Technology, Department of Computer Science. Work supported by the Deutsche Forschungsgemeinschaft (DFG, German Research Foundation) - GRK 2201/2 - Projektnummer 277991500 every job must be scheduled for pjp_j time slots within its window [rj,dj][r_j, d_j] and the goal is to minimize the total active time slots. Our model looks at the opposite perspective, where the active-time budget KK is fixed, and the algorithm must decide which jobs to complete. The minimization problem can be recovered by asking, for a given value of KK, whether the optimum throughput equals the total weight of all jobs. A binary search over KK then gives the minimum active-time. For pj=1p_j = 1, Chang et al. [4] gave an O(nlog⁡n)O(n \log n)-time algorithm that solves the active-time minimization problem optimally. They also considered throughput maximization for unit length jobs and an active-time budget K≤nK \leq n, for which they obtained an optimal dynamic programming algorithm with a (pseudopolynomial) running time of O(n5K)O(n^5 K). For arbitrary processing times, there have been several attempts to obtain good approximation algorithms for the active-time minimization problem. Chang et al. [5] gave a 2-approximation for the active-time scheduling problem with arbitrary processing times using an LP rounding procedure. Kumar and Khuller [10] showed that a 2-approximate ratio can also be obtained using a simple greedy procedure for the active-time scheduling problem that requires calculating feasibility over all jobs at each iteration. Later, Călinescu and Wang [2] gave an alternative, more involved LP rounding procedure achieving the same 2-approximation ratio. Its integrality gap is at least 5/3, but they conjecture it is strictly better than 2. Cao et al. [3] broke the 2-approximation barrier for the nested active-time scheduling setting, giving a 9/5-approximation using a complex LP rounding procedure. The complexity of the active-time scheduling problem remained open for a while, until Saha and Purohit [13] showed that active-time scheduling problem with arbitrary processing times is NP-hard, via a reduction from Balanced SAT. Later Cao et al. showed that the active-time scheduling problem remains NP-hard, even with nested intervals [3].

In a survey on busy-time and active-time scheduling, Chau and Li raised the throughput maximization setting as an interesting open research direction and as a way to settle the complexity status of the active-time scheduling problem [6]. To the best of our knowledge, the only prior work on throughput maximization in the active-time model was by Chang et al. [4], who considered unit processing time jobs. Therefore, the weighted-throughput problem with arbitrary processing times has remained largely unexplored.