arXiv:2610.41839cs.ROOct 2026

Manuscript Offprint

arXiv:2610.41839

Integrating Low-Thrust Transfer Dynamics into POMDP Planning for On-Orbit Servicing

Susmitha Patnala, Vincent Mousseau, Adam Abdin

Susmitha Patnala a^{a}, Vincent Mousseau b^{b}, Adam Abdin c∗^{c*}

a^{a} Université Paris-Saclay, CentraleSupélec, Department of Industrial Engineering, Gif-sur-Yvette, France, susmitha.patnala@centralesupelec.fr

b^{b} Université Paris-Saclay, CentraleSupélec, Department of Mathematics and Informatics, Gif-sur-Yvette, France, vincent.mousseau@centralesupelec.fr

c^{c} Université Paris-Saclay, CentraleSupélec, Department of Industrial Engineering, Gif-sur-Yvette, France, adam.abdin@centralesupelec.fr

∗^{*} Corresponding author

Recent developments in both high-thrust (HT) and low-thrust (LT) propulsion technologies broaden design options for on-orbit servicing (OOS) missions. However, incorporating LT transfers into OOS mission planning requires accounting for the trade-off between prescribed transfer duration and propellant consumption. Multi-servicing, multi-transfer OOS mission planning is inherently sequential and requires adaptive planning tools that account for propulsion-dependent transfer durations and mass-dependent propellant consumption. Thus, transfer dynamics must be integrated into mission planning and scheduling to increase flexibility and adaptability. In addition, the planning is often done with imperfect information about the system's state and stochastic service demands. This paper focuses on modeling orbital transfers, particularly LT transfers, within a Partially Observable Markov Decision Process (POMDP) framework for OOS mission planning. To enable offline policy computation, the transfer model must provide explicit state transitions and rewards for all admissible actions. The state space is therefore augmented with the servicing vehicle's remaining propellant to enable consistent mass updates. HT transfers are modeled using a precomputed transfer matrix that maps each transfer to the time of flight and propellant consumed. LT transfers are represented using an analytical GEO phasing model with prescribed transfer-duration alternatives. For each alternative, the model calculates propellant consumption and maneuver feasibility as functions of the required phase change and the current servicing-vehicle mass.

The proposed modeling approach is evaluated on simplified OOS planning scenarios using circular phasing with HT and LT propulsion. The resulting POMDPs are solved using the Successive Approximations of the Reachable Space under Optimal Policies (SARSOP) algorithm, and the policies obtained under HT and LT are compared. This comparison provides a quantitative assessment of the feasibility and operational impact of LT options, particularly regarding the potential role of advanced electric propulsion in future servicing architectures.

Keywords: on-orbit servicing, partial observability, low-thrust propulsion, high-thrust propulsion, POMDP, mission planning

1. Introduction

On-orbit servicing (OOS) includes activities such as inspection, maintenance, repair, refueling, repositioning, and life extension of satellites [1]. These capabilities can increase the operational lifetime and flexibility of space systems while reducing the reliance on frequent launches. However, in a multi-target servicing mission, each servicing decision changes the location and remaining resources of the servicing vehicle and influences which future service requests can be addressed [2]. Consequently, the value of a maneuver depends on the sequence in which target satellites are visited and on the operational state of the constellation when the maneuver is initiated [3–5].

Propulsion introduces an important fuel-time trade-off into this sequential planning problem. Chemical high-thrust (HT) propulsion provides relatively short transfer times but generally consumes more propellant. Electric low-thrust (LT) propulsion provides substantially higher specific impulse and can reduce propellant expenditure, but its lower acceleration results in longer transfer durations. LT transfers can therefore increase the time for which failed satellites remain unattended and the probability that other satellites degrade while the servicing vehicle is in transit.

LT trajectory performance also depends on the current mass of the servicing spacecraft. For a given phase change and time of flight, the initial mass affects the duration of thrust, propellant consumption, and the feasibility of the maneuver. Previous studies have investigated LT transfers for geosynchronous satellite servicing [6], and the use of high-thrust, low-thrust, and multimodal vehicles in OOS logistics optimization [7]. These studies establish the operational importance of the propulsion trade-off but do not account for imperfect knowledge of satellite health in the sequential decision state.

In practice, the health of a target satellite can only be known through incomplete telemetry, noisy monitoring, or an inspection. The servicing vehicle must then balance the value of acquiring additional information against the cost of delaying maintenance action. Propulsion and partial observability interact directly. During a long transfer, unobserved targets continue to degrade, existing health information becomes older, and failed satellites can accumulate additional downtime. A fuel-efficient transfer may therefore be operationally undesirable when the probability of failure is high, whereas a rapid high-thrust transfer may unnecessarily consume scarce propellant when service urgency is low.

In previous work, an event-based POMDP framework was developed for inspection and maintenance planning under partial observability [8]. The formulation represented uncertain satellite health, noisy inspections, stochastic degradation, servicing-vehicle location, remaining propellant, and action-dependent event durations. The present work extends this model by introducing propulsion-dependent HT and LT GEO phasing transfers.

The contributions of this paper are as follows:

  1. A fixed-duration analytical LT GEO phasing model, with mass-dependent propellant consumption and maneuver feasibility, is integrated into the event-based POMDP model.

  2. The transfer duration and propellant consumption returned by the trajectory model are incorporated into the health, fuel, and reward transitions of the POMDP.

  3. HT and LT servicing policies are compared for a three-satellite GEO scenario under partial observability.

The remainder of the paper is organized as follows. Section 2 presents the POMDP model. Section 3 describes the HT and LT transfer models and their integration into the POMDP. Section 4 presents the solution method. Section 4.1 defines the numerical case study, Section 5 discusses the results, and Section 6 concludes the paper.