Manuscript Offprint
arXiv:2611.11490Optimal power expansion planning under uncertainty in sub-Saharan Africa: A stochastic dual dynamic programming approach
Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.
Abstract
Universal electricity access and decarbonization are interlinked challenges for sub-Saharan Africa. Generation expansion planning methods used in the region rarely represent sequential and irreversible investment under demand and hydrological uncertainty. This paper develops a multistage stochastic generation expansion model solved with stochastic dual dynamic programming (SDDP) to address the problem. The model represents demand and country-specific Markov hydrological uncertainty, accounts for technology-specific construction lead times, and endogenous reliability. The model is applied to the Ethiopia and Zimbabwe power systems over 2025–2050. The results show that for Ethiopia, the least-cost pathway is hydropower, with wind and solar sources providing increasing diversification. The model reduces cumulative expected unserved energy by about 78 TWh relative to a lower-cost deterministic expected value investment plan. For Zimbabwe, the least-cost pathway expands solar, hydropower, and gas while retaining residual coal as inherited coal capacity retires. Additionally, carbon pricing reduces emissions and increases resource costs by about 3% to 5%, creating a gradual cost-emissions trade-off. Combining a carbon tax policy with concessional solar financing renders the lowest average annual emissions while keeping resource costs below the baseline, which solves the model without emission constraint. At approximately matched expected emissions, emission caps have higher net resource costs than the corresponding carbon tax scenarios. The overall results imply that adaptive investment model can reduce power shortage exposure, while carbon policy design and lower clean investment costs shape the cost of decarbonization in developing power systems.
Keywords:
Generation expansion planning, Stochastic dual dynamic programming, Sub-Saharan Africa, Ethiopia, Zimbabwe, Carbon tax and emissions cap
Power system generation expansion planning (GEP) in the developing countries’ contexts differs fundamentally from planning in liberalized electricity markets. Unlike market-based power systems, in Africa wholesale electricity markets are often absent. In these countries, retail tariffs are administratively set and frequently fail to recover full costs. Such independent power producers operate through negotiated bilateral contracts as there are no short-run spot markets and the market is not liberalized. In addition, project finance also faces constraints from sovereign risk, currency exposure, and limited domestic capital depth (Steinbuks2010; Falchetta2021). In most developing countries, the primary decision-maker is usually a national utility where it solely determines the timing and scale of generation capacity expansions to satisfy the growing demand and carbon policy constraints at minimum social cost (Blimpo2024). However, generation expansion planning is a long-term public investment problem that integrates cost, resource adequacy, emissions, and uncertainty.
Long-term power sector investment is both dynamic and partly irreversible. Capacity committed today affects the cost and feasibility of all future investment decisions. Demand evolves with population growth, electrification, and climate-related changes in cooling or irrigation loads (Dagnachew2023). These drivers resist accurate forecasting over a 25-year planning horizon, leaving uncertainty that creates value in adapting future decisions as new information emerges (Dixit1994; Fleten2004). Stochastic dual dynamic programming provides a computational approach for such multistage problems (Pereira1991). The method approximates downstream value functions with piecewise-linear cuts generated from simulated states and dual information (PhilpottGuan2008; Guigues2017; Dowson2021). The model is widely used in stochastic hydrothermal scheduling (deQueiroz2016) and has recently been applied to long-term generation expansion problems (HolePhilpottDowson2024; Sun2025).
The energy transition adds a strategic policy layer to this investment problem. Decarbonization can be pursued through price-based instruments such as carbon taxes and quantity-based instruments such as emissions caps. While the relative performance of these instruments under uncertainty is a classic economic topic, in long-term generation expansion planning, carbon policy operates within an evolving system shaped by investment timing and resource adequacy (Weitzman1974). A low carbon price may have little effect on investment or/and dispatch, while greater stringency can accelerate the retirement of thermal generation before sufficient low-carbon capacity is available. Annual emissions caps can impose similar constraints when low-carbon alternatives are limited during periods of high demand or/and low renewable availability (Blyth2007; Fuss2008; GoulderParry2008). These considerations are vital for developing power systems where emissions reduction must proceed alongside substantial generation capacity expansion (Dagnachew2023; IMFSSAClimate2024). For this reason, carbon policy can be a part of a broader planning problem involving investment, reliability, and uncertainty.
The main analysis in this paper considers two structurally different countries with nationally planned power sectors. Ethiopia possesses one of Africa’s largest hydropower resource endowments, and more than 90% of its installed capacity is hydro-based (IEA2023Africa; EEO2025). Although the Grand Ethiopian Renaissance Dam (GERD) increased the existing capacity, hydrological variability remains a primary source of supply risk in a country where drought can recur periodically (Tekleab2020). To tackle this challenge, Ethiopia needs to expand generation to support demand growth while managing drought exposure and continued dependence on hydropower. On the other hand, Zimbabwe faces a different challenge in its power system expansion planning. Its power system relies on the Kariba South hydropower complex, aging coal-fired generation at Hwange and gas-fired capacity. Available capacity is often constrained by deferred maintenance, coal-supply disruptions, in addition to drought-related reductions in water levels (Spalding2017). Zimbabwe also holds emissions reduction commitments under the Paris Agreement as it has emitting generation mix relatively. Considering this, its planning problem needs to combine resource adequacy, the retirement of existing thermal capacity, and new low-carbon investment.
This paper addresses three research questions. First, how can adaptive generation expansion planning represent sequential demand and hydrological uncertainty? Second, how do these uncertainties affect least-cost investment pathways in different power systems, and what are the value of adaptive planning and the value of perfect information? Third, at approximately matched expected emissions, how do price- and quantity-based carbon instruments differ in resource cost and expected unserved energy when technology costs and resource limits constrain the transition?
While addressing these research questions, the paper makes four main contributions. First, it develops a multistage stochastic generation expansion model in which demand and hydrological conditions are revealed sequentially, hydrology follows country-specific Markov dynamics, and investment adapts to available information. The model is a continuous multistage stochastic linear program solved with stochastic dual dynamic programming (SDDP). Second, the paper quantifies the value of adaptive investment relative to deterministic and perfect information benchmarks. In both applications, the main benefit of the proposed model arises from lower exposure to supply shortages under demand and hydrological uncertainty. Third, the analysis separates real resource costs from domestic carbon-tax transfers and compares price- and quantity-based carbon instruments at approximately matched expected emissions. In Zimbabwe, emissions caps carry modestly higher net resource costs than the corresponding carbon taxes. Fourth, the model is applied to Ethiopia and Zimbabwe over 2025–2050 using country-specific generation fleets, demand trajectories, and hydrological calibration using real data. The comparison shows how differences in resource endowments and inherited fleets shape adaptive investment pathways, providing a stochastic counterpart to existing African planning studies (Juturu2023; Gebremeskel2023).
The remainder of the paper is organized as follows. Section 2 reviews the related literature. Section 3 presents the multistage stochastic GEP model and its SDDP solution. Section describes data inputs, scenario design, and calibration. Section presents results. Section discusses the findings and policy implications. Finally, Section concludes the paper.
2 Related literature
Generation expansion planning has a long history in operations research and energy economics. Early studies formulated the problem as a deterministic dynamic optimization and showed that the timing of capacity expansion affects system cost and feasibility (Petersen1973; Masse1959). Later mixed-integer linear programming models allowed more detailed representation of technology choice and operating constraints and became widely used in vertically integrated utility planning (KoltsaklisDagoumas2018; Pfenninger2014). Electricity market liberalization subsequently shifted part of the literature toward generation expansion investment under market uncertainty (Murphy2005; Fleten2004). However, this strand is less directly applicable to many sub-Saharan African power systems, where wholesale markets remain limited and capacity expansion is often coordinated by national utilities or planning institutions. In these countries, social-planner GEP models evaluate long-term investment by minimizing expected discounted social cost subject to energy balance, capacity, and resource-adequacy constraints (Bazilian2012; Blimpo2024).
From modeling perspectives, stochastic programming extends GEP by allowing investment decisions to respond to uncertainty revealed over time (ShapiroDentchevaRuszczynski2009; Birge1997). As a solution method, Pereira1991 introduce SDDP for large multistage stochastic linear programs, using dual information to construct piecewise-linear approximations of downstream value functions. Its convergence and statistical properties have since been studied extensively (PhilpottGuan2008; Shapiro2011; Guigues2017), while current implementations support extensions including discrete decisions, risk averse behaviors, and Markovian uncertainty (Dowson2021). Specifically, deQueiroz2016 analyzes the use of SDDP in stochastic hydro-thermal scheduling, where sequential hydrological uncertainty is central to operating decisions. Zou2019 develop stochastic dual dynamic integer programming for multistage unit commitment, extending the approach to problems with discrete decisions. BotterudKorpas2007 study stochastic generation investment timing for a decentralized investor facing load-growth and electricity price uncertainty in a restructured Nordic market. HolePhilpottDowson2024 jointly model capacity investment and operational dispatch with SDDP in the hydro-dominated New Zealand system. More recently, Sun2025 use an SDDP-based generation expansion model to compare carbon taxes and emissions caps over a long planning horizon and show that the two instruments can lead to different investment pathways.
While considering GEP, the design of carbon policy has been studied extensively in environmental and energy economics. Weitzman1974 establishes that the relative performance of price- and quantity-based instruments under uncertainty depends on the slopes of marginal benefits and marginal costs. Kolstad1996 further shows that price instruments tend to perform better when abatement cost uncertainty is large and marginal damages are relatively flat, whereas quantity instruments become more attractive when uncertainty about damages is more important. In practice, instrument choice also depends on implementation costs, distributional effects, and political economy considerations (GoulderParry2008). In the electricity sector, HeWangWang2012 compare cap-and-trade and carbon taxes in a game-theoretic generation expansion model and document differences in emissions, investment, and welfare across the two instruments. Carbon policy uncertainty also interacts with irreversible investment decisions and can delay low-carbon investment by increasing the value of waiting (Blyth2007; Fuss2008).
For developing country power systems, evidence on carbon policy design is more limited. IMFSSAClimate2024 and WorldBankPower2024 examine how carbon finance and investment conditions affect low-carbon power sector development, while Dagnachew2023 show that productive uses of electricity need to be represented in African energy planning to avoid understating future investment requirements. The effectiveness of carbon pricing in these systems depends on the level of the carbon price as well as the availability and cost of low-carbon technologies, financing conditions, and the persistence of the policy framework. Less attention has been given to settings in which technology costs, existing assets, and resource constraints already push the least-cost expansion pathway toward lower-carbon generation. In such systems, the additional effect of carbon policy may differ from cases in which the policy itself is the main driver of technology choice.
The empirical literature on electricity supply in sub-Saharan Africa examines access, investment, reliability, and institutional constraints from several perspectives. Bazilian2012 analyze the electricity access challenge and emphasize the importance of market and institutional barriers, while Trotter2017 review electricity planning and implementation across the region. Egli2023 estimate that universal household electrification in sub-Saharan Africa would require investment well above current financing flows. Mensah2024 provides evidence on the economic consequences of electricity shortages, while Steinbuks2010 discuss the use of self-generation in response to unreliable supply and Farquharson2018 quantify the associated cost and emissions of backup generation. For Ethiopia, Juturu2023 examine the interaction among electrification, groundwater irrigation, and generation expansion. Gebremeskel2021 analyze long-term electricity demand, while Gebremeskel2023 study least-cost generation expansion using a deterministic optimization framework. Tekleab2020 analyze the water balance of Upper Blue Nile catchments, the basin on which much of Ethiopia’s hydropower depends. For Zimbabwe and the wider Southern African region, Spalding2017 examine climate-related reductions in hydropower availability across the Southern African Power Pool and the Zambezi basin. Similarly, declining solar investment costs have improved the competitiveness of solar PV (IRENA2023), while regional electricity pooling can reduce some of the costs associated with hydrological variability (Bissiri2024). Financing remains an important constraint, with recent assessments emphasizing the role of concessional and climate finance in supporting large-scale renewable investment (IMFSSAClimate2024).
However, three gaps in the current literature are relevant to this paper. First, closely related multistage stochastic models address important elements of generation planning under uncertainty, including stochastic hydro operation (HolePhilpottDowson2024), hydro-thermal scheduling (deQueiroz2016), and multistage unit commitment (Zou2019). Less attention has been given to long-horizon expansion models in which demand and hydrological conditions evolve sequentially and investment adapts as their realizations become known. Second, studies comparing price- and quantity-based carbon emission instruments under endogenous technology choice (HeWangWang2012; Sun2025) provide limited evidence for nationally planned systems in which inherited assets, technology costs, resource constraints, and hydrological uncertainty shape the response to carbon policy. Third, country level planning studies for sub-Saharan Africa (Juturu2023; Gebremeskel2023) rely largely on deterministic formulations and provide limited evidence on how sequential demand and hydrological uncertainty affect adaptive investment pathways and the value of adaptive planning. This paper addresses these gaps through a multistage stochastic generation expansion model applied to two structurally different sub-Saharan African power systems. The model represents demand uncertainty and country-specific Markov hydrological dynamics with adaptive investment, and it quantifies the value of adaptive planning relative to deterministic and perfect information benchmarks. The Zimbabwe application compares carbon policy instruments at approximately matched expected emissions. Table 1 summarizes the positioning relative to selected closely related studies.
Table 1: Positioning of the paper relative to selected closely related studies. A ✓denotes substantive treatment of the feature, while a dash indicates that the feature is not a central element of the study.
| Paper | Demand | Hydrology | Adaptive | Carbon | Developing |
|---|---|---|---|---|---|
| uncertainty | uncertainty | investment | policy | country | |
| deQueiroz2016 | – | ✓ | – | – | – |
| Zou2019 | ✓ | – | – | – | – |
| BotterudKorpas2007 | ✓ | – | ✓ | – | – |
| HolePhilpottDowson2024 | – | ✓ | – | – | – |
| Sun2025 | ✓ | – | ✓ | ✓ | – |
| HeWangWang2012 | – | – | – | ✓ | – |
| Bissiri2024 | – | ✓ | – | – | ✓ |
| Juturu2023 | – | – | – | – | ✓ |
| Gebremeskel2023 | – | – | – | – | ✓ |
| Dagnachew2023 | – | – | – | – | ✓ |
| This paper | ✓ | ✓ | ✓ | ✓ | ✓ |
3 Methodology
Long-term generation expansion planning can be formulated as a static problem that identifies a least-cost generation capacity mix or as a dynamic problem that determines investment and operating decisions over time. A dynamic formulation becomes important when demand evolves, investment commitments are difficult to reverse, and insufficient generation capacity and shortage in energy supply carries an economic cost. When demand and hydrological conditions are uncertain, investment decisions must also account for how current choices affect the feasible and economically cost-efficient options available in later years. This problem can be cast as a multistage stochastic program represented through a dynamic programming recursion (Bellman1952). However, explicit enumeration of the corresponding scenario tree becomes impractical over a long horizon as the number of possible histories grows rapidly with the number of stages and uncertainty realizations.
We solve this multistage stochastic linear GEP using stochastic dual dynamic programming (SDDP) (Pereira1991). As a solution method, SDDP avoids enumeration of the full scenario tree by approximating future cost functions with piecewise-affine cuts generated from dual information. Its forward simulations identify states visited by the current policy, while the backward passes refine the continuation value approximations at those states. Under the standard assumptions for multistage stochastic linear programs, these approximations converge to the optimal value function (PhilpottGuan2008; Shapiro2011; Guigues2017). In SDDP, the policy is adaptive and nonanticipative where investment and operating decisions at each stage depend only on information available at that time. The information includes installed capacity, previous investment commitments, realized demand, and the current hydrological condition. By contrast, a deterministic formulation fixes future investment decisions to a prescribed trajectory, while separate deterministic scenario runs optimize different assumed futures independently. Neither produces a common policy that adjusts investment as uncertainty is realized. This distinction is important for the two power systems considered in this paper as demand and hydrological conditions affect investment timing, capacity requirements, and exposure to supply shortages. More specifically, the model represents two exogenous sources of uncertainty, annual electricity demand and hydrological conditions. Their persistence is reflected in the information available to future decisions. To this end, demand is represented by a deterministic central trajectory and a stochastic deviation following
where denotes realized annual electricity demand in year . The parameter governs the persistence of demand deviations, while scales the innovation with the central demand () trajectory to keep relative uncertainty approximately stable as demand grows. To account for demand uncertainty, the deviation enters the state representation, allowing the continuation value to depend on the current demand realization and its implications for future demand.
| Main notation used throughout the paper. | |
|---|---|
| Symbol | Description |
| \endfirsthead Table1 (continued) | |
| Symbol | Description |
| \endhead Continued on next page |