arXiv:2608.30268cs.ARAug 2026

Manuscript Offprint

arXiv:2608.30268

FABO: Agent-Guided Discovery of Joint Breakpoint Optimization for Timing-Driven Routing Trees

Shang Liu, Wenji Fang, Jing Wang, Hongxin Kong, Yao Lu, Zhiyao Xie

Shang Liu, Wenji Fang, Graduate Student Member, IEEE, Jing Wang, Hongxin Kong, Yao Lu, Zhiyao Xie, Member, IEEE

Abstract—The topology of a routing tree determines how a multi-pin net branches and shares physical wire, directly affecting wirelength, congestion, capacitance, and delay. We study a central early-stage routing problem: minimizing wirelength while bounding the root-to-sink path stretch for every sink. SALT is the state-of-the-art constructive algorithm for this problem. We ask whether language-model-guided search can discover a constructive algorithm that improves on SALT. To make this search reliable, we develop an agent framework that combines parallel exploration with independent checking. Applied to SALT, the framework discovers a structural limitation: SALT repairs one sink path at a time and therefore never jointly decides where paths sharing root-side wire should split. This sink-local choice can split the paths too early and duplicate wire. This discovery leads to Flow-Aware Breakpoint Optimization (FABO), which jointly optimizes breakpoints across root-to-sink paths that share wire while preserving every sink's stretch budget. Across 1.29 million ICCAD15 nets and SALT's 20-point stretch-tolerance schedule, FABO reduces average FLUTE-normalized wirelength at every setting, with peak same- ϵ\epsilon reductions of 0.83% overall and 2.66% for nets with at least 30 pins. With 1.3×1.3\times SALT's runtime, FABO-FAST identifies and optimizes most nets for which FABO provides a substantial wirelength reduction. Code is available at https://github.com/DevinShang/routing-FABO.

Index Terms—Steiner tree, routing tree, timing-driven routing, breakpoint sharing, agent-guided algorithm discovery

I. INTRODUCTION

Before detailed routing, a routing tree decides where the root-to-sink paths of a multi-pin net branch and which paths share physical wire. These decisions directly affect total wirelength, routing demand, interconnect capacitance, congestion, and root-to-sink delay [1], [2]. The effect is strongest on high-fanout nets: one root-side segment may serve many sinks, so splitting those paths early can repeat substantial wire across the resulting branches.

FLUTE rapidly constructs near-minimum-wirelength rectilinear Steiner trees but does not bound the path detour of each sink [2], [3]. SALT [4] instead minimizes wirelength subject to a hard normalized-stretch bound for every sink. This is a fundamental early-design formulation: its geometry-only constraint applies before detailed resistance, capacitance, or sign-off timing is available, yet it protects every sink individually. SALT is the state-of-the-art constructive algorithm for this problem. The key question is whether a new algorithm can reduce wirelength beyond SALT under the same per-sink

Figure

Fig. 1: Agent-guided discovery and its routing outcome. The upper panel contrasts the search capabilities of the human and agent workflows. The lower panel shows the recorded superblue16 net 42 case at ϵ=0\epsilon = 0: SALT and FABO both achieve α=1.000\alpha = 1.000, while FABO moves the shared breakpoint deeper and reduces wirelength by 5.06%.

budgets, giving later physical-design stages a lighter routing structure without weakening any path guarantee.

PD-Rev balances wirelength and path detour in the Prim–Dijkstra family [5], [6]; PatLabor [7] constructs Pareto sets for wirelength and maximum path length; and Wu et al. [8] optimize Elmore delay under a wirelength requirement. These objectives are complementary, but none is a direct replacement for SALT under the per-sink normalized-stretch constraint in Section II.

From agent search to a new algorithm. Recent program-search systems show that language-model-guided search can discover new mathematical and heuristic programs [9]–[12]. Existing EDA agents mainly orchestrate existing tools [13]–[15], while algorithm-configuration methods tune parameters of a fixed procedure [16]–[18]. We instead build an agent-guided research system to develop and validate a new routing-tree construction algorithm.

A serial agent has two weaknesses in this NP-hard search. It follows one reasoning trajectory, so after adopting a construction it tends to patch that construction instead of exploring a fundamentally different one. It must also carry each idea through specification, implementation, verification, and evaluation; an unchecked error at any stage then shapes every later decision. Our framework addresses both weaknesses through multi-agent generation and checking. Eight isolated Hypothesis Agents explore different structural mechanisms, the Critic

Shang Liu, Wenji Fang, Jing Wang, Yao Lu and Zhiyao Xie are with the Department of Electronic and Computer Engineering at the Hong Kong University of Science and Technology, Hong Kong SAR, China. Corresponding Author: Zhiyao Xie (eezhiyao@ust.hk).

Hongxin Kong is with Synopsys, United States.

checks their assumptions and converts the strongest directions into fixed specifications, and three Programmer–Verifier chains implement and independently verify those specifications in parallel. The fixed Evaluator admits results from valid trees into the SSOT for the next round.

Flow-Aware Breakpoint Optimization (FABO). Per-sink budgets constrain root-to-sink path lengths; the objective minimizes total wirelength. A longer feasible path can reduce wirelength when it lets several sinks share more wire. A shared segment disappears from the tree only after every path using it is rerouted, so this saving must be evaluated jointly across those paths. SALT builds a light support tree and repairs each sink whose root path exceeds its budget: it opens a breakpoint on that path, keeps the wire from the breakpoint to the sink, and reconnects the breakpoint to the root through a shortest wire. The repair is greedy and per sink, and the postprocessing that follows moves one node at a time; sharing recovers only as a side effect, and the joint choice of where a group of paths should stop sharing one trunk is never represented or searched. The unexploited sharing grows with fanout, where many paths share one long root-side trunk.

In FABO, a flow is one root-to-sink path in the support tree. Instead of committing a flow to one repair point, FABO represents its breakpoint choices as one feasible breakpoint interval. The interval exactly characterizes all budget-feasible breakpoints. Moving a breakpoint deeper shortens the kept wire at least as much as it can lengthen the new root wire; therefore, the feasible breakpoints form one contiguous interval ending at the sink. Where intervals overlap, their flows can adopt one shared breakpoint without violating any sink budget, and FABO counts a support edge as released only when every flow using it leaves. Joint options that sink-by-sink repair never exposes thus become explicit and comparable, while every candidate tree is still checked against every sink budget.

We evaluate FABO on 1.29 million ICCAD15 nets with at least three pins under SALT's 20-point ϵ\epsilon schedule. FABO reduces average FLUTE-normalized wirelength at every setting, with peak same- ϵ\epsilon reductions of 0.83% overall and 2.66% among nets with at least 30 pins. Our contributions are:

• A multi-agent framework for reliable algorithm discovery. Parallel Hypothesis Agents explore different construction families. At each stage, other agents check the hypotheses, specifications, implementations, and evaluation outputs before the evidence enters the next round.

• Discovery of a structural bottleneck. SALT repairs one sink path at a time, so it never chooses a breakpoint jointly for paths that share the same root-side wire. Its final tree can therefore split these paths earlier than necessary and duplicate wire.

• Flow-Aware Breakpoint Optimization. FABO changes the decision unit from one sink to the group of paths sharing root-side wire. It represents each path's legal breakpoints as one interval and turns joint repair into selecting shared points from interval overlaps, making group-level wirelength gains explicit while preserving every sink's path budget.

• Quality at scale with a practical runtime option. Across 1.29 million nets and all 20 SALT tolerances, FABO reduces average FLUTE-normalized wirelength at every setting, with peak reductions of 0.83% overall and 2.66% for nets with at least 30 pins. With 1.3×1.3 \times SALT's runtime, FABO-FAST identifies and optimizes most nets for which FABO provides a substantial wirelength reduction.