arXiv:2611.04182cs.DCNov 2026

Manuscript Offprint

arXiv:2611.04182

When the Consumer Is an Agent: Execution-Grounded Service-Level Agreements

Michal Orzechowski, Renata G. Slota, Jacek Kitowski

Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.

Michał Orzechowski¹,²,³ (✉), Renata G. Slota¹, and Jacek Kitowski¹,²

¹ AGH University of Krakow, Poland morzech@agh.edu.pl

² ACK Cyfronet AGH, Krakow, Poland

³ Sano Centre for Computational Medicine, Krakow, Poland

Abstract. Large language model (LLM) agents increasingly act as service consumers. They select operations and report whether a task is complete. In an asynchronous distributed service, an accepted call or immediate state read does not establish that the required state became observable by its deadline. We introduce execution-grounded completion contracts, which treat completion as a service-level outcome. An independent control plane observes a deadline-bound service-state predicate, admits completion, and directs recovery while the agent performs the task. We evaluate placement and deletion in a live multi-provider data service with heterogeneous models and an injected transfer delay. Across policies, some tasks that missed the deadline were accepted and some that met it were rejected. Under enforcement, accepted completions remained consistent with later observations; all included healthy tasks completed, and unresolved faulted tasks terminated as unverified. The results show that completion of these tasks can be governed by independent observation of service state rather than by the agent's self-assessment.

Keywords: Service-level agreements · LLM agents · Runtime verification · Eventual consistency · Service reliability · Federated data services.

1 Introduction

LLM agents increasingly act as service consumers on behalf of users: they interpret a goal, select and invoke service operations, and report whether the requested task is complete. Unlike a deterministic program executing a fixed call sequence, each decision can fail even when every service call succeeds. An agent can therefore report completion despite contrary service state [1,24].

Asynchronous distributed services make that report difficult to assess. An accepted operation may not yet have reached every component, and data and status signals may converge at different times [26,10]. A report-time read can capture an intermediate state rather than establish whether the user's goal held by its deadline. Operation acceptance and task fulfillment are therefore distinct; completion is a service-level question about whether the requested state became observable in time.

Existing mechanisms constrain agent actions and tool use, assess execution traces, or inspect recorded environment state [27,15,9,29,28]. These mechanisms improve execution-time observability and control but leave a service-level requirement: an authoritative, deadline-aware completion decision for the requested state.

Service-level agreement methodology separates a measurable objective from its assessment and the consequences of missing it; WS-Agreement also permits guarantee terms that bind the consumer, not only the provider [2,12]. We bring this perspective to agent-mediated service tasks by treating completion as a service-level outcome rather than an agent-authored judgment. Our central idea is to separate task execution from completion authority: the agent performs the task, while an independent assessment of service state determines whether the requested state became observable within the required time. We realize this separation through execution-grounded completion contracts; Sect. 3 develops their operational model.

We combine consumer-obligated guarantee terms with independent state verification at an agentic service consumer's completion boundary, and give a first live evaluation of the resulting service-control decisions on a federated data service. The paper makes four contributions:

  1. A service-control model for agent-consumer completion contracts: state predicate, deadline, verdicts, evidence boundary, gate, and recovery outcomes.

  2. A comparison of four common completion policies with a deadline-aware reference over recorded ungated trials, showing acceptance-side and rejection-side disagreements.

  3. An evidence-based attribution rule evaluated against an injected fault, with shadowed cases reported separately from cases in which both sides leave observable evidence.

  4. A live evaluation of contract enforcement on two task types and seven models, reporting admitted completions, explicit unverified terminations, recovery mechanisms, runtime activity, and dollar cost.