arXiv:2611.07307cs.SENov 2026

Manuscript Offprint

arXiv:2611.07307

Take It From Here: Evaluating Coding Agents On Project Takeover

Dingxian Wang, Zhe Fu, Jiaqi Deng, Chao Yin, Ganesh Prabhu, Karthik Gomadam Rajagopal, Darwin Yi, Huan Huo, Guandong Xu, Xianzhi Wang, Andrew Rabinovich, Zhao Chen

Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.

ABSTRACT

Coding agents increasingly collaborate on long-term projects. When taking over a project, they need to recover currently applicable requirements from the interaction history and update them in response to new requests. However, most coding benchmarks do not include long interaction histories, and some evaluations that consider history still do not cover the full process from requirement reconstruction to project delivery. We therefore provide agents with the interaction history, current request, and pre-request project environment, ask them to make the requested changes, and assess takeover performance through delivery tests. Across six model–harness configurations and 37 targets eligible for executable validation, the mean complete-delivery rate under Full History is only 4.95%. We then use requirement atoms to independently diagnose a larger set of takeover targets, examining relevant information identification, pre-request state reconstruction, and current request processing. We further supply correct pre-request or target states to examine the remaining difficulties in requirement processing and project modification. The diagnostics show that none of the six configurations produces fully correct post-request requirement states, and a case illustrates omission of previously recovered constraints during updating. With correct target states supplied, the mean complete-delivery rate is 8.11%, with build and regression pass rates of 96.40% and 90.99%, but target-test success remains 9.01%. These results show difficulties in both forming target requirement states and implementing supplied targets in existing projects. Based on these findings, we introduce ReqMemBench, which combines requirement diagnostics with delivery validation to support systematic evaluation of project takeover.

1 INTRODUCTION

Coding agents have progressed from generating standalone code snippets (Chen et al., 2021) to browsing files, modifying implementations, and running tests in existing codebases (Yang et al., 2024; Wang et al., 2025). When serving as assistants on long-term projects, they need to understand new user requests and build on existing work to move the project forward (Le et al., 2025; Orlanski et al., 2026). However, the information needed to interpret the current request is often scattered across earlier interactions (Wu et al., 2025; Laban et al., 2026). Therefore, Coding agents must extract task-relevant requirements from long interaction histories, determine how the new request changes those requirements, and then produce the required deliverables.

Existing coding benchmarks mainly assess code generation and repository-level tasks, typically without long interaction histories (Jimenez et al., 2024; Miserendino et al., 2025). Although some studies examine history use, requirement updates, or intermediate steps, they do not cover the full process at a specified takeover point: reconstructing the current requirement state from history and

∗^{*}These authors contributed equally to this work.

†^{\dagger}Corresponding author: Huan Huo.

Figure

Figure 1: Project takeover experiments. (a) Direct delivery from history, the current request, and the initial project, followed by three delivery checks. (b) Independent requirement diagnostics (RQ1: C1 only). (c) Oracle Pre-State predicts the target from the Gold pre-state, whereas Oracle Post-State supplies the Gold target directly, followed by delivery evaluation. Diagnostic responses are not inputs to the main experiment.

delivering the requested work (Wu et al., 2025; Hu et al., 2025; Liu et al., 2026; Zhou et al., 2026). We evaluate this process across different deliverable types.

We construct takeover tasks from 44 projects' long-term interactions and test direct delivery on 37 targets from 7 of them (Figure 1). Agents receive the history, current request, and pre-request project environment and submit modified projects for testing. We compare Full History (C1) with shorter, filtered Relevant History (C2) to examine whether shortening context improves delivery. Across six model–harness configurations, mean complete-delivery rates are only 4.95% and 2.70%, respectively.

To investigate takeover difficulties, we link multi-turn descriptions through requirement atoms: semantically complete requirements that can evolve independently. On 349 targets, three diagnostics (RQ1–RQ3) assess relevant information identification, pre-request state reconstruction, and current request updating. For requests with sufficient information to proceed, no configuration produces a fully correct target state under either history condition. A case further shows that updating can omit previously recovered constraints that still apply, highlighting the difficulty of forming complete and accurate updated states.

We then use Oracle Pre-State and Oracle Post-State to examine whether target requirements become actual project changes. Pre-State supplies the correct pre-request state for the agent to update and implement; Post-State directly supplies the correct target. Under Post-State, build and regression pass rates are 96.40% and 90.99%, respectively, but target-test success is only 9.01%. Thus, correct targets still do not ensure implementation of the requested changes.

These findings motivate ReqMemBench, which links requirement diagnostics with project delivery in two phases. Agents first produce and freeze requirement responses from the history and current request. For execution-eligible targets judged actionable, they then modify the initial project using those responses and undergo delivery validation. Our contributions are:

  • We identify difficulties in both requirement understanding and project modification during takeover: agents struggle to form complete and accurate target requirement states from long interaction histories, and directly supplying correct targets still does not ensure implementation of the requested changes.

  • We establish a project-takeover evaluation framework combining direct delivery, independent requirement diagnostics, and Oracle state comparisons to assess historical requirement understanding, target-state formation, and implementation in existing projects.

  • We instantiate this evaluation design as ReqMemBench across multiple deliverable types, with 349 takeover targets from 44 projects and initial project environments and delivery validators for 37 targets, supporting joint evaluation of requirement understanding and project delivery.