arXiv:2611.00432cs.GTOct 2026

Manuscript Offprint

arXiv:2611.00432

Online Fair Division of Chores with Upgrade Recourse

Yichen Huang, Nicholas Teh

Abstract

We study the online fair division of indivisible chores among nn agents under upgrade recourse, where earlier assignments may be revised but each chore previously assigned to an agent must be replaced by a distinct chore that she finds no more costly. We show that a simple adaptation of round robin maintains envy-freeness up to one chore (EF1) together with a (2−1/n)(2-1/n)-approximation of the maximin share (MMS), and that no deterministic algorithm without predictions can do better, even when all agents rank the chores in the same order. This stands in contrast to the allocation of goods, where the optimal MMS factor vanishes as nn grows and cannot be achieved together with EF1. Moreover, knowing only the number of chores modulo a period of length O(n)O(n) (and nothing about the costs) suffices to improve upon this factor at the final configuration, while the same algorithm retains a factor below 3 even if this information is wrong. On the other hand, envy-freeness up to any chore (EFX) essentially requires the exact number of chores: uncertainty between two consecutive values already rules out every finite approximation, and even exact knowledge does not allow EFX to be combined with an MMS guarantee better than the trivial factor of nn.

1 Introduction

According to GitHub's 2025 Octoverse report, developers on the platform merged an average of 43.2 million pull requests each month (GitHub Staff, 2025)—roughly a thousand every minute. Before it is merged, a pull request can be sent to teammates for review, and reviewing someone else's code is a textbook example of a chore: a task that brings the person who performs it a cost rather than a benefit. GitHub can assign incoming review requests automatically, using either a round-robin rule, which alternates between the members of a team, or a load-balance rule, which favors members with fewer recent and outstanding requests (GitHub, 2026). Customer service platforms such as Zendesk route support tickets by analogous rules, based on round robin or on each staff member's spare capacity (Zendesk, 2026a), and online assignment of heterogeneous tasks to workers has been studied for crowdsourcing markets such as Amazon Mechanical Turk (Ho and Vaughan, 2012). In each of these settings, a web platform must decide, one request at a time, who does the work.

Two features of these applications make fair allocation difficult. First, work arrives online: a request needs an owner as soon as it appears, long before the day's workload is known. Second, the same task can cost different people very different amounts of effort—a pull request that takes the author of the affected code ten minutes may take a newcomer an afternoon. The routing rules above are simple and transparent (indeed, our main algorithm builds on round robin), but they count requests rather than effort: GitHub's load-balance rule, for instance, aims for each team member to review "an equal number of pull requests" in any 30-day period (GitHub, 2026). Moreover, since work arrives online, the fairest assignment of the morning's requests may depend on what arrives in the afternoon.

Fortunately, assignments on these platforms are not final: a review can be passed to another reviewer, and a ticket can be handed to a colleague. Reassignment is a mixed blessing, however. Unrestricted reassignment can burden a person with work she finds far more costly than what she originally accepted—a reviewer who agreed to check a two-line fix will not welcome finding it swapped for a sprawling refactor (readers who have been handed a last-minute conference review will know the feeling). Prohibiting reassignment altogether avoids this problem but, as we discuss next, severely limits fairness. Our key question is this: How fairly can chores be allocated online if assignments may be revised, but only in ways that do not make any agent's earlier commitments more costly for her?

The online fair division model requires each arriving item to be allocated immediately (Aleksandrov et al., 2015; Aleksandrov and Walsh, 2020). For nn agents with additive costs, an agent's maximin share (MMS) (Budish, 2011; Aziz et al., 2017) is the smallest cost she can guarantee herself by dividing the chores into nn bundles and receiving the most costly one, evaluated using her own costs. An allocation is α\alpha-MMS if it gives every agent cost at most α\alpha times her maximin share; smaller factors are better. With irrevocable assignments and an unknown horizon (i.e., the number of chores), the trivial nn-MMS guarantee is optimal up to an arbitrarily small additive term (Song et al., 2026). In other words, if assignments are final, no online algorithm can guarantee substantially better than handing every chore to a single (unlucky) agent. Dynamic fair division permits changes and typically measures the number of disruptions (Friedman et al., 2015; He et al., 2019). Our concern is different: which changes are acceptable to the affected agents?

Huang and Teh (2026) recently proposed upgrade recourse for goods, requiring every reassignment to leave each affected agent at least as well off. In this paper, we initiate its study for chores. Note that upgrade recourse for chores must be defined carefully and differently from that for goods, since it is not possible to leave every agent at least as well off when a chore arrives. Whenever a chore arrives, every previously assigned chore must be matched to a distinct chore in its owner's new bundle that she finds no more costly. Thus each earlier commitment has a separate replacement, and exactly one agent receives an additional chore, not necessarily the arriving one. In the code review example, the platform may swap a pending review for one that the reviewer finds no more costly, but never for a more demanding one, nor may it replace two of her pending reviews with a single review that costs her more than either. We place no bound on the number of reassignments, and we do not model when chores are performed, so every assigned chore remains available for reassignment (think of reviews that nobody has started yet).

Our algorithms use the insertion procedure of Huang and Teh (2026), adapted to chores. Fix a sequence of picking turns, each owned by an agent. When a chore arrives, the owner of each old turn, in order, keeps the less costly of the chore in that turn and the chore passed to her (initially the arrival), and passes the other on; the chore passed on from the last old turn is placed in a new final turn. Every old turn thus weakly improves for its owner. More importantly, the result is exactly the least-cost picking allocation, in which the owners of the turns, in order, each take a least costly remaining chore among all chores observed so far. The problem therefore separates into implementing a fixed sequence online and choosing one with suitable fairness guarantees. With a round-robin sequence, insertion gives each agent exactly as many chores as round-robin routing would, but lets the agents' costs decide who holds which chore. Notably, it never needs cost magnitudes: each step asks an agent only which of two chores she finds less costly.

This separation also explains the value of a small prediction. For goods, the kkth picking turn guarantees its owner her kkth most valuable good or better, whatever the horizon (Huang and Teh, 2026). For chores, the guarantee of a turn depends instead on how many turns follow it—the last turn receives the one remaining chore, which may be the most costly one. Good picking sequences for chores therefore assign each cost rank (rank 1 for the most costly chore, rank 2 for the next, and so on) to an agent and let the agents pick in reverse order of rank (Aziz et al., 2024). If this assignment follows a periodic pattern, knowing the final number of chores modulo the period tells the algorithm where in the pattern to start. Thus O(log⁡n)O(\log n) bits of horizon information suffice to surpass what any prediction-free algorithm achieves. Some platforms already forecast their workload; Zendesk, for instance, forecasts inbound ticket volume up to a year ahead from historical data (Zendesk, 2026b). We ask for far less (only the number of chores modulo a period of length O(n)O(n)) but we ask for it exactly. For this reason, we also bound the loss when the prediction is wrong; in no case do we need to predict future costs.

References (100)

Couldn't load all references. Reload the page to try again.