Manuscript Offprint
arXiv:2610.41235CONSORT: Uncertainty-Constrained Multi-Robot Planning for Cooperative Localization in GPS-Denied Environments
Tony Zhang, Ryan Bartholomew, Kalliyan Velasco, Joshua Mangelson, Brady Moon
Abstract—Centralized multi-agent path planning with cooperative localization in GPS-denied environments is generally computationally intractable when formulated in full belief space due to tightly coupled uncertainty dynamics. Prior work typically approximates belief dynamics or restricts inter-agent coupling. This work examines a multi-agent planning problem in which a primary agent must reach a goal in minimum time subject to a chance-constrained collision-avoidance requirement and a terminal bound on localization uncertainty. We obtain a tractable surrogate of the underlying belief-space problem by optimizing over the mean-state trajectories of all agents and propagating covariance for terminal constraint evaluation only. We propose CONSORT (Cooperative Navigation with Support-Optimized Routing and Trajectories), a discrete-to-continuous pipeline combining hexagonal-grid joint search with spline-based trajectory refinement. Across 50 randomized scenarios, the planners separate as the terminal uncertainty bound tightens, with CONSORT solving 80% of scenarios where the strongest baseline solves 54%, at comparable path length. In marine simulations, with the plans executed under feedback control on an independently developed factor-graph estimate, the trajectories remain collision-free and their terminal uncertainty falls within 6% of the planner's prediction.
I. INTRODUCTION
In environments where GPS signal is unreliable, such as underwater, or in regions subject to spoofing or jamming, agents must rely on other forms of information for localization. In these environments, autonomous agents struggle with state uncertainty due to inertial measurement unit (IMU) drift. As the estimation error accumulates, an agent's pose uncertainty can grow to a point where waypoint tracking degrades and mission objectives are compromised. Common planning strategies ameliorate this by biasing trajectories toward information-rich regions [1] and introducing agents to utilize inter-agent measurements for cooperative localization [2], [3]. Consequently, trajectory planning must account for uncertainty propagation when estimation error impedes task performance.
As the joint belief of a team grows exponentially with its size and inter-agent measurements couple the agents' beliefs, we optimize mean trajectories and propagate uncertainty only to evaluate constraints.
In this work, we consider a centralized multi-agent path planning with cooperative localization (MAPP-CL) problem,

Fig. 1. The escort problem. The primary must reach the goal with its localization uncertainty under a terminal bound, and the support is routed to hold it there. Support agent localizes with landmark and relays position data, enabling the primary agent to take a more direct path. Both trajectories are searched on the heading-aware hexagonal lattice and refined as B-splines.
a variant of the CL-MRMP problem [4], in which a primary agent must reach a goal in minimum time while subject to a chance-constrained collision-avoidance requirement and a terminal bound on localization uncertainty. We call this the escort problem: the support agents have no goal locations and are routed solely to hold the primary's terminal uncertainty under the constraint (Fig. 1).
We propose CONSORT (Cooperative Navigation with Support-Optimized Routing and Trajectories), a centralized planner for this escort problem.¹ We contribute the following:
-
A MAPP-CL formulation that jointly routes support and primary agents under a terminal uncertainty bound and chance-constrained obstacle avoidance.
-
CONSORT, a planner pairing joint heading-aware hexagonal lattice search with B-spline refinement, both enforcing curvature, collision, and uncertainty constraints.
-
A benchmark of 50 randomized scenarios on which CONSORT solves 80% at the 50% constraint level, against 54% for the strongest of four baselines.
-
Monte Carlo validation in HoloOcean [5] with an independent factor-graph estimator where plans stay collision-free and terminal uncertainty is within 6% of prediction.
This work was supported by the NSF-funded BYU Robotics Pioneers REU program (Award No. 2447307) and in part by the NAVSEA NEEC (Award No. N00174-23-1-0005) in coordination with NSWC PCD.
¹Authors are with the FROST Lab, Ira A. Fulton College of Engineering, Brigham Young University, Provo, UT 84602, USA.
²T. Zhang is with the Kahlert School of Computing, University of Utah, Salt Lake City, UT 84112, USA, and contributed to this work as a visiting undergraduate researcher in the FROST Lab.
¹The Julia implementation, 50 benchmark scenarios, and simulation videos are available on the project page frostlab.byu.edu/consort-planner/.
in general [7]. Belief-space planners restrict beliefs to Gaussians and propagate them along candidate trajectories, over a roadmap [8], a tree [9], or by ranking candidate paths under a closed-loop model [10], usually under the assumption that the most likely observation is received [11]. These methods plan for a single agent, and the multi-robot case of LQG-MP plans the robots one at a time without inter-agent measurements. With several agents the joint belief and the search space grow exponentially with the size of the team.
Cooperative localization lets agents share pose estimates and measure one another to reduce dead-reckoning drift [2], [3] and is established in underwater navigation [12]. Because cooperating agents share measurement history, naive fusion double counts information, and covariance intersection [13] is the usual remedy [14]. Planning with cooperative localization in the loop is more recent. Theurkauf et al. [4] grow a sampling-based tree over the joint belief of a team, and Liu et al. [15] plan risk-aware trajectories for underwater teams. Our support agents have no goals of their own and are routed only to meet the primary's terminal bound, and our joint search is exhaustive on a lattice rather than sampled.
Multi-agent path finding solves the discrete coordination problem exactly with conflict-based search [16] or approximately by planning the agents one at a time in priority order [17], [18], but it treats positions as known. Hexagonal grids give six equidistant neighbors and paths that are easier to smooth [19], and B-splines give smooth trajectories whose curvature can be bounded [20]. Obstacle avoidance under position uncertainty extends the chance-constrained formulation of Blackmore et al. [21] to uncertain obstacle positions, and we bound each spline segment by its MINVO hull [22] so that the constraint is linear in the control points.
III. PROBLEM FORMULATION
Let denote a team of agents, where agent is the primary agent tasked with reaching a goal location . All other agents are support agents whose sole task is to assist the primary agent's localization. All agents move at a common constant speed , so minimizing time is equivalent to minimizing trajectory length, and we use arc length as a shared clock throughout. The environment contains static convex obstacles , each defined as an intersection of half-planes with unit outward normals and offsets , and each located only up to a covariance . The environment also contains a set of landmarks with known positions and positional uncertainty .
A. Decision Variables
We optimize over mean-state trajectories only. The decision variables are the heading profile of every agent and the primary's path length . Positions follow from the headings at the arc samples through
B. Covariance Propagation
Let denote the position covariance of agent . Covariance is not a decision variable. It is propagated along the mean trajectories and used only to evaluate constraints. Between measurements the agents dead-reckon, and we model the drift as process noise whose variance grows linearly with distance and is larger along the direction of travel than across it:
where , is the planar rotation, and are the along-track and cross-track noise intensities.
C. Landmark Measurements
A landmark provides a range-bearing measurement whose quality decays smoothly with the distance through the logistic taper
which is close to one inside the visibility range and rolls off over a width , with no hard cutoff. Every landmark contributes information weighted by its quality, and the posterior follows the information form of the Kalman update for a direct position measurement, identical to the Joseph form for H = I:
where is the sensor noise rotated to the line-of-sight bearing .
D. Inter-Agent Fusion
Agents exchange position estimates at fixed arc-length intervals . Their estimates share history, so adding the information directly would double count it, and we fuse with covariance intersection [13], which is consistent under unknown cross-correlation. When agents i and j communicate at separation , agent i receives , where is the communication noise and is a taper of the form (3) with half weight at the communication range , and updates
with chosen to minimize . Agent is updated in the same way, and as the transferred information vanishes.
E. Optimization Problem
The planning problem collects the objective and all constraints as

| (a) | |
|---|---|
| Level | 100 % |
| Bound | 13.75 m |
| Length | 1741 m |
| Terminal | 9.73 m |
| (b) | |
| Level | 70 % |
| Bound | 9.62 m |
| Length | 1761 m |
| Terminal | 8.89 m |
| (c) | |
| Level | 50 % |
| Bound | 6.87 m |
| Length | 1822 m |
| Terminal | 6.66 m |
| (d) | |
| Level | 30 % |
| Bound | 4.12 m |
| Length | 1890 m |
| Terminal | 3.91 m |
Fig. 2. Constraint ladder on one scenario: a 1700 m corridor of staggered walls, 14 obstacles and three landmarks. The terminal bound tightens from (a) to (d), and every tightening is paid for in primary length; the levels and the solutions they produce are listed at right. In (a) the support climbs into the north pocket for the weak landmark there and rejoins; in (b) it takes the southern lane to a stronger landmark and relays it; in (c) the primary adds a turn before the goal so that the support can reach the second landmark; in (d) it dips to the center line to stall allowing the support to relay from a closer distance.
Terminal uncertainty (6a). The primary must arrive with bounded localization uncertainty. equals the standard deviation of an isotropic covariance .
Obstacle avoidance (6b). Every agent must clear every obstacle with probability at least at every instant, so for each agent , obstacle , and arc position the constraint must hold for at least one face of . The margin covers the vehicle radius and the positional uncertainty of both agent and obstacle, with and the standard normal distribution function [21]. A union bound over the agent-obstacle pairs bounds the instantaneous probability of any collision by .
Kinematics (6c). Each trajectory respects the minimum turn radius , where is the curvature.
Boundary conditions (6d). All agents start from known positions with a common prior covariance, and the primary must end at the goal.
The belief dynamics do not appear as constraints: is a deterministic function of the decision variables through (1)–(5), left implicit in (6). The agents are coupled only through (5), so the supports enter the problem only by shaping the primary's covariance, at a cost in primary length that grows as tightens (Fig. 2).
IV. METHOD
CONSORT solves (6) in two stages, a joint A* search over a heading-aware hexagonal lattice and a continuous B-spline refinement of the resulting plan, summarized in Algorithm 1.
A. Heading-Aware Hexagonal Graph
A corridor of hexagonal cells [19] of width covers the line from start to goal. A graph node pairs a cell with one of six headings spaced apart, and three moves leave each node: continue straight, or turn by and step into the cell faced by the new heading. The heading changes by at most per cell, which is the graph-level counterpart of (6c). Landmarks are appended as sensor nodes without edges that enter the search only through (4), a goal node absorbs all six headings of the goal cell so that the arrival heading is free, and obstacles act on beliefs during the search rather than removing cells. All-pairs shortest-path distances are precomputed on the graph and serve as the heuristic. With only six headings, a line aimed between two of them is traced by a zigzag at most times as long; refinement cuts these corners, shortening the seed by up to 7% (Sec. V-D).
B. Joint Discrete Search
The first stage runs an A*-style search [23] over the joint state of the team. A search state stores, for every agent, its graph node, its covariance, and the arc distance traveled. Each expansion advances every agent by one edge, so the successors of a state are the Cartesian product of the agents' three moves. The accumulated cost is the primary's arc distance alone, and states are expanded in order of , where is the precomputed shortest-path distance from the primary's node to the goal. Supports contribute no heuristic cost, so is admissible, and gives a weighted search [24] that trades a factor of at most on the seed length [25] for fewer expansions. Ties are broken toward lower primary uncertainty and then toward fewer idle supports.
During expansion each agent's covariance is propagated along its edge by (2)–(4), and (5) is applied whenever two agents reach a communication checkpoint at the same arc distance. A successor is discarded if any agent violates (6b) along its edge or if a support travels farther than the primary. Pareto pruning keeps the joint space manageable: at each joint node signature the search keeps a frontier
Algorithm 1: CONSORT
Input : hex graph , start states , goal , bound , expansion budget
Output: B-spline control points of every agent
1 ALLPAIRSSHORTESTPATHS()
2 open {joint start}; ; seed
3 while and expansions do
4 | pop the state minimizing
5 | if primary at and SEEDSPLINECLEAR(state) then
6 | if then seed state; break
7 | else if lowest so far then state
8 | end
9 | foreach joint successor (every agent one edge) do
10 | propagate by (2)–(4); fuse by (5)
11 | discard if (6b) fails or a support outruns the primary
12 | insert unless dominated in at its signature
13 | end
14 end
15 if seed then seed inc, the least-violating candidate
16 control points of the seed splines;
feats
17 if feats else ; // incumbents
18 foreach barrier stage; iterate until stationary or stalled do
19 | backtracked Adam step on
20 | if then // recovery
21 | | accept iff ; then feats
22 | else accept iff and
23 | update (shortest feasible) and (least violating) with
24 | at stage end, decay only once feats
25 end
26 return if else
of labels and discards a new label if an existing one has no larger and a covariance no larger in the positive semidefinite order. The pruning is sound because the heuristic is shared at the same node tuple and a larger covariance cannot become smaller under further propagation.
The search is anytime with respect to (6a). When a popped state places the primary at the goal and the spline seed it induces (Sec. IV-C) clears all obstacles, the state is returned if (6a) holds and otherwise kept as the incumbent if its terminal uncertainty is the lowest seen so far. If the expansion budget is exhausted, the continuous stage attempts to recover feasibility for the incumbent, relaxing only the terminal bound, never obstacle clearance.
C. Continuous B-Spline Refinement
The seed is lifted into continuous space as clamped cubic B-splines [26], one per agent, with the seed's cell centers as control points. Support paths are padded to the primary's node count, and the primary's final control point is pinned to . The decision vector stacks the free control points: the interior points of the primary and all but the first point of each support, whose terminal position is free.
The constraints of (6) form a slack vector , feasible when : the terminal bound, evaluated by propagating (2)–(5) along the sampled splines, the curvature bound, sampled from the spline derivatives, the requirement that no support spline be longer than the primary's, and obstacle clearance. For the latter, each spline segment is enclosed in the convex hull of its MINVO control points [22], and each segment-obstacle pair is committed to the face of (6b) that the seed clears by the largest margin, which fixes the homotopy class and replaces the disjunction over faces with linear rows, one per hull vertex. The refinement then minimizes the primary's length under the log-barrier merit function
where the tangent extension below the knee keeps J finite for violated constraints and supplies a constant restoring gradient, so one objective serves both feasible and infeasible seeds alike.
We minimize with Adam [27] on forward-difference gradients and a backtracking line search over a schedule of barrier stages (Algorithm 1): while a feasible trajectory has not been found, every descent step is accepted. Once one is found, only steps that remain feasible are accepted and decays. Finally, CONSORT returns the shortest feasible trajectory or the least violating if none were found.
V. RESULTS
A. Experimental Setup
We evaluate CONSORT on randomized corridor scenarios with one primary and one support. Each scenario places the goal 600 to 900m from the start, draws two to four landmarks with map covariances of 0.6 to 1.35m standard deviation, placed 280 to 430m to the side of the direct line on alternating sides so that every fix costs a detour, and draws one to three convex obstacles of up to 220m across, centered on a triangular distribution so that most scenarios have an obstacle on the direct line. The lattice width is 150m, the minimum turn radius 40m, the visibility range 100m with a 15m taper, the communication interval 100m, and the communication range 300m with a 20m taper. Dead-reckoning variance grows at per meter along track, a standard deviation of 5m after 100m, and at one ninth of that across track. The obstacle risk is per agent-obstacle pair with a 5m vehicle radius, the search runs with and expansions, and the refinement runs 15 barrier stages sharing 1000 Adam iterations.
For every scenario, we first plan a single unconstrained agent, which gives a reference length and terminal uncertainty . The bound is then tightened from 100% to 30% of in steps of 10%, and every planner is run at each level. A planner that fails at one level is counted as failing at the tighter ones. Scenarios in which a straight line already meets the loosest bound pose no localization problem and are discarded, which removed 34 of 84 draws to leave the 50 scenarios reported here. Lengths are reported relative to over the scenarios a planner solved, and wall-clock times are for the whole process including start-up and

CONSORT Formation Sequential CL-GBT Greedy
Fig. 3. Baseline comparison over the 50 randomized scenarios as the terminal uncertainty bound tightens from 100% to 30% of the single-agent reference . Top: fraction of scenarios solved. Bottom: mean primary path length over the solved scenarios, normalized by the single-agent reference length (standard deviations in Table I).
graph construction. All planners run single-threaded in Julia 1.12 on a desktop with an AMD Ryzen 5 5600X six-core processor and 32 GB of memory, one scenario at a time.
B. Baselines
We compare against four planners adapted from adjacent literature and implemented in Julia. All share the covariance model of Sec. III, the obstacle test, and the refinement of Sec. IV-C, so the comparison isolates how the team is routed.
Greedy. The primary commits to its shortest obstacle-clear route without uncertainty reasoning, and at every step the support picks, among its three successors, the move that most reduces the primary's uncertainty at that step, the one-step information-gain rule of greedy exploration [28]. This removes lookahead from the support.
Formation. The primary plans alone with a weighted A* over cells and beliefs while the support holds a fixed slot in the primary's body frame, one cell out at a 60° multiple off its heading, as in leader-referenced formation control [29]. Goal candidates are accepted on the uncertainty the primary has with the support attached, and both lateral slots are tried. This removes support routing.
Sequential. Prioritized planning [17], [18]. The primary plans first with the support parked at the start, under a bound slackened to twice the threshold, the support then plans against the committed primary to minimize the primary's terminal uncertainty, and the primary replans once against the finished support path. This avoids the joint state space.
CL-GBT. A cooperative-localization-guided belief tree, inspired by [4], who extend Gaussian belief trees [30] to grow one tree over the joint belief of a team. We keep that structure, one rapidly exploring random tree over the joint

CONSORT Formation Sequential CL-GBT Greedy
Fig. 4. Wall-clock time per planner over successful runs at five constraint levels (log scale). Boxes span the interquartile range, whiskers extend to IQR, and runs beyond the whiskers are omitted. Levels with fewer than five solved scenarios are drawn as individual runs.
state in continuous space, with goal-biased sampling for the primary and a cloning bias that places the support's sample on the primary's. Their joint Kalman belief with cross-correlations, their bound on the probability that a planned inter-agent measurement falls out of range, their robot-robot collision constraint and their re-branching step are replaced by our belief model, which credits every scheduled fusion at a range-tapered weight. Its iteration budget is set so that its compute ceiling matches ours. This replaces exhaustive lattice search with sampling.
C. Comparison With Baselines
Fig. 3 reports success rate and path length against the constraint level, and Table I lists the lengths with their spread. Every planner but Greedy solves nearly every scenario at the loosest level, and the planners separate as the bound tightens. CONSORT solves every scenario down to 70%, 96% at 60%, 80% at 50%, and 40% at 30%. Sequential matches it down to 80% but falls to 52% at 50% and 16% at 30%, and its paths grow to more than twice the reference length, since at a tight bound the primary must detour to landmarks on its own before the support is planned. Formation degrades more gracefully and is the strongest baseline from 50% down, with 54% at half the reference bound and 22% at 30%. CL-GBT solves half the scenarios at 60% and 6% at 30%, with paths 1.5 to 2 times the reference length because a random tree returns the first path it finds. Greedy solves 90% at the loosest level and almost nothing below it, since a support without lookahead rarely reaches a landmark in time.
The price of the higher success rate is modest. CONSORT's paths are among the shortest for the solved scenarios at every level, from at 100% to at 30%, with the smallest spread across scenarios. Fig. 4 reports wall-clock time: a median of 18s per run against 14s for Formation and Sequential and 16s for the single-agent reference, most of it shared overhead. Only CL-GBT grows with the bound, and its longest run took 730s.
D. Ablation
The ablation asks what each stage contributes. It runs on a separate set of 30 scenarios drawn without the straight-line screen, since one arm is the straight seed itself, and compares

Fig. 5. Ablation on a separate set of 30 scenarios drawn without the straight-line screen. Same axes as Fig. 3: top, success rate; bottom, mean path length over the solved scenarios (standard deviations in Table I).
the full pipeline with the discrete stage alone and with the refinement seeded from a straight line (Fig. 5 and the bottom block of Table I). The discrete stage alone solves the same scenarios down to 70% and one or two fewer at 60% and 50%, with paths 2 to 7% longer at every level down to 50%, which is the length the refinement recovers by cutting the lattice corners. The straight seed solves 53% of the scenarios at the loosest level and none below 60%. At the loosest level, 11 of its 16 solutions started with an obstacle violation of up to 55 m that the refinement removed, and seven of these were up to 7% shorter than the route of the full pipeline. The joint search finds the landmarks, and the refinement makes the route short, at a cost of about 1.5 s (Fig. 6).
VI. SIMULATION VALIDATION
Every planner in Sec. V propagates the same covariance model, so the benchmark cannot tell whether that model is calibrated. We therefore fly a planned trajectory with a vehicle model, a controller, and a state estimator that share none of the planner's equations, and check whether the certified constraints hold across noise seeds.
A. Simulator and Vehicle
We use HoloOcean [5] to simulate torpedo-shaped autonomous underwater vehicles with six-degree-of-freedom Fossen dynamics [31], driven by the depth and heading autopilot of HoloOcean 2.0 [32] at 30 Hz at about 2.2 m/s (Fig. 7). An outer-loop waypoint follower tracks the planned B-spline, resampled every 25 m, with a 15 m arrival radius set by the turn radius, and it steers on the estimated position, dead-reckoned forward between estimator updates, so estimation error feeds back into the executed path. The planar field is placed on one depth plane with the agents

Fig. 6. Wall-clock time of the ablation arms over successful runs, drawn as in Fig. 4 on a linear axis. The refinement adds about 1.5 s to the discrete stage. The straight seed's single run at 60% is drawn as a tick.
staggered in depth, so only agent-obstacle collisions are under test. Three cadences are scheduled on arc length accumulated from ground truth: the controller runs every tick, the estimator adds a pose node every 5 m, and an acoustic communication is attempted every 100 m and succeeds only within the planner's communication range. Measurements are ground truth with additive Gaussian noise, so the simulation tests the consistency of the belief model rather than the realism of any sensor.
B. Factor-Graph State Estimator
The estimator is an existing GTSAM factor-graph stack [33], [34], developed independently of the planner; what we supply is its configuration and, through Table II, its noise. It is an incremental smoother [33] over pose nodes, one per 5 m of arc for each agent, returning the trajectory that minimizes the weighted residuals of the factors the graph holds,
The graph is built in two layers. Each agent carries a dead-reckoning graph of its own, holding a prior factor, a between-factor for the odometry of each node, a unary depth factor, a unary three-axis orientation factor, and a range and bearing factor to every landmark inside the visibility range.
| Method | Constraint level (% of ) | |||
|---|---|---|---|---|
| 100 | 70 | 50 | 30 | |
| Baseline comparison, 50 screened scenarios | ||||
| CONSORT (ours) | 1.14±0.09 | 1.22±0.23 | 1.34±0.26 | 1.41±0.21 |
| Formation | 1.22±0.12 | 1.34±0.25 | 1.33±0.16 | 1.48±0.45 |
| Sequential | 1.18±0.14 | 1.41±0.92 | 1.36±0.50 | 2.76±1.51 |
| CL-GBT | 1.47±0.33 | 1.78±0.43 | 2.01±0.41 | 2.07±0.26† |
| Greedy | 1.24±0.10 | 1.21±0.06 | 1.13±0.01† | 1.13±0.01† |
| Ablation, 30 unscreened scenarios | ||||
| CONSORT (full) | 1.12±0.14 | 1.17±0.23 | 1.22±0.22 | 1.29±0.22 |
| Discrete only | 1.20±0.15 | 1.23±0.23 | 1.25±0.22 | 1.29±0.22 |
| Straight seed + cont. | 0.99±0.04 | 1.00±0.00† | - | - |
TABLE I. Mean ± SD of primary path length over each method's own solved scenarios, normalized by . Entries are not comparable across methods without the success rates in Figs. 3 and 5, since a method that solves only its easiest scenarios reports a short path. † marks fewer than five solved scenarios. “-” means none solved.

Fig. 7. The two vehicles in HoloOcean [5]. Each is a torpedo-shaped autonomous underwater vehicle flying its planned spline at a fixed depth over the seabed of the simulator's open-water world.
Landmarks are not free variables: each is pinned by a prior carrying the planner's map covariance, so the map is known and the problem is localization rather than mapping. This graph is what the agent steers on, and for a support it is also the source of the pose and the covariance its acoustic packets carry. The primary holds a second graph, and the covariance compared against the planner's is read from that one. It takes the primary's own nodes as they are created, and a support's nodes in a batch when a communication succeeds, seeded with the pose that support solved for itself, together with one inter-agent factor per communication. Measurements enter both layers once rather than being drawn again, and every one of them is ground truth plus additive Gaussian noise: odometry is synthesized from the simulator's pose sensor, and there is no inertial or Doppler sensor model.
A successful communication delivers the sender's most recent measured depth and orientation, and estimated pose and covariance. For robustness against dropout, we follow the origin state method of [35] and compute the relative pose and covariance between the pose most recently received and the one before it. The relative-pose factor is then inserted into the primary's graph between the two vehicles, whose translation noise carries the planner's own link weight.
C. Monte Carlo Results
We executed the two-agent behind-wall plan of Fig. 8 30 times with different noise seeds. The scenario hides its one landmark behind a wall, so only the support can see it, under a terminal bound of 1.8 m against which the planner predicts 1.80 m. Every run reached the goal within 2% of the planned length and none penetrated the wall, against an allocated
| Factor | Variables | σ |
|---|---|---|
| Odometry (between, per 5 m node) | 1°/axis; 0.22, 0.02, 0.01 m | |
| Depth (unary) | 0.5 m | |
| Compass (unary) | 0.86°/axis | |
| Landmark az/el/range | 1.05°, 1.05°, 2.09 m; r ≤ 100 m | |
| Inter-agent relative pose | 0.86°/axis; 0.5/√w m | |
| Initial pose prior | 10°/axis; 1.15, 0.76, 0.5 m |
TABLE II. Factor noise of the simulated estimator, derived from the planner's model: odometry from the , the compass from , landmark noise rescaled to one sighting per 5 m node, communication noise for link weight , and the start prior from . The depth factor keeps the stack's 0.5 m against the 0.01 m injected.

Fig. 8. Closed-loop Monte Carlo of the behind-wall plan in HoloOcean over 30 runs with different noise seeds, showing the planned trajectories (dashed) against the mean executed trajectory of each agent with the cross-track envelope. The primary passes north of the wall while the support diverts south to the landmark and rejoins before the goal. No run penetrated the wall, and the planner's predicted terminal of 1.80 m compares with 1.70 m measured from the true error.
collision probability of . The estimator's terminal marginal was under the bound in 28 of 30 runs, with the two exceptions at 1.85 and 1.96 m. The sample covariance of the true terminal error gives 1.70 m, within 6% of the prediction on the conservative side, while the estimator's mean marginal of 1.51 m is optimistic against both. The true error also carried a mean offset of 2.6 m along track and 0.8 m across, a bias no covariance check captures but one in the axis where neither the wall clearance nor the 15 m arrival radius binds. The baselines are not re-flown, as they share the belief model whose calibration is being tested.
VII. DISCUSSION AND LIMITATIONS
The discrete stage is complete only with respect to the lattice. The lattice is laid over the corridor without regard to the obstacles, so the lattice paths that clear them are neither a subset nor a superset of the continuous feasible set, and a route that exists only between two cells is not found. The straight-seed solutions of Sec. V-D show this. The refinement can shorten a seed and recover a small violation but cannot change its homotopy class. A finer lattice narrows the gap at the cost of a larger graph, and the all-pairs heuristic is cubic in the number of nodes.
The belief model is Gaussian and assumes that the planned trajectory receives the maximum-likelihood observation at each step [11]. The simulation tests calibration against an independent estimator fed ground truth plus Gaussian noise, so the Monte Carlo runs show that the planner's covariance is consistent with that estimator under Table II's noise, not that either matches a real acoustic modem or sonar. The along-track bias in the terminal error shows that a consistent covariance does not rule out a biased estimate.
CONSORT is centralized, computed offline, and executed open loop on a communication schedule fixed in arc length; replanning after a missed fix is not addressed. The belief model credits every scheduled fusion at a range-tapered weight, whereas [4] bound the probability that a planned inter-agent measurement is unavailable. The joint search grows exponentially in the number of agents, and all ex-periments use one support. In the benchmark it cost 1.3 to 1.9 times the wall clock of the single-agent reference on average, most of it fixed overhead, but the exponent will bind for larger teams. Finally, the environment is planar with static convex obstacles of known position covariance, and the vehicle is modeled by a turn-radius bound alone.
VIII. CONCLUSION
We presented CONSORT, a centralized planner for a primary agent that must reach a goal in minimum time in a GPS-denied environment while support agents are routed to keep its localization uncertainty within a terminal bound. Optimizing over mean trajectories and propagating covariance only for constraint evaluation reduces the belief-space problem to a joint lattice search followed by B-spline refinement, with chance-constrained obstacle avoidance and a curvature bound enforced in both stages. On 50 randomized scenarios CONSORT solved 80% of the scenarios at half the reference uncertainty against 54% for the strongest baseline, at comparable path length. In Monte Carlo trials with an independent factor-graph estimator, the executed trajectories remained collision-free and the planner's predicted terminal uncertainty fell within 6% of the measured spread. Future work includes receding-horizon replanning, scaling the joint search to larger teams, and hardware validation.
REFERENCES
[1] N. Roy, W. Burgard, D. Fox, and S. Thrun, "Coastal navigation-mobile robot navigation with uncertainty in dynamic environments," in Proceedings 1999 IEEE International Conference on Robotics and Automation (Cat. No.99CH36288C), vol. 1. Detroit, MI, USA: IEEE, 1999, pp. 35–40.
[2] S. Roumeliotis and G. Bekey, "Distributed multirobot localization," IEEE Transactions on Robotics and Automation, vol. 18, no. 5, pp. 781–795, 2002.
[3] A. Bahr, J. J. Leonard, and M. F. Fallon, "Cooperative Localization for Autonomous Underwater Vehicles," The International Journal of Robotics Research, vol. 28, no. 6, pp. 714–728, Jun. 2009.
[4] A. Theurkauf, N. Ahmed, and M. Lahijanian, "Multi-Robot Motion Planning with Cooperative Localization," in 2025 IEEE/RSJ International Conference on Intelligent Robots and Systems (IROS), Oct. 2025, pp. 3962–3969.
[5] E. Potokar, K. Lay, K. Norman, D. Benham, S. Ashford, R. Peirce, T. B. Neilsen, M. Kaess, and J. G. Mangelson, "HoloOcean: A full-featured marine robotics simulator for perception and autonomy," IEEE Journal of Oceanic Engineering, vol. 49, no. 4, pp. 1322–1336, Oct. 2024.
[6] L. P. Kaelbling, M. L. Littman, and A. R. Cassandra, "Planning and acting in partially observable stochastic domains," Artificial Intelligence, vol. 101, no. 1-2, pp. 99–134, May 1998.
[7] C. H. Papadimitriou and J. N. Tsitsiklis, "The complexity of Markov decision processes," Mathematics of Operations Research, vol. 12, no. 3, pp. 441–450, Aug. 1987.
[8] S. Prentice and N. Roy, "The Belief Roadmap: Efficient Planning in Belief Space by Factoring the Covariance," The International Journal of Robotics Research, vol. 28, no. 11-12, pp. 1448–1465, Nov. 2009.
[9] A. Bry and N. Roy, "Rapidly-exploring Random Belief Trees for motion planning under uncertainty," in 2011 IEEE International Conference on Robotics and Automation, May 2011, pp. 723–730.
[10] J. van den Berg, P. Abbeel, and K. Goldberg, "LQG-MP: Optimized path planning for robots with motion uncertainty and imperfect state information," The International Journal of Robotics Research, vol. 30, no. 7, pp. 895–913, Jun. 2011.
[11] R. Platt Jr., R. Tedrake, L. P. Kaelbling, and T. Lozano-Pérez, "Belief space planning assuming maximum likelihood observations," in Proceedings of Robotics: Science and Systems, Zaragoza, Spain, Jun. 2010.
[12] L. Paull, S. Saeedi, M. Seto, and H. Li, "AUV Navigation and Localization: A Review," IEEE Journal of Oceanic Engineering, vol. 39, no. 1, pp. 131–149, Jan. 2014.
[13] S. Julier and J. Uhlmann, "A non-divergent estimation algorithm in the presence of unknown correlations," in Proceedings of the 1997 American Control Conference (Cat. No.97CH36041), vol. 4, Jun. 1997, pp. 2369–2373.
[14] L. C. Carrillo-Arce, E. D. Nerurkar, J. L. Gordillo, and S. I. Roumeliotis, "Decentralized multi-robot cooperative localization using covariance intersection," in 2013 IEEE/RSJ International Conference on Intelligent Robots and Systems, Nov. 2013, pp. 1412–1417.
[15] H. Liu, M. Yu, Y. Wang, W. Zhang, and Q. Tang, "Explicit risk-Aware belief space planning for underwater active cooperative localization," Ocean Engineering, vol. 346, p. 123710, Feb. 2026.
[16] G. Sharon, R. Stern, A. Felter, and N. R. Sturtevant, "Conflict-based search for optimal multi-agent pathfinding," Artificial Intelligence, vol. 219, pp. 40–66, Feb. 2015.
[17] M. Erdmann and T. Lozano-Pérez, "On multiple moving objects," Algorithmica, vol. 2, no. 1–4, pp. 477–521, Nov. 1987.
[18] D. Silver, "Cooperative Pathfinding," in Proceedings of the AAAI Conference on Artificial Intelligence and Interactive Digital Entertainment (AIIDE), vol. 1, no. 1, Jun. 2005, pp. 117–122.
[19] P. Duszak, B. Siemiatkowska, and R. Wieckowski, "Hexagonal Grid-Based Framework for Mobile Robot Navigation," Remote Sensing, vol. 13, no. 21, p. 4216, Oct. 2021.
[20] H. Feng, Q. Hu, Z. Zhao, and X. Feng, "Smooth path planning under maximum curvature constraints for autonomous underwater vehicles based on rapidly-exploring random tree star with B-spline curves," Engineering Applications of Artificial Intelligence, vol. 133, p. 108583, Jul. 2024.
[21] L. Blackmore, M. Ono, and B. C. Williams, "Chance-Constrained Optimal Path Planning With Obstacles," IEEE Transactions on Robotics, vol. 27, no. 6, pp. 1080–1094, Dec. 2011.
[22] J. Tordesillas and J. P. How, "MINVO Basis: Finding Simplexes with Minimum Volume Enclosing Polynomial Curves," Computer-Aided Design, vol. 151, p. 103341, Oct. 2022.
[23] P. E. Hart, N. J. Nilsson, and B. Raphael, "A formal basis for the heuristic determination of minimum cost paths," IEEE Transactions on Systems Science and Cybernetics, vol. 4, no. 2, pp. 100–107, 1968.
[24] I. Pohl, "Heuristic search viewed as path finding in a graph," Artificial Intelligence, vol. 1, no. 3–4, pp. 193–204, Jan. 1970.
[25] J. Pearl, Heuristics: Intelligent Search Strategies for Computer Problem Solving. Reading, MA, USA: Addison-Wesley, 1984.
[26] L. Piegl and W. Tiller, The NURBS Book, 2nd ed. Springer, 1997.
[27] D. P. Kingma and J. Ba, "Adam: A method for stochastic optimization," in International Conference on Learning Representations (ICLR), San Diego, CA, USA, 2015.
[28] F. Bourgault, A. A. Makarenko, S. B. Williams, B. Grocholsky, and H. F. Durrant-Whyte, "Information based adaptive robotic exploration," in IEEE/RSJ International Conference on Intelligent Robots and Systems, vol. 1, 2002, pp. 540–545.
[29] T. Balch and R. Arkin, "Behavior-based formation control for multi-robot teams," IEEE Transactions on Robotics and Automation, vol. 14, no. 6, pp. 926–939, 1998.
[30] Q. H. Ho, Z. N. Sunberg, and M. Lahijanian, "Gaussian belief trees for chance constrained asymptotically optimal motion planning," in 2022 International Conference on Robotics and Automation (ICRA), May 2022, pp. 11029–11035.
[31] T. I. Fossen, Handbook of Marine Craft Hydrodynamics and Motion Control, 2nd ed. John Wiley & Sons, Apr. 2021.
[32] B. Romell, A. Austin, B. Meyers, R. Anderson, C. Noh, and J. G. Mangelson, "A preview of HoloOcean 2.0," arXiv:2510.06160, Oct. 2025.
[33] M. Kaess, H. Johannsson, R. Roberts, V. Ila, J. J. Leonard, and F. Dellaert, "iSAM2: Incremental smoothing and mapping using the Bayes tree," The International Journal of Robotics Research, vol. 31, no. 2, pp. 216–235, 2012.
[34] F. Dellaert and M. Kaess, "Factor Graphs for Robot Perception," Foundations and Trends in Robotics, vol. 6, no. 1-2, pp. 1–139, Aug. 2017.
[35] J. Walls, A. Cunningham, and R. Eustice, "Cooperative localization by factor composition over a faulty low-bandwidth communication channel," Proceedings - IEEE International Conference on Robotics and Automation, vol. 2015, pp. 401–408, 06 2015.