Manuscript Offprint
arXiv:2611.07905Tight Worst-Case Completion-Time Bounds for Dominant Resource Fairness
Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.
Abstract
Dominant Resource Fairness (DRF) is an influential policy for sharing multiple resources among jobs with heterogeneous demands. It combines sharing incentive, strategy-proofness, envy-freeness, and Pareto efficiency, making it particularly attractive for shared computing systems. DRF has been implemented in major resource-management frameworks, including Apache Mesos and Hadoop YARN. DRF is also nonclairvoyant: it requires no advance knowledge of job sizes, making it practical when processing requirements are difficult to predict. This motivates understanding its completion-time performance relative to an optimal schedule that knows all job sizes. However, elementary arguments can only give an lower bound and an upper bound for total completion time, where is the number of resource types.
In this paper, we close this gap by proving that DRF is -competitive. More generally, for every fixed real , we show that DRF is -competitive for the norm of completion times, with larger placing greater emphasis on late-finishing jobs. These bounds hold with arbitrary release times. We also give a refined analysis of total completion time for small .
1 Introduction
Shared computing systems must coordinate access to many resources, including CPU, memory, accelerators, storage I/O, and network bandwidth. In multidimensional scheduling, each distinct resource type or separately constrained resource pool corresponds to a distinct dimension, and a job's demand vector specifies how much of each resource it needs per unit of processing. The number of dimensions need not be limited to a few hardware categories. For example, when jobs transmit data along fixed network routes, each link imposes its own bandwidth constraint and can be represented by a separate dimension. Thus, the dimension can grow with the number of separately constrained resources in the system, making it important to understand how scheduling performance scales with . Accounting for these demands together avoids the waste that fixed resource bundles can cause when jobs have different bottlenecks, a central motivation of Ghodsi et al. [GZH+11].
In their influential paper, Ghodsi et al. [GZH+11] introduced Dominant Resource Fairness (DRF), which extends max-min fairness by comparing users through their dominant shares: the largest fraction of any resource allocated to each user. In their allocation model, DRF simultaneously satisfies four properties particularly well suited to a shared system. Sharing incentive ensures that a user does at least as well as with an equal private partition of the resources. Strategy-proofness rules out gains from misreporting resource demands. Envy-freeness means that no user prefers another
*University of California, Santa Cruz, US. msblue@ucsc.edu
†University of California, Santa Cruz, US. sim9@ucsc.edu
‡Institut für Mathematik, Technische Universität Berlin, Germany. alexander.lindermayr@tu-berlin.de user's allocation. Finally, Pareto efficiency means that improving one user's allocation must hurt another. Together, these properties encourage participation and truthful reporting, ensure fairness between users, and rule out avoidable inefficiency. Among the allocation policies compared in the original paper, DRF is the only one satisfying all four properties [GZH+11, Table 2].
DRF has also influenced practical resource management: it has been implemented in the Apache Mesos cluster resource manager [Apab] and is available as a built-in allocation policy in Hadoop YARN's Fair Scheduler [Apaa]. Its fractional allocation has a direct progressive-filling implementation: increase dominant shares together, freeze jobs when they encounter a binding constraint, and continue with the remaining jobs [GZH+11; PPS15]. We give the formal definition of DRF and its progressive-filling algorithm in Section 2. This simple structure makes DRF an attractive policy to understand even when other allocation rules admit stronger optimization guarantees. Our analysis concerns this fractional scheduling model, rather than the placement and indivisibility constraints of a particular cluster implementation.
Fairness of an instantaneous allocation does not, however, determine when jobs finish. A policy can divide resources fairly at every moment and still delay many jobs relative to a schedule that chooses a different allocation over time. This distinction is especially important in the nonclairvoyant setting: the scheduler knows a job's resource demands but learns its total processing requirement only when the job completes. Here a natural benchmark is the total completion time of an optimal offline schedule that knows all processing requirements in advance.
For Proportional Fairness (PF), a classical allocation rule from communication networks [KMT98], this connection between allocation and scheduling is well understood. Im, Kulkarni, and Munagala [IKM18] proved that PF is -competitive for total weighted completion time under general polyhedral packing constraints, which include multidimensional scheduling. PF chooses rates by maximizing a weighted sum of their logarithms. DRF instead has the direct progressive-filling description above, without requiring a general nonlinear optimization routine. The performance guarantee for PF does not transfer to DRF: indeed, Im et al. [IKM18] already observed that DRF need not be -competitive.
Elementary arguments give two bounds that leave a substantial gap. With resource types, a simple instance gives an lower bound for total completion time; we reproduce the construction in Proposition 1. On the other hand, a straightforward comparison gives an upper bound; see Theorem 4. Thus some dependence on the number of resources is unavoidable for DRF, but its correct magnitude is not determined by these bounds. This raises the question:
What is the asymptotically tight competitive ratio of DRF for job completion times as a function of the number of resources?
An algorithm is said to be -competitive if its objective is at most times the objective of the (offline) optimum solution for all inputs.
For a completion-time vector and a real , the objective is
When , this is total completion time, equivalently average completion time up to the factor . Larger penalizes large completion times more strongly, while the limit as is the maximum completion time. These objectives let us examine whether an allocation policy's aggregate performance comes at the expense of particularly late-finishing jobs.
Tight dependence on the dimension and norm. For every integer and real , the competitive ratio of DRF is in
Theorem 2 and Corollary 2 establish this bound for zero and arbitrary release times, respectively. The hidden constants are independent of both and . In particular, for each fixed , the dependence on the dimension is . The allocation rule itself does not depend on . These are tight bounds for DRF, not lower bounds for every nonclairvoyant algorithm: PF's dimension-independent constant-factor guarantee for total completion time illustrates the distinction.
Sharper bounds for total completion time. We analyze the case separately to obtain a simpler proof and better constants. When all jobs are released at time zero, DRF is -competitive, while its competitive ratio is at least (Theorem 1 and Proposition 1). For two and three resources, a more detailed analysis improves the upper bounds to and , respectively (Theorems 5 and 6). These low-dimensional guarantees are relevant when jobs compete for only a small number of resource types.
Arbitrary release times. We first analyze instances in which all jobs are available at time zero. A black-box reduction then extends the bounds to arbitrary release times at a cost of at most two (Theorem 8). The reduction applies to any positive allocation rule that depends only on the active set and does not decrease a remaining job's rate when other jobs are removed. DRF itself is not monotone in this sense, but its simplified variant one-shot DRF is, and DRF completes every job no later than this variant (Lemma 1). In particular, the total-completion-time guarantee becomes , with improvements to and for two and three resources (Corollary 1).
1.2 Overview of the Analysis
For intuition, scale each resource's supply to one and first consider jobs with binary demand vectors in these units. Each job therefore uses a nonempty subset of resources and needs one unit of each to run at unit rate. Assume also that all jobs are released at time zero and that rate caps do not restrict processing. We refer to Section 2 for the full definitions of DRF and one-shot DRF.
In this special case, DRF initially increases every unfinished job's rate equally until some resource becomes fully utilized. It freezes the rates of jobs using that resource and continues increasing the rates of the other jobs, repeating until no rate can be increased. One-shot DRF stops at the first such bottleneck. At time , let be the number of jobs unfinished under one-shot DRF, and let be the maximum number of these jobs that demand any one resource. One-shot DRF gives every unfinished job rate . We analyze this simpler rule: a coupling shows that full DRF completes every job no later, so the resulting upper bounds also hold for full DRF (Lemma 1).
The elementary bounds. Since , every unfinished job receives at least rate . This is the rate these jobs would each receive if they shared a single unit-speed machine equally, ignoring their heterogeneous resource requirements. Such equal sharing is Round Robin. Since one-shot DRF also gives all unfinished jobs the same rate, and their total rate is at least one, every job completes under one-shot DRF no later than under this single-machine policy. In contrast, every feasible schedule has aggregate processing rate at most , because each job uses at least one unit-capacity resource. Round Robin's constant competitive ratio thus gives the elementary upper bound (Theorem 4). For the lower bound, take one unit-size job per resource and unit-size jobs that each require every resource. All resources become tight together, so DRF gives every job rate and incurs total completion time . A better scheduler can first complete the single-resource jobs in parallel and then process the remaining jobs sequentially, for total completion time (Proposition 1).
The key distinction: concentrated demand or rapid progress. The improvement comes from distinguishing between (i) times when some resource is demanded by a large fraction of unfinished jobs and (ii) times when no resource is so heavily shared. In case (i), one-shot DRF is slowed by a bottleneck that also constrains OPT. Importantly, all jobs still unfinished at time have received the same amount of processing, so each of their processing requirements is at least this amount. In particular, each of the jobs using the bottleneck requires at least this much processing on that resource even in OPT. In case (ii), is small relative to , and one-shot DRF makes rapid aggregate progress at rate . OPT's aggregate rate, meanwhile, cannot exceed .
Cauchy–Schwarz for total completion time. We make this distinction quantitative by weighting the instantaneous completion-time cost in two complementary ways. Motivated by case (i), we weight by the fraction of unfinished jobs that demand the bottleneck resource, obtaining . As noted above, each bottleneck job requires at least the common amount of processing already received by the unfinished jobs. Using these lower bounds on processing requirements and the nestedness of the unfinished sets, we bound by OPT (Lemma 5). Motivated by case (ii), we instead weight by one-shot DRF's aggregate processing rate , obtaining . Comparing this rate with OPT's aggregate capacity , we bound by (Lemma 4). Since the two weights are reciprocals, Cauchy–Schwarz combines the bounds:
For two and three resources, we obtain smaller constants by treating each resource as a separate unit-speed machine. On each machine, a job's processing requirement is the work it needs from that resource. We split each job's completion cost among the machines using nonnegative weights that sum to one for that job, avoiding double counting. The sum of the optimal weighted completion costs on these machines then gives a lower bound on OPT. Unlike the aggregate-capacity bound motivated by case (ii), which uses only the total capacity , this bound accounts for which jobs compete for each resource (Section B).
LP dual fitting for general norms. For the objective, the analogous identity is . We use a continuous-time linear programming relaxation of this objective and construct dual solutions from the one-shot DRF schedule. By weak duality, each feasible dual solution gives a lower bound on the optimal sum of th powers of completion times. Fix a threshold and call a time if , and otherwise. If heavy times contribute more to the objective, we partition time into intervals, starting a new interval whenever drops below half its value at the start of the current interval. For each interval, we choose a resource with the most unfinished jobs just before the interval ends and use it to construct the dual prices. If light times contribute more, we assign the same price to all resources and exploit the high aggregate processing rate. These two constructions yield competitive bounds and , respectively. Choosing balances them and gives . The elementary processor-sharing comparison also gives an bound for every . The matching lower bounds extend the construction for total completion time described above to the objective (Theorem 7).
General demands, rate caps, and release times. For nonbinary demands, we replace the number of jobs using a resource by the sum of their demands per unit of processing. For example, a job whose demand on a resource is 0.2 contributes 0.2 to this sum rather than one.
A job may also have a maximum useful resource allocation: once it receives all the resources it requests, it runs at its maximum processing rate, and giving it more resources does not make it faster. We represent this maximum rate by , the job's rate cap. A job of size therefore needs at least time even in OPT. We separate this unavoidable delay from congestion. In the remaining analysis, a cap-limited job counts fractionally, according to its actual rate relative to the common rate. On each resource, we sum the jobs' demands multiplied by these fractions. These weighted sums replace the binary job counts in the arguments above; they are not the resource's current utilization or the amount of work remaining on it.
Finally, consider arbitrary release times. Removing other active jobs reduces competition for resources, so one-shot DRF can only increase a remaining job's rate. Equivalently, if we include not-yet-released jobs when computing the allocation at a given time, the rates assigned to already active jobs cannot increase. We use this fact to construct a virtual instance in which all jobs are released at time zero, choosing their sizes so that the algorithm has the same completion times as in the original instance. Each job's virtual size is at most its original size plus the processing it receives before its original release time. Combining a schedule for this extra early processing with an optimal schedule for the original instance costs at most a factor of two (Theorem 8).
1.3 Other Related Work
The product-maximization principle underlying PF dates back to Nash [Nas50]. Kelly, Maulloo, and Tan [KMT98] developed PF for bandwidth sharing in communication networks. The closest worst-case results concern PF in nonclairvoyant scheduling under general packing constraints. As discussed above, Im, Kulkarni, and Munagala [IKM18] proved a dimension-independent constant competitive ratio for total weighted completion time in this model. Jäger, Lindermayr, and Megow [JLM26] improved the bound to 27, and to 4 when removing jobs cannot decrease the remaining jobs' PF rates. This monotonicity holds, for example, in related-machine and restricted-assignment scheduling. In these two models, they also obtain a tight factor of 2 for unweighted completion time with simultaneous arrivals. These results do not transfer to DRF, whose completion-time guarantees necessarily depend on the number of resources.
Subsequent work on DRF studies weighted entitlements and indivisible resources [PPS15], and incentives under changing demands when allocations account for past service [FAT24]. Unlike DRF, PF is not strategy-proof in general. Cole, Gkatzelis, and Goel [CGG13] construct a truthful mechanism that guarantees each user at least a fraction of its PF utility for fixed-proportion valuations. The mechanism withholds resources and thus gives up Pareto efficiency. These works concern allocation and strategic behavior rather than completion-time guarantees.
On a single unit-speed machine, processor sharing, or fractional Round Robin (RR), is tightly 2-competitive for total completion time when all jobs arrive together [MV22; MPT94]. For norms of completion times, Moseley and Vardi [MV22] prove a tight bound with simultaneous arrivals and integer , and a factor of 4 with arbitrary release times and real . With arbitrary releases, RR's ratio for total completion time can exceed 2: Jäger, Lindermayr, and Megow [JLM26] give a lower bound of 2.19. With a single resource and nonbinding rate caps, DRF reduces to RR. Our work determines how these guarantees degrade with the number of resources when jobs have heterogeneous resource demands.
A separate literature studies flow time, , often with speed augmentation, which gives the online algorithm faster resources than its offline benchmark. See [BP10; KP00] for single-machine results and [CGKK04] for identical parallel machines. Further results address unrelated machines [AGK12; IKMP14] and parallel jobs with general speedup curves [EP12]. The gradient-descent framework of Chen, Im, and Petety [CIP25] gives further results across several scheduling models. These guarantees concern a different objective and benchmark from our same-capacity completion-time bounds. For broader background on online scheduling and resource augmentation, see the survey by Pruhs, Sgall, and Torng [PST04].
Fair sharing has also been studied extensively under stochastic workloads. Bonald and Massoulié [BM01] analyze the stability and throughput of fair bandwidth-sharing policies, while Bonald et al. [BMPV06] compare max-min fairness, PF, and balanced fairness in processor-sharing networks. Massoulié [Mas07] establishes PF stability under more general service and routing models. Closer to our setting, Bonald and Roberts [BR15] compare DRF and PF under dynamic multiresource workloads, studying throughput and delay. Such analyses address stability and steady-state performance under probabilistic assumptions. Our competitive analysis instead compares DRF with a clairvoyant optimum on every finite instance, without distributional assumptions on arrivals or job sizes.
Our analysis also connects to LP-based dual fitting. Anand, Garg, and Kumar [AGK12] apply this technique to weighted flow time with resource augmentation. The PF analyses of Im, Kulkarni, and Munagala [IKM18] and Jäger, Lindermayr, and Megow [JLM26] use the optimality conditions of PF's instantaneous allocation program to guide the construction of dual lower bounds. For general norms, our dual variables instead exploit DRF's bottleneck structure.
1.4 Organization of the Paper
Section 2 defines the model and the two DRF variants. Section 3 establishes the tight asymptotic bound for total completion time, and Section B in the appendix sharpens the upper bounds for two and three resources. Section 4 gives the upper and lower bounds for general norms. Proofs omitted from the main body are also collected in the appendix. Finally, Section D in the appendix proves the black-box reduction and states the resulting guarantees for arbitrary release times.
2 Model and Algorithms
2.1 Multidimensional Scheduling
We consider jobs sharing divisible resources, such as CPU, memory, or network bandwidth, each of unit capacity. Job has a processing requirement , a release time , a rate cap
, and a demand vector
The entry is the amount of resource that job uses per unit of processing rate. The resource that job demands most is its dominant resource, and we normalize so that this entry equals one. Unless stated otherwise, all jobs are released at time zero. We extend our results to arbitrary release times in Section D.
A schedule specifies a rate vector at every time . We set before job is released. Running job at rate consumes units of resource . A schedule is feasible if it satisfies the following three constraints.
• Rate caps. for every job and time .
• Resource capacities. for every resource and time .
- Job completion. Every job has a finite completion time , which is the time at which it has received its full processing requirement, that is, .
We call a single vector a feasible rate vector if it satisfies the rate caps and resource capacities.
Our objective is to minimize the total completion time . More generally, for a real , we study the norm of the completion-time vector , which is the total completion time for . For a given objective, we write OPT for the value of an optimal feasible schedule and ALG for the value attained by the algorithm under consideration.
At time , let be the set of active jobs, which have been released but not yet completed. When all release times are zero, this is simply the set of unfinished jobs.
The online algorithms analyzed throughout this paper are nonclairvoyant. When job arrives, the algorithm learns its demand vector and rate cap , but not its processing requirement . The algorithm only learns that a job is done when it completes, and it has no information about jobs that have not yet been released. This models cluster schedulers, which typically know the resources a job requests but not how long it will run. Each allocation decision is irrevocable.
We say that an algorithm is -competitive for an objective if for every instance . The infimum over all such is the algorithm's competitive ratio for this objective.
2.2 Dominant Resource Fairness and One-Shot DRF
Since , the rate of job equals the fraction of its dominant resource that it receives, which is called its dominant share. Dominant Resource Fairness (DRF) [GZH+11] aims to equalize the dominant shares of all active jobs. It computes an allocation by progressive filling, as described in Algorithm 1. The rates of all jobs start at zero and increase at the same speed. A job is frozen, meaning that its rate stays fixed from then on, once it reaches its cap or once a resource it uses becomes tight. The remaining jobs keep increasing their rates. Each iteration freezes at least one additional job, so the procedure terminates with a feasible rate vector. Over time, DRF recomputes this allocation whenever the active set changes, that is, it runs every job at rate . We refer to this algorithm as full DRF to distinguish it from the one-shot variant introduced below.
Algorithm 1: Full DRF allocation
Input: Active set , normalized demands with , and caps
Output: Rate vector
1 Set for every and ;
2 while do
3 Increase at the same speed for every until a job reaches its cap or a resource becomes tight;
4 Remove every job with from ;
5 foreach resource with do
6 Remove every job with from ;
7 end
8 end
9 return ;
We call the part of progressive filling until a tight resource first freezes a job strictly below its cap the initial round. If no such event occurs, the initial round ends when all jobs reach their caps. A resource that becomes tight when all jobs using it have reached their caps does not end this round; the other jobs continue increasing their rates. The initial round has a simple closed-form description. For any nonempty set of active jobs, define its common fair-share rate as the largest such that running every job at rate respects all resource capacities. Formally,
For the empty active set, we set . If all jobs in can run at their caps simultaneously without exceeding any resource capacity, then . At the end of the initial round, job has rate . Full DRF may increase the rates of some jobs during subsequent rounds. Its final allocation therefore satisfies for every .
We also study one-shot DRF, which stops progressive filling after the initial round. It assigns every job the rate
This allocation is feasible by the definition of . Unlike full DRF, it does not redistribute capacity among the remaining jobs after the initial round. One-shot DRF may therefore leave some capacity unused. However, it is easier to analyze, because every job's rate depends on the active set only through the single number . When applying the rule over time, we abbreviate and for active jobs, and set for all other jobs.
A key property of one-shot DRF is that the rate of a job can only decrease when more jobs are active.
Observation 1 (Active-set monotonicity of one-shot DRF). If , then
Observation 1 holds because removing jobs only relaxes the constraints in (1), so every that is feasible for is also feasible for .
Lemma 1. On every instance, every job completes under full DRF no later than under one-shot DRF.
We prove Lemma 1 in Section A.
Lemma 1 allows us to analyze one-shot DRF instead of full DRF, since every upper bound for one-shot DRF also holds for full DRF. This simplifies our analysis considerably. All uncapped jobs of one-shot DRF run at the same rate , and when all jobs are released at time zero, the active set only shrinks over time. By Observation 1, the rate of every job is then nondecreasing over time. With arbitrary release times, new arrivals may decrease the rates of existing jobs. In Section D, we show that the monotonicity in Observation 1 still suffices to extend our bounds to this setting, losing only a factor of two.
Full DRF does not have this monotonicity property when demands can be zero. For example, take four jobs with unit rate caps that demand the resource sets , , , and , respectively. Full DRF gives the first job rate , but once the fourth job completes, every job runs at rate . We therefore apply the release-time reduction to one-shot DRF, and full DRF inherits the resulting bounds by Lemma 1.
The original DRF paper [GZH+11] uses unnormalized demand vectors and unit rate caps. In Section A.2, we show that this formulation is equivalent to ours and that original DRF and Algorithm 1 give every job the same resource allocation at every time and the same completion time. We use the normalized formulation because is then exactly job 's dominant share, which makes both progressive filling and our analysis easier to express.
3 Total Completion Time
We begin by optimizing the total completion time. This is the special case of of the more general -norm objective studied afterwards in Section 4. This special case admits a simpler proof with a better performance guarantee.
3.1 Upper Bound
In the first part of Section 3, we will prove the following theorem.
Theorem 1. For every instance of multidimensional scheduling with resources and zero-release times, one-shot DRF and full DRF satisfy
for the total completion-time objective. Therefore, both algorithms are -competitive for minimizing total completion time.
By Lemma 1, it suffices to analyze one-shot DRF rather than full DRF. Throughout this section, we fix an instance and the schedule of one-shot DRF with completion times .
The proof has three steps. First, we observe that every job needs at least time in every schedule, since its rate never exceeds its cap. The sum of these times is a lower bound on OPT. We show that one-shot DRF exceeds this bound only by a quantity , which measures how long jobs are slowed down by congestion. Second, we use the Cauchy-Schwarz inequality to split into two factors. Third, we bound each factor by comparing it with OPT. The first comparison uses only the total capacity of all resources and loses a factor of . The second uses the bottleneck resources of one-shot DRF and loses only a constant factor. Together, this gives .
3.1.1 Notation and setup
Recall that is the set of unfinished jobs. Since all jobs are released at time zero, the active set equals and hence . Moreover, exactly when all unfinished jobs run at their caps.
We use the following quantities.
• The congestion is , where if .
• The effective mass of job is .
• The effective job count is .
• The effective resource load of resource is .
Intuitively, is the rate of job relative to the common rate . It equals one if job runs at rate , and it is smaller than one if job is limited by its cap. Hence, counts the unfinished jobs, where jobs limited by their caps count only fractionally.
We now make this intuition precise. For every unfinished job with , we have and the rate rule in (2) gives
If , then both and are zero. If , then for every job and . Thus (3) holds for every job and time.
It follows by feasibility of that for every resource , we have
If , then is finite, so at least one resource is tight in (1). For this resource, we have
If , then every and therefore every is zero. In summary, the congestion equals the effective load of the most loaded resource, that is,
Before we continue, we argue that many of the considered quantities are monotone over time.
Lemma 2 (Monotonicity). The functions , , , and are nonincreasing and constant between job completions. At a completion time , their values are computed using , which excludes every job that completes at time . All four functions are zero after a finite time.
Proof. The set of unfinished jobs only shrinks, so is nondecreasing and is nonincreasing. Both factors in the definition of are nonnegative and nonincreasing. The same therefore holds for and for the sums defining and . All these quantities depend only on . Therefore, they remain unchanged while no job completes. When one or more jobs complete at time
If all demand vectors are binary and no job is limited by its rate cap, then is simply the maximum number of unfinished jobs that demand the same resource at time t.
, those jobs do not belong to , so the values at time are already the values for the smaller unfinished set.
Finally, is a feasible candidate fair-share rate for every unfinished set. Every unfinished job therefore receives rate at least and finishes in finite time. Once every job has completed, all four quantities are zero.
3.1.2 Accounting for rate caps
We now separate the contribution of the rate caps from the rest of the objective. Job cannot finish before time in any feasible schedule. Thus,
The remaining part of the objective is captured by the integral of the effective mass. Since while job runs below its cap, this integral is at least the time that job spends below its cap. Using the definitions
we have the following separation lemma.
Lemma 3. For every job , we have . Consequently,
Proof. Because is nondecreasing, a job that reaches its cap stays at that cap until it completes. Let be the first time job runs at its cap, or if it completes without reaching its cap. Before , the job has , so
After , any remaining work takes at most time. Hence
Summing over all jobs and using proves the claim.
It remains to bound . Since whenever , Cauchy-Schwarz gives
We bound the first factor using the total processing capacity of all resources (Lemma 4), and the second using the bottleneck resources of one-shot DRF (Lemma 5).
The subscript 1 indicates q = 1 as we will generalize this notation later to general norms.
3.1.3 Lower bound from aggregate processing capacity
The first lower bound ignores the detailed geometry of the demand vectors and uses only their normalization.
Lemma 4. It holds that
Proof. Since and demands are nonnegative, every job satisfies . Thus every feasible rate vector satisfies
We may therefore relax the instance to a single machine of speed , discard all rate caps, and retain the processing requirements . The optimal value of this relaxation is a lower bound on OPT. Shortest-processing-time first is optimal for total completion time on this relaxation. Thus,
We next bound the integral in the statement of the lemma. Since , expanding its square gives
We bound the individual-job terms and the pairwise terms separately. For every job , the identity in (3) and the bound imply, whenever , that
Integrating and using that job receives exactly units of processing over its execution, we obtain
For two distinct jobs j and , the same reasoning gives
Thus by taking the integral over time, we have
Substituting these bounds into the expansion of and applying (6) yields
which completes the proof of the lemma.
3.1.4 Lower bound from bottleneck resource loads
We next bound in terms of OPT. We use the allocation rule of one-shot DRF to relate congestion to processing requirements on a bottleneck resource. These requirements limit how many jobs OPT can complete by a given time.
For the proof of this bound, and for the refined bounds in Section B, we divide the schedule of one-shot DRF into phases. Partition the schedule at its job completion times and omit phases with . Let be the remaining phases in chronological order, with if there are none. In phase , write , , and , and define its uncapped service amount , which is the processing a job would receive during phase at the common rate without an individual cap. By (3), job actually receives units of processing during phase . Therefore, we have for every job . The inequality may be strict because jobs can also be processed during the omitted phases, in which they run at their caps. Since in the omitted phases, we also have .
Lemma 5. It holds that
Proof. If , then at all times and the claim is immediate. Otherwise, fix an optimal schedule and let be the number of jobs that are unfinished in this schedule at time . Thus . Let , with , and set . Since is nonincreasing by Lemma 2, summation by parts gives
Fix a phase . Some resource is tight in this phase, so . Moreover, the effective masses are nonincreasing across phases by Lemma 2, which implies
for every job . We first use this phase to bound how many jobs remain unfinished in OPT. To complete job , OPT must perform units of processing. Each unit of processing consumes units of resource , so completing this job requires at least units of that resource.
Fix any , and let be the jobs that OPT has completed by time . Since resource has capacity one, OPT can have used at most units of this resource by that time. Hence
Since , the jobs unfinished in OPT satisfy
Note that the quantities are determined by phase of one-shot DRF and not by the remaining work in OPT. Each of them is at most one, so OPT must have at least unfinished jobs at time . Because , we conclude that

Figure 1: Schematic of the area lower bound, with two phases and . The horizontal axis is time in OPT's schedule. The shaded regions are bounds derived from DRF phases, not the time intervals of those phases. Initially (drawn with strict inequality). The unshaded area above the bands is not counted in the lower bound. At each height , phase provides a horizontal segment below . Its shaded region has area . The two regions may overlap in time, but their height intervals are disjoint, so their areas can be added without double counting.
All jobs are released at time zero, so is nonincreasing. Thus throughout . We now combine these bounds across phases without double counting. Recall that OPT is the area under the curve . The bound just proved says that, at height , this area contains a horizontal segment of length . For phase , we count only the segments at heights . Since is nonincreasing, these height intervals have disjoint interiors for different phases. No area is therefore counted twice. See Figure 1 for a visualization. Integrating the segment lengths over their assigned heights and using (7) gives
This completes the proof of the lemma.
3.1.5 Completing the upper bound
Proof of Theorem 1. Combining (5) with Lemmas 4 and 5 gives
Lemma 3 therefore yields
This proves the bound for one-shot DRF when all jobs are released at time zero. A common positive release time adds the same amount to every job's completion time in both schedules, so the bound continues to hold. Finally, by Lemma 1, full DRF completes every job no later than one-shot DRF and satisfies the same bound.
In Section D, we remove the assumption that all jobs are released at time zero, losing only a factor of two.
3.2 Lower Bound
We now show that the dependence on D is tight up to a constant factor. The instance combines jobs that each use a single resource with jobs that use every resource. Both algorithms give all jobs the same rate, whereas a comparison schedule first completes the single-resource jobs in parallel.
Proposition 1. For every integer , the competitive ratio of one-shot DRF and full DRF for minimizing total completion time in multidimensional scheduling with resources is at least , even for binary demands, release times , and .
Proof. Fix an integer . For each resource , create jobs that demand only resource . Also create jobs that demand all resources. Every positive demand is one, and every job has and .
Each resource is demanded by exactly jobs, so one-shot DRF assigns every job rate . All resources are tight at this rate, so full DRF makes the same allocation. All jobs complete at time , giving
We compare this with a schedule that first processes the single-resource jobs in m rounds, one job per resource in parallel, and then processes the remaining k jobs sequentially. Thus
The first term is the contribution of the single-resource jobs. The remaining jobs complete at times , giving the last two terms. Since as , we obtain
Together with Theorem 1, this shows that both algorithms have competitive ratio for total completion time with zero-release times.
4 Minimizing Norms
In this section, we study the -norm objective when all jobs are released at time zero. Given a real number and a feasible schedule with completion times , the norm is . For , this is the total completion time. Larger values of put more weight on jobs with large completion times, and the norm approaches the maximum completion time as . Hence, norms interpolate between average and worst-case job latency. Our goal is to prove the following theorem.
Theorem 2. For every integer and real , one-shot DRF and full DRF have a competitive ratio in
for minimizing the norm of completion times in multidimensional scheduling with resources and zero-release times. In particular, the competitive ratio is in if .
For , the theorem recovers the bound of Section 3. We first prove the upper bound in Section 4.1 and then the upper bound in Section 4.2. Matching lower-bound instances for one-shot DRF and full DRF are given in Section C.2, and the remaining omitted proofs of this section in Section C. The black-box extension to arbitrary release times is deferred to Section D.
Throughout this section, we reuse the congestion , the effective masses , the effective job count , and the effective resource loads from Section 3.1.1.
4.1 An Upper Bound Depending on
Fix a real number and assume that all jobs are released at time zero. Now fix a schedule of one-shot DRF with completion times . Let .
For any , a speed- schedule has capacity on every shared resource and rate cap for each job . Thus its rates must satisfy, at every time ,
Let denote the minimum norm among speed- schedules. In particular, is the usual unit-speed optimum. Speed- schedules only serve as an analysis tool. In the proof of Theorem 3, we show that , so our final bounds compare against the usual unit-speed optimum.
The proof first separates the delay caused by rate caps. We then introduce a continuous-time relaxation and construct two dual solutions to bound the remaining contribution, depending on whether the effective job count is concentrated on one resource or spread across resources. Intuitively, the effective count discounts jobs whose rates are already limited by their caps, so its weighted integral captures the part of the objective caused by competition for shared resources. At heavy times, the most loaded resource carries a significant fraction of this count, allowing us to charge the delay to a single bottleneck. At light times, the count is spread across resources, and we instead charge it through all resource constraints. A threshold balances the losses in these two arguments and leads to the factor .
At the end, we use Lemma 1 to transfer the guarantee to full DRF.
4.1.1 Accounting for rate caps
For every time , we define the nondecreasing weight . When , we set also at . For every time horizon , we have
This identity lets us express completion-time powers as integrals and separate the cap contribution from the rest of the objective.
We now separate the contribution of the rate caps, as in Section 3.1.2. Job cannot finish before time in a speed- schedule. Since , we have and thus
As before, we capture the remaining part of the objective by integrating the effective masses, now weighted by . For every job , define
and
For , these are exactly the quantities and from Section 3.1.2. The following separation lemma generalizes Lemma 3.
Lemma 6. For every job , let be the first time it runs at its cap, or if it finishes without reaching its cap, and write . Then
Consequently, for every , we have
4.1.2 A continuous-time relaxation
By Lemma 6, it remains to bound in terms of . We do this by dual fitting. We formulate a linear programming relaxation for speed-s schedules and construct feasible solutions to its dual from the schedule of one-shot DRF. By weak duality, the objective value of every such dual solution is a lower bound on . This way, we never need to reason about the structure of an optimal schedule directly.
Fix . In the following relaxation, the variable is the rate of job at time .
(LP)
The objective charges each unit of processing of job at time a cost of . Since job receives units of processing before , its total cost in a feasible schedule is at most .
Its continuous dual is given below, with dual variables , , and .
(DLP)
We will always set . The dual then has a natural economic interpretation. We can think of as the price of resource at time and of as a budget of job . The dual constraint says that the budget of job is at most the cost of completing at time plus the price of processing the entire job at time . The dual objective is the total budget minus the total value of the resource capacity. We will choose the prices according to the congestion in the schedule of one-shot DRF.
We first show that (LP) is indeed a relaxation of .
Lemma 7. For every and , the optimal value of is at most .
The next lemma states weak duality with the cap variables set to zero.
Lemma 8 (Weak-duality bound). Fix . Suppose that for every and that each is a nonnegative and integrable function on . If
for every and , then
4.1.3 Dual fitting
We now use Lemma 8 to bound . If , Lemma 6 gives , so assume . Fix a parameter which we will optimize later.
Definition 1 (Heavy and light times). A time is heavy if , and light otherwise. Denote the heavy-time and light-time contributions to by
Then . We distinguish two cases, depending on whether heavy or light times contribute more to , and construct a different dual solution for each case.
4.1.4 Dual fitting case 1: heavy times dominate
Assume that . Let be the first time at which all unfinished jobs can run at their rate caps simultaneously. Since , we have , so . By Lemma 2, is positive for and zero for all . Some jobs may continue running at their caps after .
We next partition into intervals as follows. Start at . For each interval, set and let be the first time . Such a time exists no later than . Stop when , and let be the number of intervals. Thus
For each interval , consider the effective resource loads immediately before its endpoint . Taking the values immediately before in (4) gives . Choose a resource attaining this maximum, and call it the bottleneck resource of . We use the values immediately before because jobs completing at are removed from and may cause the effective loads to decrease at that time.
Fix a time . Since , every unfinished job satisfies
Moreover, Lemma 2 implies that the effective load on resource cannot increase between and . Finally, by the definition of . Combining these facts gives
The next lemma performs the full dual fitting argument and concludes this case.
Lemma 9 (Heavy-case dual fitting). If , then .
4.1.5 Dual fitting case 2: light times dominate
Now assume that . For every time , define . Thus bounds the weighted effective job count at every time at or after . It is nonincreasing because the set of later times only shrinks. It is finite, and it is zero once has become zero. In contrast to the heavy case, we now put the same price on all resources.
Lemma 10 (Light-case dual fitting). If , then .
4.1.6 Proof of an upper bound depending on q
We now conclude Section 4.1 by showing the following theorem.
Theorem 3. For every integer and real , one-shot DRF and full DRF have a competitive ratio in for minimizing the norm of completion times in multidimensional scheduling with resources and zero-release times.
Proof. Assume that all jobs are released at time zero. Fix . Take an optimal unit-speed schedule with rates and replace them by . At time , every resource load and job rate is times its value at time in the original schedule. The new schedule therefore respects resource capacities and rate caps . Moreover, for every job and time ,
Thus each completion time is multiplied by , and so is the norm. Since this is a feasible speed- schedule,
If , Lemma 6 with already gives . Hence, assume and fix . When , we combine Lemma 9 with the bound for . When , we combine Lemma 10 with this bound for . This gives the respective bounds and , where
Here we used , , and . At least one of the two cases holds, so
We choose , which lies in . This choice makes the two terms in the maximum equal, since
We obtain when all jobs are released at time zero.
Finally, by Lemma 1, full DRF completes each job no later than one-shot DRF on the same instance. Its norm is therefore no larger, so the same guarantee holds for full DRF.
4.2 An Upper Bound Independent of q
We now give an upper bound that is linear in and does not grow with . It improves upon Theorem 3 for large , in particular when . We reuse the cap separation from Lemma 6 and bound the time jobs spend below their rate caps. The idea is that a job running below its cap receives at least the rate of every other job, while the total rate of all jobs is at least one. Hence, every job reaches its cap no later than it would complete under processor sharing on a single unit-speed machine. In contrast, even an optimal schedule can process at most units of work per unit of time.
Theorem 4. For every integer and real , one-shot DRF and full DRF have a competitive ratio in for minimizing the norm of completion times in multidimensional scheduling with resources and zero-release times.
Proof. Assume that all jobs are released at time zero, and consider one-shot DRF. Let be as in Lemma 6. By that lemma with , it suffices to show .
Fix a job . For , job receives rate . Every other unfinished job receives at most this rate, and completed jobs receive rate zero. Since , (3) and (4) give
The inequality holds because , as . Thus the schedule processes at least one unit of work per unit of time throughout . At the same time, every job has received no more processing than job , and no job receives more than its own processing requirement. More precisely,
Consequently,
Now relabel the jobs so that , and let . Then . Moreover, it holds that
for every , so the sequence is nondecreasing. Let and denote the corresponding vectors. We have
The second equality writes once for each index , hence exactly times. For the first inequality, note that if , then , and therefore because . The final equality uses . For , this already says . For , Hölder's inequality with exponents and gives
Dividing by shows that for every .
Let and be the completion time and rate of job in an optimal unit-speed schedule, and define . Since and demands are nonnegative, we have for every job , so
For any and exponents with , Hölder’s inequality states that .
Let denote the th smallest optimal completion time. By time , at least jobs have completed. Their total processing requirement is at least , the sum of the smallest processing requirements. Hence . Since the norm is symmetric, . Combining this with (12) and Lemma 6 at gives
By Lemma 1, full DRF completes every job no later than one-shot DRF, so the same bound holds for full DRF.
5 Conclusion
We establish asymptotically tight worst-case completion-time guarantees for DRF in multidimensional nonclairvoyant scheduling. With resources, DRF is -competitive for total completion time and -competitive for the norm of completion times for each fixed real . These guarantees hold with arbitrary release times and without advance knowledge of job sizes. We also obtain sharper bounds for total completion time with two and three resources.
The analysis combines lower bounds based on shared bottlenecks with those based on aggregate processing capacity. Cauchy–Schwarz combines these two perspectives for total completion time, while LP dual fitting extends the approach to general norms. The resulting bounds quantify how DRF’s instantaneous fairness translates into completion-time performance, and identify the dependence on the number of resources. Determining the optimal competitive constants, especially for small numbers of resources, remains an interesting direction.
Methods and AI Use
The authors initiated this study with the binary-demand case and developed complete proofs; earlier attempts to obtain these proofs using AI were unsuccessful. We used OpenAI Codex and Anthropic Claude Code to assist with drafting and revising text, searching and checking references, preparing illustrations, and checking mathematical arguments. AI assistance was also used to generalize some arguments, including extending them to incorporate job-specific rate caps. The authors verified all content, including the proofs and references, and take full responsibility for its correctness.
Acknowledgments
AL was supported by the Deutsche Forschungsgemeinschaft (DFG, German Research Foundation) under Germany’s Excellence Strategy – The Berlin Mathematics Research Center MATH⁺ (EXC-2046/1, EXC-2046/2, project ID: 390685689). MB and SI were supported in part by NSF grants CCF-2423106, CCF-2537126, and CCF-2535599.
References
[AGK12] S. Anand, Naveen Garg, and Amit Kumar. Resource augmentation for weighted flow-time explained by dual fitting. In: SODA. 2012, pp. 1228–1241.
[Apaa] Apache Software Foundation. Apache Hadoop 3.5.0: Hadoop: Fair Scheduler. Accessed: 2026-09-30. URL: https://hadoop.apache.org/docs/r3.5.0/hadoop-yarn/hadoop-yarn-site/FairScheduler.html (visited on 09/30/2026).
[Apab] Apache Software Foundation. Apache Mesos: Roles. Accessed: 2026-09-30. Documentation of the weighted dominant resource fairness allocator. URL: https://mesos.apache.org/documentation/latest/roles/ (visited on 09/30/2026).
[BP10] Nikhil Bansal and Kirk Pruhs. Server Scheduling to Balance Priorities, Fairness, and Average Quality of Service. In: SIAM J. Comput. 39.7 (2010), pp. 3311–3335.
[BM01] Thomas Bonald and Laurent Massoulié. Impact of fairness on Internet performance. In: SIGMETRICS/Performance. 2001, pp. 82–91.
[BMPV06] Thomas Bonald, Laurent Massoulié, Alexandre Proutière, and Jorma T. Virtamo. A queueing analysis of max-min fairness, proportional fairness and balanced fairness. In: Queueing Syst. Theory Appl. 53.1-2 (2006), pp. 65–84.
[BR15] Thomas Bonald and James W. Roberts. Multi-Resource Fairness: Objectives, Algorithms and Performance. In: SIGMETRICS. 2015, pp. 31–42.
[CGKK04] Chandra Chekuri, Ashish Goel, Sanjeev Khanna, and Amit Kumar. Multi-processor scheduling to minimize flow time with epsilon resource augmentation. In: STOC. 2004, pp. 363–372.
[CIP25] Qingyun Chen, Sungjin Im, and Aditya Petety. Online Scheduling via Gradient Descent for Weighted Flow Time Minimization. In: SODA. 2025, pp. 3802–3841.
[CGG13] Richard Cole, Vasilis Gkatzelis, and Gagan Goel. Mechanism design for fair division: allocating divisible items without payments. In: EC. 2013, pp. 251–268.
[EP12] Jeff Edmonds and Kirk Pruhs. Scalably scheduling processes with arbitrary speedup curves. In: ACM Trans. Algorithms 8.3 (2012), 28:1–28:10.
[FAT24] Giannis Fikioris, Rachit Agarwal, and Éva Tardos. Incentives in Dominant Resource Fair Allocation Under Dynamic Demands. In: SAGT. 2024, pp. 108–125.
[GZH+11] Ali Ghodsi, Matei Zaharia, Benjamin Hindman, Andy Konwinski, Scott Shenker, and Ion Stoica. Dominant Resource Fairness: Fair Allocation of Multiple Resource Types. In: NSDI. 2011.
[IKM18] Sungjin Im, Janardhan Kulkarni, and Kamesh Munagala. Competitive Algorithms from Competitive Equilibria: Non-Clairvoyant Scheduling under Polyhedral Constraints. In: J. ACM 65.1 (2018), 3:1–3:33.
[IKMP14] Sungjin Im, Janardhan Kulkarni, Kamesh Munagala, and Kirk Pruhs. SelfishMigrate: A Scalable Algorithm for Non-clairvoyantly Scheduling Heterogeneous Processors. In: FOCS. 2014, pp. 531–540.
[JLM26] Sven Jäger, Alexander Lindermayr, and Nicole Megow. The Power of Proportional Fairness for Nonclairvoyant Polytope Scheduling. In: SIAM J. Comput. 55.2 (2026), pp. 247–279.
[KP00] Bala Kalyanasundaram and Kirk Pruhs. Speed is as powerful as clairvoyance. In: J. ACM 47.4 (2000), pp. 617–643.
[KMT98] Frank P. Kelly, A. K. Maulloo, and David Kim Hong Tan. Rate control for communication networks: shadow prices, proportional fairness and stability. In: J. Oper. Res. Soc. 49.3 (1998), pp. 237–252.
[Mas07] Laurent Massoulié. Structural Properties of Proportional Fairness: Stability and Insensitivity. In: The Annals of Applied Probability 17.3 (2007), pp. 809–839.
[MV22] Benjamin Moseley and Shai Vardi. The efficiency-fairness balance of Round Robin scheduling. In: Oper. Res. Lett. 50.1 (2022), pp. 20–27.
[MPT94] Rajeev Motwani, Steven J. Phillips, and Eric Torng. Non-Clairvoyant Scheduling. In: Theor. Comput. Sci. 130.1 (1994), pp. 17–47.
[Nas50] John F. Nash Jr. The Bargaining Problem. In: Econometrica 18.2 (1950), pp. 155–162.
[PPS15] David C. Parkes, Ariel D. Procaccia, and Nisarg Shah. Beyond Dominant Resource Fairness: Extensions, Limitations, and Indivisibilities. In: ACM Trans. Economics and Comput. 3.1 (2015), 3:1–3:22.
[PST04] Kirk Pruhs, Jiri Sgall, and Eric Torng. Online Scheduling. In: Handbook of Scheduling: Algorithms, Models, and Performance Analysis. Ed. by Joseph Y.-T. Leung. Chapman & Hall/CRC, 2004. Chap. 15, pp. 15-1–15-41.
A Omitted Details from Section 2
A.1 Full DRF Dominates One-Shot DRF
Lemma 1. On every instance, every job completes under full DRF no later than under one-shot DRF.
Proof. Run both algorithms on the same instance, with identical release times, processing requirements, demands, and caps. For , let be its active set and let
be the work it has processed on job by time , taking the rate to be zero before release and after completion. Thus . We prove the invariant
for every job and time . This invariant implies , because if is released and unfinished under full DRF, then , so it is also unfinished under one-shot DRF.
We induct over the release times and the completion times in either schedule. Initially, both schedules have processed zero work. Suppose the invariant holds at an event time , after all releases and completions at that time have been accounted for. Until the next event time , both active sets remain unchanged. For every and , we therefore have
The first inequality holds because full DRF only increases rates after the initial round; the second follows from Observation 1 and the active-set inclusion at . Integrating this inequality from to preserves the work invariant for these jobs. Every other job either has not yet been released, so both work values are zero, or has already completed under full DRF, so .
The work functions are continuous, so the invariant also holds at . In particular, if a job completes under one-shot DRF at , then full DRF has already processed at least units of that job and has completed it by . Any newly released job starts with zero processed work in both schedules. Hence the invariant and the active-set inclusion survive all events at , including simultaneous releases and completions. This completes the induction. At , the invariant gives , proving for every job .
A.2 Equivalence with the Unnormalized Formulation
The original DRF paper [GZH+11] uses unnormalized demand vectors. In the corresponding scheduling formulation, job has a processing requirement , a nonzero demand vector
whose infinity norm may be arbitrary, and a unit rate cap. Here, is the amount of resource that job uses when it runs at full speed. A schedule satisfies , together with the corresponding resource-capacity and completion constraints. Original DRF applies progressive filling to the jobs' dominant shares rather than to their raw rates. It freezes jobs that use a tight resource and continues with the remaining jobs.
Algorithm 1 instead uses normalized demand vectors and job-dependent rate caps. The two formulations are equivalent, and converting between them only changes the units in which demands, rates, and processing requirements are expressed. Under this conversion, original DRF and Algorithm 1 give every job the same amount of every resource, and every job has the same completion time in both formulations. We use the normalized formulation because is then exactly job 's dominant share, which makes both progressive filling and our analysis easier to express. If the original demand vectors already have unit infinity norm, then for every job and Algorithm 1 is exactly the original DRF allocation.
Lemma 11 (Equivalence of the two formulations). There is a one-to-one correspondence between instances of the normalized formulation with job-dependent rate caps and instances of the unnormalized formulation with unit rate caps. For every pair of corresponding instances, there is a one-to-one correspondence between their feasible schedules that preserves every job's completion time.
Proof. First, consider an instance of the unnormalized formulation. For every job , let , and construct the corresponding normalized job by setting
The release time is unchanged. By construction, we have .
Conversely, given an instance of the normalized formulation, define the corresponding unnormalized job by
The release time is unchanged. Since , we have . Hence the two instance transformations are inverses.
It remains to relate schedules on corresponding instances. Given a schedule for the unnormalized instance, define
Conversely, recover from by setting . These maps are inverses. Furthermore, if and only if , and
so the two schedules have identical resource consumption at every time. Finally, because ,
Thus the schedule correspondence preserves feasibility and every job's completion time.
The correspondence also preserves the allocation selected by DRF. Indeed, consider an unnormalized job with demand vector , and let . If is its rate, then its dominant share is , which is exactly the corresponding normalized rate . Therefore, increasing the dominant shares of all unfrozen jobs at the same speed in the unnormalized instance is equivalent to increasing their normalized rates at the same speed. Moreover, we have . So although the scalar rates are expressed in different units, every job receives exactly the same amount of each resource in the two instances. Consequently, the same resources become tight and the same jobs are frozen in every round. Thus, if and are the DRF allocations for corresponding unnormalized and normalized instances, respectively, then for every job . Together with Lemma 11, this shows that original DRF and Algorithm 1 give every job the same resource allocation at every time and the same completion time.
B Low-Dimensional Bounds
We now sharpen Theorem 1 for two and three resources. These cases are of particular practical interest, since cluster jobs typically request only a few resources such as CPU and memory. For and , Theorem 1 gives competitive ratios of and . We improve these to and , respectively.
We retain the zero-release assumption and the notation from Section 3, in particular the phase notation from Section 3.1.4. Recall that is the effective mass of job in phase , is the uncapped service amount of that phase, , and is the congestion.
The general analysis loses a factor of because Lemma 4 only uses the total capacity of all resources. For few resources, we can afford to derive lower bounds on OPT from each resource separately. To this end, we view each resource as a unit-speed single machine. On resource , job requires units of processing. Any feasible multidimensional schedule induces a feasible schedule on this machine in which each job finishes no later than in the original schedule. However, simply adding the unweighted completion costs of these projected schedules could count the same job's completion cost several times.
To avoid this double counting, we use auxiliary weighted single-machine instances. In such an instance, job has a processing requirement and a nonnegative weight , and the objective is , called the total weighted completion time. The auxiliary instances also have all release times zero. In our applications, the weights assigned to a job across the resource projections sum to one. They therefore split its original completion cost among the resources, rather than counting that cost in full for each resource. The sum of the projected optimal weighted costs is then a lower bound on OPT. These weights are only a tool for the analysis. The multidimensional problem and the DRF algorithm remain unweighted. We choose the weights according to the resource demands so that the resulting lower bounds on OPT can be expressed in terms of the resource loads that determine one-shot DRF's processing rates.
To apply the next lemma to resource , we choose a weight and set . During phase , one-shot DRF performs units of processing on job , using units of resource . We count only units of this resource usage. Because , the amount counted is no larger than the amount actually used. Its sum over the phases is therefore at most the projected processing requirement . Also, because . The following lemma uses precisely these two inequalities to lower-bound the optimal weighted completion time.
Lemma 12. Consider jobs with processing requirements and weights on a unit-speed single machine. Suppose that, for each job and phase , we are given a value satisfying
and . If , then
where is the optimal weighted completion time on the single machine.
Proof. On a single machine with all release times zero, Smith's rule is optimal for total weighted completion time. It schedules the jobs in nonincreasing order of . The completion time of a job consists of its own processing requirement and those of all jobs scheduled before it. Hence, the optimal value is
We compare this expression with the individual-job and pairwise terms in . For every job j, the assumptions on give
For two distinct jobs , they similarly give
Interchanging and also bounds this sum by , so it is at most . Expanding now yields
This completes the proof of the lemma.
We use this lemma to bound . For each of the two cases below, we first obtain a lower bound on OPT from weighted resource projections, and then compare it with phase by phase. The decomposition from Lemma 3 then gives the competitive ratio.
B.1 Two Resources
For every phase , let and be the effective loads of the two resources. By (4), we have . Demand normalization also gives , while implies and .
Lemma 13 (Two-resource projection bound). For resources, it holds that
Proof. Fix an optimal multidimensional schedule with completion times . We first split job j's completion cost between the two resources using weights and .
Project the schedule onto resource 1, giving job processing requirement and weight . The projected schedule is feasible on a unit-speed single machine and has weighted completion time at most . On the other hand, Lemma 12 with lower-bounds the optimum of this single-machine instance. Hence
For resource 2, give job processing requirement and weight , and set . Normalization gives , so and these values again satisfy the lemma's assumptions. Since , the same argument gives
Since the two weights of each job sum to one, adding these inequalities counts each job's completion cost exactly once. This gives
Interchanging the roles of the resources, using weights and instead, yields
Averaging the two inequalities proves the lemma.
Lemma 14. For all with , it holds that
Proof. By symmetry, assume . Since , we have . For fixed , the term is minimized at . This choice is feasible because it satisfies both and . Therefore,
The derivative of the right-hand side has the sign of . Thus its maximum on occurs at and equals , proving the claim.
Theorem 5 (Two resources). For multidimensional scheduling with and zero-release times, one-shot DRF and full DRF are -competitive for minimizing total completion time.
Proof. For every phase with , set and . These normalized loads lie in and satisfy , so we may apply Lemma 14. Multiplying its inequality by and using gives
Multiplying by , summing over the phases, and applying Lemma 13, we obtain
The effective-time decomposition in Lemma 3 now gives
This proves the bound for one-shot DRF. Full DRF satisfies the same bound by Lemma 1.
B.2 Three Resources
For each phase and resource , define the effective load . As before, we have , , and . We use the same approach as for two resources, but now split the weight remaining after one projection between the two other resources.
Lemma 15 (Three-resource projection bound). For resources, it holds that
Proof. Fix a resource . We assign weight to job in projection , and distribute the remaining weight between the other two projections. Each assigned weight must be at most the corresponding demand. Such a split is possible because normalization gives .
Denote the resulting weights by , so , , and .
Project an optimal multidimensional schedule onto each resource . In projection , give job processing requirement and weight , and set . These values satisfy the assumptions of Lemma 12 because . As in the two-resource case, the weights sum to one for each job, so the sum of the three projected optima is at most OPT. Set . Summing the three applications of Lemma 12 gives
By construction, and . For a fixed sum, the sum of the squares of the two remaining loads is smallest when they are equal. Formally, Cauchy–Schwarz gives
Consequently,
Averaging this inequality over the three choices of proves the lemma.
Lemma 16. For all with , it holds that
Proof. Let . Since , we have . The identity
shows that each summand on the right-hand side is minimized at . For fixed , we therefore minimize their sum by setting the other two coordinates to . This choice is feasible because both coordinates are at most and . The sum is then , so
The derivative of the right-hand side has the sign of . Thus its maximum on occurs at and equals , proving the claim.
Theorem 6 (Three resources). For multidimensional scheduling with and zero-release times, one-shot DRF and full DRF are -competitive for minimizing total completion time.
Proof. For every phase with , set . These normalized loads lie in and satisfy . Apply Lemma 16, multiply by , and use to obtain
Multiplying by , summing over phases, and applying Lemma 15 gives
By Lemma 3,
The same bound holds for full DRF by Lemma 1.
C Omitted Proofs from Section 4
C.1 Omitted Proofs for the Upper Bound Depending on q
Lemma 6. For every job , let be the first time it runs at its cap, or if it finishes without reaching its cap, and write . Then
Consequently, for every , we have
Proof. Because is nondecreasing, a job that reaches its cap stays at that cap until it finishes. In particular, when the job starts at its cap. Before time , the cap does not restrict the job's rate, so . After time , any remaining work takes at most time. Hence
and
Thus, we have in total
The second inequality is the triangle inequality for the norm. The last equality uses the definitions of and . Finally, applying (9) and gives, for every ,
This concludes the proof of the lemma.
Lemma 7. For every and , the optimal value of is at most .
Proof. Consider an optimal speed- schedule with completion times . Let be its rate for job until completion, and set for . These rates satisfy the primal's resource constraints and rate caps because the schedule is feasible. Moreover, each job receives exactly its processing requirement by completion, so
Thus is a feasible primal solution. Since for , its objective value satisfies
The primal's optimal value is no larger than the value of this feasible solution, which proves the claim.
Lemma 8 (Weak-duality bound). Fix . Suppose that for every and that each is a nonnegative and integrable function on . If
for every and , then
Proof. Set for every job and time . Subtracting from (10) and dividing by gives exactly the constraint of (DLP). Thus is a feasible dual solution with objective value
By weak duality, this value is at most the optimal value of (LP). By Lemma 7, that optimal value is at most , which proves the claim.
Lemma 9 (Heavy-case dual fitting). If , then .
Proof. We only put a positive price on the bottleneck resource of each interval . This price reflects the congestion in the interval and the weight at its end, and it applies to all times before . Formally, we define the following variables for the weak-duality bound in Lemma 8.
Every is nonnegative because its defining sum has only nonnegative terms. For a fixed resource , is a finite sum of nonnegative terms. As increases, terms can only be removed from this sum, so is nonincreasing. It is bounded and zero for , hence integrable.
It remains to verify (10). Fix a job and a time . If , disjointness of the intervals and give , so the condition holds. Hence assume . We have
(13)
We first focus on the first sum of (13). Since the intervals are disjoint, , and , we have
by (8). For the second sum in (13), we have
The individual steps are justified as follows.
• Equation (14) holds because is empty if .
• Equation (15) uses that is nondecreasing.
- Equation (16) uses that on any nonempty interval , job is unfinished and . Hence .
• Equation (17) uses that the integrand is nonnegative.
• Equation (18) uses that job j has at most units of processing left at time .
Thus, by applying both upper bounds to (13), we have in total
which verifies the condition of Lemma 8. Therefore, the lemma implies that
It remains to compare the right-hand side of this inequality with . To this end, define
Summing over all jobs and applying (11) at each time in each interval gives
The definition of gives
where we use that and . Since and , we have
Using the definition of and the preceding inequality, we obtain
Thus . Together with (19) and setting we have
At a heavy time, the definition gives . Moreover, for every . Since for , only the intervals contribute to . Therefore,
Since , we conclude that
Finally, Lemma 6 gives
Substituting proves the claimed bound.
Lemma 10 (Light-case dual fitting). If , then .
Proof. Define the following variables for the weak-duality bound in Lemma 8.
Every is nonnegative because its defining integral has a nonnegative integrand. Since is nonnegative and nonincreasing, the same is true of every . The function is bounded and zero after becomes zero.
It remains to verify (10). Fix a job and a time . Since , the contribution to from times before is at most by (8). If , there is no later contribution. Otherwise, at every light time , job is unfinished and
The equality uses (3). The first inequality uses that is light, so . The second inequality follows from the definition of , since implies . Consequently,
The second inequality uses that the remaining processing is at most . The last inequality uses because and demands are nonnegative. This verifies the condition of Lemma 8. Thus, the lemma implies that
It remains to compare the right-hand side of this inequality with .
To this end, we first prove the auxiliary bound . Let be the times at which decreases, including its last decrease to zero, and let be the size of the decrease at time . Since is nonincreasing and eventually zero, its value at any time equals the sum of all its future decreases, that is,
Fix and consider any . Since is nondecreasing,
The last expression is independent of . Taking the supremum over therefore gives
The term indexed by on the right is present precisely when . Integrating this bound gives
We now bound the two terms on the right-hand side of (20). First, summing the definition of over all jobs gives
The last inequality follows from the case assumption and the identity .
Second, since for every resource , we have
The last inequality uses the bound proved above. We now set . Together with (20), the above gives
Thus . Finally, Lemma 6 gives
Substituting proves the claimed bound.
C.2 Lower Bounds
We now show that the minimum of the two upper bounds is tight up to constant factors. All jobs in the constructions below are released at time zero and have unit rate caps. The first construction uses binary demands and applies to one-shot DRF. It arranges jobs in blocks of disjoint resources, with geometrically decreasing populations and geometrically increasing processing requirements. Within each block, the instance resembles the one from Proposition 1. DRF shares the resources equally between jobs that use a single resource and jobs that use the entire block, whereas it would be better to complete the single-resource jobs first. Across blocks, one-shot DRF gives all jobs the same rate, so it is always slowed down by the most congested unfinished block. In contrast, a comparison schedule processes all blocks in parallel. For full DRF, we add small demands on earlier blocks so that the same bottleneck freezes every unfinished job.
Theorem 7. For every integer and real , one-shot DRF and full DRF have a competitive ratio in
for minimizing the norm of completion times in multidimensional scheduling with resources. The lower bound holds with normalized demands, zero-release times, and unit rate caps. For one-shot DRF, it holds even for binary demands.
Proof. Instance for one-shot DRF. Fix and . We first construct a binary-demand instance for one-shot DRF. Set and . Divide resources into disjoint blocks , each containing resources. The remaining resources are not used. Next, define , , and for . For every block , we create two groups of jobs.
-
For each resource , create jobs that demand only resource .
-
Create jobs that demand every resource in and no resource outside .
Every positive demand is one, and every job associated with block has processing requirement . Thus the number of jobs per resource halves from one block to the next, while the processing requirements double. If , the second group is empty. On every resource, there are times as many block-wide jobs as single-resource jobs. For , there is only one block, and the instance is similar to the one from Proposition 1.
Schedule of one-shot DRF. Suppose blocks are unfinished. Each resource in is demanded by unfinished jobs, while every resource in a later block is demanded by fewer jobs. Hence one-shot DRF assigns every unfinished job rate . Since all unfinished jobs receive the same rate and , the blocks complete in increasing order of their indices. This confirms that the unfinished jobs always form blocks for some .
The first block completes at time one. When block completes, every job in block has already received units of processing. For , the additional time needed to complete block is therefore
Consequently, all jobs in block complete at time . In particular, the last block contains jobs, all of which complete at time .
Comparison schedule. We compare this outcome with a schedule that processes all blocks in parallel. In every block , first run the single-resource jobs at rate for time units. Each resource has load one, and all these jobs complete at time . If , then run every remaining job in the block at rate for time units. Each resource again has load one, and these jobs complete at time one. The blocks use disjoint resources, so these steps can be performed simultaneously in all blocks. All rates are at most one, and the schedule is feasible. It follows that
where the second inequality uses , , , and .
Bounding the ratio. Counting only the single-resource jobs in the last block in the algorithm's objective gives
The last inequality follows from and , which imply . If , then and . Since , the ratio is at least . If , then and , and the ratio is at least . Thus the claimed asymptotic lower bound holds for one-shot DRF.
Extension to full DRF. The instance above does not directly apply to full DRF. When , full DRF continues to increase the rates of jobs in later blocks after the resources of the first unfinished block become tight, because these jobs use disjoint resources. We now add small cross-block demands to prevent this redistribution. We keep the processing requirements and the original demands. Additionally, we give every job associated with block a demand of on each resource in every earlier block , where . Every job still has demand one on some resource in its own block, so all demand vectors remain normalized.
Suppose blocks are unfinished. Let denote their total demand on a resource in block . By symmetry, this quantity is the same for every resource in the block. Let . Since block contains jobs, we have
In particular, . Moreover, implies . Using and , we obtain
Thus the resources in carry the largest total demand and are the first to reach capacity when the rates of all unfinished jobs increase together. Every unfinished job demands at least one of these resources, so full DRF freezes every job during the initial round of progressive filling, at the common rate .
The unfinished jobs again receive equal rates and the blocks complete in increasing order. Set . The time between the completions of blocks and is , where the first interval starts at time zero. Therefore, the completion time of block satisfies
Hence the algorithm's completion times are no smaller than those in the one-shot construction.
It remains to adapt the comparison schedule to the new cross-block demands. During its first step, the jobs from block create load one on each resource in that block, while the single-resource jobs from each later block add load . Thus the load on a resource in is at most
If , then during the second step each later block adds load , so the load is at most
Scale every rate in the comparison schedule by 4/5 and every duration by 5/4. The resulting schedule is feasible and its completion-time norm is 5/4 times the norm of the original comparison schedule. Since the algorithm's completion times have not decreased, its ratio is at least 4/5 times the one-shot lower bound, and hence at least
This proves the theorem.
D A Black-Box Reduction for Release Times
The zero-release analyses in Sections B to 4 use that the unfinished set only shrinks when all jobs are released at time zero. With arbitrary release times, new arrivals may decrease the rates of existing jobs. We now show that monotonicity with respect to the active set still suffices to extend these guarantees, losing only a factor of two. The reduction is black-box in the sense that it applies to every allocation rule with a few natural properties, not only to one-shot DRF. We then restate the resulting bounds for total completion time and norms with arbitrary release times.
A set-based allocation rule assigns to every set of jobs a feasible rate vector with for . The rule may depend on the demand vectors and rate caps of the jobs in , but not on their processing requirements or release times. Over time, it runs the jobs at rates . In other words, the allocation depends on the execution only through the active set. We call the rule positive if for every , and monotone if implies for every . We state the reduction for the norm of completion times with , which includes total completion time as the special case .
Theorem 8. Let , and consider a positive, monotone, set-based allocation rule for multidimensional scheduling. If the rule is -competitive for minimizing the norm of completion times with zero-release times, then it is -competitive for this objective with arbitrary release times .
The idea is to construct a virtual instance in which all jobs are released at time zero and on which the rule produces exactly the same completion times. Each virtual job may receive processing before its original release time, while its rate after release can be lower than in the original execution. Its virtual processing requirement is therefore at most its original requirement plus the virtual work received before release. We bound the optimum of the virtual instance by combining this pre-release work with an optimal schedule for the original instance. Running both in parallel at half speed preserves feasibility and at most doubles every completion time.
Proof. Fix an instance with processing requirements and release-time vector , and run the allocation rule on this instance. Let be the resulting completion time of job , and write . Denote the norms of the completion-time vectors of the rule and of an optimal schedule by and , respectively. Since demand vectors and rate caps stay fixed throughout the proof, we omit them from this notation. A subscript 0 denotes the corresponding values when all release times are zero. At time , let be the active set and let contain all jobs that have not yet completed, including those not yet released. Since , monotonicity gives for every .
We associate with the release-time instance a virtual instance in which all jobs are available at time zero. The virtual processing requirement of job is
This instance is used only for the analysis and need not be constructed online. It has the same demand vectors and rate caps, so whenever the virtual active set is , the rule assigns the rate vector . The definition of makes job complete at time . Positivity rules out an earlier completion, since for every , we have
An induction over the distinct completion times therefore shows that the virtual execution has active set and the same completion-time vector as the original execution. Hence .
It remains to compare the two optimal values. Define the virtual work accumulated before the release of job by . The rate comparison above implies
Let be an optimal schedule for the original instance, with completion times , and write . To process the virtual instance, we combine the pre-release work with the processing in . Consider the rates
In words, runs at half speed. It uses one half of the capacity to perform the virtual work that each job receives before its release, and the other half to follow . Since all demands are nonnegative, setting some coordinates of a feasible rate vector to zero keeps it feasible. In particular, the vector obtained from by setting the coordinates of released jobs to zero is feasible. Moreover, the rate caps and resource capacities are linear constraints, so the average of two feasible rate vectors is feasible as well. Finally, and a change of variables give
where the last inequality follows from (21). Thus every virtual job receives its required processing by time . Any processing after a virtual job completes may again be set to zero without violating feasibility. Since the norm is monotone in every coordinate, we obtain . Consequently,
which proves the theorem.
One-shot DRF is set-based because its allocation only depends on the demand vectors and rate caps of the active jobs. It is positive because , and it is monotone by Observation 1. Hence, Theorem 8 applies. We transfer the resulting guarantees to full DRF using Lemma 1, which holds for arbitrary release times.
Corollary 1. For multidimensional scheduling with resources and arbitrary release times , one-shot DRF and full DRF are -competitive for minimizing total completion time. For and , respectively, the upper bounds improve to and . For both algorithms, the competitive ratio is .
Proof. Apply Theorem 8 with to the one-shot DRF bounds in Theorems 1, 5 and 6, and then use Lemma 1 for full DRF. The matching lower bound from Proposition 1 already holds with zero-release times, so it also applies here.
For the norm objective, write for the norm of the algorithm's completion-time vector , and let be the minimum norm over feasible unit-speed schedules. Both values refer to the original instance with its given release times.
Corollary 2. For every integer and real , one-shot DRF and full DRF satisfy
on every instance of multidimensional scheduling with resources and arbitrary release times. Their competitive ratios for minimizing the norm of completion times are in
In particular, both algorithms have competitive ratio when .
Proof. The proofs of Theorems 3 and 4 give one-shot DRF competitive factors and , respectively, when all jobs are released at time zero. Applying Theorem 8 to each bound gives the displayed upper bound for arbitrary release times. Since the reduction acts on the norm itself, rather than on the sum of th powers, its factor of two is independent of . By Lemma 1, full DRF completes every job no later than one-shot DRF on the same instance, so it satisfies the same norm bound.
The lower bound in Theorem 7 uses only instances with zero-release times and unit rate caps, and hence also applies to the larger class of instances considered here. Together with the upper bound, it gives the claimed bound.