The Exact Robustness of Smith's Rule with Predicted Processing Times

Ohad Ayalon, Ilan Reuven Cohen

Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.

Abstract

Smith’s rule orders jobs by their weight-to-processing-time ratios. We study the robustness of the resulting list schedule on identical parallel machines when processing times are only approximately known. Job j is ordered using a nominal processing time μj\mu_j, while its true processing time satisfies

μj≤pj≤αμj,\mu_{j}\leq p_{j}\leq\alpha\mu_{j},

where α≥1\alpha \geq 1 is the distortion parameter.

We determine the exact worst-case approximation ratio of the list schedule induced by the nominal Smith order on identical parallel machines, measured against the clairvoyant optimum and taking the supremum over the number of machines. The ratio is an explicit continuous piecewise-algebraic function of α\alpha. It equals the classical Kawaguchi–Kyan constant (1+2)/2(1 + \sqrt{2})/2 at α=1\alpha = 1, and becomes exactly α\sqrt{\alpha} for every α≥4\alpha \geq 4. On a single machine, the exact ratio is α\sqrt{\alpha}. For every fixed machine count, no deterministic nonpreemptive algorithm can improve on this guarantee, even if it knows α\alpha.

The proof reduces to jobs with a common nominal Smith ratio and pj/μj∈{1,α}p_j/\mu_j \in \{1, \alpha\}. A prefix–suffix certificate, obtained by cutting the list schedule at its minimum final machine load, bounds all earlier work together and each remaining job piece separately. Two ways of packing a matching lower-bound instance explain the algebraic branches below α=4\alpha = 4.

We also show that any fixed schedule ordered by nominal Smith ratios on each machine, with nominal approximation ratio 1+δ1 + \delta, has realized ratio at most α+αδ\sqrt{\alpha} + \alpha\delta. Combining this transfer with a nominal approximation scheme gives, for every fixed ε>0\varepsilon > 0, a deterministic polynomial-time algorithm, independent of α\alpha, with ratio (1+ε)α(1 + \varepsilon)\sqrt{\alpha} simultaneously for every 1≤α≤41 \leq \alpha \leq 4. Thus computing a nominal assignment can improve on the fixed list rule while retaining a uniform robustness guarantee.

1 Introduction

Smith’s rule is a classical scheduling principle for minimizing total weighted completion time. Consider a batch of jobs available at time zero, each of which must run uninterrupted once it starts. Job j has a processing time pj>0p_j > 0, a weight wj>0w_j > 0, and a completion time CjC_j. Interpreting wjw_j as the cost per unit time while job j remains unfinished, the objective is the accumulated cost of unfinished jobs,

∑jwjCj.\sum_{j}w_{j}C_{j}.

On one machine, ordering jobs in nonincreasing order of wj/pjw_j/p_j minimizes this objective exactly [25]. On identical parallel machines, the same order defines the weighted shortest processing time (WSPT) list rule: whenever a machine becomes idle, it starts the next job in the list. The rule requires processing times before the jobs run. How much does its performance deteriorate when these priorities are computed from estimates?

Processing-time estimates may come from a heuristic or a learned predictor. Prediction errors can then reverse the preferred order of jobs. Processing-time predictions have therefore motivated robust scheduling models that bound the effect of multiplicative error [1, 2]. We study both the loss incurred by the nominal Smith order and the guarantees obtainable by computing a more careful assignment from the same estimates.

For a concrete setting, consider a batch of computational tasks ready to run on identical workers. A duration estimate can guide the assignment, and weights can express how costly it is to keep different tasks waiting for their results. If tasks must run uninterrupted once dispatched, an underestimated task can occupy a worker while other work waits. This illustrative setting captures known weights, uncertain durations, and uninterrupted execution without assuming a particular prediction method or probability distribution.

Classical parallel-machine benchmark. Even with exact processing times, the WSPT list rule can incur a loss on parallel machines. Kawaguchi and Kyan proved that its best-possible worst-case approximation ratio is

ρKK:=1+22\rho_{\mathrm{K K}}:=\frac{1+\sqrt{2}}{2}

when the processing times are known [15]. This constant is the starting point for studying how the guarantee changes under prediction error.

Prediction model. All n jobs and their weights are available initially. There are m identical machines, so a job's duration does not depend on its assignment. Processing is nonpreemptive: once started, a job runs to completion on its assigned machine. Its true processing time is revealed only when it completes. These assumptions isolate uncertainty in duration from the separate effects of future arrivals, machine heterogeneity, and the ability to interrupt a job. The algorithm receives a nominal (predicted) processing time μj>0\mu_j > 0 for every job and the true processing times satisfy

μj≤pj≤αμjfor every job j,\mu_{j}\leq p_{j}\leq\alpha\mu_{j}\qquad\mathrm{f o r~e v e r y~j o b~}j,

where α≥1\alpha \geq 1 is the distortion. The robust weighted shortest processing time rule, denoted by RWSPT, orders jobs in nonincreasing order of wj/μjw_j/\mu_j. The RWSPT algorithm need not know α\alpha. Whenever nominal ratios are tied, our upper bounds include every valid tie-breaking; VLV_L, defined formally in Section 2.1, denotes the largest resulting list-schedule cost. On parallel machines the rule uses only the nominal data and observed completions: start its first min⁡{m,n}\min\{m, n\} jobs at time zero, and whenever a machine becomes idle, dispatch the next unstarted job in the order. If several machines become idle simultaneously, ties among them may be resolved arbitrarily.

Multiplicative error measures relative accuracy across jobs of different sizes and is unchanged by the choice of time units. The common bound α\alpha allows different jobs to have different errors within the interval; it imposes no distributional assumption. For RWSPT, the one-sided interval is only an analytical normalization: uniformly rescaling arbitrary positive estimates preserves their Smith order and reduces two-sided multiplicative errors to this form. The resulting distortion is the product of the largest overestimate and underestimate, as in robust flow-time scheduling [2]; see Remark 2.1. This rescaling need not be computed by the algorithm.

For a scheduling rule A\mathcal{A}, let A(μ,p,w,m)\mathcal{A}(\boldsymbol{\mu}, \boldsymbol{p}, \boldsymbol{w}, m) denote its total weighted completion time, and let OPT(p,w,m)\mathrm{OPT}(\boldsymbol{p}, \boldsymbol{w}, m) denote the value of an optimal clairvoyant schedule. We call Af(α)\mathcal{A} f(\alpha)-robust if

sup⁡m,n∈Nμ,p,w∈R>0nμ≤p≤αμA(μ,p,w,m)OPT(p,w,m)≤f(α),\sup_{\substack{m,n\in\mathbb{N}\\ \mu,p,w\in\mathbb{R}_{>0}^{n}\\ \mu\leq p\leq\alpha\mu}}\frac{\mathcal{A}(\mu,p,w,m)}{\mathrm{OPT}(p,w,m)}\leq f(\alpha),

with the supremum restricted to m = 1 for the single-machine problem. We compare costs on the same realized processing vector; only the comparison schedule knows that vector before execution.

The supremum ranges over all nominal inputs and their allowed realizations. Minimizing the largest absolute cost for a fixed nominal input is a different objective: for a fixed assignment and job order on each machine, completion times are nondecreasing in the job durations, so the largest absolute cost occurs at p=αμ\boldsymbol{p} = \alpha \boldsymbol{\mu}. The approximation ratio also depends on the realization's optimum; Appendix E illustrates this distinction.

Our main results. We distinguish two algorithmic choices: executing one nominal priority list, and using the nominal data to compute a fixed assignment and order on each machine. Our first result determines the exact robustness of the parallel-machine list rule. Let R(α)\mathcal{R}(\alpha) be its worst-case ratio, where the supremum is over the number of jobs, the number of identical machines, and all instances of distortion at most α\alpha.

Theorem 1.1 (Parallel-machine main theorem). The worst-case approximation ratio of the RWSPT list rule is the explicit function L(α)\mathcal{L}(\alpha) defined in (6):

R(α)=L(α).\mathcal{R}(\alpha)=\mathcal{L}(\alpha).

In particular, L(α)=α\mathcal{L}(\alpha) = \sqrt{\alpha} for α≥4\alpha \geq 4. The same supremum is obtained even if instances are required to have distinct nominal Smith ratios.

Figure 1 shows the exact curve. It starts at L(1)=(1+2)/2\mathcal{L}(1) = (1 + \sqrt{2})/2, and its two algebraic branches meet continuously at α0=(17+33)/12≈1.8954\alpha_0 = (17 + \sqrt{33})/12 \approx 1.8954. Section 3.2 specifies these branches exactly. Sections 3.3 and 3.4 give the lower-bound construction and the general upper-bound certificate proof; Appendices B and C supply the extremal parameters and scalar checks establishing equality. The scheduling ideas behind these bounds are explained in Section 1.1.

The one-machine problem has a simpler exact answer and supplies the α≥4\alpha \geq 4 branch of the parallel result.

Theorem 1.2 (Single-machine theorem). For nonpreemptive weighted completion time on one machine, RWSPT is α\sqrt{\alpha}-robust. This is best possible for every deterministic algorithm, even if the algorithm knows α\alpha.

Lemma 2.7 strengthens this benchmark: for every fixed number of machines m, every deterministic nonpreemptive algorithm has worst-case ratio at least α\sqrt{\alpha}, even knowing α\alpha. The lower bound is over nominal inputs and allowed realizations for that fixed m; it does not assert optimality for each fixed nominal input. Our second algorithmic result uses a nominal assignment to approach this benchmark simultaneously throughout 1≤α≤41 \leq \alpha \leq 4.

Theorem 1.3 (Near-optimal robust algorithm). For every fixed ε>0\varepsilon > 0, there is a deterministic polynomial-time algorithm, independent of α\alpha, that takes the number m of identical machines as part of the input and, from (μ,w,m)(\boldsymbol{\mu}, \boldsymbol{w}, m), constructs a fixed nonpreemptive schedule S satisfying

∑jwjCjS(p)≤(1+ε)αOPT(p,w,m)for every 1≤α≤4 and μ≤p≤αμ.\sum_{j}w_{j}C_{j}^{S}(\boldsymbol{p})\leq(1+\varepsilon)\sqrt{\alpha}\mathrm{O P T}(\boldsymbol{p},\boldsymbol{w},m)\qquad{f o r~e v e r y~}1\leq\alpha\leq4{~a n d~}\boldsymbol{\mu}\leq\boldsymbol{p}\leq\alpha\boldsymbol{\mu}.

The general nominal-to-robust transfer separates nominal approximation quality from distortion; its proof combines Smith-ratio layers with a hybrid machine assignment. Lemma 4.1 applies to every fixed schedule that orders jobs by nominal Smith ratios on each machine and has nominal cost at most 1+δ1 + \delta times the nominal optimum. Its realized ratio is at most α+αδ\sqrt{\alpha} + \alpha\delta for every α≥1\alpha \geq 1. Corollary 4.2 sets δ=0\delta = 0: an exact nominal optimum, Smith-ordered on each machine, achieves optimal deterministic robustness α\sqrt{\alpha} for every fixed m, simultaneously for all α≥1\alpha \geq 1. Computing it may be expensive.

Applying the polynomial-time approximation scheme (PTAS) of Skutella and Woeginger to the nominal instance and choosing δ=ε/2\delta = \varepsilon/2 gives the theorem above [24]. The assignment

Figure

Figure 1: The matching upper and lower bounds give R(α)=L(α)\mathcal{R}(\alpha) = \mathcal{L}(\alpha). The dash-dotted curve is the preliminary bound from Theorem 3.1. The dotted curve is the deterministic benchmark for every fixed machine count. Vertical lines mark α0\alpha_0 and 4. For α≥4\alpha \geq 4, the preliminary and exact bounds both equal α\sqrt{\alpha}. Below 4, the solid curve linearly interpolates generated samples of the algebraic branches in (6); the interpolation illustrates the exact bound proved in the paper.

is computed before execution and does not depend on the realized errors. This separates the quality of the nominal optimization from the loss caused by prediction error.

For α≥4\alpha \geq 4, the RWSPT list rule attains the benchmark α\sqrt{\alpha} exactly for every fixed mm. The nominal PTAS and the list rule generally produce different schedules. It remains open whether, for every fixed ε>0\varepsilon > 0, there is a deterministic polynomial-time algorithm, independent of α\alpha and with mm as part of the input, that attains a (1+ε)α(1 + \varepsilon)\sqrt{\alpha} guarantee simultaneously for every α≥1\alpha \geq 1.

The classical problem through a distortion lens. The exact curve quantifies when the fixed priority list pays an additional price for distributing jobs across machines. It describes how the Kawaguchi–Kyan constant at α=1\alpha = 1 deforms as the processing-time information deteriorates, until the deterministic obstruction α\sqrt{\alpha} becomes decisive at α=4\alpha = 4. Below that threshold, the certificate explains the extra list-rule loss and the change of extremal packing regime. The general transfer shows how nominal assignments approach the fixed-machine benchmark within any fixed factor 1+ε1 + \varepsilon.

The connection also works in the opposite direction. Combining our exact one-machine theorem with the classical lower bound of Eastman, Even, and Isaacs already recovers the tight α\sqrt{\alpha} branch for α≥4\alpha \geq 4. Conversely, the upper-bound argument developed for the distorted problem specializes at α=1\alpha = 1 to a short certificate-based derivation of the Kawaguchi–Kyan bound; see Remark C.1. The same load decomposition therefore accounts for both the classical constant and its change under multiplicative error.