Abstract—Probabilistic load forecasts for AI data centers need to represent both uncertainty under changing workloads and temporal dependence to support grid operations. This paper develops an open, grid-oriented benchmark using measured GPU power from a 448-GPU AI cluster. Forecasts are evaluated through four stages: probabilistic prediction, online uncertainty calibration, temporal scenario generation, and horizon-wide reserve sizing. Following a change in cluster utilization, a quantile LightGBM forecast achieves only 63.4% coverage for a nominal 90% interval, while online regime-conditioned calibration increases coverage to 87.3%. Even with well-calibrated marginal forecasts, independent sampling produces unrealistic ramp distributions and excessive reserve procurement. Reconstructing temporal dependence from historical forecast errors reduces the discrepancy in ramp statistics and lowers realized reserve cost by 7.4–10.6% across three forecasting tasks. These findings show that marginal forecast quality alone is insufficient for operational decisions and motivate joint evaluation of calibration, temporal structure, and decision outcomes.

Index Terms—AI data centers, probabilistic load forecasting, conformal prediction, scenario generation, operating reserve.

I. INTRODUCTION

Electricity demand from data centers is growing quickly, and artificial intelligence (AI) training and inference on graphics processing units (GPUs) account for a rising share of it [1], [2]. For utilities and system operators the difficulty lies less in the expected level of this load than in its uncertainty. They need to know how fast a facility ramps, how long it stays near its peak, and how often it departs from a schedule. Recent industry studies describe data-center demand through multiple growth scenarios [3] and identify the uncertainty of large-load forecasts as a risk for resource and transmission planning [4].

Existing studies on data-center load forecasting have employed statistical models, recurrent, convolutional and attention-based networks, probabilistic methods, and physics-informed hybrids [5]. However, many studies emphasize point forecast accuracy and rely on proprietary or synthetic datasets. Their results are therefore difficult to compare, and conventional accuracy metrics alone do not establish whether a forecast is suitable for grid studies.

Forecast accuracy alone does not establish decision value in power system applications [6]. For grid studies, two aspects of probabilistic load forecasts are particularly important. The first is reliable uncertainty calibration under changing workload conditions, ensuring that prediction intervals maintain their nominal coverage. The second is realistic temporal dependence across the forecast horizon, since load ramps, peaks, and high-load durations directly affect ramping and reserve requirements. A forecast may achieve a low continuous ranked probability score (CRPS) at each step while failing to maintain reliable coverage or reproduce realistic temporal dependence.

Evaluating these properties requires assessing both marginal forecast calibration and the temporal structure of generated load scenarios, while meaningful comparisons require accessible data. This paper therefore develops an open benchmark using GPU telemetry and scheduler logs from the MIT Supercloud TX-Gaia cluster [7] and evaluates forecasts stage by stage, from probabilistic forecasting to reserve sizing. The main contributions are summarized as follows:

  1. An open benchmark for grid-oriented probabilistic forecasting of AI-cluster GPU power. Using measured GPU telemetry and scheduler logs, we define three forecasting tasks from intra-hour to day-ahead horizons and provide reproducible data processing and evaluation that score ramp, peak and reserve outcomes alongside conventional probabilistic metrics.

  2. A four-stage evaluation framework that links probabilistic forecasts to reserve decisions. The framework evaluates probabilistic prediction, online calibration, temporal scenario generation, and horizon-wide reserve sizing using stage-specific metrics. Its modular structure allows different forecasters and scenario generators to be evaluated without modifying the remaining stages.

  3. An empirical assessment of forecast calibration, temporal dependence, and their implications for reserve decisions. Online calibration improves coverage from 63.4% to 87.3% for an under-calibrated forecaster but offers limited benefit to one already near nominal coverage. Despite near-nominal marginal coverage, independent scenario sampling distorts load ramps and leads to excessive reserve procurement. Reconstructing temporal dependence from past forecast errors while preserving the conditional marginal distributions lowers realized reserve cost by 7.4–10.6% across three forecasting tasks.

The processing, baseline and evaluation code is available at https://github.com/dinglin613/Data_center_forecasting.

References (10)

  • 2024 united states data center energy usage report
  • Energy and AI
  • Powering intelligence 2026: Updated scenarios of U.S. data center electricity use and power strategies
  • Forecasting for large loads: Current practices and recommendations
  • Critical review of artificial intelligence and machine learning methods for data-center load forecasting
  • Bridging prediction and decision: An application-driven review of load forecasting in energy systems
  • The MIT supercloud dataset
  • LightGBM: A highly efficient gradient boosting decision tree
  • An Empirical Evaluation of Generic Convolutional and Recurrent Networks for Sequence Modeling
  • The Schaake shuffle: A method for reconstructing space-time variability in forecasted precipitation and temperature fields