arXiv:2611.07468cs.GTNov 2026

Manuscript Offprint

arXiv:2611.07468

Polynomial-Time Approximate EFX for Chores via Flow and Matching

Genjie Qin, Qizhi Fang, Minming Li, Wenjing Liu, Xin Chen

Genjie Qin¹, Qizhi Fang¹, Minming Li¹,², Wenjing Liu¹,³, Xin Chen⁴,*

¹School of Mathematical Sciences, Ocean University of China

²Department of Computer Science, City University of Hong Kong

³School of Mathematical Sciences and Laboratory of Marine Mathematics, Ocean University of China

⁴College of Computer Science and Technology, Ocean University of China

Genjie Qin: qgj@ouc.edu.cn; Qizhi Fang: qfang@ouc.edu.cn

Minming Li: minming.li@cityu.edu.hk; Wenjing Liu: liuwj@ouc.edu.cn

Xin Chen*: chenxin1403@ouc.edu.cn

  • Corresponding author.

Abstract We study approximate EFX allocations of indivisible chores under nonnegative additive costs. Exact EFX allocations need not exist in general. We develop a polynomial-time algorithm that computes a complete (3+ε)(3+\varepsilon)-EFX allocation for any rational 0<ε≤10 < \varepsilon \leq 1, improving the previous approximation guarantee from a factor depending on the number of agents to a constant. The algorithm extends to EFkX, achieving a (2+1/k+ε)(2+1/k+\varepsilon)-approximation for every integer k≥1k \geq 1.

For instances with relatively few chores, the polynomial-time BRBI algorithm gives stronger guarantees. It finds exact EFkX allocations when m≤2knm \leq 2kn and achieves a factor of at most 2−1/k2-1/k when m≤(3k−1)nm \leq (3k-1)n. In particular, k=1k=1 and m≤2nm \leq 2n give exact EFX.

We further show that the approximation factor 2+1/k2+1/k is asymptotically tight for our main algorithm. We also construct a four-agent, ten-chore instance in which every complete allocation has EFX approximation factor at least 11/10, improving upon the 20/19 lower bound for submodular costs even under additive costs.

Keywords: indivisible chores, EFX, max-flow, matching-based rounding, EFkX extension

1 Introduction

Fair allocation of indivisible chores concerns the distribution of burdens among agents with heterogeneous preferences and is a fundamental problem in algorithmic game theory and social choice [1]. We consider a set NN of nn agents and a set MM of mm indivisible chores, which impose costs on their recipients. Each agent ii has a nonnegative additive cost function ci(⋅)c_i(\cdot), with ci(S)=∑g∈Sci(g)c_i(S) = \sum_{g \in S} c_i(g) for every bundle S⊆MS \subseteq M. A complete allocation X=(Xi)i∈NX = (X_i)_{i \in N} assigns every chore to exactly one agent, with XiX_i denoting the possibly empty bundle assigned to agent ii. Envy-freeness (EF) would require each agent to weakly prefer her own bundle to every other bundle, but even one positive-cost chore can make this impossible. Envy-freeness up to any chore (EFX) asks that envy disappear after any one chore is removed from the agent's own bundle, with both bundles evaluated using that agent's costs. Our goal is to compute, in polynomial time, allocations satisfying approximate EFX. For α≥1\alpha \geq 1, an allocation is α\alpha-EFX if, after removing any single chore from an agent's own bundle, her remaining cost is at most α\alpha times her cost for any other agent's bundle.

Exact EFX allocations can be computed in polynomial time in several restricted settings, including m≤2nm \leq 2n [2]. In general, however, exact EFX allocations need not exist, even when all costs are drawn from a set of three positive values [3]. We study multiplicative approximation: for α≥1\alpha \geq 1, an allocation is α\alpha-EFX if removing any single chore from XiX_i leaves agent ii with cost at most α⋅ci(Xj)\alpha \cdot c_i(X_j) for every other agent jj. Garg et al. [4] established the existence of 4-EFX allocations using earning-restricted equilibria, and Garg and Murhekar [5] subsequently improved the guarantee to 2 via local swaps on a suitable price-supported EF1 allocation. On the algorithmic side, Zhou and Wu [6] presented a polynomial-time (3n2−n)(3n^2 - n)-EFX algorithm for n≥4n \geq 4, but its approximation factor grows quadratically with nn. We therefore ask whether a constant-factor EFX allocation can be computed directly from the cost matrix in polynomial time.