arXiv:2611.04425cs.DCNov 2026

Manuscript Offprint

arXiv:2611.04425

Minimizing Bottleneck Overload Risk in Online Edge Task Placement under Workload Uncertainty

Lei Wang, Winston K. G. Seah, Gang Xu, Xiaodong Xu, Baoqi Huang

Lei Wang, Winston K.G. Seah, Gang Xu*, Xiaodong Xu and Baoqi Huang

Abstract—In edge computing, tasks must be placed on servers of finite capacity before workloads are realized, often with only workload means and variances known. An assignment balanced on expected load can still leave a server with more fluctuations than its residual capacity can absorb. Per-server risk constraints can enforce a prescribed overload tolerance but do not distinguish the assignments that meet it by how close the riskiest server comes to the limit. We show that, for independent tasks, placement preserves a period's total variance and total residual capacity, and decides only how fluctuation, measured by standard deviation, is paired with residual capacity across servers. The risk ratio, the ratio of fluctuation to residual capacity, parameterizes a server's worst-case overload probability over all aggregate workload distributions with given mean and variance. We minimize the largest risk ratio, attained at the risk bottleneck. Risk-Bottleneck Placement (RBP) places tasks in descending order of standard deviation, each on the server with the smallest post-assignment risk ratio, and refines the assignment with relocations and swaps within a finite per-period online budget. On small instances solved exactly by enumerating every assignment, minimizing the maximum expected utilization leaves the largest risk ratio 25.66–29.19% above its exact minimum on average, even with risk-minimizing tie-breaking, and the corresponding gap for RBP is 1.77–2.64%. In trace-derived multi-period simulations at two workload pressures, RBP reduces the worst-server overload probability by 26.0% and 18.0% relative to the best baseline and remains the lowest at every tested pressure and scale.

Keywords—Edge computing, online task placement, load balancing, workload uncertainty, overload risk, risk-aware scheduling.

I. INTRODUCTION

Edge computing places computation close to users and data sources to reduce response latency, but each edge server operates with finite local capacity [1–3]. A placement decision must often be made before the actual computation demand of the arriving tasks is realized. The processing resources a task requires are uncertain before execution [4–6] and may become known only when the task completes [6]. What the scheduler can obtain in advance are low-order statistics of each task's workload, typically its mean and variance [6, 7]. In an online system, the tasks of each decision period are placed using these moments together with the current server state before the workload realizations of the period are observed. A server that cannot complete its realized workload within the period carries the remainder into the next period as backlog.

Under this information, balancing expected workload is not the same as balancing overload risk. After a placement, each server has a residual capacity, the capacity left after its backlog and the expected workload of its new tasks, and an aggregate workload fluctuation, measured by the standard deviation of the workload it has received. The residual capacity is the headroom available to absorb that fluctuation. We call the ratio of a server's aggregate fluctuation to its residual capacity the server's risk ratio. The larger it is, the more fluctuation the server must absorb with the headroom it has. A server can look well balanced in expectation while carrying more fluctuation than its headroom can safely absorb. Fig. 1 illustrates this on a small instance with 12 tasks and 3 servers, for which we enumerate all 312=531,4413^{12} = 531,441 complete assignments so that both assignments shown are exact optima. The assignment that minimizes the maximum expected utilization, which we call the expected-load optimum, gives the three servers nearly equal expected utilization. Yet S2 cannot absorb its fluctuation since its uncertainty margin, a safety margin proportional to its workload standard deviation, is larger than its residual capacity. The assignment that minimizes the largest risk ratio, the risk-ratio optimum, redistributes the same tasks so that expected utilization becomes uneven, with S1 carrying more expected load than S2 and S3, but fluctuation is better matched to the headroom of each server. The example raises a placement question that an expected-load criterion does not answer, that is, which server carries the largest fluctuation relative to the capacity left to absorb it and how a placement can make that ratio as small as possible.

Classical scheduling rules operate on deterministic task sizes or estimated execution costs [8]. Chance-constrained programming [9, 10] and moment-based distributionally robust optimization [11–13] provide tools for turning probabilistic requirements into deterministic constraints, and the latter can derive such constraints from moment information without assuming a particular distribution. Work on mobile edge computing with uncertain processing cycles uses these tools to bring moment information into the decision. Li et al. [6] use the mean and variance of processing cycles to provide probabilistic deadline guarantees while minimizing user energy consumption, and Fan et al. [7] bound the computation-outage probability under an unknown workload distribution while also minimizing energy consumption. In both works, the probabilistic requirement determines which decisions are acceptable, and the optimized objective is energy consumption. Applied to placement, a requirement of this kind accepts every placement that keeps each server within the tolerance, however close its riskiest server comes to the limit. A scheduler may

∗^{*}Corresponding author: Gang Xu (e-mail: csxugang@imu.edu.cn).

L. Wang, G. Xu, X. Xu and B. Huang are with the College of Computer Science, Inner Mongolia University, Hohhot 010021, China.

W. K. G. Seah is with the School of Engineering and Computer Science, Victoria University of Wellington, Wellington 6140, New Zealand.

Figure

Figure

Fig. 1. Expected-load optimum (left) and risk-ratio optimum (right) for one instance with 12 tasks and 3 servers, both obtained by enumerating every assignment. The expected-load optimum minimizes the maximum expected utilization and, among tied optima, minimizes the largest risk ratio. The risk-ratio optimum minimizes the largest risk ratio. Arrows mark the risk bottleneck, the server with the largest risk ratio. The uncertainty margin is a safety margin proportional to the server's workload standard deviation.

instead balance a risk-adjusted load, which adds an uncertainty margin to the backlog and the expected workload of each server. Keeping this load within capacity marks the same boundary as a limit on the risk ratio, but two servers with the same risk-adjusted utilization can still have different risk ratios (Section III), so balancing risk-adjusted utilization does not directly minimize the largest one.

Under the independent-task model considered in this work, server-level overload risk has a simple structure (Section IV). The total workload variance of a decision period is fixed by the arriving batch, and the total residual capacity is fixed by the batch and the current server state. Placement therefore cannot remove uncertainty or create headroom. It decides only how fluctuation is paired with residual capacity across servers. The risk ratio also has a distributionally robust meaning. Among all aggregate workload distributions with a server's mean and variance, the largest overload probability is an increasing function of the risk ratio, which is the tight form of Cantelli's inequality [11, 13]. We call the server with the largest risk ratio the risk bottleneck and take the bottleneck risk ratio, the largest risk ratio across servers, as the objective of per-period placement. Minimizing it therefore minimizes the largest worst-case overload probability across servers. A per-server risk tolerance defines a feasibility boundary but does not distinguish the placements within it. The bottleneck risk ratio ranks them by how close their riskiest server comes to the limit. Since a placement meets the tolerance if and only if its bottleneck risk ratio does not exceed a threshold set by the tolerance (Section III), every minimizer of the bottleneck risk ratio meets the tolerance whenever some placement does. For given residual capacities, the pairing view also shows that the bottleneck risk ratio is smallest when every server carries

fluctuation in proportion to its headroom. Tasks are indivisible, so this proportion cannot always be met exactly. On small instances with 3 and 4 servers, whose exact optima we obtain by enumerating every assignment, the bottleneck risk ratio of the optimum exceeds the proportional ideal by a median of 0.33% and 0.69%.

Risk-Bottleneck Placement (RBP) builds on this structure in two stages that share one finite online budget. The construction stage processes tasks in descending order of workload standard deviation and places each on the server with the smallest post-assignment risk ratio. The refinement stage then spends the remaining budget on one-task relocations and two-task swaps aimed at reducing the bottleneck risk ratio.

The main contributions are as follows.

  • Pairing view of server-level overload risk. Under task independence, the total workload variance and the total residual capacity of a decision period do not depend on placement, which acts only on how fluctuation is paired with headroom across servers. The risk ratio, a server's aggregate fluctuation relative to its residual capacity, parameterizes the worst-case overload probability over all aggregate workload distributions with the given mean and variance, so minimizing the bottleneck risk ratio minimizes the largest such worst-case probability. The analysis also gives a lower bound on the bottleneck risk ratio of an assignment in terms of its residual capacities, attained if and only if every server carries fluctuation in proportion to its residual capacity.

  • Risk-Bottleneck Placement for finite-budget online assignment. RBP assigns each task to the server with the smallest post-assignment risk ratio, with tasks taken in descending order of standard deviation. It then refines the

assignment with relocations and swaps aimed at reducing the bottleneck risk ratio, within a finite online budget that includes construction.

The remainder of the paper is organized as follows. Section II positions this work relative to scheduling under workload uncertainty. Section III presents the system model and the risk formulation, and Section IV derives the structural properties. Section V describes RBP, Section VI reports the evaluation and Section VII concludes the paper.

References (48)