The continuous expansion of digital infrastructure especially data centers has imposed unprecedented and geographically concentrated stress on existing power grids. However, rigorous causal evidence quantifying how these facilities reshape local power infrastructure supply remains limited. This study constructs a comprehensive county-level panel dataset spanning the United States from 2010 to 2024, uniquely integrating individual data center building area footprints with power plant additions. To overcome endogeneity and high-dimensional confounding, this study employs Double Machine Learning (DML) with five-fold cross-fitting, controlling for county and year fixed effects, along with regional socioeconomic conditions. The baseline estimates reveal a significant positive effect: The positive temporal association effect is highly robust across a series of rigorous treatments: it persists after 1% and 99% winsorization to exclude mega-clusters such as Loudoun County. Increasing the data center per unit area will significantly increase the electricity demand of nearby power generation facilities (ATE=1.982, P=0.000, CI: [1.25, 2.72]). It remains significant when using one-year lagged treatment to address reverse temporal association; and it holds under alternative state-level fixed effects. An event study framework, augmented with historical agglomeration controls, validates clean parallel trends and reveals a sharp rise in the point estimate precisely at t = 3 (coinciding with the typical utility-scale grid construction lag), although

the confidence interval is wide and includes zero. The estimates become more precise in later periods. Furthermore, a placebo test confirms that the related estimates cannot be replicated by random chance. Regional heterogeneity further reveals stark spatial divergence, with strong positive effects concentrated in the West and significant negative displacement effects observed in the resource-constrained Northeast. These findings offer critical, timely insights for urban planners and energy regulators, underscoring the necessity of forward-looking grid infrastructure investments to sustain the ongoing digital transformation.

CCS Concepts: • Applied computing → Data centers; • Information systems → Geographic information systems; • Hardware → Power networks.

Keywords: Data center, Power Infrastructure, Double Machine Learning, United States

ACM Reference Format:

Yutong Ma. 2026. Data Center Agglomeration and Power Infrastructure Capacity in the United States. In The 4th ACM SIGSPATIAL International Workshop on Advances in Urban-AI (Urban-AI '26), November 03–06, 2026, Riverside, CA, USA. ACM, New York, NY, USA, 10 pages. https://doi.org/10.1145/3849742.3856076

1 Introduction

The rapid advancement of digital infrastructure has fundamentally restructured urban economies, and data centers have emerged as the physical backbone of this digital trans (Ma & Du, 2026). As the deployment of cloud computing and artificial intelligence accelerates, the geographic footprint of data centers has expanded dramatically across U.S. counties, driven by the need for proximity to power infrastructure and urban markets. This surge in digital infrastructure, however, imposes an unprecedented energy burden on local power grids. Unlike traditional industrial loads, modern data centers require continuous, high-density electricity for both

Figure

This work is licensed under a Creative Commons Attribution 4.0 International License.

Urban-AI '26, Riverside, CA, USA

© 2026 Copyright held by the owner/author(s).

ACM ISBN 979-8-4007-3064-1/2026/11

https://doi.org/10.1145/3849742.3856076

Urban-AI '26, November 03–06, 2026, Riverside, CA, USA

Yutong Ma

computing servers and advanced cooling systems. Consequently, the ongoing expansion of data centers has become a dominant catalyst for escalating regional electricity demand, challenging the operational stability and generation capacity of existing power systems. Understanding the dynamic causal relationship between urban digitalization and regional power provision is thus essential for designing resilient energy policies in the era of AI-driven urban growth.

Power availability and grid capacity constitute the dominant constraint in contemporary data center site selection, as hyperscale and AI facilities often require hundreds of MW with rapid interconnection timelines (Goffri, 2026; American Action Forum, 2025). Reliable delivery and substation headroom further differentiate sites, because interconnection feasibility alone does not guarantee stable supply without costly upgrades (Cooper, 2026). Fiber-optic connectivity and proximity to internet exchange points rank nearly as highly, especially for latency-sensitive workloads, while cooler climates reduce cooling energy and improve power usage effectiveness (DataX Connect, 2024). Natural disaster risk such as flood, seismic, and extreme weather exposure drives avoidance of high-hazard zones or necessitates expensive hardening (BCEA, 2026; Coolnet, 2025). Water availability for cooling has risen in importance amid drought concerns, although power access frequently overrides it in practice (Damicis & Tranmer, 2026; Eusterman, 2026). Tax incentives, streamlined permitting, land cost and scalability, political stability, and access to renewable energy complete the multi-criteria matrix routinely applied by developers (Baudry, 2021; Arzumanyan et al., 2025). Empirical spatial analyses in China and the United States confirm that computing demand, economic development, energy access, and hazard exposure jointly explain clustering patterns, with metropolitan areas often emerging as optimal under multi-criteria decision models (Huang et al., 2025; Arzumanyan et al., 2025).

Data center entry generates measurable local employment gains, with counties receiving their first large facility experiencing 3.5-5 percent increases in total private employment and larger effects in construction and information-sector jobs over five to six years (Yue & Zeng, 2026; Alvarez et al., 2026). Construction phases produce substantial temporary job-years and regional output, while operational employment remains modest often dozens to a few hundred permanent technical and facility roles, yet multipliers are amplified in metropolitan areas with existing labor and supplier clusters (Hanlin & Roechr, 2026; Brookings Institution, 2026). Fiscal benefits can be sizable: facilities contribute significant property tax revenue that funds public infrastructure and services, sometimes covering large shares of local budgets and enabling tax-rate reductions (Schaap, 2025; WRI, 2026). Positive effects also appear on the number of establishments, adjusted gross income, wages, and house prices, although electricity prices rise and benefits are weaker or negligible in

rural counties (Alvarez et al., 2026; Yue & Zeng, 2026; Ao et al., 2026). Broader spillovers include upgraded roads, broadband, and power infrastructure that improve quality of life, together with supply-chain and induced service-sector activity (Hardisty Jones, 2026; Roychoudhury & Ross, 2026). Overall, the literature portrays data centers as capital-intensive fiscal assets whose net local prosperity depends heavily on host-community economic density and the presence of multiple facilities.

Surging electricity demand, projected to rise sharply to 2030, strains grids, elevates local rates in some markets, and complicates decarbonization pathways even as operators pursue renewable power purchase agreements (Xiao et al., 2025). Water consumption for cooling, which can reach hundreds of thousands to millions of gallons per day for large facilities, intensifies stress in already water-scarce regions where many new campuses are sited (WRI, 2026; Siddik et al., 2021). Carbon and broader environmental footprints remain substantial under current energy mixes, and best-practice efficiency measures alone are unlikely to achieve net-zero targets without offsets whose permanence is uncertain (Cao et al., 2024; UNU-INWEH, 2026). Community opposition has blocked or delayed tens of billions of dollars in projects over concerns about noise, land conversion, air quality from backup generators, and perceived imbalance between fiscal incentives and local benefits (Harvard Gazette, 2026). Land-use conflicts with agriculture and residential needs, e-waste generation, and skilled-workforce shortages further constrain rapid expansion (WRI, 2026). These interlocking energy-water-social dilemmas force operators and policymakers to navigate trade-offs between growth, sustainability, and equitable distribution of costs and benefits (Deng Hong-hao, 2026).

While the existing literature has extensively examined the energy efficiency, cooling technologies, and electricity price transmission mechanisms associated with data centers, systematic economic evidence regarding whether, and to what extent, the expansion of data centers causally drives investment responses on the regional electricity supply side (i.e., generation capacity) remains notably scarce. Furthermore, constrained by the historical availability of granular data, few empirical studies have successfully disentangled the marginal effects of newly established facilities from the persistent path dependence driven by historical agglomeration. This study contributes to the existing literature in three main dimensions.

This study contributes through innovations in data and empirical measurement. It constructs a novel county-level panel dataset covering the United States from 2010 to 2024, uniquely integrating individual data center building footprints with county-level power generation capacity. By explicitly incorporating an index of historical data center agglomeration (HDA) established prior to 2010, this dataset

Urban-AI '26, November 03–06, 2026, Riverside, CA, USA

provides the micro-level foundation necessary to isolate the marginal effects of new infrastructure shocks.

This study contributes through methodological advancements in causal identification. Departing from traditional linear correlation analyses, this study is among the first to apply the Double Machine Learning (DML) framework to the interface of digital infrastructure and electricity supply. By leveraging orthogonalization and 5-fold cross-fitting, the framework effectively mitigates regularization bias arising from high-dimensional control variables. Furthermore, the integration of an event study design precisely identifies a significant "grid construction lag" occurring three years after initial data center establishment, thereby establishing a robust causal inference strategy.

This study contributes through spatially heterogeneous insights and policy implications. The heterogeneity analysis reveals stark spatial divergence in the regional impacts of data centers: high-density Western technology hubs exhibit strong positive pull effects on local power capacity, whereas resource-constrained Northeastern regions display significant negative temporal association effects. These findings challenge conventional "one-size-fits-all" energy planning approaches and provide region-specific, actionable policy guidance for mitigating grid stress driven by AI-led urban development.

Figure

Figure 1. The spatial distribution of added data centers and power infrastructure each year in the U.S.

The remainder of this paper is organized as follows. Main presents the case study context, delineating the current spatial distribution and evolution of energy infrastructure and data centers across U.S. counties. Results report the main empirical results, including the baseline causal estimates,

the dynamic event study findings, and the regional heterogeneity analysis. Discussion provides a comprehensive discussion of the underlying mechanisms, policy implications, and inherent limitations stemming from these empirical findings. Methods details the data sources and the econometric methodology, explicitly describing the Double Machine Learning (DML) framework, the event study design, and the placebo test used to validate the causal identification strategy.