arXiv:2610.41351cs.LGOct 2026

Manuscript Offprint

arXiv:2610.41351

Quantile Propagation Planning for Budgeted Tail-Risk Evaluation

Weijia Han, Zhi Huang, Lisha Qu, Yuanyuan Tan, Jiayue Meng

Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.

Abstract

Risk-aware planning must identify rare, costly outcomes using only a limited number of model evaluations. Monte Carlo rollouts spend this budget on noisy tail estimates, while planning from the mean can miss the tail entirely. We introduce quantile propagation planning (QPP), which propagates a small, fixed set of disturbance quantiles through the dynamics and integrates the resulting cost curve to evaluate both mean and tail risk. The method is exact at the propagated levels, converges as the quantile grid is refined, and admits a one-sided conservatism guarantee under stated structural conditions. In controlled overload and inventory tasks, QPP reduces realized tail cost and constraint violations relative to mean-rollout planning. On overload, it remains competitive with sampled evaluators that use substantially more trajectories. These results position QPP as a transparent, budget-controlled approach to tail-risk evaluation.

Keywords: quantile propagation, risk-aware planning, model predictive control, CVaR, cross-entropy method, stochastic model-based planning

1. Introduction

Forecasts guide actions before their outcomes are known. Retail demand forecasts drive purchasing, inventory, logistics, and pricing (Fildes et al., 2022); building and microgrid controllers schedule energy from uncertain load and weather (Drgoña et al., 2020); and portfolio optimizers are sensitive to errors in estimated returns and covariances (Kolm et al., 2014). Learning-based model predictive control (MPC) faces the same issue: stochastic learned models must be used without losing constraint reliability (Hewing et al., 2020). Optimization can therefore amplify a modest predictive error by selecting a different action and propagating its effect through repeated decisions.

Rare errors also have asymmetric consequences. A full-scale vehicle study reports that a deterministic MPC baseline using one dynamics model may lose control in adverse conditions, whereas a risk-averse controller accounts for uncertain friction and tire parameters (Lew et al., 2024). Worst-case protection, however, can make a plan too conservative to use. The practical goal is therefore to balance typical performance against costly tail outcomes, not merely to optimize either the mean or the worst case.

This balance becomes a statistical bottleneck when a planner ranks many candidates under a fixed model-call budget. At tail mass α\alpha, empirical CVaR uses only the worst α\alpha fraction of sampled trajectories; with α=0.1\alpha = 0.1 and five rollouts, the estimate is controlled by the single most costly rollout. Concentration results formalize how the sample budget affects CVaR accuracy and selection error (Prashanth et al., 2020). Recent CVaR policy-optimization work likewise traces poor sample efficiency to underused non-tail trajectories (Mead et al., 2025; Luo and Delage, 2026). Although those methods study policy learning, they expose the same scarcity of useful tail data.

Stochastic MPC represents uncertainty through distributions, scenarios, or probabilistic constraints, but the general nonlinear problem remains computationally demanding (Mesbah, 2016). Risk-aware planners use, for example, stochastic search over nonlinear beliefs (Wang et al., 2021)

© 2027 W. Han, Z. Huang, L. Qu, Y. Tan & J. Meng.

or sample-based CVaR constraints (Lew et al., 2024). A recent nonlinear SMPC framework still reports an accuracy-computation trade-off among uncertainty-propagation methods (Landgraf et al., 2026); analytic propagation avoids sampling variance but typically requires compatible distributional and value-function structure (Sharma and Precup, 2026). Mean-only planning is cheaper but can hide skew and harmful tails. The open question is how to rank many plans by mean and tail cost when each candidate can afford only a handful of model calls.

We introduce quantile propagation planning (QPP), which evaluates KK fixed disturbance levels and integrates their piecewise-linear cost curve to obtain its mean and CVaR. QPP holds the same disturbance rank across time and coordinates, so it evaluates a comonotonic surrogate rather than the independently disturbed execution process. This shared-rank coupling can be conservative and may change which plan is preferred.

Our contributions are:

  • A deterministic level-curve evaluator that uses KK model trajectories and does not require an ordering projection.

  • Coupled-process guarantees for exactness at the chosen levels, grid-refinement convergence, and one-sided conservatism under stated conditions.

  • An evaluation across controlled overload and inventory tasks and a fitted microgrid, with budget-matched sampling baselines and ablations that identify when QPP is effective.

References (35)