arXiv:2611.09585cs.NINov 2026

Manuscript Offprint

arXiv:2611.09585

Scalable Full-Horizon SFC Deployment over Predictable SAGIN Topologies via Configurable Column Generation Framework

Hang Li, Hao Huang, Yihu Xu, Zixuan Kong, Yanling Jin

Hang Li, Hao Huang, Yihu Xu, Zixuan Kong, and Yanling Jin

Abstract—Space-air-ground integrated networks (SAGINs) integrate heterogeneous communication and computing resources to support ubiquitous services. Service function chains (SFCs) enable complex services to be composed of ordered functions and executed collaboratively across these resources. Mobility continuously reshapes connectivity throughout service execution, yet much of the resulting topology evolution is predictable. Decisions based only on isolated topology snapshots may therefore overlook valuable future connectivity. We formulate an admission-first, cost-aware model on a time-expanded graph for SFC deployment. Our key observation is that temporal feasibility is request-specific, whereas global coupling arises mainly from shared-resource competition. We therefore develop a configurable column-generation framework in which complete request deployments form columns and a restricted master problem coordinates admission and resources. SAGINFE, a fast constructive heuristic built on per-flow embedding (PFE), supplies a standalone feasible solution and initial columns. Configurable pricing schedules combine early-terminated and stricter searches, supplemented by selective PFE candidates. Candidates undergo feasibility and exact reduced-cost checks. Request-wise pricing can run in parallel, followed by finite-pool integer selection. The default configuration improves the admission-first objective over initialization on all 120 main instances. Four pricing workers achieve up to a 2.69-fold median pricing-stage speedup while preserving admitted request counts in the tested cases.

Index Terms—Service function chain (SFC) deployment, space-air-ground integrated networks (SAGINs), time-varying topology, admission control, time-expanded graph (TEG), Dantzig-Wolfe decomposition, configurable column generation.

I. INTRODUCTION

SPACE-air-ground integrated networks (SAGINs) combine satellites, aerial platforms, and terrestrial infrastructure to extend network coverage and support services beyond the reach of ground networks. Besides communication connectivity, the computing resources distributed across these network segments allow service processing to be performed collaboratively [1], [2]. Network function virtualization (NFV) facilitates this collaboration by implementing network functions as software that can be deployed on different computing nodes [3]. In an NFV-enabled network, a service can be represented by a service function chain (SFC), which specifies the functions that its data must traverse and their required processing order [4]. Deploying an SFC therefore requires jointly determining virtual network function (VNF) execution locations and the routing paths connecting them [5]. This provides a flexible means of coordinating communication and computing resources for service provisioning in SAGINs [6].

Nevertheless, such flexibility is accompanied by additional deployment challenges. In SAGINs, the movement of satellites and aerial platforms changes network connectivity during service execution. A node suitable for processing a VNF in the current time slot may not provide an immediate connection to the node selected for the next VNF. Meanwhile, satellite orbits and planned aerial trajectories make much of this topology evolution predictable. Flow data can consequently be processed at an available node, stored there, and forwarded through a contact available in a later time slot [7]. Decisions based only on isolated topology snapshots may overlook these opportunities. Exploiting predictable connectivity requires planning function execution, transmission, and waiting throughout each request's lifecycle, while ensuring that all required VNFs are executed in order and that the data reach the destination before the deadline.

Existing studies have advanced SFC deployment through joint resource orchestration, time-expanded modeling, and decomposition-based optimization [6], [8]–[10]. These developments provide a basis for using future connectivity in deployment planning. Their practical use also raises a computational question: how can a fast feasible deployment be followed by joint optimization whose search effort and execution can be configured for different problem sizes and computation requirements? Addressing this question requires connecting two aspects of full-horizon planning: the effort spent finding alternative deployments and the coordination of these alternatives under shared resource constraints.

The first challenge concerns the variable computational burden introduced by full-horizon planning. A time-expanded graph (TEG) replicates network nodes across time slots and represents transmission and waiting opportunities. Even with a fixed physical network, extending the planning horizon adds node copies and can enlarge the deployment search space. Network size, request count, chain lengths, and resource competition further affect the search burden. Decomposition reduces individual problem sizes, but repeated per-request searches can remain expensive. Different planning instances

This research was funded by the Jilin Province Natural Science Foundation, grant number YDZJ202501ZYTS641.

Hang Li and Yihu Xu are with the College of Engineering, Yanbian University, Yanji 133002, China (e-mail: lihang0402@gmail.com and lihang0402@ybu.edu.cn for Hang Li; xuyh@ybu.edu.cn for Yihu Xu). Hao Huang is with Chongqing University of Posts and Telecommunications, Chongqing 400065, China (e-mail: huanghao@cqupt.edu.cn). Zixuan Kong is with Beijing University of Posts and Telecommunications, Beijing 100876, China (e-mail: kong_zx@bupt.edu.cn). Yanling Jin is with Fujitsu Limited, Japan (e-mail: kinkenrei83@gmail.com). (Corresponding author: Yihu Xu.) therefore call for different computational effort. This motivates fine-grained quality-time control through search strength and scheduling, supplementary candidates, and parallel execution within a common framework.

The second challenge is turning that search effort into a jointly feasible deployment. In a sequential construction procedure, an early placement or routing choice may consume resources needed by later requests. Improving admission can therefore require revising several deployment choices together. The initial deployments and newly generated alternatives need a common representation so that they can be jointly reconsidered without violating temporal feasibility or shared resource capacities. Moreover, the fractional selections used during optimization must ultimately be converted into an implementable integer solution. A feasible starting solution should remain available when additional search yields no better deployment.

In view of the above challenges, we study full-horizon SFC deployment over predictable SAGIN topologies. We consider offline planning with known topology evolution and request information, and formulate an integer linear program (ILP) that first maximizes the number of admitted requests and then minimizes normalized resource consumption. Each admitted request has a complete deployment from its source and arrival slot to its destination within the deadline, including ordered VNF execution, transmission, and waiting. Our design exploits the fact that temporal feasibility is request-specific, whereas the coupling among requests arises from shared node and link resources. Following the Dantzig-Wolfe decomposition principle [11], we represent complete per-request deployments as columns. A restricted master problem (RMP) coordinates admission and resource allocation using these alternatives. This representation connects initial construction with subsequent joint optimization under the same objective and deployment constraints.

To obtain a feasible starting solution efficiently, we develop the SAGINFE heuristic. Its per-flow embedding (PFE) procedure searches successive VNF stages over the TEG while tracking remaining resources. SAGINFE provides a standalone deployment and initial per-request columns for subsequent joint optimization.

Each pricing subproblem seeks a complete deployment for one request under dual prices from the RMP's linear relaxation. Solvers and problem-specific heuristics can therefore serve as interchangeable candidate generators, subject to feasibility and exact reduced-cost checks before insertion. The same interface could also accommodate other methods that construct complete feasible deployments for individual requests.

The subsequent optimization provides fine-grained quality-time control through pricing schedules that arrange early-terminated and stricter solver-based searches, selective PFE candidate generation, and configurable request-wise parallelism. Finally, integer selection over the generated finite column pool yields compatible deployments. Comparing this result with the SAGINFE initialization preserves the better feasible solution under the admission-first objective.

Specifically, our contributions in this paper are summarized as follows:

  1. We formulate full-horizon SFC deployment over predictable SAGIN topologies as an admission-first, cost-aware ILP and prove its NP-hardness. The model jointly describes ordered VNF execution, communication, and waiting from request arrival to delivery within a deadline. Complete per-request deployments provide a common column representation for fast construction and subsequent resource coordination.

  2. We develop a configurable column-generation framework that connects SAGINFE initialization with subsequent joint optimization. Its per-request column interface accommodates solver-based and heuristic candidates. Pricing-stage schedules, selective candidate generation, and request-wise parallelism provide fine-grained control of computational effort while retaining the same deployment objective and feasibility requirements. Finite-pool integer selection and an initial-solution safeguard yield a feasible result no worse than the SAGINFE initialization under the stated objective.

  3. We evaluate the framework across network scales, traffic loads, and planning horizons, including pricing-schedule comparisons and component ablations. The default configuration improves the admission-first objective over initialization on all 120 main instances. Parallel-pricing experiments demonstrate up to a 2.69-fold median pricing-stage speedup with four workers, without changing admitted request counts in the evaluated cases.

The remainder of the paper is organized as follows. Section II reviews related work, and Section III presents the system model and problem formulation. Section IV develops the proposed solution framework, which is evaluated through simulations in Section V. Finally, Section VI concludes the paper and outlines future work.

References (36)