Manuscript Offprint
arXiv:2610.40728Bayesian Distribution System State Estimation with Flow Matching
Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.
Nan Lin, Graduate Student Member, IEEE, Peter Palensky, Senior Member, IEEE, Pedro P. Vergara, Senior Member, IEEE
Abstract—Medium-voltage feeders have few real-time measurements, so distribution system state estimation (DSSE) rests on pseudo-measurements of the secondary substations, a prior in Bayesian terms. Weighted least squares keeps the power flow exact but reduces this prior to a mean and variance, while supervised deep learning estimators also learn the power flow and are tied to one measurement set. We propose PoSE (posterior sampling for state estimation), which keeps the Bayesian structure of DSSE and learns only what the distribution system operator does not know, namely the distribution of substation injections, modelled by a neural network trained with flow matching on historical data. The power flow equations, grid topology and measurements enter only at sampling, through a noise-aware Kalman-type correction. The neural network therefore never approximates the power flow, but every posterior sample is a physically consistent operating point, and one trained prior serves any measurement set, noise level and topology. On the IEEE 33-bus feeder, PoSE lowers the probabilistic injection error (CRPS) by 6.7–7.5% against a full-covariance Gaussian prior in all 12 tested settings. It provides reliable uncertainty: the 90% intervals contain the true injection almost exactly as often as exact posterior samples would, whereas those of supervised estimators contain it in only 37–78% of cases. On the 240-bus unbalanced three-phase Iowa feeder, it gives the lowest injection, voltage and branch-current errors of all estimators. A fast variant matches this accuracy at 0.2–0.6 s per snapshot and, without retraining, beats Gaussian priors and retrained supervised estimators on seven reconfigured topologies.
Index Terms—Distribution system state estimation, flow matching, diffusion, generative models, pseudo-measurements, neural networks.
I. INTRODUCTION
Distribution system operators (DSOs) must know the voltages and branch loading of their medium-voltage feeders to keep them within limits, and rooftop PV pushes these feeders towards those limits in both directions: voltage rise and reverse flow at midday, voltage drop and peak loading in the evening. Yet a typical feeder is measured in real time only at the primary substation and at a few remote points. Distribution system state estimation (DSSE) is therefore underdetermined, and pseudo-measurements of the secondary substations, estimates of their
injections from historical data, carry most of the information about the state [1], [2], [3].
Two requirements follow. The first is a realistic joint description of the substation injections, which are correlated across substations through shared weather and consumption patterns and non-Gaussian under rooftop PV. The second is physical and measurement consistency. The estimator must incorporate sparse, noisy measurements through the nonlinear power flow equations and provide calibrated uncertainty.
Existing approaches meet only one requirement at a time. Weighted least squares with Gaussian pseudo-measurements meets the second. It accepts any measurement set, weights each measurement by its noise variance and solves the AC power flow. It describes the injections, however, by independent means and variances, and both simplifications distort the uncertainty it reports. Rooftop PV output rises and falls together across substations under shared irradiance, so an independent prior understates how far the substations can deviate together, which is what drives midday voltage rise and reverse flow. When the pseudo-measurements are skewed or heavy-tailed, the WLS overstates the uncertainty, by a margin that varies across buses and operating points [4]. The WLS covariance therefore does not give a reliable limit violation probability. Gaussian mixture pseudo-measurements add a non-Gaussian shape [5], [6], but the estimator still returns one point and one covariance, so a skewed or bimodal injection is reported as a symmetric interval around a single estimate.
Learned estimators take the statistics of the injections and voltages from data rather than from an assumed Gaussian shape, but give up parts of the second requirement. Learned pseudo-measurements improve the point estimate [7], [8]. Bayesian deep estimators approximate the minimum mean square error estimator [9], [10] or the voltage distribution [11], and a conditional diffusion model trained on measurement-state pairs gives voltage point estimates [12]. Each is trained for one measurement configuration, so a failed meter, a new sensor, a change in sensor accuracy or a switching action requires retraining. The estimators that output voltages see the measurement noise only through simulated training pairs and must approximate the power flow equations themselves, so their voltages and branch currents need not form a physically consistent operating point. They return a point, or a mean and variance of the voltage magnitudes, which does not give the probability that a branch exceeds its thermal limit. A generative adversarial prior over unobservable injections, fitted to the measurements at inference through LinDistFlow, avoids retraining [13]. Without a noise model, however,
Nan Lin is funded by NWO Align4Energy Project NWA.1389.20.251. This work used the Dutch national e-infrastructure with the support of the SURF Cooperative using grant no. EINF-17304.
Nan Lin, Peter Palensky, and Pedro P. Vergara are with the Intelligent Electrical Power Grids Group, Delft University of Technology, 2628 CD Delft, The Netherlands (e-mail: N.Lin@tudelft.nl, P.Palensky@tudelft.nl, P.P.VergaraBarrios@tudelft.nl).
The code is available on Github: https://github.com/sentient-codebot/PoSE and https://github.com/distributionnetworksTUDelft/PoSE it treats every measurement as exact, so the measurement noise passes into the estimate, and its single point estimate satisfies only the linearized power flow. A normalizing flow has been used to learn the state distribution [14]. Table I summarizes these approaches by the quantity each models, either as a regression from the measurements y or as a distribution , over the injections s or the voltage phasors V, possibly given calendar context c. It also marks whether a new measurement set or noise level needs retraining, and whether the measurement noise covariance enters the estimator explicitly, only through simulated training pairs, or not at all.
The design principle we follow separates what the DSO knows from what must be learned. The power flow equations, the feeder topology, and the sensor locations and noise are known, and they define the likelihood of the measurements. The joint distribution of the injections is unknown and is learned from historical data as the prior. Bayes' rule combines the two into the posterior, which is available in closed form only for a Gaussian prior and linear measurements. Diffusion and flow priors have made this posterior tractable for non-Gaussian priors and nonlinear measurements [15], [16], [17], [18], and SmartMeterFM applies measurement-guided flow matching to smart meter data [19]. We train the prior once, and the measurements enter only at sampling, so the same prior serves any measurement set, noise level and topology. DSSE adds a combination these methods have not addressed: noisy measurements of a few aggregate quantities through the AC power flow, and estimates that must be physically consistent and calibrated.
Our solution, PoSE (posterior sampling for state estimation), is a conditional flow matching prior [20] over the substation injections, sampled with a noise-aware endpoint correction linearized through the power flow model. The contributions are:
-
To our knowledge, PoSE is the first DSSE method that samples the posterior with a learned generative prior and an inference-time endpoint correction toward the measurements. The prior over the secondary-substation injections is trained once on historical data and contains no sensor or noise information. The measurement set, its noise and the feeder model enter only through the correction. The same trained prior therefore serves any meter configuration, noise level and switching configuration of the feeder without retraining, and they return the posterior distribution of the state rather than a single estimate.
-
PoSE returns estimates that satisfy the AC power flow by construction. The prior is learned in the injection space, so the network never has to approximate the power flow equations, as estimators that output voltages must. Every posterior sample is instead mapped through the AC power flow, so every sampled voltage and branch current is a physically consistent operating point. Operational quantities, such as the probability that a voltage or thermal limit is violated, are read directly from the samples.
-
We design a noise-aware endpoint correction mechanism, with proven exactness in linear-Gaussian. It uses the full covariance of the learned prior instead of an isotropic or diagonal approximation. Its fast variant, PoSE-fast, forms
this covariance only along the measured directions, so its cost grows with the number of measurements, which is small in distribution grids, rather than with the state dimension.
A. State, Measurements and Posterior
We consider a radial medium-voltage distribution feeder, modeled as a single-phase equivalent or as an unbalanced three-phase network, with a known slack voltage at the primary substation and load nodes, the secondary substations. The unknown is the vector of net active power , in kW, and net reactive power , in kvar, drawn at the load nodes in one snapshot, positive for consumption and negative for net export; determines the operating point. Buses without load are part of the feeder model, not of the state. An AC power flow maps to the node voltages and the branch currents; we write
where runs the power flow and returns the measured quantities: active and reactive power at the feeder head, voltage magnitudes at selected buses and, where available, the injections of monitored secondary substations. With few real-time measurements, , and is not identifiable from alone.
Given calendar context (month, time of day and day type), DSSE is the inverse problem of recovering from . Its Bayesian solution is the posterior
whose likelihood follows from (1) and whose prior describes how the injections of all substations behave jointly in that context. Every quantity a DSO monitors is a function of s: the posterior over s, pushed through the AC power flow, gives the posterior over voltages and branch currents, and with it the probability that a limit is violated.
B. Correspondence with Bayesian Inverse Problems
Table II maps the terms of DSSE onto those of Bayesian inverse problems. Pseudo-measurements act directly as a prior distribution: the classical weighted least-squares (WLS) estimator with Gaussian pseudo-measurements [1] is formally the maximum a posteriori (MAP) estimate under a diagonal Gaussian prior. Similarly, feeder unobservability represents ill-posedness, where real-time measurements alone leave a subspace of injections undetermined, which the prior must resolve. The estimation quality of an unobservable feeder is therefore fundamentally governed by prior expressiveness, making a richer joint prior the direct route to superior state estimates.
TABLE I COMPARISON WITH PRIOR DSSE APPROACHES
| Approach | Model family | Modelled quantity | Deep learning | Output | No retraining | Noise | AC-consistent |
|---|---|---|---|---|---|---|---|
| WLS, Gaussian pseudo-meas. [1] | Diagonal Gaussian | Injections, | ✗ | Point, covariance | ✓ | Explicit | ✓ |
| GMM pseudo-meas. [6] | Gaussian mixture | Injections, | ✗ | Point, covariance | ✓ | Explicit | ✓ |
| Learned pseudo-meas. [7] | Linear regression | Injections, | ✗ | Point, covariance | ✗ | Explicit | ✓ |
| End-to-end pseudo-meas. [8] | MLP | Injections, | ✓ | Point, covariance | ✗ | Explicit | ✓ |
| Bayesian deep estimator [9] | MLP | Voltages, | ✓ | Point | ✗ | Training only | ✗ |
| GAN-based estimator [10] | GAN; MLP | Inj., ; volt., | ✓ | Point | ✗ | Training only | ✗ |
| Multi-fidelity deep GP [11] | Deep Gaussian process | Voltage magn., | ✓ | Mean, variance | ✗ | Training only | ✗ |
| Conditional diffusion [12] | Conditional diffusion | Voltages, | ✓ | Point | ✗ | Training only | ✗ |
| Physics-conditioned GAN [13] | Wasserstein GAN | Unobs. injections, | ✓ | Point | ✓ | None | ✗ |
| PoSE (ours) | Flow matching | Injections, | ✓ | Posterior samples | ✓ | Explicit | ✓ |
TABLE II DSSE TERMS AND THEIR BAYESIAN COUNTERPARTS
| DSSE | Bayesian inverse problem |
|---|---|
| Pseudo-measurements | Prior |
| Real-time measurements and their accuracy | Likelihood |
| Unobservable feeder | Ill-posed inverse problem |
| WLS with pseudo-measurements | MAP under a Gaussian prior |
| Estimate with uncertainty | Posterior |

Fig. 1. PoSE in two phases. Offline, a flow matching prior over the substation injections is trained once on historical data, without sensors, noise model or grid model. Online, the measurements and the feeder model enter only through the endpoint correction (4) at each Euler step (6). The inset shows 25 real sampling paths of the bus-13 injection for one test snapshot, under the prior and under S2, drawn with an earlier prior over active power alone.
III. PoSE METHODOLOGY
The method keeps the two factors of (2) apart. A flow matching model learns the prior once from historical secondary substation data; measurements enter only at inference, through a correction of the sampler's endpoint estimate. The same trained weights therefore serve any measurement set, noise level and radial topology. Fig. 1 shows which part is trained, when, and with which data.
A. Flow Matching Prior over Injections
We standardize the injections per node, , with the mean and standard deviation of the training snapshots, and train a conditional flow matching model [20] on the linear
path , , with at the data. A neural network regresses . Its endpoint estimate
approximates . The neural network is a residual multilayer perceptron with adaptive layer normalization on an embedding of and . Month and time of day enter through low-order Fourier features of the yearly and daily cycles, and day type through a learned embedding. Smooth calendar features let the neural network share information between neighbouring hours and months instead of fitting each calendar cell separately, which matters because a year of data offers only a few days per cell. The neural network has four residual blocks of width 512 (256 for the Fluvius data) and a 128-dimensional embedding. We train for 10,000 steps with AdamW (learning rate , 1,000 warm-up steps followed by a cosine decay, batch size 1,024, weight decay 0.1), dropout 0.1 and an exponential moving average of the weights with decay 0.999, and keep the average with the lowest flow matching loss on validation weeks, evaluated every 2,000 steps. The configuration was selected on validation data only.
B. Posterior Sampling through Noise-Aware Endpoint Correction
At every sampling step the endpoint estimate is corrected towards the measurements by a Kalman-type update in standardized space,
where the residual always uses the AC model and is the fixed matrix of LinDistFlow, the linearized DistFlow model [21]. Its linearization error is folded into the noise: , with the covariance of the difference between the AC and the LinDistFlow measurements over the training snapshots.
Unbalanced three-phase networks: For multi-phase feeders, the state remains the 2N nodal injections at the secondary substations. The active and reactive power of each bus is split over its load connections in proportion to their nominal active power, and the share of a three-phase load is split equally over its phases. Each connection lies on the phases, or phase pairs for delta connections, of its distribution transformer winding. The per-phase injections are thus a fixed linear function of , and the imbalance adds no unknowns. Voltages and branch currents are indexed over node-phases and branch-phases. Node-phase has phase with rotation , . Delta connections are converted to equivalent wye powers at flat balanced voltages, which gives the active and reactive injections and at node-phase . The linear operator is the unbalanced LinDistFlow matrix [22], obtained by linearizing the AC power flow at no load around the balanced slack voltage , with the slack voltage magnitude. Let be the sum, over the branches shared by the paths from the slack to node-phases and , of the per-unit series impedance entry between phases and , and . The first-order expansion of the voltage magnitude is . Composing this expansion and the per-phase head flows with the allocation gives a fixed linear operator from to the measurements, so the correction (4) operates under multi-phase physics without retraining the prior.
Endpoint covariance : The isotropic choice with is the pseudoinverse-guided correction of PiGDM [16] as carried to flows by OT-ODE [18]. The Tweedie choice uses the conditional covariance of the endpoint [23], [17],
which we symmetrize and project onto the positive semidefinite cone. The full Jacobian costs one forward-mode product per state dimension and step. The state dimension of the IEEE 33-bus feeder is 64, so the exact covariance is affordable. The gain needs only through and . A fast variant, PoSE-fast, forms only these, as the cost analysis of TMPD assumes [17]: forward- and reverse-mode products per step, which give the symmetrized product, instead of . It projects the matrix , whitened by , onto the positive semidefinite cone; the same directions are removed from , so the update remains a Kalman update with a positive semidefinite covariance and never increases the whitened linear residual. The number of Jacobian products then grows with the number of measurements rather than with the state dimension, as analyzed in Section V-H.
Noise: treats the measurements as exact; otherwise the noise covariance and the linearization error enter as above. With , recovers the projection guidance of SmartMeterFM [19] and the noise-aware isotropic correction of PiGDM and OT-ODE; PoSE pairs the Tweedie covariance with , as in the TMPD update [17].
The corrected endpoint drives the sampler. We integrate the posterior flow using the Euler step
with steps along the quadratic time grid , , which places more steps near , where the narrow conditional posterior is resolved, and return the corrected endpoint of the final step.
C. Exactness for a Gaussian Prior
Proposition 1 (Exactness): If the prior on is Gaussian, is linear (so that and ), is independent of and of the sampler noise, and exactly, then the PoSE correction gives , and the flow (6) in continuous time transports to the posterior .
Proof: For a Gaussian prior, is Gaussian with mean and covariance (5), and is linear-Gaussian in and independent of given . The Kalman update of this Gaussian by is (4), so . On the linear path the velocity of the posterior flow is , which is (6).
The update has the form of the denoising step of TMPD [17], adapted here to a linear-path flow sampler. Because conventional WLS with Gaussian pseudo-measurements corresponds to the MAP estimate under a diagonal Gaussian prior, PoSE directly reduces to the full Bayesian posterior of WLS when the prior is Gaussian. In practice, exact posterior recovery depends on the fidelity of the learned prior, sampler time discretization and power flow linearization. Because the true distribution of load and rooftop PV injections is non-Gaussian and unknown in closed form, we verify theoretical exactness on a linear-Gaussian testbed in Section V-A and evaluate empirical performance under realistic distribution conditions in Sections IV and V.
D. Physically Consistent Samples
Each posterior sample of s is passed through the AC power flow, which gives samples of all node voltages and branch currents that satisfy the power flow equations exactly. Point estimates are posterior means; uncertainty and violation probabilities follow from the samples without further assumptions.
IV. CASE STUDY
A. Feeder and Power Flow
The main testbed is the IEEE 33-bus radial feeder [24] as provided by pandapower (case33bw) [25]: 12.66 kV, 32 load nodes and 32 branches, with the slack voltage fixed at 1.0 p.u. A batched backward/forward sweep in PyTorch supplies h and its Jacobian; it matches pandapower to within p.u. in voltage magnitude on 100 test snapshots of each data set. Because case33bw has no ampacities, the rating of a branch is its current at nominal loading, and branch currents are reported in percent of that rating.
Reconfigured feeders: Branches 1–32 of case33bw feed buses 2–33, and branches 33–37 are the normally open tie switches between buses 8–21, 9–15, 12–22, 18–33 and 25–29. These five ties give seven further radial topologies, listed in Table III: one that opens branches 7, 9, 14, 32 and 37, which lowers the losses at nominal loading from 202.68 to 139.55 kW; one with all five ties closed; and, for each tie, the topology that closes it and opens the adjacent sectionalizing
TABLE III
RADIAL TOPOLOGIES OF THE IEEE 33-BUS FEEDER AT NOMINAL LOADING
| Topology | Open branches | Loss (kW) | (p.u.) | (p.u.) |
|---|---|---|---|---|
| Original | 33, 34, 35, 36, 37 | 202.68 | 0.9131 | - |
| Loss-reducing | 7, 9, 14, 32, 37 | 139.55 | 0.9378 | 0.0412 |
| All ties closed | 7, 9, 14, 28, 32 | 139.98 | 0.9413 | 0.0458 |
| Tie 8-21 | 7, 34, 35, 36, 37 | 158.39 | 0.9299 | 0.0192 |
| Tie 9-15 | 14, 33, 35, 36, 37 | 196.42 | 0.9167 | 0.0134 |
| Tie 12-22 | 11, 33, 34, 36, 37 | 156.79 | 0.9267 | 0.0416 |
| Tie 18-33 (stress) | 32, 33, 34, 35, 37 | 203.95 | 0.9067 | 0.0098 |
| Tie 25-29 | 28, 33, 34, 35, 36 | 175.13 | 0.9285 | 0.0297 |
branch. At nominal loading the largest change of a bus voltage from the original topology, , reaches 0.046 p.u. Closing the tie between buses 18 and 33 raises the losses and lowers the minimum voltage; it serves as a stress case. The voltage meters of S2 stay at buses 18, 22 and 33, and the branch ratings of each topology are its own currents at nominal loading. The flow matching prior, the Gaussian and mixture priors and all tuned hyperparameters are those of the original topology. Only h, H and are rebuilt. The supervised estimators are run both as trained on the original topology and retrained for each topology.
Iowa 240-bus system: The second feeder is the Iowa distribution test system [26], a real 13.8 kV network with three feeders and one year of hourly smart meter data from 2017. Net active and reactive powers are aggregated at primary buses, yielding a 386-dimensional injection state across 193 load nodes. We evaluate two representations. First, a balanced positive-sequence equivalent preserving lateral voltage drops, with two 50 kvar fixed capacitor injections, 1.025 p.u. slack voltage and dead ends removed. On 100 test hours with active regulators, it matches the unbalanced OpenDSS solution to within 0.004 p.u. in bus voltage magnitudes. Its measurement set is the equivalent, with substation , and three farthest bus voltages. Second, a full unbalanced three-phase model with 455 node-phases and 432 kept branch-phases, excluding 23 branch-phases carrying no downstream loads or capacitors, preserving OpenDSS line impedances and lateral phase assignments. The reference is the reduced OpenDSS model without regulators, transformers or line charging, which the three-phase power flow reproduces to within p.u. in voltages and kW in per-phase head active power on 100 test hours. The same model generates synthetic measurements and serves the estimator. Grid model mismatch is out of scope. Across test snapshots, voltage unbalance remains mild, with unbalance factor at three-phase buses at most 0.13% and maximum phase spread 0.006 p.u., whereas head current imbalance reaches 30.6% with a median of 11.9%, and 20.8% of three-phase branch-phase currents exceed the balanced equivalent by over 10%. The measurement set is -3ph with measurements: per-phase head and , and the voltage magnitudes at bus 1017 phase c, bus 2048 phase b and bus 3091 phase a.
B. Injection Data
Ausgrid: The main testbed uses the Ausgrid solar home electricity data [27]: 300 homes with rooftop PV in the distribution

Fig. 2. IEEE 33-bus feeder with the PV-heavy secondary substations (buses 13–18) and the measurement sets: S1 measures active and reactive power at the feeder head, S2 adds voltage magnitudes at buses 18, 22 and 33, and S3 adds the active power of the substations at buses 16 and 30.
network of Ausgrid in New South Wales, Australia, half-hourly general consumption, controlled load and gross PV generation from 1 July 2010 to 30 June 2013. Each load node aggregates nine homes; the 54 homes with the largest PV systems feed buses 13–18, at the end of the long branch, and the remaining homes are assigned at random. The net injection of each node is scaled so that the 99th percentile of its gross consumption over the training days matches the node's nominal case33bw load, and net power is scaled by the same factor, so PV export keeps its ratio to consumption. The reactive injection of a node is its scaled gross consumption times the tangent of the node's nominal case33bw power factor, with PV at unity power factor, so reactive and active power differ at midday. A high-PV scenario multiplies gross generation by three, which corresponds to about 5 kWp per home and produces reverse flow and voltage rise at midday.
Fluvius: The second data set is one year (2024) of 15-minute smart meter data from 2,400 Flemish homes published by the DSO Fluvius [28], aggregated to 75 homes per node with the PV homes concentrated on buses 13–18. These meters record net offtake and injection rather than gross consumption, so the reactive injection is the nominal power factor applied to the net offtake. These data serve the exactness test described in Section V-A and the study of the training data volume in Section V-E.
Split and context: Days 8–14 of every month are test days (252 days for Ausgrid, 84 days each for Fluvius and Iowa), days 22–28 validation days, and the remaining days training days; the split is strictly by time, never at random. The Ausgrid data yield 592 training days, the Fluvius data 198, and the Iowa data 197. From the pool of test days, 1,000 test snapshots are drawn by stratified sampling round-robin across the 24 hours of the day, ensuring balanced representation of diurnal operating points across all seasons. The context c consists of month, time of day, and weekday or weekend.
C. Measurement Sets and Noise
Three measurement sets cover the observability of a typical medium-voltage feeder, illustrated in Fig. 2: S1 holds the active and reactive power at the feeder head; S2 adds the voltage magnitudes at buses 18, 22 and 33, the ends of the three laterals; S3 adds the active power of the secondary substations at buses 16 and 30. Each measurement has Gaussian noise with a standard deviation of one third of a 1% maximum error of its nominal magnitude (nominal noise), or three times that value (high noise). Measurements are generated from the AC power flow of the true injections.
D. Baselines
Alternative estimators: Six estimators from four families serve as benchmarks. For classical point estimation, WLS uses diagonal Gaussian pseudo-measurements with the mean and variance of each node in the training snapshots of the same month and day type within one hour, solved by Gauss–Newton on the AC model, with samples from the Laplace approximation at the estimate. For Bayesian estimation without deep learning, the correlated Gaussian replaces the diagonal covariance by the Ledoit–Wolf estimate of the full covariance [29] to account for correlations between substations; the pooled Gaussian retains the full-covariance Gaussian but pools all training snapshots of the same day type with circular Gaussian kernels in time of day and month, shrunk towards the diagonal to share information across calendar contexts; and the Gaussian mixture uses a mixture prior per context bin [5] with the exact mixture posterior under the bias-corrected LinDistFlow model. For supervised deep learning, the supervised MLP maps to s, retrained for every measurement set and noise level, with Monte Carlo dropout [30] for samples. For supervised generative modelling, the supervised flow is a conditional flow matching model of with the same architecture and budget as the prior, retrained for every measurement set and noise level, following the formulation of supervised conditional diffusion estimators [12].
Guidance variants with the same prior: The ablation keeps the learned prior and changes only how the measurements enter: the projection and isotropic variants of Section III-B, and diffusion posterior sampling (DPS) [15], the standard gradient guidance of generative inverse solvers, which moves each sample along the gradient of the measurement residual of its endpoint estimate.
Tuning: Hyperparameters are chosen on the validation weeks: the number of mixture components and the bandwidths and shrinkage of the pooled Gaussian (time of day 0.5–4 h, month 0.5–2 months, shrinkage 0–0.2) once per data set and PV scenario by validation log-likelihood, and the DPS step size from to 1 separately for every measurement set, noise level and scenario by validation CRPS. The pooled Gaussian is solved as the correlated Gaussian. Validation selects a single mixture component on every data set, so the Gaussian mixture acts as a per-bin Gaussian prior with the exact posterior of the bias-corrected LinDistFlow model.
WLS is the conventional reference in the main results table. The correlated Gaussian tests the additional benefit beyond a Gaussian prior that captures correlations.
E. Metrics
Every method returns 100 samples per snapshot on the 1,000 stratified test snapshots, spread evenly across the 24 hours of the day so that every operating point is equally represented. All methods see the same truths, measurements and initial noise: each comes from its own random generator, seeded per snapshot. Injection accuracy is measured by the continuous ranked probability score (CRPS) of the active power per node in kW [31]; a point estimate scores its absolute error. The CRPS of the reactive power, in kvar, is reported
next to it. Voltage accuracy is the RMSE of the posterior-mean voltage over the buses, in p.u., and branch accuracy the error of the posterior-mean current in percent of the rating. Uncertainty calibration is evaluated by the coverage of the central 90% sample intervals of the active injections. With K exact samples, such an interval covers a new draw with probability , which is 0.882 for K = 100; we report coverage next to this attainable value. For operational limit and violation monitoring, we score the detection of limit violations: voltages outside 0.95–1.05 p.u. and branch loading above 100% of the rating. The predicted violation probability is the fraction of AC-consistent samples that violate the corresponding limit; we report its Brier score, and the hit and false-alarm rates of alarms raised at probabilities of 0.5 and 0.1. Differences between methods are given with 95% confidence intervals from a paired block bootstrap over test days.
V. RESULTS
A. Exactness at Feeder Scale
We test Proposition 1 at the scale of the feeder. A Gaussian is fitted to the active injections of one midday hour of the Fluvius data, its analytic endpoint replaces the network, and the exact posterior for S2 at nominal noise is known in closed form. With 200 steps and 4,000 samples, PoSE matches the posterior: the largest per-node error of the mean is 1.97 Monte Carlo standard errors, the per-node standard deviation ratios lie in 0.971–1.017, and the relative Frobenius error of the covariance is 0.040, below the 0.047 of 4,000 exact draws.
B. Accuracy and Uncertainty Calibration
Table IV compares the alternative estimators against WLS in the setting with voltage measurements at nominal noise. Its CRPS is the CRPS of a method minus that of WLS, computed before rounding, with the 95% paired block-bootstrap confidence interval; negative values favour the method. For coverage, bold marks the value closest to the attainable 0.882. PoSE lowers the injection CRPS by 1.85 kW on the base feeder and 4.22 kW on the high-PV feeder relative to WLS, with both paired confidence intervals below zero. The correlated Gaussian improves on WLS by accounting for correlations, and pooling calendar contexts adds 0.18 and 0.20 kW; PoSE lowers the CRPS by a further 0.34 and 0.35 kW against the pooled Gaussian, with the lowest voltage and branch-current errors on the base feeder and the lowest branch-current error under high PV.
Across the whole matrix, shown in Fig. 3(a), three measurement sets, two noise levels and two PV scenarios, PoSE has a lower CRPS than every alternative estimator in all 12 settings, with the 95% confidence interval of the difference below zero. Against the correlated Gaussian the gain is 7.2–7.5% on the base feeder and 6.7–7.1% under high PV, and 0.25–0.43 kW in the midday hours; against the pooled Gaussian it is 4.3–5.0%. PoSE lowers the branch-current error relative to the correlated Gaussian in every setting, by 4.3–6.9%, and has the lowest reactive CRPS of all alternative estimators in every setting.
TABLE IV
INJECTION ACCURACY, VOLTAGE AND BRANCH CURRENT ERRORS AND COVERAGE, S2 AT NOMINAL NOISE. BOLD: BEST PER COLUMN.
| Method | Base PV | High PV | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| CRPS kW | CRPS vs WLS [95% CI] | V RMSE p.u. | Branch % | Cov. | CRPS kW | CRPS vs WLS [95% CI] | V RMSE p.u. | Branch % | Cov. | ||
| Reference | Reference | ||||||||||
| WLS | 8.27 | 1.04 | 4.27 | 0.941 | 11.56 | Reference | 1.20 | 5.59 | 0.952 | ||
| Correlated Gaussian | 6.94 | -1.33 [-1.47, -1.20] | 0.87 | 3.53 | 0.906 | 7.87 | -3.68 [-4.11, -3.27] | 0.94 | 3.92 | 0.904 | |
| Pooled Gaussian | 6.76 | -1.51 [-1.66, -1.38] | 0.86 | 3.45 | 0.902 | 7.68 | -3.88 [-4.30, -3.47] | 0.92 | 3.84 | 0.900 | |
| Gaussian mixture | 6.91 | -1.36 [-1.49, -1.22] | 0.93 | 3.54 | 0.879 | 7.89 | -3.67 [-4.09, -3.27] | 1.14 | 3.98 | 0.881 | |
| Supervised MLP | 7.78 | -0.49 [-0.66, -0.31] | 0.97 | 3.55 | 0.415 | 8.61 | -2.95 [-3.40, -2.53] | 1.10 | 4.04 | 0.490 | |
| Supervised flow | 6.87 | -1.40 [-1.55, -1.23] | 0.88 | 3.45 | 0.765 | 7.84 | -3.72 [-4.15, -3.31] | 0.96 | 3.90 | 0.762 | |
| PoSE (ours) | 6.42 | -1.85 [-2.00, -1.71] | 0.81 | 3.28 | 0.874 | 7.33 | -4.22 [-4.66, -3.80] | 0.95 | 3.73 | 0.876 | |

Fig. 3. Injection accuracy and calibration of each estimator, one marker per measurement set and noise level (six per PV scenario), 1,000 test snapshots each. (a) Injection CRPS relative to WLS, the reference of Table IV. (b) Coverage of the central 90% intervals of the active injections; the vertical line is the coverage that exact samples attain with , .
Figure 3(b) demonstrates that PoSE produces well-calibrated uncertainty intervals. Its 90% intervals cover the truth in 0.870–0.877 of cases across the 12 settings, against an attainable 0.882 for 100 samples, and 0.873–0.881 for the reactive injections. The Gaussian priors are too wide (correlated 0.900–0.908, pooled 0.896–0.904). The Gaussian mixture (0.869–0.883) is calibrated as well but less accurate. The supervised estimators are overconfident: the supervised flow covers 0.716–0.780 and the supervised MLP 0.365–0.563. A prior learned once and corrected at inference thus gives a posterior that is both accurate and well calibrated in its uncertainty, while the estimators trained for each measurement set are overconfident.
The learned posterior is not Gaussian. Across all test cases, the resulting posteriors are unimodal yet distinctly asymmetric. The absolute skewness of the PoSE samples at the PV-heavy buses at midday exceeds 0.5 in 24% of node-snapshots, against 4% for the correlated Gaussian, whose samples are Gaussian by construction so that its share reflects sampling noise alone. The PoSE-fast posteriors in Fig. 4(d) are likewise asymmetric.
PoSE has a lower voltage RMSE than every alternative estimator in 10 of the 12 settings, including all six on the base feeder. Under high PV with voltage measurements at nominal noise (S2 and S3), the pooled Gaussian reaches 0.92 and p.u. and the correlated Gaussian 0.94 and 0.88, against 0.95 and 0.89 for PoSE. In those two high-PV settings, the normalized chi-squared of the PoSE residual is 2.0–4.2 across the three measurement sets, reflecting the increased LinDistFlow linearization error under heavy reverse flow, compared to at most 0.9 under nominal conditions.
C. Operational Limit and Violation Monitoring
Table V reports what a DSO monitoring limits would see. Voltage alarms are raised at a predicted probability of at least 0.5; the hit rate is the share of true violations that raise an alarm, and the false-alarm rate the share of non-violating bus-snapshots that do. The last column of each scenario is the 95th percentile over snapshots of the largest branch-current error in a snapshot. The base feeder has 613 voltage violations and 62 overloads (bus or branch and snapshot), the high-PV feeder 1,891 and 2,119. PoSE has the lowest 95th percentile of the largest branch-current error of a snapshot and the lowest overload Brier score in both scenarios. Against the correlated Gaussian, this tail error falls from 30.7–33.8% to 28.2–31.3% of the rating across all 12 settings. For voltages, PoSE raises the fewest false alarms in both scenarios (0.10% and 0.16%, tied with WLS on the base feeder) while maintaining a hit rate within 1.0 percentage point of the correlated Gaussian. Although the Gaussian mixture flags more violations on the base feeder, it does so at three times the false-alarm rate (0.31%), and Gaussian priors yield comparable voltage Brier scores (3.3–3.4 against 3.5 under high PV) while suffering from significantly worse branch-current tail errors.
Fig. 4 shows the estimates of PoSE-fast and WLS over one test week of the high-PV feeder. At midday, when PV export dominates, the 90% intervals of the bus-13 injection are about a third as wide for PoSE-fast as for WLS, with a median width of 64 against 215 kW over the 63 midday half-hours. At the marked snapshot, the 221 kW interval of the learned prior falls to 75 kW with the feeder-head power alone and changes little with the further meters of S2 and S3. Every voltage and branch-current sample is an AC power flow solution, so the violation probabilities follow from the same samples. Over this week the Brier score of the overloads of branch 12 is 0.010 for PoSE-fast against 0.015 for WLS. At bus 17, next to the voltage meter at bus 18, both reach 0.021.
D. Ablation of Measurement Guidance Mechanisms
Table VI keeps the learned prior and changes only the guidance, at nominal noise. Accounting for the measurement noise is essential: projection works when only the feeder-head power is measured, with a CRPS 2.0–4.0% below the correlated Gaussian across both noise levels, but with voltage measurements its CRPS is 2.1–6.6 times that of the correlated Gaussian, because exact projection onto noisy voltages forces the injections to fit the noise. The noise-aware isotropic correction recovers most of the accuracy, and the Tweedie
TABLE V
LIMIT MONITORING, S2 AT NOMINAL NOISE. BOLD: BEST PER COLUMN.
| Method | Base PV | High PV | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| V hit % | V FA % | V Brier | I Brier | I err p95 % | V hit % | V FA % | V Brier | I Brier | I err p95 % | |||
| WLS | 85.0 | 0.10 | 2.9 | 1.9 | 32.4 | 91.5 | 0.23 | 5.0 | 12.9 | 40.5 | ||
| Correlated Gaussian | 91.5 | 0.15 | 2.1 | 1.6 | 30.7 | 95.5 | 0.22 | 3.4 | 6.4 | 31.9 | ||
| Pooled Gaussian | 91.5 | 0.13 | 2.0 | 1.6 | 30.6 | 95.7 | 0.20 | 3.3 | 6.3 | 31.3 | ||
| Gaussian mixture | 96.9 | 0.31 | 2.7 | 1.6 | 30.9 | 91.7 | 0.21 | 5.1 | 7.0 | 31.8 | ||
| Supervised MLP | 84.5 | 0.16 | 3.3 | 1.7 | 32.4 | 93.0 | 0.25 | 4.9 | 7.1 | 32.2 | ||
| Supervised flow | 92.2 | 0.17 | 2.4 | 1.6 | 31.3 | 96.1 | 0.27 | 3.6 | 6.5 | 33.0 | ||
| PoSE (ours) | 91.8 | 0.10 | 1.9 | 1.5 | 28.2 | 94.6 | 0.16 | 3.5 | 6.2 | 29.3 | ||

Fig. 4. Estimates over the test week of 8–14 July 2011 on the high-PV feeder, S2 at nominal noise, 100 samples. (a) Net active injection at bus 13. (b) Voltage magnitude at bus 17, the unmeasured bus with the most true voltage violations in the week. (c) Current of branch 12, which feeds bus 13, in percent of its rating. Bands are the central 50% and 90% sample intervals of PoSE-fast, dashed lines those of WLS, and shading marks true violations. (d) Kernel density estimates of the bus-13 injection at the marked snapshot under the learned prior and the PoSE-fast posteriors for S1, S2 and S3, with the WLS posterior for S2 dashed. Bars and numbers give the 90% intervals.
TABLE VI
INJECTION CRPS (kW) AND 90% COVERAGE (IN PARENTHESES) OF THE GUIDANCE VARIANTS. BOLD: LOWEST CRPS PER COLUMN.
| Base PV | High PV | |||||
|---|---|---|---|---|---|---|
| Guidance | S1 | S2 | S3 | S1 | S2 | S3 |
| Correlated Gaussian (reference) | 7.07 (0.908) | 6.94 (0.906) | 6.65 (0.900) | 8.06 (0.906) | 7.87 (0.904) | 7.39 (0.901) |
| Projection | 6.82 (0.874) | 14.76 (0.689) | 15.11 (0.632) | 7.90 (0.878) | 17.65 (0.708) | 17.82 (0.657) |
| Isotropic | 6.80 (0.876) | 6.69 (0.874) | 6.36 (0.875) | 7.87 (0.881) | 7.70 (0.878) | 7.24 (0.879) |
| DPS | 6.54 (0.868) | 6.48 (0.866) | 6.33 (0.841) | 7.50 (0.871) | 7.42 (0.863) | 7.15 (0.843) |
| PoSE | 6.54 (0.872) | 6.42 (0.874) | 6.15 (0.872) | 7.52 (0.875) | 7.33 (0.876) | 6.87 (0.877) |
covariance supplies the rest: the isotropic correction loses 41–52% of the gain of PoSE over the correlated Gaussian on the base feeder and 57–73% under high PV, where the conditional covariance of the injections is least isotropic.
DPS, with a step size tuned per setting, comes closest to PoSE in point accuracy but is overconfident, with coverage 0.836–0.871, and its gap to PoSE grows as measurements are added: PoSE is 0.06–0.09 kW below DPS in S2 and 0.16–0.28 kW in S3, with 95% confidence intervals below zero. With only the feeder-head power measured (S1), the two achieve comparable CRPS, but DPS requires sensitive manual step-size returning for every measurement setting. Furthermore, while DPS has a fast per-step evaluation (0.17 s), it lacks the exact covariance guidance needed for uncertainty calibration, a computational gap that PoSE-fast closes without loss of accuracy, as detailed in Section V-H.
E. Sensitivity to Historical Training Data Volume
We used a model world to isolate the amount of data: a flow prior trained on all real Fluvius days serves as the true distribution, and only the number of independent training

Fig. 5. Model world (active-power state): a flow prior trained on all real days of the Fluvius data serves as the true distribution. Left: CRPS of PoSE relative to the correlated Gaussian with 95% paired block-bootstrap intervals; right: coverage of PoSE, both for S2 at nominal noise and 1,000 test snapshots, as the number of independent training snapshots grows.
snapshots changes, as illustrated in Fig. 5. Across 1,900, 19,000 and 190,000 training snapshots, PoSE consistently outperforms the correlated Gaussian: from 19,000 to 190,000 snapshots, the CRPS of PoSE falls from 4.17 to 4.13 kW, while that of the correlated Gaussian decreases from 4.31 to 4.20 kW. Crucially, the coverage of PoSE reaches the attainable value from 19,000 snapshots on.
TABLE VII
INJECTION CRPS (kW) ON RECONFIGURED FEEDERS. BOLD: LOWEST ON EVERY TOPOLOGY.
| Base PV | High PV | |||||||
|---|---|---|---|---|---|---|---|---|
| Method | S1 | S2 | S1 | S2 | ||||
| Orig. | Reconf. | Orig. | Reconf. | Orig. | Reconf. | Orig. | Reconf. | |
| WLS | 8.45 | 8.45–8.46 | 8.27 | 8.23–8.31 | 12.09 | 12.05–12.09 | 11.56 | 11.48–11.66 |
| Correlated Gaussian | 7.07 | 7.06–7.07 | 6.94 | 6.92–6.99 | 8.06 | 8.06–8.06 | 7.87 | 7.86–7.96 |
| Pooled Gaussian | 6.88 | 6.88–6.88 | 6.76 | 6.73–6.80 | 7.87 | 7.87–7.87 | 7.68 | 7.66–7.77 |
| Gaussian Mixture | 7.04 | 7.03–7.04 | 6.91 | 6.91–6.97 | 8.08 | 8.06–8.08 | 7.89 | 7.88–7.97 |
| Supervised MLP, retrained | 7.93 | 7.93–7.93 | 7.78 | 7.78–7.86 | 8.81 | 8.80–8.84 | 8.61 | 8.62–8.73 |
| Supervised MLP, original topology | 7.93 | 7.92–7.93 | 7.78 | 7.82–8.38 | 8.81 | 8.79–8.81 | 8.61 | 8.80–9.93 |
| Supervised flow, retrained | 7.01 | 7.01–7.02 | 6.87 | 6.89–6.95 | 7.99 | 7.99–8.01 | 7.84 | 7.86–7.96 |
| Supervised flow, original topology | 7.01 | 7.01–7.01 | 6.87 | 6.95–7.63 | 7.99 | 7.99–8.01 | 7.84 | 8.03–8.96 |
| PoSE-fast (ours) | 6.54 | 6.54–6.54 | 6.42 | 6.40–6.46 | 7.52 | 7.51–7.52 | 7.33 | 7.31–7.41 |
TABLE VIII
PERFORMANCE ON THE UNBALANCED THREE-PHASE 240-BUS IOWA FEEDER (S2-3PH, NOMINAL NOISE, 1,000 TEST SNAPSHOTS). BOLD: BEST PER COLUMN; FOR COVERAGE, CLOSEST TO THE ATTAINABLE 0.882.
| Method | CRPS P kW | CRPS Q kvar | V RMSE p.u. | Branch % | Cov. 90% | Time s |
|---|---|---|---|---|---|---|
| WLS | 1.30 | 0.69 | 0.21 | 5.70 | 0.881 | 0.11 |
| Correlated Gaussian | 1.22 | 0.74 | 0.16 | 5.41 | 0.884 | 0.20 |
| Pooled Gaussian | 1.25 | 0.66 | 0.18 | 5.43 | 0.934 | 0.12 |
| Gaussian mixture | 1.36 | 0.77 | 0.18 | 5.65 | 0.735 | 0.43 |
| PoSE-fast (ours) | 1.13 | 0.66 | 0.15 | 4.79 | 0.810 | 0.58 |
F. Scalability on the Unbalanced Three-Phase Iowa Feeder
On the unbalanced three-phase Iowa feeder, with 455 node-phases, 432 branch-phases and a 386-dimensional injection state, the learned prior applies directly without retraining: multi-phase physics enters solely through the unbalanced LinDistFlow operator and AC power flow. As summarized in Table VIII, PoSE-fast achieves the lowest active injection CRPS at 1.13 kW, reducing by 7.4% relative to the correlated Gaussian at 1.22 kW, and outperforming the pooled Gaussian at 1.25 kW, WLS at 1.30 kW, and the Gaussian mixture at 1.36 kW, with all paired confidence intervals strictly below zero. PoSE-fast also attains the lowest overall voltage RMSE of p.u. and branch-current error of 4.79% of rating against 5.41–5.70% for the baselines, with 95% bootstrap intervals below zero across all snapshots; voltage RMSE ties the correlated Gaussian at midday. On reactive CRPS it ties the pooled Gaussian at 0.664 kvar, where the difference is within bootstrap error. Compared to the single-phase balanced equivalent, where PoSE-fast obtains 1.13 kW CRPS and 0.816 coverage, three-phase results are virtually identical, differing by only -0.003 kW, which confirms that multi-phase physics is handled entirely at inference time. In contrast, the Gaussian mixture degrades by 11.4% in CRPS, from 1.22 to 1.36 kW. As with the balanced feeder, 197 training days leave the learned prior's coverage at 0.810 against an attainable 0.882. Voltages remain within 1.011–1.025 p.u., yielding zero voltage violations. For the 1,648 branch-phase overloads, the pooled Gaussian achieves the lowest false-alarm rate at against for PoSE-fast, while correlated Gaussian and mixture exhibit higher hit rates at , reaching 18.8% and 21.4% against 16.9%. While exact full-covariance PoSE
takes 76 s per snapshot on the 386-dimensional state on one H100 on the balanced feeder, PoSE-fast reduces this runtime to 0.58 s in the three-phase network, confirming that exact measurement guidance scales to multi-phase grids in real time.
G. Reconfigured Feeders without Retraining
Reconfiguration changes the feeder model but not the sub-station injections, so the learned prior carries over unchanged. Rebuilding , and for a new topology takes 0.4–1.8 s, against 52–59 s to retrain a supervised estimator on one H100. Table VII reports PoSE-fast on the seven reconfigured topologies, both PV scenarios and S1 and S2 at nominal noise, 28 settings. For each estimator it gives the CRPS on the original topology (Orig.) and its range over the seven reconfigured ones (Reconf.); on the original topology, the supervised estimators trained there are the retrained ones, so the two rows coincide in the Orig. columns. PoSE-fast has a lower CRPS than WLS, the three Gaussian priors and both supervised estimators, retrained or trained on the original topology, in all 28 settings, with every 95% interval below zero. Against the correlated Gaussian the gain is 6.8–7.6%, against the pooled Gaussian 4.5–5.0%, as on the original topology. Its coverage stays at 0.871–0.878, against an attainable 0.882, and it samples in 0.21–0.23 s per snapshot.
Supervised estimators trained on the original topology carry over when only the feeder-head power is measured: in S1 their difference to the retrained model includes zero in 11 (MLP) and 14 (flow) of 14 settings, and the MLP trained on the original topology is 0.03–0.05 kW better than the retrained one in three high-PV settings. With voltage measurements they lose accuracy: in S2 they are worse than retrained in 13 (MLP) and 14 (flow) of 14 settings, by up to 1.22 and 1.00 kW under high PV on the loss-reducing topology and with all ties closed.
Across all 28 reconfigured settings, PoSE-fast consistently maintains the lowest reactive CRPS and branch-current error, achieving the lowest 95th percentile of the largest branch-current error in 27 settings and the lowest voltage RMSE in 24 settings. It also attains the lowest overload Brier score in 26 settings, matching or exceeding the reliability of Gaussian and mixture estimators while operating on unseen topologies without retraining.
H. Computational Efficiency and Runtime Analysis
On the IEEE 33-bus feeder on one NVIDIA H100, PoSE takes 15.3 s per snapshot with 200 steps and 100 samples, against 0.03 s for the correlated and pooled Gaussians. The difference to the isotropic correction reflects the Tweedie covariance of the 64-dimensional state. Fifty steps give essentially the same CRPS (6.426 vs. 6.417 kW on base, 7.334 vs. 7.332 kW under high PV, S2 nominal) at 3.7–3.9 s per snapshot, with coverage 0.865 and 0.869. PoSE-fast reduces runtime to 0.23 s per snapshot on the base feeder and 0.53 s on the balanced Iowa network, reaching 0.58 s in the three-phase setting, 67 and about 140 times faster than PoSE while matching its accuracy and calibration. Across all 1,000 test snapshots of five settings (base feeder S2; high PV S1, S2 and S3; Iowa S2; nominal noise), its injection CRPS differs from PoSE by -0.009 to 0.000 kW, with every 95% paired interval within ±0.015 kW; coverage differs by at most 0.0013 and branch-current error by at most 0.005% of rating. Voltage RMSE differs by -1.1% on Iowa to +1.4% under high PV S3.
VI. CONCLUSION
PoSE formulates DSSE as posterior sampling and separates what the DSO knows from what must be learned. A flow matching prior learns the joint distribution of substation injections from historical data, while power flow equations, topology and sensors enter only at sampling through a noise-aware endpoint correction. The network never approximates the power flow, and every posterior sample, mapped through the AC power flow, is a physically consistent operating point.
The learned prior provides the realistic representation of injections that DSSE requires. On the IEEE 33-bus feeder with three years of recorded load and PV data, PoSE lowers injection CRPS against Gaussian, mixture and supervised estimators across all evaluated measurement sets, noise levels and PV penetrations, and on the 240-bus unbalanced three-phase Iowa feeder it achieves the lowest injection, voltage and branch-current errors. The noise-aware correction brings in measurements consistently, providing calibrated uncertainty on the 33-bus feeder without retraining. PoSE-fast matches this accuracy at 0.2–0.6 s per snapshot. Because topology enters only at sampling, the unchanged prior carries over to seven reconfigured topologies, maintaining its lead over Gaussian priors and retrained supervised estimators.
Future work follows the same separation. On the prior side, the calibration of the uncertainty depends on the amount of training data, and composing feeder priors from per-household models serves DSOs with short histories, and time series or weather forecasts enter by modifying only the prior network.
REFERENCES
[1] A. Abur and A. Gómez-Expósito, Power System State Estimation: Theory and Implementation. CRC Press, 2004.
[2] K. Dehghanpour, Z. Wang, J. Wang, Y. Yuan, and F. Bu, “A survey on state estimation techniques and challenges in smart distribution systems,” IEEE Transactions on Smart Grid, vol. 10, no. 2, pp. 2312–2322, 2019.
[3] A. Primadianto and C.-N. Lu, “A review on distribution system state estimation,” IEEE Transactions on Power Systems, vol. 32, no. 5, pp. 3875–3883, 2017.
[4] B. Mamudi, J. Stiasny, and J. Cremer, “Sensitivity quantification for distribution system state estimation,” arXiv:2605.13390, 2026.
[5] R. Singh, B. C. Pal, and R. A. Jabr, “Statistical representation of distribution system loads using Gaussian mixture model,” IEEE Transactions on Power Systems, vol. 25, no. 1, pp. 29–37, 2010.
[6] R. Singh, B. C. Pal, and R. A. Jabr, “Distribution system state estimation through Gaussian mixture model of the load as pseudo-measurement,” IET Generation, Transmission & Distribution, vol. 4, no. 1, pp. 50–59, 2010.
[7] J. G. De la Varga, S. Pineda, J. M. Morales, and Á. Porras, “Learning-based state estimation in distribution systems with limited real-time measurements,” Electric Power Systems Research, vol. 241, p. 111268, 2025.
[8] J. G. De la Varga, S. Pineda, A. Stratigakos, and J. M. Morales, “End-to-end pseudo-measurement learning for state estimation under limited observability,” Electric Power Systems Research, vol. 265, p. 114220, 2026.
[9] K. R. Mestav, J. Luengo-Rozas, and L. Tong, “Bayesian state estimation for unobservable distribution systems via deep learning,” IEEE Transactions on Power Systems, vol. 34, no. 6, pp. 4910–4920, 2019.
[10] K. R. Mestav and L. Tong, “State estimation in smart distribution systems with deep generative adversary networks,” in Proc. IEEE Int. Conf. Communications, Control, and Computing Technologies for Smart Grids (SmartGridComm), 2019, pp. 1–6.
[11] J. Zhang, J. Zhao, J. Yang, and J. Zhao, “Deep multi-fidelity Bayesian data fusion for probabilistic distribution system voltage estimation with high penetration of PVs,” IEEE Transactions on Power Systems, vol. 39, no. 2, pp. 3661–3672, 2024.
[12] D. Hua, L. Zhang, W. Tang, J. Wu, and T. Qian, “A spatiotemporal diffusion framework for state estimation in low-observability distribution systems,” International Journal of Electrical Power & Energy Systems, vol. 177, p. 111839, 2026.
[13] M. B. Kamal, W. Li, D. Deka, and H. Mohsenian-Rad, “Physics-conditioned generative adversarial networks for state estimation in active power distribution systems with low observability,” in Proc. IEEE Int. Conf. Smart Grid Synchronized Measurements and Analytics (SGSMA), 2022, pp. 1–6.
[14] S. Afrasiabii and X. Liang, “Normalizing flows-based probabilistic learning-aided distribution system state estimation,” in Proc. IEEE Canadian Conf. Electrical and Computer Engineering (CCECE), 2024, pp. 823–828.
[15] H. Chung, J. Kim, M. T. McCann, M. L. Klasky, and J. C. Ye, “Diffusion posterior sampling for general noisy inverse problems,” in Proc. Int. Conf. Learning Representations (ICLR), 2023.
[16] J. Song, A. Vahdat, M. Mardani, and J. Kautz, “Pseudoinverse-guided diffusion models for inverse problems,” in Proc. Int. Conf. Learning Representations (ICLR), 2023.
[17] B. Boys, M. Girolami, J. Pidstrigach, S. Reich, A. Mosca, and O. D. Akyildiz, “Tweedie moment projected diffusions for inverse problems,” Transactions on Machine Learning Research, 2024, arXiv:2310.06721.
[18] A. Pokle, M. J. Muckley, R. T. Q. Chen, and B. Karrer, “Training-free linear image inverses via flows,” Transactions on Machine Learning Research, 2024, arXiv:2310.04432.
[19] N. Lin, Y. Wang, J. Heres, P. Palensky, and P. P. Vergara, “SmartMeterFM: Unifying smart meter data generative tasks using flow matching models,” arXiv:2601.21706, 2026.
[20] Y. Lipman, R. T. Q. Chen, H. Ben-Hamu, M. Nickel, and M. Le, “Flow matching for generative modeling,” in Proc. Int. Conf. Learning Representations (ICLR), 2023.
[21] M. E. Baran and F. F. Wu, “Optimal sizing of capacitors placed on a radial distribution system,” IEEE Transactions on Power Delivery, vol. 4, no. 1, pp. 735–743, 1989.
[22] L. Gan and S. H. Low, “Convex relaxations and linear approximation for optimal power flow in multiphase radial networks,” in Proc. Power Systems Computation Conf. (PSCC), 2014, pp. 1–9.
[23] B. Efron, “Tweedie’s formula and selection bias,” Journal of the American Statistical Association, vol. 106, no. 496, pp. 1602–1614, 2011.
[24] M. E. Baran and F. F. Wu, “Network reconfiguration in distribution systems for loss reduction and load balancing,” IEEE Transactions on Power Delivery, vol. 4, no. 2, pp. 1401–1407, 1989.
[25] L. Thurner, A. Scheidler, F. Schäfer, J.-H. Menke, J. Dollichon, F. Meier, S. Meinecke, and M. Braun, “pandapower—an open-source Python tool for convenient modeling, analysis, and optimization of electric power systems,” IEEE Transactions on Power Systems, vol. 33, no. 6, pp. 6510–6521, 2018.
[26] F. Bu, Y. Yuan, Z. Wang, K. Dehghanpour, and A. Kimber, “A time-series distribution test system based on real utility data,” in Proc. North American Power Symposium (NAPS), 2019, pp. 1–6.
[27] E. L. Ratnam, S. R. Weller, C. M. Kellett, and A. T. Murray, “Residential load and rooftop PV generation: An Australian distribution network dataset,” International Journal of Sustainable Energy, vol. 36, no. 8, pp. 787–806, 2017.
[28] Fluvius, “Verbruiksprofielen digitale elektriciteitsmeters: kwartierwaarden voor een volledig jaar,” Fluvius Open Data, data set 1.50, 2024 sample. [Online]. Available: https://opendata.fluvius.be/explore/dataset/1_50-verbruiksprofielen-dm-elek-kwartierwaarden-voor-een-volledig-jaar/
[29] O. Ledoit and M. Wolf, “A well-conditioned estimator for large-dimensional covariance matrices,” Journal of Multivariate Analysis, vol. 88, no. 2, pp. 365–411, 2004.
[30] Y. Gal and Z. Ghahramani, “Dropout as a Bayesian approximation: Representing model uncertainty in deep learning,” in Proc. Int. Conf. Machine Learning (ICML), ser. Proceedings of Machine Learning Research, vol. 48, 2016, pp. 1050–1059.
[31] T. Gneiting and A. E. Raftery, “Strictly proper scoring rules, prediction, and estimation,” Journal of the American Statistical Association, vol. 102, no. 477, pp. 359–378, 2007.