arXiv:2611.06307cs.LGNov 2026

Manuscript Offprint

arXiv:2611.06307

When Does Risk-Controlled Throughput Forecasting Actually Control Risk? A Reproduction Study on LEO Satellite Link

Mayan Sharma, Kriti Saini, Devansh Behl, Suganya R, S. Vijayaragavan

MAYAN SHARMA, Vellore Institute of Technology, India

KRITI SAINI, Vellore Institute of Technology, India

DEVANSH BEHL, Vellore Institute of Technology, India

SUGANYA R, Vellore Institute of Technology, India

S. VIJAYARAGAVAN, Nelco Network Products Ltd., India

Risk-budgeted throughput forecasting has been proposed as a way to make LEO satellite capacity estimates safe for admission control: a point forecast is converted into a conservative bound whose overestimation rate is held at a user-specified budget. We reproduce the state of the art, BG-CFQS, on the three Starlink traces its authors used and on an independent fourth dataset, and report four findings.

First, its risk guarantee is reproducible but conditional on the calibration split. Under a random split of the same data we recover every published quantity, including the risk-pass column at 3 of 3 datasets. Under a contiguous temporal split, which is what a deployed terminal faces, it holds on 1 of 3.

Second, and independent of any split, the method cannot serve a risk budget below 0.15. Its published candidate quantile set is T=[0.15,0.40]T = [0.15, 0.40], and when the budget is tighter than the risk at the most conservative candidate the selection interval collapses to a point and the achieved rate pins there. On all four datasets the achieved rate is identical at budgets of 0.05, 0.10 and 0.15, overshooting by 1.4x to 3.7x at the tightest. The paper evaluates only at 0.35, where the floor never binds.

Third, we show that static conformal calibration cannot improve a ranking at all, only shift an operating point along an unchanged curve, and confirm the consequence exactly on latency spike detection. Online calibration is not so constrained and improves detection AUPRC by up to 51%.

Fourth, we evaluate the natural remedy, group-conditional online recalibration, and find that it splits into two mechanisms with very different standing. The online part replicates: it tracks the budget within 1% at every point from 0.05 to 0.35, where static calibration is 16 to 21% off, and it dominates static calibration on both tail risk and accuracy at matched achieved risk. The group-conditional part does not: on three of four datasets, conditioning on any covariate we have, including measured serving-satellite geometry, is worse than not conditioning at all. We attempted to predict which datasets benefit, from a statistic computable on the calibration split, and failed. We report that failure in full.

What is new here is empirical, not algorithmic. The mechanisms we evaluate are all published, and Section 6 says which paper each comes from. We claim the findings, not the methods.

CCS Concepts: • Networks → Network measurement; Network performance modeling; • Computing methodologies → Machine learning.

Additional Key Words and Phrases: LEO satellite networks, Starlink, throughput forecasting, conformal prediction, risk control, reproducibility

1 Introduction

A LEO access link is a hard thing to allocate bandwidth over. Capacity moves on a 15-second scheduling cadence [4, 15], handovers are frequent, and the achievable rate varies by more than a factor of three within a single hour [12]. An allocator that acts on a point forecast will over-promise whenever the forecast is optimistic, and over-promising drops sessions.

The natural response is to allocate against a conservative bound rather than a point forecast, and to control how often that bound is wrong. BG-CFQS [18] does this by selecting a quantile level

Authors' Contact Information: Mayan Sharma, Kriti Saini, Devansh Behl and Suganya R, School of Computer Science and Engineering, Vellore Institute of Technology, Chennai, Tamil Nadu, India; S. Vijayaragavan, Nelco Network Products Ltd., India. Corresponding author: Mayan Sharma, mayan25sharma@gmail.com.

whose overestimation rate on a calibration set meets a user-specified budget. It reports a global overestimation rate of 0.349 against a budget of 0.35, and a risk-pass on all three of its datasets.

This paper asks whether that guarantee survives contact with the conditions a deployed terminal actually operates in, and what the remedies cost. We do not propose a method. Both mechanisms we evaluate are published, and Section 6 is explicit about which paper each comes from.