arXiv:2611.04283cs.DSNov 2026

Manuscript Offprint

arXiv:2611.04283

Metric TSP in Sublinear Time: Breaking Two Approximation

Amir Azarmehr, Soheil Behnezhad

Abstract

The seminal result of Czumaj and Sohler [STOC'04] showed that a 2-approximation of the value of metric TSP can be obtained with sublinear queries. Whether sublinear algorithms can break the 2-approximation barrier has remained a major open problem. See problem 71 on sublinear.info.

This paper resolves this open problem. We show there are fixed ε,δ>0\varepsilon, \delta > 0 such that a (2−δ)(2-\delta)-approximation of metric TSP value can be obtained with O(n2−ε)O(n^{2-\varepsilon}) queries. Here nn is the number of vertices, and the input size is Θ(n2)\Theta(n^2).

*Northeastern University, Boston, Massachusetts, USA. Supported in part by NSF CAREER Award CCF 2442812, a Sloan Fellowship, and a Google Research Award. Emails: {azarmehr.a, s.behnezhad}@northeastern.edu.

Contents

1 Introduction 1
2 Technical Overview 2
2.1 TSP through the Cut LP ..... 2
2.2 Towards a Subquadratic Query Algorithm ..... 5
3 Preliminaries 9
4 The Dual LP and MST Shortenings 12
4.1 Dual LP and Tree Representation ..... 12
4.2 MST Shortening ..... 13
5 The Core 15
5.1 Base Terminals and the MST Fragments ..... 15
5.2 Core Terminals ..... 16
5.3 The Computed Core ..... 17
5.4 Core Alignment and the Comparison Tree ..... 19
6 Cell Decomposition and Local Solutions 21
7 Construction of FdualF_{dual} 22
7.1 Contracted Cells ..... 22
7.2 The Global Solution ..... 25
8 Analysis of w(Fdual)w(F_{dual}) 25
8.1 Regular Cells ..... 26
8.2 Contracted Cells ..... 29
9 Subquadratic Implementation 33
9.1 Base Terminals and Access to MST Fragments ..... 34
9.2 Estimating the Contributions of Contracted Cells ..... 36
9.3 Final Estimate L^\widehat{L} ..... 42
9.4 Subquadratic Time ..... 42

References (16)