Abstract

This study compares two implemented intra-aisle robotic-picking configurations through discrete-event simulation. Without an onboard tote lift, two level-captive shuttles serve the two tested levels; with the lift, one shuttle remains on its horizontal level and its onboard mechanism moves the order tote to allow picks from the adjacent upper level. Thirty configuration–task-size experiments (n = 1–15 locations; ten replications each) yield 300 replication-level cycle-time observations. Two-sided Welch tests are applied to the replication means, with Holm adjustment across the 15 comparisons. The onboard-tote-lift configuration has longer mean cycle time at all tested task sizes. At n = 15, the means are 299.477 and 333.231 s/cycle, respectively: a 33.753 s increase (11.27%). The corresponding cycle-time-derived item rates are 180.314 and 162.050 items/h (-10.13%). These rates are calculated as 3600n divided by the scenario-mean cycle time; they are not measurements of the combined concurrent capacity of two level-captive shuttles. Importantly, task locations are sampled from different eligible-level sets in the two configurations, so the result concerns the implemented configuration-and-task-generation packages, not the isolated effect of a five-second tote-lift operation under identical picked locations. The study quantifies a cycle-performance difference alongside a reduction from two dedicated shuttles to one within the tested two-level block; it does not quantify system-level maximum throughput, investment cost, or reliability.

Keywords: automated warehousing; robotic order picking; shuttle system; tote lift; discrete-event simulation; resource-performance trade-off

1. Introduction

Automated warehousing increasingly combines storage, transport and picking functions to reduce manual travel and support short response times. The resulting systems are not interchangeable: performance depends on where item transfer occurs, which resources move totes or order containers, and whether horizontal and vertical movements are performed by dedicated or shared devices (de Koster et al., 2007; Boysen et al., 2019; Tappia et al., 2019). Shuttle-based storage and retrieval systems illustrate this design problem because the number of shuttles, their level coverage, lift architecture and control rules determine both resource requirements and achievable throughput (Eder, 2020; Ekren et al., 2024; Eder, 2024).

The system studied here is an intra-aisle robotic picking concept in which a mobile shuttle transports an order tote along the aisle and an integrated picking function transfers items at storage locations. This differs from conventional parts-to-picker architectures because the item transfer occurs inside the aisle. A related analytical formulation for a robotic order-picking shuttle was reported by Lerher (2018), and Lerher et al. (2025) later formulated expected cycle time and item throughput for a multi-command robotic picking cycle. The present article does not repeat the analytical-model correspondence assessment. Instead, it uses the simulation model to address a separate design decision: whether two adjacent storage levels should be served by separate level-captive shuttles or by one shuttle equipped with an onboard tote lift.

The two options represent a direct engineering trade-off. Without an onboard tote lift, each tested level has its own shuttle and track service. With an onboard tote lift, one shuttle remains on its assigned level while the tote lift moves the tote vertically relative to the shuttle so that picks can be made from both the shuttle level and the level above. The second configuration therefore reduces the dedicated shuttle count across the two tested levels from two to one, but adds lift operations and changes routing and controller behaviour. It must be assessed as a complete configuration change rather than as a five-second timing penalty in isolation.

Published shuttle-system studies show that architecture choices can trade investment, utilisation and throughput against one another. Tier-captive SBS/RS uses level-dedicated shuttles and separate lifts for tote movement, whereas tier-to-tier or movable-lift concepts redistribute transport resources across levels (Eder, 2020; Ekren et al., 2024). Eder (2024) further shows that lift capacity and shuttle-lift coordination are explicit performance variables. These studies provide the architectural context, but their transport processes and KPI boundaries are not identical to the intra-aisle item-picking process considered here. Their numerical results are therefore not used as matched benchmarks.

The research question is: Under the defined two-level benchmark and its configuration-dependent task generation, how do replication-mean picking-cycle times and cycle-time-derived item rates differ between two level-captive shuttles and one shuttle with an onboard tote lift? The study also records the change in dedicated shuttle count. It does not estimate the aggregate concurrent capacity of the two-shuttle arrangement. The contribution of the article is a bounded configuration comparison with an explicit KPI boundary and independently reproducible replication-level statistical results. The comparison was originally developed as Study B of the author's Master's thesis (Moursi, 2026) and is presented here as a focused article rather than a claim of previously unreported simulation experiments.

References (19)