Shortest-path optimality does not guarantee that a memoryless graph generator preserves a prescribed source–target correspondence. We study whether reordering legal shortest edits can retain this correspondence without changing the pairing, mandatory edits, or sampling budget. Under a common Poisson clock, we establish an exact criterion for endpoint coupling recoverability: the source-blind Markov projection attains the unavoidable clock-error floor if and only if routes to distinct targets do not share graph states. Routes to the same target may merge without sacrificing endpoint fidelity. This characterization leads to an exact finite-state routing formulation and a legality-preserving scheduling procedure with recovery certificates. A marker-free construction demonstrates how shared edge structure can retain source distinctions, while a capacity-constrained family exhibits a sharp separation in paired error between edit orders with identical marginal error. Finally, a target-conditioned aliasing bound connects structural route design to the terminal fidelity of a learned graph-only generator. These results characterize when legal edit ordering can preserve a prescribed coupling under fixed operational costs.
1 Introduction
A graph-to-graph transformation is correct only if it sends a particular source to its intended target. Nevertheless, many generative constructions are assessed by legality, edit distance, and agreement with the target graph marginal. These requirements do not guarantee the specified source–target correspondence. A memoryless student, observing only the current graph and time, may merge trajectories from different sources and average incompatible next edits. Marginally correct generation can therefore coexist with incorrect paired transformations, even with a population-optimal predictor. That coupling information can be lost under Markovian projection is known from bridge and trajectory matching [2, 3].
There is, however, a more constrained design question. Suppose the pairing is fixed, every primitive edit is fixed, every path must remain legal and shortest, and both the sampling clock and the student's available state are unchanged. The only remaining freedom is the order of the necessary edits. Different orders traverse different intermediate graph states, and those states are precisely what the memoryless student observes. Thus, an edit order may itself carry the information that the student is forbidden to store explicitly. The possibility is not universal: graph constraints may force distinct tasks through an information-erasing bottleneck. Nor is it enough to observe that orders influence
*Preprint, October 2026. Work in progress, not peer-reviewed.
training: learnable action orders and trajectory-conditioned discrete flows are already studied [4, 5]. The question here is when edit order alone can recover a prescribed coupling under unchanged operational costs.
We formulate this question as a constrained routing problem in the space of legal graph states. The central challenge is not merely whether prescribed teacher paths are Markov-consistent, but whether compatible shortest routes can be selected to preserve the intended endpoint coupling. We establish an exact criterion for when the source-blind Markov projection attains the unavoidable clock-error floor, connecting endpoint fidelity to target-separated shortest routing. Building on this characterization, we provide structural cut obstructions, an exact finite-state routing formulation, and a legality-preserving scheduling procedure that certifies recovery when target conflicts vanish. A four-edit construction demonstrates that recovery does not require globally private edges, while a capacity-constrained family shows that legal edit ordering can produce a sharp separation in paired accuracy without changing marginal error or shortest-path length. Finally, a target-conditioned error bound connects route ambiguity and learned-action error to terminal coupling fidelity. Together, these results establish a structural foundation for understanding when legal edit ordering can preserve source-target correspondence, and when graph constraints make such preservation impossible.
with the usual conventions for zero probabilities. For sets and , we write for set difference, for symmetric difference, and for cardinality. The indicator of an event is written as . We use Pois() for the Poisson distribution with mean , and for a null edit that leaves the current state unchanged.
Let be a finite set of identifiable edges and let be any family of legal graph states. An edit adds or deletes one edge, provided its resulting state belongs to . We are given a deterministic pairing
Let denote the random source-target pair. The sources are distinct, so implies , although different sources may share the same target. Write , , and . We require that each pair admit a legal monotone route: a sequence from to that toggles each edge of exactly once, and no other edge. Here and . For , the state is the graph after edits, and is the legal action taking to . This is precisely a legal shortest route because every edge in the symmetric difference must be toggled at least once. Monotone feasibility is automatic for downward-closed legal families, but downward closure is not assumed in the results below. The source-target pairing, mandatory edits, and path lengths are held fixed; only their permissible ordering changes.
Let be a nonhomogeneous Poisson clock, independent of , with intensity almost everywhere on and cumulative budget , where . The route teacher starts at and, at each event, takes its next prescribed action; after reaching it applies the null action . Thus
All graph-only policies considered below use the same independent clock, make at most one legal edge toggle per event, and may depend on the current graph and time but not on the original source or past trajectory. The probability of insufficient clock events gives
For every such policy , : reaching requires at least toggles, regardless of the policy. As is deterministic given , the paired total variation is precisely its mispairing probability, and hence
Equality in (4) is our operational definition of clock-floor coupling recovery. It does not assert exact recovery at finite .
3 A Structural Criterion for Coupling Recoverability
The route teacher knows the source index and therefore its next edit. Its source-blind Markov projection instead uses the pooled next-action law
at every teacher-occupied graph. It draws marks from at intensity and starts from the same marginal source law. To see the marginal identity explicitly, put and let denote the graph after action , with . Conditioning the teacher's probability flux on its current graph gives
These are precisely the forward equations of the source-blind projected process, with the same initial law. Uniqueness of the finite-state solution proves equality of their one-time marginals. The analogous identity conditional on uses , not necessarily , which explains why the pooled projection need not preserve the prescribed pairing [2, 3].
Let be the set of graphs visited by route . Two routes can share a graph without harming the pairing if their targets agree: although their next edits may differ, all legal shortest continuations towards that common target still reduce its edit distance. By contrast, a shared graph between routes with different targets erases the distinction that the student needs at termination.
Theorem 3.1 (Exact endpoint recoverability criterion). Under the preceding assumptions, the source-blind Markov projection attains the clock floor if and only if the selected legal shortest routes satisfy
Thus routes to a common target may merge, while routes to distinct targets must be state-disjoint. The equivalence concerns the fixed-route Markov projection; it is not a statement that an arbitrary separately designed student must imitate those routes.
Proof. Suppose (7) holds. Every graph visited by a teacher route is then associated with a unique target , although several sources may share that target. Every non-null action supported by is an action of a monotone shortest route to , so it decreases by exactly one. Its successor belongs to a route with the same target. At all supported actions are null. Starting from , the projected process therefore reaches at exactly its th clock event and remains there. Its conditional error is , proving equality in (4).
For necessity, suppose instead that for two routes with . Every prescribed prefix has positive probability of being followed by the blind projection: at every occupied state and every interior time, its prescribed action has strictly positive pooled probability, because the corresponding Poisson route-position probability is positive. Hence, at any fixed , the blind process has positive probability of when started at , and likewise of when started at . These events may have different past event counts, but the future marked process, conditional on the same graph at time , has the same law for both sources and is independent of the past event count.
If the projection attained the lower bound in (4), its conditional error for each source would equal , since each conditional error has that lower bound and all are positive. Consequently, after either positive-probability prefix, the future output would have to equal the respective target almost surely whenever the number of subsequent events satisfies or , respectively. Condition on the same value ; this event has strictly positive probability. Given , the future action law is identical for the two sources, yet the equality assumption would require it to be concentrated both on and on . This contradicts . Therefore any such intersection makes .
Theorem 3.1 answers the endpoint question, not merely the stronger demand that every source-conditioned action law be reproduced. For comparison, a deterministic graph-only action map can reproduce the full selected teacher routes if and only if routes sharing a state prescribe the same next action there. This follows directly by assigning that common action and inducting over clock events, and is the familiar Markov-consistency criterion. It is stronger than (7) when several routes lead to the same target. The relevant structural object for coupling recovery is thus target-separated shortest routing, rather than pathwise agreement of every edit decision.
3.1 The legal-state graph and an obstruction
For each task define its monotone interval
Direct each legal single-edge move from to whenever . The resulting directed graph is acyclic; its paths are exactly the permissible shortest edit orders. Theorem 3.1 therefore gives an existence question entirely within the legal state space: can one choose one path in each so that paths to different targets have no common state?
A basic impossibility certificate follows immediately. If tasks have pairwise distinct targets and a set of fewer than states intersects every shortest route for every task, then no route selection attains the clock floor. Each of the disjoint routes would require a different state of . This is a structural obstruction to recovery, not a quantitative bound on the excess paired error. A sharp endpoint bound for a concrete bottleneck appears in Section 5.
4 Certified Edit Scheduling under General Legality Constraints
A useful construction should not require every task to own an exclusive edge, or the legal state network to be planar. We therefore give a general exact formulation and a feasible route-improvement algorithm. They operate on the same graph-legality predicate; their distinct guarantees are stated explicitly.
4.1 An exact finite-state formulation
Write for the set of distinct targets. Form the union of legal monotone intervals, and let contain the directed edges of . Introduce binary route-flow variables
for , and binary target-occupancy variables for and . Require
(9)
The flow-balance equations in (9) apply only when ; a task with has a zero-length route, enforced by its endpoint occupancy constraint alone. Variables on nonexistent arcs are absent. The formulation allows routes to a common target to share states; it forbids sharing between different targets.
Proposition 4.1 (Exact route selection for an arbitrary legal family). The binary system (9) is feasible if and only if some selection of legal monotone shortest edit routes attains . An integral solution yields such routes by following the positive flow for each task. This claim requires no downward closure, private markers, or planarity.
Proof. Each strictly decreases the nonnegative distance to along every arc and hence is acyclic. Unit integral flow conservation from to therefore gives an path, without cycles or disconnected flow components. The occupancy constraints prevent paths with different targets from sharing a graph. Theorem 3.1 proves sufficiency. Conversely, set the flow variables to one on any target-separated shortest route family, zero elsewhere, and assign exactly when a route to target visits . Every constraint is then satisfied.
For finite graphs this is a complete decision procedure, but explicit can have exponentially many states in . Even with an efficient legality oracle, arbitrary constraints do not imply a polynomial-size state representation or a polynomial-time integer solver. The formulation is valuable as a small-instance optimum, a feasibility certificate, and a reference against which more scalable schedules can be compared.
4.2 A marker-free construction at the capacity boundary
The criterion does not rely on dedicated source identifiers. Let be any preserved collection of edges and let be distinct permitted edges. Consider
If the following states are legal (for instance under the edge-capacity constraint with fixed), take the two routes, suppressing :
Both use exactly four mandatory edits, remain at or below their endpoint edge capacity, and have disjoint visited states; Theorem 3.1 yields clock-floor recovery. Yet : no edge is globally private to either task. This example demonstrates distributed source distinction, without assuming that all legal constrained instances admit such routing.
4.3 A legality-preserving scheduling procedure
In large spaces, storing every state in is often impractical. We use a legality-preserving local search procedure to reduce structural conflicts among supplied shortest routes, while keeping their endpoints, mandatory edits, and lengths unchanged. Represent each route by its ordered list of mandatory edge toggles. Swapping two adjacent edits preserves the endpoint and the entire edit multiset. Only the intermediate graph after the first of these edits changes. The swap is legal if and only if this one new intermediate graph belongs to ; all other states remain unchanged. Thus one legality-oracle query is sufficient to certify the modified route.
For a computable zero-loss certificate, let be the number of selected routes to target visiting state , and set
Here is any fixed order on the finite target set. Each term is nonnegative, and if and only if (7) holds. This score certifies clock-floor recoverability when it vanishes. For positive values, however, it neither estimates the endpoint TV error nor guarantees that reducing the score reduces that error. Accepting only legal adjacent swaps with strictly decreasing terminates after finitely many moves, leaves every route shortest, and returns a certified clock-floor solution if it reaches zero. Otherwise it reports only a local optimum; no global recovery or approximation ratio is asserted.
Require: Paired sources and targets; any legal monotone shortest routes; legality oracle Legal(x). 1: Build target-labeled state incidence counts and compute from (12). 2: repeat 3: improved ← false. 4: for each route and adjacent edit positions do 5: Compute the intermediate state created by reversing these two edits. 6: if Legal() and the exact updated is smaller then 7: Apply the swap; update the incidence counts and . 8: improved ← true; break. 9: end if 10: end for 11: until not improved or 12: return legal shortest routes and the certificate .
Algorithm 1: Legality-preserving coupling-aware edit scheduling
Any constraint expressible as a state-membership test can be used, including edge capacities, degree bounds, forbidden subgraphs, and connectivity, provided a legal monotone shortest initialization exists. Under downward-closed constraints, delete-first initialization is always valid. In a general legality family, an initial route can be found by search on the monotone interval or supplied by the application. Adjacent-swap local minima need not be globally optimal: the exact formulation (9) remains the definitive existence test where the state space is manageable.
5 When constraints force the wrong pairing
A target-separation obstruction is not merely a problem of imitating teacher actions. In some legal graph systems it imposes a measurable endpoint error even for a perfect population-optimal student.
Theorem 5.1 (An arbitrary-size capacity separation). Let be distinct identifiable edges, , with equiprobable paired tasks and . Let and . At capacity every shortest route must delete before adding , and the source-blind projection satisfies
At capacity , the same pairs also admit legal add-first shortest routes, and for those routes
Moreover, at fixed , comparing delete-first with add-first changes only the edit orders: all sources, targets, required actions, path lengths, and clock budgets remain identical. The paired-error gap is exactly at every .
Proof. All tasks require exactly two edits. At capacity one, adding first would violate legality, so all routes pass through after their first clock event. Since the common clock is independent of the uniform source, the pooled Markov policy at this state chooses each target edge with probability . A run with fewer than two events cannot finish; after two or more events, it reaches a target, but that target matches the source with probability . Thus the correct-pair mass is , whereas the total mass on the target set is . This proves (13).
At capacity two, route may instead use . Routes to different targets have no common state, so Theorem 3.1 gives paired error . Their terminal marginal has mass at each target and no other target mass, giving marginal error . Delete-first remains legal at capacity two and retains the previous error formula. These calculations establish both (14) and the fixed-capacity order-only comparison.
For the delete-first family, the target-conditioned aliasing budget defined below is : the sole disagreement is at the common empty state, with conditional action-TV . Thus the paired-risk bound in Theorem 6.1 is sharp for the population-optimal student. The example is a sharp separation rather than a claim that every capacity constraint causes failure. It also exhibits an important boundary: increasing edit length or supplying the source could change the answer, but neither intervention belongs to the fixed-cost, source-blind question studied here.
6 Learning error and exact evaluation of a selected schedule
A structural certificate gives the performance of the ideal pooled policy. To relate that certificate to a trained student, it is useful to measure ambiguity at the target level, because differences between teacher routes to the same target need not affect the paired endpoint. Define
This quantity is zero when target classes never share graph states; it does not penalize alternative valid edits among sources headed to a common target. For a legal student action law , including the null action, let
with and the usual support condition for KL.
Theorem 6.1 (Paired and marginal error guarantees). Under the assumptions of Section 2, the source-blind student satisfies
(17)
Here . If (7) holds and the student exactly matches , its paired risk equals .
Proof. Construct a target-aware process with the same initial pairs and clock, but with action law . By the finite-state forward equation, its joint marginals equal those of the route teacher: the transition flux conditional on is obtained by averaging the teacher's source-specific action fluxes over its occupied states. Furthermore, every action supported by decreases Hamming distance to , so from any of its associated sources , this process reaches after exactly events and then remains there. Its paired error is therefore .
Couple this target-aware process and the source-blind projection with the same and clock, and maximally couple their action marks until the first disagreement. The probability of disagreement by time is at most the mean integrated conditional mark-TV under the target-aware process. Its occupancy matches the teacher's, so this mean is precisely . Therefore the paired TV between their terminal laws is at most . Next compare the blind projection with the student, using the same initial source and clock. Because the projected unconditional state occupancy equals the teacher's, the marked-path chain rule gives
Pinsker's inequality bounds the TV of their terminal laws by . The triangle inequality gives the paired upper bound. Marginal consistency of the blind projection with the teacher and direct application of the latter KL bound give the marginal upper bound. Finally, the clock lower bound is (4).
For any fixed schedule, the endpoint risk can also be evaluated directly, without relying on an upper bound. Work in cumulative clock time . On route , the occupancy weight at position is
Consequently, the projected kernel at a teacher-visited graph is explicitly
where any value may be assigned at states with zero denominator. Define , initialized by . With denoting the legal successor and , solve the finite forward system
Every successor with positive is a state on a selected teacher route, so the system closes on the finite union of their visited graphs. The exact projected paired risk is
Equations (20)–(22) supply a task-aligned objective for evaluating or selecting legal orders when C > 0, and an independent numerical check on the theoretical bounds. They do not imply that globally optimizing edit order is computationally easy.
7 Relation to prior work and applicability
Coupling loss under Markovian projection and the use of initial-point augmentation are established in Augmented Bridge Matching [2]; conditional flow consistency and trajectory information are studied in Trajectory Flow Matching [3]. Learned generation orders [4] and trajectory-conditioned discrete flow matching [5] already treat action order as a modeling variable. Our question fixes the pairing, admissible primitive edits, minimal length, and clock, then examines which legal graph states permit coupling recovery without source input. General discrete paths [6], graph edit flows [7], and hard-constrained graph generation [8] provide methodological context. Vertex-disjoint shortest routing is itself a classical combinatorial problem [1]. The binary flow formulation uses standard integer-programming tools; its role is to solve the specific clock-floor recoverability criterion, not to introduce a new optimization primitive.
Theorems 3.1 and 6.1 allow repeated targets and arbitrary legal-state predicates, but require deterministic paired targets, an observable graph representation with identifiable edges, a common source-independent positive clock, and the specified single-toggle monotone shortest routes. A stochastic one-to-many coupling, partially observed graphs, or a generator that explicitly accesses the source falls outside this theory. The finite-state exact solver is complete but can be expensive; the adjacent-swap scheduler preserves feasibility for arbitrary legality predicates but offers no unconditional optimality guarantee. Our capacity construction is an analytical example, not a neural-network benchmark. These boundaries identify the remaining empirical question: how often does legal edit ordering reduce paired error on real graph-transformation tasks, relative to random orders, standard order learning, and source-conditioned models?
Scope and limitations. Our analysis considers deterministic source–target pairings on finite graph spaces with identifiable edges, legal monotone shortest edits, and a common source-independent Poisson clock. Within this setting, the recoverability criterion is exact, and the proposed scheduling procedures preserve edit legality and cost. The exact formulation may require an explicit state space, while local scheduling provides feasibility and recovery certificates rather than a global optimality guarantee. Extensions to stochastic pairings, partially observed graph structures, and more general editing dynamics remain natural directions for future work.
8 Conclusion
This work establishes a structural perspective on coupling preservation in graph flow matching, showing how the ordering of legal shortest edits can determine whether a memoryless generator retains the prescribed source–target correspondence. We formulated coupling recoverability as a legal graph-edit ordering problem with fixed source–target pairings, editing costs, and sampling budgets. Our analysis establishes an exact structural criterion for attaining the unavoidable clock-error floor, connecting endpoint fidelity to target-separated shortest routing. Building on this characterization, we developed a certified routing formulation and a legality-preserving scheduling procedure. A marker-free construction demonstrates how shared graph structure can retain source distinctions, while a capacity-constrained family shows that legal edit restrictions can force substantial pairing errors even when the marginal TV error remains unchanged. Finally, the paired-error bound connects structural recoverability to the behavior of a learned graph-only generator. Together, these results establish a structural foundation for understanding when edit ordering can preserve source–target correspondence, and when graph constraints prevent it.
References
[1] A. Botea, M. Mattetti, A. Kishimoto, R. Marinescu, and E. Daly. Counting Vertex-Disjoint Shortest Paths in Graphs. Proceedings of the International Symposium on Combinatorial Search, 12(1):28–36, 2021.
[2] V. De Bortoli, G.-H. Liu, T. Chen, E. A. Theodorou, and W. Nie. Augmented Bridge Matching. arXiv:2311.06978, 2023.
[3] X. Zhang, Y. Pu, Y. Kawamura, A. Loza, Y. Bengio, D. L. Shung, and A. Tong. Trajectory Flow Matching with Applications to Clinical Time Series Modelling. NeurIPS, 2024.
[4] D. Patel, B. Rozonoyer, G. Pandey, T. Naseem, R. F. Astudillo, and A. McCallum. Insertion Based Sequence Generation with Learnable Order Dynamics. ICML, PMLR 306, 2026.
[5] N. Kemper, M. Lienen, D. Lüdke, and S. Günnemann. Trajectory Matching: Discrete Flow Matching with Structured Actions. arXiv:2610.32602, 2026.
[6] N. Shaul, I. Gat, M. Havasi, D. Severo, A. Sriram, P. Holderrieth, B. Karrer, Y. Lipman, and R. T. Q. Chen. Flow Matching with General Discrete Paths: A Kinetic-Optimal Perspective. ICLR, 2025.
[7] M. Havasi, B. Karrer, I. Gat, and R. T. Q. Chen. Edit Flows: Flow Matching with Edit Operations. arXiv:2506.09018, 2025.
[8] M. Madeira, C. Vignac, D. Thanou, and P. Frossard. Generative Modelling of Structurally Constrained Graphs. NeurIPS, 2024.
[9] M. Guo, V. Thost, B. Li, P. Das, J. Chen, and W. Matusik. Data-Efficient Graph Grammar Learning for Molecular Generation. ICLR, 2022.
[10] G. Ding, A. Schrijver, and P. D. Seymour. Disjoint Paths in a Planar Graph—A General Theorem. SIAM J. Discrete Math., 5(1):112–116, 1992.
[11] Y. Wang. Maximum Integer Flows in Directed Planar Graphs with Vertex Capacities and Multiple Sources and Sinks. SODA, 2019.
[12] K. Gajjar, A. V. Jha, M. Kumar, and A. Lahiri. Reconfiguring Shortest Paths in Graphs. Algorithmica, 86:3309–3338, 2024.
A Projection and clock identities
Route occupancies and conditional kernels. For the selected route of length , write . Independence of the clock from gives, for ,
The terminal formula also covers , in which case . Along each monotone route, the states are distinct, so the next action at an occupied is the point mass at , with . In particular, every route position has positive occupancy for interior times .
Forward equations. Put and let be the state after action , with . At occupied states define . Conditioning the route teacher's event flux on its current state gives
The right-hand side is the finite-state forward equation of the source-aware Markov process. Since the clock intensity is integrable, its solution with initial distribution is unique. Multiplying (24) by and summing over s yields the pooled equation, using
Thus the source-blind Markov projection has the teacher's unconditional one-time graph marginals, without necessarily preserving its source-conditioned marginals.
The same argument applies after conditioning on a target. With , set
The identity
shows that the target-aware projection preserves the joint one-time marginals of the route teacher. This does not assert preservation of the full source-conditioned path laws.
The clock floor. Every legal single-edge toggle changes at most one coordinate of the edge-set representation. Hence at least events are required to reach from , even for a policy not following the selected route. Because the clock is independent of the source,
Taking the -weighted average proves (4). Conversely, if every event before arrival at decreases by one and is absorbing, equality holds for source .
B Details of endpoint recoverability
Positive support of prescribed prefixes. Fix and a nonterminal route position , where . By (23),
The denominator includes terminal positions, whose action is . For any , condition on exactly clock events before time . At each of their event times the required next action has strictly positive probability under the pooled kernel; induction therefore gives positive probability that the blind projection started at follows the entire prescribed prefix and occupies at time . The assertion also covers and a terminal position .
Why different targets cannot share a state at the floor. Suppose but . The preceding argument provides, for each initial source, a positive-probability prefix reaching at the same fixed interior time , possibly after different numbers of clock events. Assume that the blind projection attains . Each conditional error already has its individual clock lower bound, and every is strictly positive. Consequently,
Now condition either prefix on exactly future clock events, where . This conditioning has positive probability in both cases by independent Poisson increments. Starting from the same state at the same time , the source-blind policy and future clock increments have identical conditional laws, irrespective of the original source or the number of preceding events. Yet (25) requires this common terminal law to put probability one on in the first case and on in the second. As these targets differ, this is impossible. This proves the necessity in Theorem 3.1 without requiring equal route depths or distinct targets for all tasks.
Shared targets and pathwise consistency. For a fixed target , every action supported by on a teacher-visited state reduces by one; at , only is supported. Thus all sources assigned to can follow mixtures of one another's valid shortest continuations and still complete in exactly their own events. This explains why target separation is sufficient even when two routes with the same target disagree about the next edge to edit. In contrast, reproducing the individual teacher paths requires agreement of next actions at every shared state.
C Verification of route-selection certificates
The binary routing formulation. Each directed arc of decreases the integer quantity by one, so is acyclic. For , a binary unit flow satisfying the balance constraints in (9) therefore decomposes into one directed path: a disconnected positive-flow component would contain a directed cycle, which is impossible. The path has exactly arcs and consists only of legal mandatory edits. For , its single endpoint is represented directly by . The inequalities linking to and the per-state capacity constraint ensure that routes to distinct targets cannot share a state. Conversely, any target-separated family defines a feasible binary solution by setting its path arcs and target-labeled visited states to one. This proves Proposition 4.1 including zero-length tasks.
Adjacent swaps and termination. Suppose two consecutive mandatory edits toggle distinct edges and , and let be the state immediately before them. Their final state is independent of their order: . Hence reversing the edits changes only the intermediate state from to ; the remainder of the route is unchanged. If , the new route is legal and still uses exactly the required edits. The score (12) is a nonnegative integer and vanishes precisely when no state is visited by routes with different targets. Every accepted swap strictly decreases this score, so the procedure terminates after finitely many accepted swaps. A positive local minimum is neither an impossibility certificate nor a bound on paired TV error.
Exact enumeration of the crossed example. Take and the capacity-two family in (10). Each task has two deletions and two additions. Its first edit must be a deletion (two choices). Thereafter, one may either delete the other old edge and insert the two new edges in either order, or insert one new edge, delete the remaining old edge, and insert the remaining new edge. This gives legal shortest orders per task. Directly comparing the visited-state sets of all pairs gives six state-disjoint choices. One of these six, written as signed edit lists for the first and second tasks respectively, is
Both lists are legal at capacity two and lead to distinct state sets; more generally, the routes displayed in (11) supply the direct certificate used in the main text. These counts are finite combinatorial checks, not learned-model experiments.
D Target aliasing, learned policies, and exact checks
Target-aware comparison. The target-aware projection starts from the same and uses . By the target-conditioned forward identity in Appendix A, its one-time marginals equal those of the teacher. More strongly, from any of its associated source states, each non-null edit reduces distance to its fixed target by one, and the target itself is absorbing. Hence it attains paired error exactly , even if it switches between teacher routes that share the same target.
Couple the target-aware process and the blind projection using the same initial and exogenous Poisson events. Until the first mismatch, their graph states are equal, and maximal coupling of the action marks has mismatch probability . If is the first mismatch time, the compensator and a union bound give
(26)
The second inequality uses the known marginal of the target-aware process. Thus target aliasing controls the extra paired error of the ideal blind projection.
Source-action versus target-action ambiguity. For deterministic source-conditioned paths, the law is a point mass. Therefore the familiar identity
holds at every occupied state. The target-conditioned law need not be a point mass when multiple sources share the same target. Accordingly, the bound in Theorem 6.1 uses the target-conditioned discrepancy from (15), not the source-action Gini expression.
Marked-path relative entropy. Include the initial source, the common clock times, and every action mark, including , in the compared path laws. The exogenous clock has the same distribution in both models, so it contributes no likelihood-ratio term. If , the student assigns positive probability to every blind-projection-supported mark. The conditional chain rule for the action marks, followed by the Poisson compensator, yields
(27)
Here the last equality uses equality of the blind projection’s unconditional state marginals and the route teacher’s. Data processing to , followed by Pinsker’s inequality, gives . Combining this with (26) and the clock floor proves Theorem 6.1. The marginal bound follows by comparing the blind projection directly with the student.
Finite-state and capacity checks. For a selected family of routes, compute from (19), form the pooled kernel (20), and integrate the conditional forward equations (21) from the initial states to budget B. The resulting terminal probabilities give (22); states outside the union of selected route states cannot be reached by the ideal projection. At u = 0, kernels at zero-occupancy states can be specified arbitrarily, since the continuous clock places no event at that single time.
For the uniform -pair capacity example, set . Delete-first routes spend exactly one event in the common empty state; on reaching it, the target index is uniform. Therefore
Add-first routes keep different targets separated, giving . At the empty state, the target-conditioned mark law is a point mass while the blind mark law is uniform on m target additions. Consequently,
which equals the excess paired risk of delete-first ordering. This verifies sharpness of the aliasing term when the student matches the pooled kernel exactly.