Manuscript Offprint
arXiv:2611.12486Optimizing the Steady-State Travel Time of Nash Flows over Time with Capacity Increases
Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.
Abstract
We study budgeted capacity augmentation for single-source single-sink Nash flows over time under constant inflow . The goal is to increase capacities on arcs subject to a global budget constraint in order to minimize the steady-state travel time in the network. We show that this problem is weakly NP-hard on series-parallel networks and provide an exact pseudopolynomial algorithm as well as a fully polynomial algorithm that attains the optimum travel time for budget while spending at most . On general networks the problem becomes strongly NP-hard. Moreover, unless , for every fixed , no polynomial-time algorithm can achieve the optimal steady-state travel time while exceeding the budget by at most a factor of . Lastly, we give structural properties about steady-state travel time under varying arc capacities. We identify capacity thresholds determined by subsets of -t-cuts and show that the travel time is constant in the interior of the cells resulting from the corresponding hyperplane arrangement.
*RWTH Aachen, dahlmeier@gdm.rwth-aachen.de †ETH Zurich, paul.paschmanns@inf.ethz.ch ‡RWTH Aachen, laura.ritter@oms.rwth-aachen.de §EPFL, ruben.skorupinski@epfl.ch
1 Introduction
Congestion is a common feature of many real-world network problems, inherent in traffic and communication networks. Here, selfish users choose a path to traverse a network depending on link lengths and congestion induced by other users. This phenomenon can be modeled with a game theoretic variant of flows over time, in which infinitesimally small selfish agents traverse a network according to specified free flow arc traversal times as well as arc capacities. If the capacities in the network are exceeded, queues start to build up, adding to users' travel time. Assuming omniscient users, this leads to the notion of a Nash flow over time, a strategy profile in which all users are traveling on shortest paths. Crucial structural results on Nash flows over time by Koch and Skutella [14] (see also [13]) have led to many properties of Nash flows over time being established for single-source single-sink networks. Key among those are existence [6], uniqueness of equilibrium travel times [6, 17], continuity [17], a bound on the price of anarchy in special cases [9], and long-term behavior [7, 17]: following transient phases, a Nash flow over time settles into a so-called steady state in finite time. In the steady state, queues grow at a constant rate or remain constant [7, 17]. A comprehensive overview of Nash flows
On general networks, increasing capacities is not necessarily beneficial, an instance of Braess' paradox [3]. However, the topology of series-parallel networks yields both monotone behavior and a characterization of in terms of dually active paths. These structural results enable us to develop algorithms for the series-parallel case. On general networks that can lack such structure and monotonicity SSCA is inapproximable in terms of budget.
1.2 Overview and Results
In Section 2 we introduce the Vickrey bottleneck model, our setting and the terminology.
Section 3 contains structural results which later enable the development of algorithms for the series-parallel case. Fixing the network topology, transit times, and inflow rate, we identify an explicit arrangement of hyperplanes in the capacity space such that the steady-state travel time is constant within every full-dimensional cell. These hyperplanes are defined by signed capacity balances across source-sink cuts. Thus, changes in the steady-state travel time occur only at specific capacity thresholds. For series-parallel networks, we establish additional structure: away from the exceptional hyperplanes, equals the minimum longest free-flow source-sink path length over supports of feasible static flows and is non-increasing under capacity increases.
Lastly, Section 4 considers the problem of increasing capacities in order to minimize steady-state travel time under a budget constraint. We refer to this problem as SSCA. Here, we state an idealized version of the problem.
Idealized Steady State Capacity Augmentation for Nash Flows over Time (SSCA):
Given , consisting of a network with capacities and free flow travel times , an inflow rate and a budget , find a capacity vector with such that the Nash flow instance has minimum steady-state travel time.
To avoid exceptional hyperplanes, the version we study in Section 4 considers the steady-state travel time after multiplying the final capacities by an arbitrarily small perturbation.
First, we resolve SSCA for the case of series-parallel networks. Weak NP-hardness follows from the classic KNAPSACK reduction. We subsequently give both a pseudopolynomial algorithm as well as a fully polynomial time algorithm with additive budget augmentation in order to obtain a solution with at most the optimal travel time for the original budget. More precisely, given an instance , let be the minimum achievable steady-state travel time. We now ask by how much the budget has to be relaxed in order to obtain a steady-state travel time of at most in polynomial time. In Section 4.2 we show that the problem generally is strongly NP-hard, even on DAGs. Furthermore, we give an budget inapproximability result in a similar sense as the budget augmentation algorithm above, where is the number of vertices of the constructed SSCA instance. We obtain both of these results with a reduction from -DISJOINT PATHS.
1.3 Related Literature
While heuristics for the network design problem with capacity modifications have been studied for a long time [20], some more recent work has provided algorithms with provable guarantees: Closest to our work are Bhaskar, Fleischer and Anshelevich [1] who optimize two price of anarchy measures of a Nash flow over time by decreasing arc capacities. They obtain a small constant bound on two price of anarchy versions for a fixed flow volume, however, the required capacity decrease can be large. For the problem of optimizing average travel time in a static budgeted capacity improvement setting, Bhaskar, Ligett, and Schulman [2] show NP-hardness and an FPTAS for series-parallel networks. Both in terms of the objective and results, this work is closest to ours in the static setting. Gairing, Harks, and Klimm [12] prove strong NP- and APX-hardness as well as approximation results for continuous network design, where investment and equilibrium routing costs are optimized jointly. However, while the steady state essentially constitutes a static flow, the problem structure of SSCA remains fundamentally different from purely static settings as even the steady-state congestion delays in the Vickrey bottleneck model arise from dynamically generated queues.
One key ingredient for our algorithms in the series-parallel case is the characterization of in terms of static flow supports and the resulting monotonicity of in the capacities, i.e., the absence of Braess' paradox. In static routing games, the networks immune to Braess' paradox are exactly those without the Braess network as a topological minor, i.e., series-parallel networks [5, 16]. In the dynamic case, the series-parallel network topology giving rise to the pulse gadget [7] also exhibits Braess-like behaviour during the transient phases of a Nash flow over time [15]. Recently, Chen, Deng and Wang [4] fully characterized the network topologies immune to Braess' paradox during the entire flow evolution as a subclass of series-parallel networks. The same subclass constitutes the most general class of networks for which the monotonicity conjecture is known to hold [4]. The monotonicity conjecture [9] asks whether the time required for a fixed flow mass to reach the sink is non-increasing in the inflow rate. It was recently disproved for general networks [8] but remains open for series-parallel networks. Thus, optimizing transient together with steady-state travel times likely requires different techniques not relying on monotonicity properties.
Acknowledgments Some of the results in this paper were obtained as part of Ruben Skorupinski's master's thesis at ETH Zurich, under the supervision of Leon Sering. The author is very grateful to Leon for introducing him to the world of Nash Flows over Time and for the many helpful discussions during the writing of the thesis.
AI Disclosure OpenAI GPT 5.6 Sol gave a first idea for the strong NP-hardness proof using 2-disjoint paths. We extended this construction to yield strong NP-hardness on DAGs and inapproximability. We used
OpenAI GPT 5.5 to adapt an example in which was non-monotone when modifying the capacities of two arcs to only require a capacity change on a single arc. Several AI tools were used for final polishing of all figures and for proofreading.
2 Model and Preliminaries
We consider the Vickrey bottleneck model [19] consisting of a directed network with a designated source and sink . Flow enters the network at at a constant network inflow rate . Moreover, each arc is equipped with a free flow transit time , a bottleneck capacity and a point queue at the entrance of the arc in which flow accumulates if the inflow into the arc exceeds . We assume for convenience that every node lies on some -t-path and that the network does not contain any directed cycles of transit time 0. We will refer to this network with all its parameters as . We denote the set of arcs entering and leaving a vertex set by and respectively, and , as well as for some arc set , omitting set notation for single element sets. We write for a time measured at the source and for a snapshot time during the evolution.
2.1 Flows over Time
A flow over time is a family of functions , where and denote the in- and outflow rate for arc at time . The cumulative inflow into up to time is defined as the definition for the cumulative outflow is analogous. The flow volume in the queue on at time can thus be expressed as . Queues operate at capacity so that for all and almost all
The queueing time a flow particle entering arc at time experiences on is thus . A feasible flow over time needs to satisfy flow conservation, i.e., for almost all :
2.2 Nash Flows over Time
Starting from an empty network, we define the earliest arrival labels for a flow particle entering the network at time via the Bellman equations
The set of earliest arrival labels at time defines the set of active arcs and resetting arcs :
Intuitively, active arcs lie on a shortest s-v-path for some as seen by a particle entering the network at time ; on resetting arcs such a particle would encounter a queue if it enters the arc at the earliest possible time. A dynamic equilibrium, or Nash flow over time, is a feasible flow over time in which almost all particles travel on a shortest s-t-path.
Definition 2.1. A Nash flow over time is a feasible flow satisfying for each arc and almost all times , where is the set of network entry times for which arc is active.

(a) Pulse gadget [7] with unnecessary queue on ; the minimum cut capacity equals the inflow rate.

(b) Network exhibiting Braess' paradox and behavior that is non-monotonic in .
Figure 1: Examples for complex behavior of Nash flows over time with arc data .
2.3 Setting
2.3.1 Inflow Rate Bounded by Minimum Cut Capacity
In our single-source, single-sink setting, Nash flows over time exist and are unique in the sense that the earliest arrival labels are unique [6].
A key property of Nash flows over time is that there exists a finite time such that a steady state is reached [7, 17]. Upon reaching the steady state, the queueing times and thus the earliest arrival labels grow linearly at a constant rate. In particular, by Lemma 6.34 in [13] and Theorem 3.3 in [17] the growth rate of the steady-state travel time is , where is the capacity of a minimum cut. If , the main contribution to the steady-state travel time is the positive growth rate. Thus, in this case, optimizing the steady-state travel time asymptotically amounts to minimizing the slope of its linear growth. This is equivalent to maximizing , which can be done by including variables for budget assignment into a max-flow LP. The resulting LP still has polynomial size and can thus be solved efficiently.
Thus, we restrict to the more interesting case for the remainder of this work and optimize the intercept instead of the slope of the affine linear function describing the steady-state travel time. We denote the steady-state travel time by . Given a network with data , we write for the time to reach steady state and for the steady-state travel time in . All subsequent results are contingent on the assumption that any capacity vector we consider yields a minimum cut with capacity at least .
The steady-state behavior of Nash flows over time can be characterized by the primal and dual linear programs for minimum cost flows [7]; here, refers to the set of static s-t-flows of value and is used as shorthand for the corresponding flow conservation constraints.
Primal:
(P)
Dual:
(D)
The interpretation of the dual in terms of normalized earliest arrival labels is straightforward: having fixed , the label can be seen as the shortest possible travel time from s to v in the steady state; gives the queueing times in steady state. Our main interest lies in the value of as there always exists an optimal dual solution with [7]. In particular, can be obtained from (D) whenever is unique.
Example 2.2. Consider the network depicted in Fig. 1a, consisting of a pulse gadget [7] composed with a single arc . The pulse gadget has the property that for a short time interval during the evolution of the Nash flow over time the total outflow rate out of arcs and exceeds . In the present network, this pulse then causes a queue to build up on arc which can never deplete, as after the pulse the inflow into is equal to its capacity. The queue on and the additional queueing time it induces in the steady state is in some sense “unnecessary” as increasing the capacity of arc by any leads to the depletion of the queue and thus its absence in the steady state. The value for this network is not unique as increasing both and by the same value results in a different optimal dual solution.
2.3.2 Series-Parallel Networks
Series-parallel networks are a fundamental class of networks in flow theory because their recursive structure facilitates analysis and algorithm design.
Definition 2.3. A directed series-parallel network is a network with a source and a sink which either consists of a single arc or can be obtained by a series or parallel composition from two series-parallel networks. Given two series-parallel networks with sources and sinks , a series composition merges and to a single node, whereas a parallel composition merges with and with . Note that parallel arcs between two nodes are allowed.
Despite the simple structure of series-parallel networks, Nash flows over time can exhibit complex behavior even on this class of networks, as in Example 2.2.
3 Structural Results
3.1 General Networks
The goal of this section is to analyze the steady state travel time in a given network under changes of its capacities . First, observe that uniqueness of the value in an optimal solution to (D) is determined by the set of active and resetting arcs in the steady state.
Proposition 3.1. There exist distinct -values among the set of optimal solutions to the LP (D) for a network if and only if there exists an optimal solution with active and resetting arcs , and an -t-cut such that .
Intuitively, if all flow must travel via arcs which already have a queue, as these are the only active arcs across the cut, then there exists a small modification of the queueing times such that no inactive arc becomes active and no queue is removed completely. This argument can be made formal, however, we instead present the following concise LP-based proof.
Proof: Let be the face of all optimal solutions to (D), and let index the constraints tight throughout . The equalities
define the affine hull of . Eliminating for shows that these equalities fix if and only if contains an undirected -t-path. At an optimal solution in the relative interior of , we have . Thus, if is not constant on , there is no such path, and hence there exists an -t-cut with . Conversely, at every optimal solution. Therefore, the existence of such a cut at any optimal solution rules out an undirected -t-path in , so is not constant on .
Corollary 3.2. If there exist optimal solutions to the LP (D) with distinct -values in a network , then there exists an -t-cut and an optimal steady state solution with active arcs such that .
Proof: By Proposition 3.1, there exists an -t-cut and an optimal dual solution with active arcs and resetting arcs such that . Consider an optimal primal solution . By complementary slackness, for all . Moreover, as is a flow of value and since for all , we have .
The converse of Corollary 3.2 does not hold. Consider the graph , that is, a path with three arcs. Given the inflow rate we choose capacities and consider the -t-cut . Then, . However, the unique minimum cost flow of value does not saturate any arc so any dual optimal steady state solution yields and . By Proposition 3.1, is unique.
By Corollary 3.2, the value can only be non-unique if the capacity vector lies on one of finitely many hyperplanes defined by (subsets of) -t cuts. We will henceforth consider the geometry of these hyperplanes.
Corollary 3.3. The set of vectors for which the -value of (D) is not unique on forms a null-set. More specifically, these vectors are a subset of the following collection of hyperplanes:
In the following we refer to as a hyperplane arrangement and to the resulting -dimensional (closed) polyhedra as cells of . Finally, we call two cells and adjacent if there exists a hyperplane in the arrangement such that their intersection with the hyperplane is an -dimensional face of both cells.
The above results already imply that attains only finitely many values outside since the -values are restricted to the lengths of residual network paths. The next theorem makes this more concrete, proving that in every connected component of , i.e., in the interior of every cell, the -value of an optimal dual solution stays constant. For we denote by the unique value in an optimal dual solution for .
Theorem 3.4. Let for . If , then and are separated by a hyperplane.
Proof: Let denote the faces of the feasibility polyhedron of the dual LP (D) that are optimal for and respectively. Since , all vertices within either of the two faces share the same -value. In particular, since , the two faces are disjoint. Now, consider the line segment , for and let denote a point on . As varies from 0 to 1 we exhibit a sequence as well as vertices of the polyhedron such that for every both vertices and are optimal solutions to (D). Since there exists an index where . Since and are optimal for we deduce from Corollary 3.2 that . Thus, and must lie in two distinct cells of the hyperplane arrangement since otherwise the entire line segment would also lie in the shared cell, i.e., , a contradiction.
The converse of Theorem 3.4 does not hold: in Fig. 2b the cells separated by the hyperplane at only have differing -values for the region of capacity space where .
The following result shows that while we cannot easily determine when as discussed in Example 2.2, we can still bound from above and below by the values on two cells adjacent to at . This is especially important since it allows us to perturb slightly to obtain for some such that . We will refer to such a perturbation as an -increase.
Lemma 3.5. Consider with . There exists small enough such that the sink potential under capacities , respectively , is unique and equal to the minimal, respectively maximal possible, sink potential under .
The proof is deferred to the appendix. Intuitively, if a face of positive dimension is optimal for the dual (D), perturbing the objective of (D) slightly, some lower dimensional face of the solution polyhedron remains

(a) The Braess network with data .

(b) The value of for varying and in the network to the left. In the left gray region, .

(c) Optimal steady state flows in the network in 2a for varying capacities. From left to right the capacities are (3.5,2), (2.5,1.5) and (2.5,2) leading to -values of 2, 3 and 4. Dashed arcs are non-active, black arcs are active but non-resetting and blue arcs are resetting.
Figure 2: Local behavior of as a function of the capacities as described in Theorem 3.4. On this specific non-series-parallel network (the Braess network) is not monotone in .
optimal. The specific perturbation is chosen to guarantee that is unique. An additive perturbation may not have the desired effect if the number of arcs entering and leaving the relevant cut is the same.
3.2 Series-Parallel Networks
In this section we establish two desirable properties of on series-parallel networks: monotonicity of in and a characterization of as the length of the longest active path in the network in terms of free-flow transit times. These results are crucial for the algorithms we present in Section 4.1. The advantage of series-parallel networks, formalized in Lemma 3.6, is that in some sense flow only moves “forwards” through the network.
Lemma 3.6. Let be a series-parallel network and let . Assume there exists an -t-cut such that . Then, there exists a second -t-cut which still satisfies but also .
Proof: We show the claim by induction over the size of . It holds for the graph consisting of just two vertices and and a single arc connecting the two as there is only one -t-cut and no backwards arcs crossing it. Now, consider a series-parallel graph and define sets and . Let be an -t-cut in satisfying . Assume that is the series composition of some and with sources and sinks . Since is an -t-cut, is an -t-cut for one satisfying . Let be the extended cut produced by the induction hypothesis on . This gives the desired -t-cut in the full graph by setting or . If is the parallel composition of and , the desired cut is the union of the two extended cuts obtained by applying the induction hypothesis on the cuts as these are both -t-cuts in .
This forward-flowing property directly leads to two corollaries simplifying the hyperplane arrangements and the set of values can attain on series-parallel networks.
Corollary 3.7. Let be a series-parallel network. There exist distinct -values among the set of optimal solutions to the LP (D) if and only if there exists an optimal steady state solution with active arcs and resetting arcs as well as an -t-cut satisfying .
Proof: Set in Lemma 3.6 and combine with Proposition 3.1.
In the following, we consider such that throughout. The following observation, while obvious from the shortest path labels in (D), is immensely useful. Here, the -length of a path is measured in terms of the free-flow transit times .
Observation 3.8. In any network, is at least the -length of the longest active -t-path.
Crucially, on series-parallel networks, this is not only a lower bound, but an equality.
Corollary 3.9. In a series-parallel network with , is equal to the -length of the -longest active -t-path.
Proof: The lower bound is given by Observation 3.8. If was strictly larger, there would exist a cut such that . As the network is series-parallel, this contradicts by Corollary 3.7.
This equality does not hold in general networks, as the third network in Fig. 2c shows. The -longest path in the network has length 3, but the steady state travel time is 4.
Lemma 3.10. In a series-parallel network with , let be the maximum -length of any -t-path in the support of a feasible flow of value . Then .
Proof: As the steady state flow is feasible and its support only contains active arcs, Observation 3.8 gives . Now consider any feasible flow and assume that . Then all -t-paths in contain a queueing arc. Otherwise, a non-resetting -t-path implies , a contradiction. Thus, there is an -t-cut which satisfies . By Lemma 3.6 we may assume without loss of generality that . As is an -t-cut, the entire flow passes through , so , but all -leaving arcs in are queueing and hence saturated by , implying so , a contradiction.
Finally, we obtain monotonicity of as a function of on series-parallel networks.
Lemma 3.11. Let for a series-parallel network . Then, implies , i.e. is monotonically non-increasing in .
Proof: This follows by Lemma 3.10 as any flow feasible under remains feasible under .
Again, this statement does not hold for general networks. In the network in Fig. 1b it suffices to change the capacity of the single arc to observe non-monotone : for the steady state travel time is 3, for it is 4 and for it is 2.
4 Optimizing Steady-State Travel Time
In this section we consider the problem of minimizing the steady-state travel time when we are allowed to increase capacities on arcs. More precisely, we are given a budget with which we can increase capacities on arcs by satisfying .
Definition 4.1. An instance of the Steady State Capacity Augmentation for Nash Flows over Time (SSCA) consists of a network with designated source and sink, an inflow rate , capacities , travel times and a budget . The task is to compute capacity increments which obey the budget constraint such that for every sufficiently small the steady-state travel time in the network with capacities , travel times , and inflow is minimized.
Remark 4.2. A simple exponential time algorithm is given by enumerating the vertices of the dual feasibility polyhedron , and checking if the capacities can be increased to reach each vertex of the polyhedron. This can easily be done using a linear program, and the number of vertices of can be upper bounded by yielding an exact algorithm for SSCA running in time .
Remark 4.3. The motivation for the scaling by in the definition of SSCA is due to Lemma 3.5: a sufficiently small -increase ensures that equals the unique from (D). In the following, whenever we invoke a statement requiring , we apply it to the capacities plus an -increase.
We consider polynomial-time algorithms obtaining the optimal while violating the budget by some small additive term. Indeed, if , the resulting algorithm constitutes an FPTAS with the approximation in the budget.
Definition 4.4 (Budget Augmentation Algorithm). Let denote the optimum steady-state travel time for the SSCA instance . An -budget augmentation algorithm computes in polynomial time capacity increments with that result in a steady-state travel time of at most .
Using a standard reduction from KNAPSACK, we show that the NTP is weakly NP-hard even when restricted to series-parallel networks. Subsequently, we give both a dynamic program with pseudopolynomial runtime solving the problem exactly and a fully polynomial time algorithm with additive budget augmentation for any fixed . Lastly, we obtain strong NP-hardness and -inapproximability even for acyclic non series-parallel networks using a reduction from -DISJOINT PATHS. Here, is the number of nodes in .
4.1 SSCA on Series-Parallel Networks
4.1.1 Weak NP-Hardness of SSCA on Series-Parallel Networks
In this section, we show that the SSCA is weakly NP-hard on series-parallel networks by a reduction from KNAPSACK.
Theorem 4.5. The SSCA on series-parallel networks is weakly NP-hard.
Proof: Given a KNAPSACK instance consisting of a set of items of positive weight and value for and a capacity constraint , we define an instance of SSCA as follows. We set , and define the graph with and where and are parallel arcs directed from node to with and for .
We show that a solution for the constructed SSCA instance with yields a feasible solution of value to the KNAPSACK instance. In the SSCA instance without any capacity increase we have as for all , so grows a queue until becomes active. We refer to increasing the capacity of by to as buying . Increasing the capacity on without buying has no effect on . Buying implies that the entire flow can travel along arc , which decreases the travel time from node to by . Summing over all bought in the SSCA solution, we obtain . But clearly is a feasible solution of value to the KNAPSACK instance, as we have . The backward direction works analogously.
4.1.2 Dynamic Programming for SSCA on Series-Parallel Networks
We now present a pseudopolynomial dynamic program that optimally assigns the budget on series-parallel networks. Together with standard rounding techniques, this dynamic program can be extended to a fully polynomial algorithm that achieves the optimal steady-state travel time using a slightly increased budget of .
Lemma 4.6. Consider a series-parallel instance of SSCA for which and are integral. Then there is an optimal budget assignment together with a feasible flow in the network such that both and are integral. (The budget assignment might not use the full budget.)
Proof: We argue that for each fractional solution (i.e. one that might assign non-integral budget to arcs) there is an integral solution that achieves at most the same steady-state travel time. Let be a (fractional) budget assignment and let be the corresponding steady-state flow. We now want to assign budget so that all flow can travel only on . We construct an auxiliary network as follows.
We set . For each arc , the network contains two arcs with the same start and end points, one with capacity and cost 0, and one with unlimited capacity (equivalently capacity ) and cost 1. The first arc represents the capacity in that we can use for free. The second arc represents the additional capacity we can buy with our budget. The flow in can be turned into a feasible -flow in with cost at most . Hence, there also is an integral -flow in with cost at most . This in turn gives an integral budget assignment (using at most budget ) that allows routing all flow integrally using only arcs in . As is a feasible flow in , this integral budget allocation achieves (at most) the same steady-state travel time as the fractional by Lemma 3.10.
Theorem 4.7. The SSCA on series-parallel networks with integral inflow and integral capacities can be solved optimally in time .
Proof: By Lemma 4.6, it suffices to consider integral budget assignments (and thus also integral flows). Our strategy is to use a dynamic program that determines for a (sub-)network (with designated source and sink) with inflow the minimal travel time one can achieve with a budget of . We denote this value by .
Every series-parallel network containing two or more arcs can be composed from smaller series-parallel networks using a parallel or a series composition. We fix such a composition and compute for all subnetworks appearing in this composition and all , . We do this in a bottom-up way, starting with the minimal subnetworks (i.e., those containing only one arc). Hence, we need to determine three things: for such minimal subnetworks, for being a series composition of and depending on and , and finally the same for parallel compositions.
Base case: Let be a network containing a single arc (and its endpoints and ). Let and be the travel time and capacity of . Then
Series composition: Let arise from the two series-parallel networks and using a series composition. Because each flow particle traversing has to traverse both and , the only decision to make is how to distribute the budget between and . By Lemma 3.10, the travel time through is determined by the sum of the travel times through and :
Parallel composition: Let arise from the two series-parallel networks and using a parallel composition. A flow particle traversing can either go through or through . By Lemma 3.10, the travel time through is then determined by the maximum travel time through and through . In a steady state, the flow is distributed between and such that this maximum is minimized. Hence, we obtain the following recursion:
There are at most subnetworks in our composition of . Hence, we compute many entries for our dynamic program. Each entry can be computed in time using the recursion above. This results in a total run time in . The optimal budget assignment can be extracted by backtracking how was computed.
Theorem 4.8. Fix small and let be an SSCA instance with being a series-parallel network. There is an -budget augmentation algorithm for with runtime in .
Proof: Without loss of generality, for all . We round the instance such that Theorem 4.7 can be applied using only a polynomial runtime (in the size of ). Let . To construct our rounded instance, define , , and where and .
By Theorem 4.7, the instance can be solved optimally in time . Let and be the optimal travel time for instances and . We claim two things. First, . Second, given an (optimal) solution to the instance , we can turn it into a solution of the instance with steady-state travel time at most . If , the bound is even .
For the first claim, Lemma 3.11 implies that increasing cannot increase the optimal steady-state travel time. The same holds for decreasing , as scaling up by a factor is equivalent to scaling down by . Furthermore, by Lemma 4.6, if and all capacities are multiples of , there is an optimal solution assigning the budget in multiples of . Hence, rounding down as well does not affect the optimal travel time, yielding the first claim.
For the second claim, we first assume that . Consider an optimal budget assignment for the instance . By Lemma 3.10, there exists a flow in of value with such that the longest -t path in the support of has length (at most) . By adding flow of value to some -t path in the support of (which exists by ) we obtain a flow with
Hence, choosing suffices to ensure that there is a flow of value with , whose support is no larger than the support of . By Lemma 3.10, this implies that the steady-state travel time for budget assignment is bounded by . The total sum of the values differs from the total sum of the values by .
If , then . Hence, in this case, we can achieve the best possible travel time by assigning units of budget to each arc of some shortest -t path. This uses a total budget of at most .
Remark 4.9. An interesting related problem is reducing transit times with a budget. It can easily be seen that this problem is already NP-hard on a single bundle by a reduction from KNAPSACK. On series-parallel networks, this problem is solvable with a similar dynamic program to the capacity version above with the caveat that for transit times fractional changes can have an impact on . Consequently, a corresponding hyperplane arrangement would have regions in which is piecewise linear. Combining the dynamic programs for capacities and transit times, one can optimize both simultaneously.
4.2 NP-Hardness and Inapproximability of SSCA on General Networks
On general networks, SSCA is strongly NP-hard, by a reduction from -DISJOINT PATHS. In -DISJOINT PATHS a directed graph with source-sink pairs is given. The task is to decide whether there exist vertex- or edge-disjoint -paths in , one for each pair of terminals. If is part of the input, this problem is NP-hard [11] even on directed acyclic graphs (DAGs) [10]. The vertex and edge disjoint versions of this problem are well-known to be equivalent (see e.g. [18]); we consider the vertex disjoint version of -DISJOINT PATHS. We assume without loss of generality that there exists an -path in the input network for every and that all terminals are distinct; otherwise, we cannot hope for vertex-disjointness.
The idea is the following: Given an instance of -DISJOINT PATHS with nodes, we introduce a super-source with inflow rate and a super-sink together with an -arc with capacity and travel time to provide a baseline travel time. We show that any algorithm for SSCA with budget at most can decide -DISJOINT PATHS based on whether or not it can obtain . To this end, we connect to each and to via chains of arcs. Each chain has capacity 1, this forces the algorithm to spend its budget inside , as the budget is insufficient to increase the capacity of a long chain to support an additional unit of flow. Moreover, the travel times on the chains are chosen to enforce disjoint paths; if the paths of cross

Figure 3: The constructed SSCA instance for the reduction in the proofs of Theorems 4.12 and 4.13.
at , particles first choose the shorter -path on which queues grow until becomes active, yielding a travel time of at least by Observation 3.8.
Construction of the SSCA instance: Given an instance of -DISJOINT PATHS, we create an instance of SSCA with as follows. Let and define the node set to be for some with . The arc set consists of the arc set together with an arc as well as . Thus, both the super-source and the super-sink are connected to each of the respectively by a path containing internal vertices. We set as inflow and set the capacities to , for and for . Moreover, we set the transit times to be and , for , all other transit times are set to 1. We set the budget to be . Note that if is a DAG, then so is . The construction is illustrated in Fig. 3.
Observation 4.10. Consider a budget allocation yielding . Then no active path in the steady state of a Nash flow over time can connect and with .
Proof: An -t path using such an -t-path has length . As it is active, the path length yields a lower bound on .
The core ingredient of the hardness and inapproximability proofs is the following lemma. Whenever we invoke previous lemmata, we only consider the network without 0-capacity arcs and as usual apply an -increase after the budget allocation so that .
Lemma 4.11. If there exists an allocation of a budget of at most achieving , then is a YES-instance of -DISJOINT PATHS.
Proof: Assume that we have a budget allocation yielding and consider the steady-state flow of some Nash flow over time. Clearly, . We show that then the support of must contain disjoint -t-paths for , and thus we have a YES-instance. We can assume without loss of generality that if fractional budget is allocated to an -s-path or a -t-path, then the same amount of budget , respectively , is allocated to each arc on the path. Let be the cumulative capacity increase on the set of -s-paths and that on the set of -t-branches. The total budget spent can be lower bounded by . Hence, . Consider any subset of and let denote the total through flow of the vertices in . If is less than , the difference has to travel through some other -s-paths, but all paths from to can only support an additional flow of . Thus, . Now let denote the set of -t paths chosen as strategy by the flow particles in the Nash flow over time steady state such that each carries positive flow. Let be the subset of reachable from via paths in . Observe that . Thus, , but , and we can choose the -increase small enough for the resulting inequality to remain strict. It follows by Hall's Theorem that there must be a perfect matching consisting of -paths in the support of . But the support of cannot contain any paths for by Observation 4.10. Thus, the perfect matching also cannot contain any paths for and thus consists entirely of -paths. Moreover, we cannot have a No-instance, as in that case for any choice of paths there exist such that the - and -paths share a vertex . Without loss of generality, . But as all four segments , , and are active since they are flow-carrying, so is the path via and . But then by Observation 4.10, a contradiction.
Theorem 4.12. The SSCA on general networks is strongly NP-hard, even on DAGs.
We directly prove the stronger result that SSCA is hard to approximate, even on DAGs.
Theorem 4.13. Unless , for every fixed , there is no better-than--budget-augmentation algorithm for the SSCA, even on DAGs. Here denotes the number of nodes of the SSCA instance.
Proof: Suppose there is a budget augmentation algorithm with augmentation ratio less than for some . Choose some integer and let . Thus, . Let , then as an budget augmentation algorithm spends at most . This decides -DISJOINT-PATHS in polynomial time on sufficiently large instances. On a YES-instance, the algorithm obtains a solution with which is only possible by finding disjoint -paths for due to the augmented budget being bounded above by . By Lemma 4.11, on a No-instance, no solution with can be found. Therefore, no such budget augmentation algorithm can exist unless .
References
[1] Umang Bhaskar, Lisa Fleischer, and Elliot Anshelevich. A Stackelberg strategy for routing flow over time. Games and Economic Behavior, 92:232–247, 2015.
[2] Umang Bhaskar, Katrina Ligett, and Leonard J. Schulman. Network improvement for equilibrium routing. In International Conference on Integer Programming and Combinatorial Optimization, pages 138–149. Springer, 2014.
[3] Dietrich Braess. Über ein Paradoxon aus der Verkehrsplanung. Unternehmensforschung, 12(1):258–268, 1968.
[4] Xujin Chen, Xiyuan Deng, and Changjun Wang. Network topology that excludes Braess's paradox and maintains monotonicity in flows over time. arXiv preprint arXiv:2609.32738, 2026.
[5] Xujin Chen, Zhuo Diao, and Xiaodong Hu. Excluding Braess's paradox in nonatomic selfish routing. In International Symposium on Algorithmic Game Theory, pages 219–230. Springer, 2015.
[6] Roberto Cominetti, José Correa, and Omar Larré. Dynamic equilibria in fluid queueing networks. Operations Research, 63(1):21–34, 2015.
[7] Roberto Cominetti, José Correa, and Neil Olver. Long-term behavior of dynamic equilibria in fluid queuing networks. Operations Research, 70(1):516–526, 2022.
[8] José Correa. A counterexample to the monotonicity conjecture for dynamic equilibria in flows over time. October 4, 2026. URL: https://www.dii.uchile.cl/~jcorrea/papers/Manuscripts/2022CC0counterexample.pdf.
[9] José Correa, Andrés Cristi, and Tim Oosterwijk. On the price of anarchy for flows over time. In Proceedings of the 2019 ACM Conference on Economics and Computation, pages 559–577, 2019.
[10] Shimon Even, Alon Itai, and Adi Shamir. On the complexity of time table and multi-commodity flow problems. In 16th annual symposium on foundations of computer science (sfcs 1975), pages 184–193. IEEE, 1975.
[11] Steven Fortune, John Hopcroft, and James Wyllie. The directed subgraph homeomorphism problem. Theoretical Computer Science, 10(2):111–121, 1980.
[12] Martin Gairing, Tobias Harks, and Max Klimm. Complexity and approximation of the continuous network design problem. SIAM Journal on Optimization, 27(3):1554–1582, 2017.
[13] Ronald Koch. Routing games over time. Technische Universität Berlin (Germany), 2012.
[14] Ronald Koch and Martin Skutella. Nash equilibria and the price of anarchy for flows over time. Theory of Computing Systems, 49(1):71–97, 2011.
[15] Martin Macko, Kate Larson, and L'uboš Steskal. Braess's paradox for flows over time. Theory of Computing Systems, 53(1):86–106, 2013.
[16] Igal Milchtaich. Network topology and the efficiency of equilibrium. Games and Economic Behavior, 57(2):321–346, 2006.
[17] Neil Olver, Leon Sering, and Laura Vargas Koch. Continuity, uniqueness and long-term behavior of Nash flows over time. In 2021 IEEE 62nd Annual Symposium on Foundations of Computer Science (FOCS), pages 851–860. IEEE, 2022.
[18] Alexander Schrijver. Combinatorial Optimization, volume 24 of Algorithms and Combinatorics. Springer Nature, 1st edition, 2003.
[19] William S. Vickrey. Congestion theory and transport investment. The American Economic Review, 59(2):251–260, 1969.
[20] Hai Yang and Michael G H. Bell. Models and algorithms for road network design: a review and some new developments. Transport Reviews, 18(3):257–278, 1998.
A Appendix
A.1 Omitted Proofs
Lemma 3.5. Consider with . There exists small enough such that the sink potential under capacities , respectively , is unique and equal to the minimal, respectively maximal possible, sink potential under .
Proof: Note that perturbing by a factor of for some is equivalent to perturbing by a factor of for . This holds as the objective of (D) for and differs only by a constant multiplicative factor and the feasible region remains unaffected.
Let denote the solution polyhedron of (D) with inflow rate . First, we show that there exists such that for all perturbations of the inflow rate we have . Let be the objective value at a vertex of the feasible region as we perturb the inflow and note that is continuous in . For a suboptimal we have . Thus, continuity implies that there exists such that remains suboptimal for all with .
Second, note that for , the reduction in the objective compared to is smallest for those solutions with minimal -value. For , the increase in objective value is largest for those solutions with maximal -value. As , the statement follows.
Theorem 4.12. The SSCA on general networks is strongly NP-hard, even on DAGs.
Proof: We choose and claim that an instance of -DISJOINT PATHS is a YES-instance if and only if . Given a YES-instance, we can allocate one unit of capacity to each arc in the support of the vertex-disjoint paths in the solution at cost at most , the bound being tight if all nodes of are visited by the paths. Then, the internally vertex-disjoint paths in all satisfy . The resulting network restricted to arcs with positive capacity is series-parallel and the capacity of after an -increase suffices to support the Nash flow over time, thus, by Lemma 3.10. Lemma 4.11 gives the reverse direction.
A.2 Additional Structural Result
Recall that given a network with data , we denote by the time to reach steady state and by the steady-state travel time of the Nash flow over time in . We show that if a hyperplane divides two regions with different , the time to reach steady state diverges to if the hyperplane is approached from at least one side.
Proposition A.1. Consider two cells and of the hyperplane arrangement with non-empty intersection. Let be a point in the interior for and let . If then for every such that (of which there is at least one),
Proof: As , we must have for at least one , without loss of generality for . Now assume for a contradiction that as approaches . Then there exists a bound as well as a sequence converging to such that and for all . Let be a time at which in all networks and the steady state is reached. As the steady-state travel time of all particles in a network is exactly , by Theorem 3.4 we have
where is the earliest arrival time at of a particle departing the source at time and traveling through . Since converges to , together with (1) directly contradicts the continuity of with respect to at time (Theorem 3.6 of [17]).
Example A.2. Consider again the example from Fig. 1a, with an additional arc with data and consider as the capacity varies over for some sufficiently small . For the minimum cut condition to be satisfied, we require . The steady-state travel time from to remains unaffected. We thus only consider the steady-state travel time from to . For , as a queue builds up on until arc becomes active. For , , the queueing time caused by the “unnecessary” queue on . Lastly, for , as the “unnecessary” queue can deplete and arc never becomes active. Thus, at , lies strictly between the minimum and the maximum value of any optimal dual solution. This also implies that as , the time to reach steady state in the networks with and both diverge to infinity.