Manuscript Offprint
arXiv:2610.30607Continuous-Time Motion Planning and Steering with Global Convergence
ABSTRACT
Motion planning is central to robotics, and it is increasingly used to correct the motions proposed by learned planners and policies. In both uses, constraints must hold at every instant of the motion, not only at sampled times. To our knowledge, no algorithm provably converges to a globally optimal motion once a smoothness cost is combined with such constraints. We cast planning and steering as a single continuous-time program: robots avoid one another and static or moving obstacles, and a learned proposal is steered by keeping the motion close to it. The program is elementary to state, yet nonconvex. We propose GlobMP (Global Motion Planning), a gradient projection method over piecewise-polynomial curves, on which each constraint is one polynomial per piece that must stay nonnegative over the whole motion; it alternates cost reduction with feasibility restoration. Under mild assumptions, we show that, from a fine grid start, its cost approaches the global optimum as the number of polynomial pieces grows, with every constraint met to any chosen tolerance, or exactly on stable instances. We demonstrate its superior performance over strong baselines in real and synthetic experiments, including teams of up to 200 robots, multi-robot planning on the Robotarium testbed and an extended benchmark, maze navigation, and steering tactile-reactive policies on a bimanual humanoid.
1 INTRODUCTION
Motion planning is a fundamental problem in robotics: it asks for a trajectory that connects a given initial state to a goal while satisfying motion constraints, such as avoiding collisions (LaValle, 1998). It underlies navigation, manipulation (Sundaralingam & Hermans, 2019; Gao et al., 2024; Amice et al., 2024), multi-robot coordination (Li et al., 2021; Tang et al., 2025; Shaoul et al., 2025), and, increasingly, the steering of learned planners and policies (Janner et al., 2022; Carvalho et al., 2023; Chi et al., 2023; Giaretta et al., 2026).
Motion planners approach this problem in several ways, each with a gap. Sampling-based planners explore many routes (Karaman & Frazzoli, 2011), yet smoothing their waypoints can introduce collisions; optimization-based planners improve a motion locally (Zucker et al., 2013; Tedrake & the Drake Development Team, 2019), with TrajOpt (Schulman et al., 2014) also supporting continuous collision checks. Constraints enforced at sampled times do not ensure feasibility between them (Hargraves & Paris, 1987; Figure 1). Convex-region planners search a decomposition of free space (Deits & Tedrake, 2015a; Marcucci et al., 2023), and semidefinite relaxations certify a polynomial motion as globally optimal only when the relaxation is tight (Graesdal et al., 2026). Even shortest-path complexity depends on the geometry: polynomial-time in the real-RAM model among planar discs (Chang et al., 2005), NP-hard among polyhedra in (Canny & Reif, 1987), and still open in even among disjoint unit discs or axis-aligned unit cubes (Mitchell, 2017).
Our setting is a point robot in that travels between prescribed boundary states around obstacles while minimizing a smoothness cost; steering a learned planner or policy is the same problem with one added constraint that keeps the robot near its proposal. Although elementary to state, this setting already contains the core difficulty of avoiding collisions; to our knowledge, no algorithm converges to its global optimum once a derivative cost such as acceleration or snap is combined with collision
Equal contribution.
(1) Direct paths collide

(2) Checked at 8 samples

(3) GlobMP: feasible for every t

Figure 1: Two robots, A and B, planned jointly among ellipsoidal obstacles; each obstacle and the other robot enter the program as a collision constraint (ellipses through the weighted norm of Appendix A2.1). Top: each robot's path in its colour (A teal, B magenta), with both robots drawn at the time of the dark-grey A–B mark and a faded disc where each was earlier; red marks a collision. Bottom: robot A's clearance to each coloured obstacle and the A–B clearance (dark grey) over time; below zero is a collision. (1) The direct (dashed) paths collide. (2) Checking the constraints at 8 sample times (open dots) misses collisions between them. (3) The final solid curves keep every clearance nonnegative on [0, 1]; coloured dashed: an unrestored cost step; grey dashed: numerically refined alternatives, with cost relative to GlobMP's.
constraints on the whole time interval. We introduce GlobMP and show that, from a fine grid start, its cost approaches the global optimum as the number of pieces grows, within any constraint tolerance or exactly on stable instances.
GlobMP combines exact whole-interval constraints, gradient-based refinement and a systematic search over initial curves. We consider
(P∞)
Here is the robot's trajectory, with time normalized to , and denotes the Sobolev space of curves whose derivatives through order are square-integrable: the objective is finite exactly on , and its curves have continuous derivatives, so the constraints and boundary values are defined at every instant. The objective measures smoothness through the th derivative: penalizes acceleration and snap (Mellinger & Kumar, 2011). The collision constraints keep the robot at distance at least from each of obstacle centres , which may move, and the steering constraint keeps it within of a reference , both at every instant. The boundary conditions fix the position and its derivatives through order at both ends. Unlike Graesdal et al. (2026), whose spheres are static, we let the centres move in time; this single extension covers several robots, each a moving centre for the others, and steering, where the robot must stay near the moving centre .
Several robots are planned by stacking their curves into one and keeping robots and (radii ) apart: (Shaoul et al., 2025). The reference can be the waypoints of a learned planner (Janner et al., 2022) or the action chunk of a policy (Chi et al., 2023), which the steering constraint corrects rather than replaces; with it is dropped and is plain motion planning. Boundary orders bind only our polynomial curves (Assumption A). Ellipsoids, walls, corridors and other variants are in Appendix A2.1.
Our contributions address two difficulties of : constraints must hold at every instant, and improving one feasible curve need not find the best route.
C1. We enforce collision constraints exactly in continuous time. At a fixed polynomial degree, each constraint becomes a univariate polynomial that must be nonnegative on (Powers & Reznick, 2000), so it holds between sample times too; collision, robot separation and steering share one block formulation ( ).
C2. We propose GlobMP, a gradient projection algorithm that alternates a cost step with feasibility restoration ( ). Cone projections give coefficient corrections for violated blocks, which Jacobians turn into control-point updates, block by block and with the boundary states kept.
C3. We prove global convergence (Theorem 1): GlobMP keeps every curve feasible without increasing its cost and, from a fine grid start with N polynomial pieces, approaches the best continuous-time motion as N grows, within any constraint tolerance and exactly on stable instances.
C4. We deploy GlobMP on real robots and show superior performance over strong baselines: multi-robot teams on the Robotarium testbed ( ), and steering state-of-the-art expert policies on a bimanual humanoid with dexterous hands in tactile manipulation tasks ( ). The appendix adds an extended multi-robot benchmark, maze navigation and end-effector obstacle avoidance on D3IL (Appendix A4).
The columns of are the control points, whose convex hull contains the curve. Substituting this representation into the objective gives
where tr is the trace and is precomputed exactly, so each cost step uses a matrix gradient without reevaluating the integral. Since (positive semidefinite), the objective is convex; the constraints carry the nonconvexity.
Let constraint be , where for the collision constraints , and for the steering constraint when . With several robots, each robot's own position replaces , and each pair of robots forms an additional collision block, with and in place of and ; from here on, counts both the obstacle blocks and the pair blocks. For polynomial obstacle centres and a polynomial reference, the value along the curve is a polynomial in time,
with degree bound , or for a centre moving on a polynomial path of degree (the reference plays the role of a centre for ); piecewise-polynomial data are handled interval by interval (Appendix A3.3). Its coefficient vector is quadratic in . The constraint holds at every instant exactly when this vector belongs to the closed convex cone
This tests the entire polynomial: has Bernstein coefficients yet is nonnegative, so a coefficient-sign test would wrongly reject it. The coefficients are quadratic in , so the set of control points that satisfy a block need not be convex. Integral budgets, an optional extension beyond , fit the same notation as scalar blocks,
(1e) where encodes the signed budget margin; for uniform notation we also write for budgets. Let denote the number of pointwise blocks ( with the steering block, without); the budgets are blocks . We collect the constraints as
Now, substituting (1a) into the objective and the constraints of gives (1b) and (1c)–(1f); with the boundary conditions written as linear equations in the control points, we obtain the degree-d reformulation of as
Let denote the control points that satisfy them. We fix one such point and allow only changes that keep the equations. When , every is , where the columns of are an orthonormal basis of the null space of and , , collects the free coordinates (Lemma 3, Appendix A3.1); distances between free and full control points agree. In these free coordinates
(P)
Every reconstructed curve meets the boundary conditions; for piecewise curves the junction conditions join the linear equations. Fixing the degree restricts the curves but neither discretizes time nor weakens the whole-interval constraints.
Write for . Restoration, Algorithm 2, takes gradient steps on the summed squared distances of the blocks to their cones, where maps a vector to its nearest point in ,
The squared distance to a closed convex cone is differentiable, with gradient twice the residual , which vanishes exactly when block is satisfied. The chain rule gives , where is the Jacobian (matrix of first derivatives) in free coordinates and the gradient is reshaped as a control-point matrix. Only violated blocks contribute (lines 4–5). GlobMP (Algorithm 1) alternates a cost step along with restoration (lines 4–6), and rebuilding from the free coordinates preserves the boundary states. denotes Algorithm 2, which need not return an exactly feasible or nearest curve in finitely many steps; the theory analyses the repair below.
Each cone projection is a small convex problem. Evaluating a polynomial at time is an inner product of its coefficients with , so the vectors , generate the dual cone , and by Moreau's decomposition (Moreau, 1962) the projection adds to the point of closest to . We build greedily as a nonnegative combination of over a growing set of selected times, with the part of still to be corrected:
(3)
Each step adds the time , where the corrected polynomial is most negative relative to its scale, and refits nonnegative weights on all selected times (Algorithm 3; Locatello et al., 2017), with error bounds in Appendix A3.1.4; scalar budgets use . The selected times locate the violation rather than fix a list of checks, and blocks are projected independently, so the work per iteration grows linearly with the number of blocks at fixed degree and cone-solve iterations.
For the analysis we use a feasible version of the repair step. Let denote the free coordinates stacked into one vector and the cost; we keep the notation , and for the blocks, their Jacobians and the feasible set. Each collision block is convex in the control points,
Algorithm 1 GlobMP
Require: anchor and basis , start , step , iterations
1: restore start
2: for do
3: reconstruct curve
4: cost gradient
5: cost step
6: restore, Alg. 2
7: end for
8: return candidate
Algorithm 2 Feasibility restoration for (P)
Require: free coordinates , blocks , tolerance tol, step , iterations
1: for do
2: all blocks
3: if
4: violated blocks
5: merit gradient
6: restoration step
7: end for
8: return candidate
so its linearization at any z lies below it at every instant. For a sphere the linearized constraint is a half-space that excludes the whole obstacle, so each step keeps every robot behind a moving plane that separates it from each obstacle and from each other robot. Let D denote the points that satisfy the steering block exactly, a speed limit (Appendix A2.1) when present, and the optional budgets; steering and speed sets are convex, since balls are convex and the curve depends affinely on the free control points; the budgets are assumed convex (D is all points when none is present). Let
Then is convex and contained in , and it contains when is feasible. Line 6 of Algorithm 1 becomes the convex solve
Every iterate is feasible, and is rebuilt after each step, so this is not a convex reformulation of (P); it needs a feasible start and an exact solve. In the analysis, GlobMP starts from the cheapest feasible point of a grid of free control points, each tested exactly over the whole interval. For it adds pieces (Theorem 1) or raises the degree (Algorithm 4, under a condition on configurations).
3 THEORY
We state one theorem, for ; its fixed-degree counterpart and all proofs are in Appendix A3. Let denote the optimal value of .
Assumption A (problem data). The cost order is and the endpoints fix derivatives of orders (if , keeps those of order below ); the obstacle centres and the reference are continuous and piecewise polynomial in ; the endpoints are strictly feasible; and is feasible.
Assumption B (enough boundary conditions). The two endpoints fix at least as many values per coordinate as the order of the cost: .
A change of the curve that keeps the boundary values and has zero kth-derivative cost is a polynomial of degree below with a root of order at each endpoint, which is zero under Assumption B. Hence is strongly convex, with curvature at most , . For , below every radius and half the endpoint clearance (Appendix A3.2.2), let (\mathbf{P}_\infty^\tilde{r}) denote with every obstacle radius raised by , every pair separation by and lowered by ( , a tolerance, loosens them), and its optimal value.
Let denote the curves of polynomial pieces of a fixed degree on equal intervals, joined with continuous derivatives. Let denote a cheapest point of the grid of spacing in their free control points that is feasible for the problem being solved; grid points can be checked exactly by root isolation for rational data.
Theorem 1 (global convergence for ). Under Assumptions A and B, run GlobMP (Algorithm 1, line 6 solved exactly by (5)) over on (\mathbf{P}_\infty^\tilde{r}) with a step ( computed for ).
(i) From a feasible start, every iterate is feasible for at every instant, with nonincreasing cost.
(ii) If a curve of cost at most is feasible for , , , and , , with depending on , and the data, then for small , exists and every cost from it lies in .
(iii) For and , these curves violate no constraint of by more than ( for a separation) and cost at most ; as (so ), the costs tend to and the curves have subsequences converging uniformly to global minimizers of .
At the costs converge to when the optimal value is stable, as , that is, when the robust-optimum analogue of sampling-based planners (Solovey et al., 2020) is the optimum; this holds at all but countably many in place of 0; if , the rate is . Methods that keep a positive clearance never reach on unstable instances (Appendix A3.3).
The proof (Appendix A3.2) has three steps. First, in (4) is convex and, collision constraints being convex in position, inside ; the repair (5) lowers . Second, interpolating a curve of with pieces never raises its cost and moves it by less than , so a ball around it, which the grid hits, is feasible for ; if , an end correction costs . Third, curves of bounded cost have uniform limits, which are optimal as .
Corollary 2. Under Assumptions A and B, (i) if , Theorem 1(ii) holds with and ; (ii) for either , , and , the curves of Theorem 1(iii), within tolerance , cost at most .
In minimum-snap planning (k = 4) with position through jerk fixed at both ends ( ), accuracy takes order pieces ( and for ). Fixing the snap too ( ) adds cost of order 1/N at the end pieces, hence order pieces.
4 EXPERIMENTS
We evaluate GlobMP on synthetic teams of 2 to 200 robots among spheres ( ), a multi-robot benchmark on the Robotarium testbed ( ) and tactile-reactive manipulation ( ). Algorithm 2 restores from heuristic seeds (route classes, prioritized plans, the executing curve).
4.1 SYNTHETIC EXPERIMENTS
The synthetic study (Problem 1, Appendix A4.2) has robots exchange places in pairs past static spheres, under the minimum-snap cost with piecewise degree-9 polynomials; each pair or sphere can be passed on either side, so an instance has many route classes. A curve is feasible if it makes no contact at any t; GlobMP keeps a 0.5 cm margin. GlobMP runs Algorithms 1–2 from one waypoint path per route class and keeps the cheapest feasible result. The baselines are RRT-Connect (Kuffner & LaValle, 2000), RRT* (Karaman & Frazzoli, 2011) and GCS (Marcucci et al., 2023) on IRIS regions (Deits & Tedrake, 2015a) in the joint configuration space, whose paths are fitted by the cheapest collision-free (else least-colliding) curve in GlobMP's class (Richter et al., 2016), and SDP-MP of Graesdal et al. (2026) on the same program (Appendix A4.2).
Each baseline imposes the constraints off the curve it returns (along a sampled path, inside convex regions, or on a relaxed variable), keeps centimetres to decimetres of slack, and fails more often as robots are added; SDP-MP collides or times out on every instance (Figure 2a,b). GlobMP is feasible at every t on every instance and ends at the margin. Feasible baseline curves cost from about twice to hundreds of times more, with a gap that mostly grows with team size (Figure 2c); where SDP-MP returns a lower bound, GlobMP is within 6% of it at the median. Theorem 1 covers this curve class ( , rate ) but not its seeds, so the lowest cost found is not a proven optimum. From 2 to 200 robots GlobMP is feasible at every t on every seed, at 200 robots (82,000 blocks) in two minutes on CPU and 28 s on one GPU from straight lines (Figure 3a,b), with time per iteration at most linear in the blocks (Figure 3c); the baselines are feasible on at most 2 of 5 seeds at eight robots and on none from 16.
To check the rates of Theorem 1 and Corollary 2, we solve one two-robot instance again and again with more pieces N and track how far GlobMP's best cost stays above the limit (Figure 4). When the ends fix every derivative up to the one in the cost, the extra cost halves each time N doubles,
(a) tightness, one instance

(b) tightness, all instances
(c) cost
GlobMP (Ours)
RRT-Connect
RRT
GCS
SDP-MP
Figure 2: Tightness and cost, 20 instances each with 2, 4, 6 and 8 robots. (a) Clearance over time on one 2-robot instance, between the robots (top) and to the spheres (bottom). (b) Minimum clearance of each returned curve, with the share of runs feasible at every t. (c) Cost of feasible curves relative to GlobMP's (median and interquartile range).
(a) scalability, time

(b) feasibility at scale
GlobMP (Ours)
RRT-Connect
RRT
GCS
SDP-MP
(c) time per iteration (GlobMP)
Figure 3: Scalability from 2 to 200 robots (10 runs per size for GlobMP, 5 per baseline). (a) Median CPU time to the first collision-free trajectory, setup included; where shaded, no baseline finds one. (b) Share of runs collision-free at every instant. (c) Algorithm 2's time per iteration against the number of blocks; dashed: linear growth.
for velocity, acceleration, jerk and snap: this is the cost of the end pieces in the discussion after Corollary 2, and the bound is tight for . With one derivative fewer fixed and , the extra cost falls much faster than the corollary's bound and is below the numerical precision by for jerk, for snap and for acceleration, so the bound holds but is loose here. For the cost grows linearly with the obstacle margin, so the rate after Theorem 1 fits.
4.2 MULTI-ROBOT MOTION PLANNING
Multi-robot motion planning coordinates the simultaneous motion of several robots toward assigned goals while avoiding collisions with obstacles and with one another. We evaluate GlobMP on five multi-robot environments, Empty, Conveyor, Cross-Room, Drop-Region and Corridor-Bay, from Shaoul et al. (2025) (Cross-Room and Corridor-Bay reconstructed from Liang et al. 2025), following the test-time velocity constraint and collision predicate of Giaretta et al. (2026) on the Georgia Tech Robotarium (Wilson et al., 2020), with teams of robots. The environments are fitted to the m Robotarium arena, with the common velocity limit selected for the Robotarium setting and inflated robot radius m. For each (map, team-size) pair, we use ten start-goal instances: nine sampled from the benchmark distribution and one “ring” instance across the workspace (Conveyor below : ten sampled). Hardware details of the Robotarium setup are provided in Appendix A4.1.
(a) rate in

(b) rate in
(c) stability in the margin

Figure 4: Relative extra cost over the limit as the number of pieces grows (one two-robot instance), for velocity to snap . (a) One derivative fewer fixed at the ends; dotted: rates of Corollary 2; shaded: numerical precision. (b) The cost's own derivative also fixed; dashed: halving per doubling. (c) Extra cost against the margin , with the smaller sphere radius.
GlobMP needs no training: at test time it solves each instance directly as one (P), with the robots' curves stacked, a collision constraint at radius 2r for every pair and affine blocks for boxes (Appendix A2.1.1), so its plan is collision-free at every t. The baselines are CD, PCD-LB and PCD-SHD (Luan et al., 2026), Final Proj. and DiRecT (Giaretta et al., 2026) and MMD-CBS (Shaoul et al., 2025). Each method is evaluated on the same start–goal instances. The sampling baselines draw 64 candidates, whereas GlobMP returns one trajectory.
Figure 5 reports the success of a single returned plan across the five environments and team sizes. On Conveyor and Cross-Room, baseline performance drops rapidly as the number of robots increases: every baseline reaches zero on Conveyor at and stays at or below 0.50 on Cross-Room from , whereas GlobMP's single plan succeeds on every instance except two of the ten on Conveyor at . The stronger projection baselines remain more reliable on Empty, Drop-Region, and Corridor-Bay, but most also degrade with team size. Figure 6 presents representative 12-robot ring trajectories on Cross-Room and Conveyor. Appendix A4.5 extends the evaluation to eight environments, teams of up to 21 robots, three velocity caps, and a larger set of start-goal instances.
4.3 STEERING TACTILE-REACTIVE DEXTEROUS POLICIES
A Dexmate Vega-1 with two XHAND1 hands with fingertip force sensing (Appendix A4.1) performs four bimanual tasks learned from teleoperation (Figure 7a). The expert policies are two state-of-the-art vision-language-action models, GR00T N1.7 (NVIDIA, 2026), built on the GR00T N1 architecture (NVIDIA et al., 2025), and (Physical Intelligence et al., 2025), each with and without tactile input. Both command absolute joint targets for both arms and hands (n = 38) at 30 Hz in chunks of 16 executed steps.
Deployed, the policies fail geometrically (they replay memorized targets), temporally (consecutive chunks disagree by up to 0.5 rad) and at contact, mostly because of observations outside the training distribution, which no motion constraint can observe; so we separate deciding which constraints apply from enforcing them (Figure 7b). A meta-reasoner, the vision-language model Claude Opus 5.5 (Anthropic, 2026), defines the constraints once, at reset, from the images, the task and the measured state, for example the keep-out, keep-in and grip of Figure 7b. A certifier then solves (P) per chunk, with the policy's chunk as the reference , so the executed curve meets every active constraint at every t. Keep-out and keep-in blocks act on hand positions, which depend on the joints through forward kinematics; the certifier enforces them by linearizing the kinematics at the current curve and re-solving, so for these blocks feasibility at every t holds up to that linearization, while blocks on the joints themselves, such as the grip, are exact. The meta-reasoner only chooses constraints and never solves them, so a wrong choice changes which feasible curve is returned, never whether it is feasible, unlike model-written programs (Huang et al., 2024). If the policy slows, a demonstrated time law rescales the reference (Kant & Zucker, 1986).

Figure 5: Success of a single returned plan on the Robotarium arena for robots, one panel per map; for GlobMP, the one plan it returns, and for a sampling baseline, the first of its 64 candidates. PCD-LB is at zero throughout: its log-barrier pushes agents into the arena boundary. MMD-CBS returns a single plan, with 60 s per instance.

Figure 6: Executed Robotarium trajectories for the 12-robot ring instance on Cross-Room and Conveyor. Obstacle-hit counts span the whole run; circles magnify highlighted regions.
The baselines are the expert policies alone, with and without touch (none with touch on the tissue), and every condition run has 9 or 10 real trials per task. Steering matches or raises every task (Figure 7c): it turns the tissue, which the policies alone rarely complete, into a mostly successful task, and completes the handover in every trial. Touch pays off where the hand must regulate contact, as in placing the toy, pulling the tissue and stowing the mug, and adds little where the task is guided by vision, as in the handover, where it even hurts the policies alone. In a closed-loop simulator replaying failed real tissue deployments, the pinch lands where and when demonstrated only with steering.
5 CONCLUSION
We developed GlobMP, a gradient projection method with convex feasibility restoration for continuous-time motion planning over polynomial curves; it enforces every collision constraint at every instant, with planning and steering in one program. Under mild assumptions and from a fine grid start, its cost approaches the continuous-time optimum as the number of pieces grows, within any constraint tolerance and exactly on stable instances. In real and synthetic experiments, from teams of up to 200 robots to the Robotarium testbed and tactile manipulation on a bimanual humanoid, it outperforms strong baselines. Extending the guarantee to speed limits and corridor constraints is a natural next step.
(a)
Tissue pull
Handover
Toy pick-and-place
Mug into backpack

Meta-reasoner (one call)
Constraint blocks
Steered motion planning
Robot
30 Hz
(b)
measured events (stall, touch, grasp force) switch blocks and ; no further call
(c)
GR00T N1.7

Figure 7: (a) The initial head-camera frame of each task. (b) Steered motion planning on one real toy trial: one meta-reasoner call at reset sets the active blocks and their parameters; (P) takes the policy’s chunk as and returns a curve that is smooth, collision-free and within of at every ; measured events then switch blocks. (c) Real-robot success of GR00T and per task (9 or 10 trials per bar): the policy without and with touch input, and steered without and with touch; dash: not run.
AI USE STATEMENT
We disclose the use of large language models (LLMs) to aid and polish the writing, editing the text for clarity and length; for retrieval and discovery, helping find related work and check citations; and to generate the synthetic datasets, whose instances are produced by LLM-assisted scripts from fixed seeds (Appendix A4.2). The authors take full responsibility for all content.
REPRODUCIBILITY STATEMENT
We will release all code: the GlobMP solver (restoration and projected gradient steps), the scripts and configurations for every experiment and figure, and the steering and deployment code for learned policies on the Vega-1 with XHAND1 hands (certifier, grounding, time law, policy servers), together with the teleoperation demonstrations and fine-tuned policy checkpoints of §4.3. The project page, https://GlobMP.github.io/, collects the videos and results.
REFERENCES
Alexandre Amice, Peter Werner, and Russ Tedrake. Certifying bimanual RRT motion plans in a second. In IEEE International Conference on Robotics and Automation (ICRA), pp. 9293–9299, 2024. doi: 10.1109/ICRA57147.2024.10611296. arXiv:2310.16603.
Anthropic. Claude Opus 5.5. https://www.anthropic.com/claude-opus-5-5, 2026. Released September 22, 2026.
Jacek Bochnak, Michel Coste, and Marie-Françoise Roy. Real Algebraic Geometry, volume 36 of Ergebnisse der Mathematik und ihrer Grenzgebiete. Springer, 1998.
Jérôme Bolte, Aris Daniilidis, Adrian Lewis, and Masahiro Shiota. Clarke subgradients of stratifiable functions. SIAM Journal on Optimization, 18(2):556–572, 2007.
John Canny and John Reif. New lower bound techniques for robot motion planning problems. In 28th Annual Symposium on Foundations of Computer Science (FOCS), pp. 49–60, 1987.
João Carvalho, An T. Le, Mark Baierl, Dorothea Koert, and Jan Peters. Motion planning diffusion: Learning and planning of robot motions with diffusion models. In IEEE/RSJ International Conference on Intelligent Robots and Systems (IROS), pp. 1916–1923, 2023.
Ee-Chien Chang, Sung Woo Choi, DoYong Kwon, Hyungju Park, and Chee-Keng Yap. Shortest path amidst disc obstacles is computable. In Proceedings of the 21st Annual Symposium on Computational Geometry (SoCG), pp. 116–125, 2005. doi: 10.1145/1064092.1064112.
Cheng Chi, Siyuan Feng, Yilun Du, Zhenjia Xu, Eric Cousineau, Benjamin C. M. Burchfiel, and Shuran Song. Diffusion policy: Visuomotor policy learning via action diffusion. In Proceedings of Robotics: Science and Systems, 2023. doi: 10.15607/RSS.2023.XIX.026. URL https://www.roboticsproceedings.org/rss19/p026.html.
Jacob K. Christopher, Stephen Baek, and Ferdinando Fioretto. Constrained synthesis with projected diffusion models. Advances in Neural Information Processing Systems, 37:89307–89333, 2024.
Hyungjin Chung, Jeongsol Kim, Michael T. McCann, Marc L. Klasky, and Jong Chul Ye. Diffusion posterior sampling for general noisy inverse problems. In International Conference on Learning Representations, 2023.
Robin Deits and Russ Tedrake. Computing large convex regions of obstacle-free space through semidefinite programming. In Algorithmic Foundations of Robotics XI, volume 107 of Springer Tracts in Advanced Robotics, pp. 109–124, 2015a. doi: 10.1007/978-3-319-16595-0_7.
Robin Deits and Russ Tedrake. Efficient mixed-integer planning for UAVs in cluttered environments. In IEEE International Conference on Robotics and Automation (ICRA), pp. 42–49, 2015b. doi:10.1109/ICRA.2015.7138978.
Prafulla Dhariwal and Alexander Nichol. Diffusion models beat GANs on image synthesis. In Advances in Neural Information Processing Systems, volume 34, pp. 8780–8794, 2021.
Steven Diamond and Stephen Boyd. CVXPY: A Python-embedded modeling language for convex optimization. Journal of Machine Learning Research, 17(83):1–5, 2016.
Shiying Dong, Zhipeng Shen, Rudolf Reiter, Hailong Huang, Bingzhao Gao, Hong Chen, and Wen-Hua Chen. A fast semidefinite convex relaxation for optimal control problems with spatiotemporal constraints, 2026. arXiv:2601.03055.
Justin Fu, Aviral Kumar, Ofir Nachum, George Tucker, and Sergey Levine. D4RL: Datasets for deep data-driven reinforcement learning, 2020. arXiv:2004.07219.
Fei Gao, William Wu, Yi Lin, and Shaojie Shen. Online safe trajectory generation for quadrotors using fast marching method and Bernstein basis polynomial. In Proceedings of the IEEE International Conference on Robotics and Automation (ICRA), pp. 344–351, 2018.
Xiao Gao, Kunpeng Yao, Farshad Khadivar, and Aude Billard. Enhancing dexterity in confined spaces: Real-time motion planning for multifingered in-hand manipulation. IEEE Robotics & Automation Magazine, 31(4):100–112, 2024. doi: 10.1109/MRA.2024.3433110. arXiv:2309.06955.
Paolo Giaretta, Zeyang Li, and Navid Azizan. DiRecT: Safe diffusion-based planning via receding-horizon denoising, 2026. arXiv:2606.15359.
Paul J. Goulart and Yuwen Chen. Clarabel: An interior-point solver for conic programs with quadratic objectives. arXiv preprint arXiv:2405.12762, 2024.
Bernhard Paus Graesdal, Shao Yuan Chew Chia, Tobia Marcucci, Savva Morozov, Alexandre Amice, Pablo A. Parrilo, and Russ Tedrake. Towards tight convex relaxations for contact-rich manipulation. In Robotics: Science and Systems (RSS), 2024.
Bernhard Paus Graesdal, Alexandre Amice, Pablo A. Parrilo, and Russ Tedrake. Semidefinite relaxations for collision-free motion planning, 2026. arXiv:2606.14063.
C. R. Hargraves and S. W. Paris. Direct trajectory optimization using nonlinear programming and collocation. Journal of Guidance, Control, and Dynamics, 10(4):338–342, 1987. doi: 10.2514/3.20223.
Hannah Häring, Dennis Gramlich, Christian Ebenbauer, and Carsten W. Scherer. Trajectory generation for the unicycle model using semidefinite relaxations. European Journal of Control, 80:101063, 2024. doi: 10.1016/j.ejcon.2024.101063.
Zhilin He, Yorai Shaoul, and Jiaoyang Li. Model-based diffusion optimal control for multi-robot motion planning, 2026. arXiv:2607.12423.
Wenlong Huang, Chen Wang, Yunzhu Li, Ruohan Zhang, and Li Fei-Fei. ReKep: Spatio-temporal reasoning of relational keypoint constraints for robotic manipulation. In Proceedings of the 8th Conference on Robot Learning, volume 270 of Proceedings of Machine Learning Research, pp. 4573–4602, 2024.
Michael Janner, Yilun Du, Joshua B. Tenenbaum, and Sergey Levine. Planning with diffusion for flexible behavior synthesis. In Proceedings of the 39th International Conference on Machine Learning, volume 162 of Proceedings of Machine Learning Research, pp. 9902–9915, 2022.
Xiaogang Jia, Denis Blessing, Xinkai Jiang, Moritz Reuss, Atalay Donat, Rudolf Lioutikov, and Gerhard Neumann. Towards diverse behaviors: A benchmark for imitation learning with human demonstrations. In International Conference on Learning Representations (ICLR), 2024.
Shucheng Kang, Guorui Liu, and Heng Yang. Global contact-rich planning with sparsity-rich semidefinite relaxations. In Robotics: Science and Systems (RSS), 2025. doi: 10.15607/RSS.2025.XXI.046. arXiv:2502.02829.
Kamal Kant and Steven W. Zucker. Toward efficient trajectory planning: The path-velocity decomposition. The International Journal of Robotics Research, 5(3):72–89, 1986.
Sertac Karaman and Emilio Frazzoli. Sampling-based algorithms for optimal motion planning. The International Journal of Robotics Research, 30(7):846–894, 2011.
James J. Kuffner and Steven M. LaValle. RRT-Connect: An efficient approach to single-query path planning. In Proceedings of the IEEE International Conference on Robotics and Automation (ICRA), volume 2, pp. 995–1001, 2000. doi: 10.1109/ROBOT.2000.844730.
Jean-Bernard Lasserre. Global optimization with polynomials and the problem of moments. SIAM Journal on Optimization, 11(3):796–817, 2001.
Steven M. LaValle. Rapidly-exploring random trees: A new tool for path planning. Technical Report TR 98-11, Computer Science Dept., Iowa State University, 1998.
Jiaoyang Li, Wheeler Ruml, and Sven Koenig. EECBS: A bounded-suboptimal search for multi-agent path finding. In Proceedings of the AAAI Conference on Artificial Intelligence, volume 35, pp. 12353–12362, 2021.
Jinhao Liang, Jacob K. Christopher, Sven Koenig, and Ferdinando Fioretto. Simultaneous multi-robot motion planning with projected diffusion models. In Proceedings of the 42nd International Conference on Machine Learning (ICML), volume 267 of Proceedings of Machine Learning Research, pp. 37162–37180, 2025.
Francesco Locatello, Michael Tschannen, Gunnar Rätsch, and Martin Jaggi. Greedy algorithms for cone constrained optimization with convergence guarantees. In Advances in Neural Information Processing Systems (NeurIPS), volume 30, pp. 773–784, 2017.
George G. Lorentz. Bernstein Polynomials. Chelsea Publishing, New York, 2nd edition, 1986.
Hao Luan, Yi Xian Goh, See-Kiong Ng, and Chun Kai Ling. Projected coupled diffusion for test-time constrained joint generation. In The Fourteenth International Conference on Learning Representations, 2026. URL https://openreview.net/forum?id=1FEm5JLpvg.
Ishaan Mahajan, Jon Arrizabalaga, Andrea Grillo, Fausto Vega, James Anderson, Zachary Manchester, and Brian Plancher. TinySDP: Real time semidefinite optimization for certifiable and agile edge robotics, 2026. arXiv:2605.13748.
Tobia Marcucci, Mark Petersen, David von Wrangel, and Russ Tedrake. Motion planning around obstacles with convex optimization. Science Robotics, 8(84):eadf7843, 2023.
Tobia Marcucci, Jack Umenberger, Pablo A. Parrilo, and Russ Tedrake. Shortest paths in graphs of convex sets. SIAM Journal on Optimization, 34(1):507–532, 2024. doi: 10.1137/22M1523790.
Tobia Marcucci, Mathew Halm, Will Yang, Dongchan Lee, and Andrew D. Marchese. A biconvex method for minimum-time motion planning through sequences of convex sets. In Robotics: Science and Systems (RSS), 2025. arXiv:2504.18978.
Daniel Mellinger and Vijay Kumar. Minimum snap trajectory generation and control for quadrotors. In IEEE International Conference on Robotics and Automation (ICRA), pp. 2520–2525, 2011.
Joseph S. B. Mitchell. Shortest paths and networks. In Jacob E. Goodman, Joseph O'Rourke, and Csaba D. Tóth (eds.), Handbook of Discrete and Computational Geometry, chapter 31. CRC Press, 3rd edition, 2017. doi: 10.1201/9781315119601.
Jean-Jacques Moreau. Décomposition orthogonale d'un espace hilbertien selon deux cônes mutuellement polaires. Comptes Rendus de l'Académie des Sciences de Paris, 255:238–240, 1962.
NVIDIA. Isaac GR00T N1.7. https://github.com/NVIDIA/Isaac-GR00T, 2026. Model release.
NVIDIA, Johan Bjorck, Fernando Castañeda, Nikita Cherniadev, et al. GR00T N1: An open foundation model for generalist humanoid robots, 2025. arXiv:2503.14734.
Alan Papalia, Andrew Fishberg, Brendan W. O'Neill, Jonathan P. How, David M. Rosen, and John J. Leonard. Certifiably correct range-aided SLAM. IEEE Transactions on Robotics, 40:4265–4283, 2024.
Pablo A. Parrilo. Semidefinite programming relaxations for semialgebraic problems. Mathematical Programming, Series B, 96:293–320, 2003. doi: 10.1007/s10107-003-0387-5.
Physical Intelligence, Kevin Black, Noah Brown, James Darpinian, Karan Dhabalia, Danny Driess, et al. : A vision-language-action model with open-world generalization. In Conference on Robot Learning (CoRL), volume 305 of Proceedings of Machine Learning Research, pp. 17–40, 2025. arXiv:2504.16054.
Victoria Powers and Bruce Reznick. Polynomials that are positive on an interval. Transactions of the American Mathematical Society, 352(10):4677–4692, 2000.
Charles Richter, Adam Bry, and Nicholas Roy. Polynomial trajectory planning for aggressive quadrotor flight in dense indoor environments. In Robotics Research: The 16th International Symposium ISRR, volume 114 of Springer Tracts in Advanced Robotics, pp. 649–666, 2016.
Stephen M. Robinson. Stability theory for systems of inequalities, part II: Differentiable nonlinear systems. SIAM Journal on Numerical Analysis, 13(4):497–513, 1976. doi: 10.1137/0713043.
R. Tyrrell Rockafellar and Roger J.-B. Wets. Variational Analysis. Springer, 1998.
David M. Rosen, Luca Carlone, Afonso S. Bandeira, and John J. Leonard. SE-Sync: A certifiably correct algorithm for synchronization over the special Euclidean group. The International Journal of Robotics Research, 38(2-3):95–125, 2019.
John Schulman, Yan Duan, Jonathan Ho, Alex Lee, Ibrahim Awwal, Henry Bradlow, Jia Pan, Sachin Patil, Ken Goldberg, and Pieter Abbeel. Motion planning with sequential convex optimization and convex collision checking. The International Journal of Robotics Research, 33(9):1251–1270, 2014.
Yorai Shaoul, Itamar Mishani, Shivam Vats, Jiaoyang Li, and Maxim Likhachev. Multi-robot motion planning with diffusion models. In International Conference on Learning Representations (ICLR), 2025.
Naum Z. Shor. Quadratic optimization problems. Soviet Journal of Computer and Systems Sciences, 25:1–11, 1987.
Kiril Solovey, Lucas Janson, Edward Schmerling, Emilio Frazzoli, and Marco Pavone. Revisiting the asymptotic optimality of RRT*. In IEEE International Conference on Robotics and Automation (ICRA), pp. 2189–2195, 2020. arXiv:1909.09688.
Josef Stoer and Roland Bulirsch. Introduction to Numerical Analysis, volume 12 of Texts in Applied Mathematics. Springer, 3rd edition, 2002.
Ioan A. Şucan, Mark Moll, and Lydia E. Kavraki. The Open Motion Planning Library. IEEE Robotics & Automation Magazine, 19(4):72–82, 2012.
Balakumar Sundaralingam and Tucker Hermans. Relaxed-rigidity constraints: kinematic trajectory optimization and collision avoidance for in-grasp manipulation. Autonomous Robots, 43(2):469–483, 2019. doi: 10.1007/s10514-018-9772-z. arXiv:1806.00942.
Jingtao Tang, Zining Mao, Lufan Yang, and Hang Ma. Space-time graphs of convex sets for multi-robot motion planning. In IEEE/RSJ International Conference on Intelligent Robots and Systems (IROS), pp. 8683–8690, 2025. doi: 10.1109/IROS60139.2025.11246429.
Russ Tedrake and the Drake Development Team. Drake: Model-based design and verification for robotics, 2019. URL https://drake.mit.edu.
Sangli Teng, Ashkan Jasour, Ram Vasudevan, and Maani Ghaffari. Convex geometric motion planning on Lie groups via moment relaxation. In Robotics: Science and Systems XIX, 2023. doi:10.15607/RSS.2023.XIX.058.
Kevin Tracy, Taylor A. Howell, and Zachary Manchester. Differentiable collision detection for a set of convex primitives. In IEEE International Conference on Robotics and Automation (ICRA), pp. 3663–3670, 2023. doi: 10.1109/ICRA48891.2023.10160716.
Fausto Vega, Jon Arrizabalaga, Ryan Watson, and Zachary Manchester. Convex maneuver planning for spacecraft collision avoidance. In International Conference on Space Robotics (iSpaRo), pp. 626–633, 2025. doi: 10.1109/iSpaRo66239.2025.11437385.
David von Wrangel and Russ Tedrake. Using graphs of convex sets to guide nonconvex trajectory optimization. In IEEE/RSJ International Conference on Intelligent Robots and Systems (IROS), pp. 9863–9870, 2024. doi: 10.1109/IROS58592.2024.10802426.
Andreas Wächter and Lorenz T. Biegler. On the implementation of an interior-point filter line-search algorithm for large-scale nonlinear programming. Mathematical Programming, 106(1):25–57, 2006.
Zhongqi Wei and Frederike Dümbgen. Global sampling-based trajectory optimization for contact-rich manipulation via KernelSOS, 2026. arXiv:2604.27175.
Peter Werner, Richard Cheng, Tom Stewart, Russ Tedrake, and Daniela Rus. Superfast configuration-space convex set computation on GPUs for online motion planning. In Robotics: Science and Systems (RSS), 2025. doi: 10.15607/RSS.2025.XXI.045.
Peter Werner, Thomas Cohn, Rebecca H. Jiang, Tim Seyde, Max Simchowitz, Russ Tedrake, and Daniela Rus. Faster algorithms for growing collision-free convex polytopes in robot configuration space. The International Journal of Robotics Research, 2026. doi: 10.1177/02783649261436917.
Sean Wilson, Paul Glotfelter, Li Wang, Siddharth Mayya, Gennaro Notomista, Mark Mote, and Magnus Egerstedt. The Robotarium: Globally impactful opportunities, challenges, and lessons learned in remote-access, distributed control of multirobot systems. IEEE Control Systems Magazine, 40(1):26–44, 2020.
Wei Xiao, Tsun-Hsuan Wang, Chuang Gan, Ramin Hasani, Mathias Lechner, and Daniela Rus. SafeDiffuser: Safe planning with diffusion probabilistic models. In The Thirteenth International Conference on Learning Representations, 2025. URL https://openreview.net/forum?id=ig2wk7kK9J.
Heng Yang, Jingnan Shi, and Luca Carlone. TEASER: Fast and certifiable point cloud registration. IEEE Transactions on Robotics, 37(2):314–333, 2021. doi: 10.1109/TRO.2020.3033695.
Lujie Yang, Tobia Marcucci, Pablo A. Parrilo, and Russ Tedrake. A new semidefinite relaxation for linear and piecewise-affine optimal control with time scaling. In IEEE International Conference on Robotics and Automation (ICRA), pp. 9228–9235, 2025. doi: 10.1109/ICRA55743.2025.11128850.
Jichen Zhang, Liqun Zhao, Antonis Papachristodoulou, and Jack Umenberger. Constrained diffusers for safe planning and control. In Advances in Neural Information Processing Systems (NeurIPS), volume 38, pp. 39283–39316, 2025.
Matt Zucker, Nathan Ratliff, Anca D. Dragan, Mihail Pivtoraiko, Matthew Klingensmith, Christopher M. Dellin, J. Andrew Bagnell, and Siddhartha S. Srinivasa. CHOMP: Covariant Hamiltonian optimization for motion planning. The International Journal of Robotics Research, 32(9-10):1164–1193, 2013. doi: 10.1177/0278364913488805.
Appendix
CONTENTS
A1 Addendum to Section 1: related work and Figure 1 16
A1.1 Extended related work 16
A1.2 Inexact sampled checks and the data for Figure 1 17
A2 Addendum to Section 2: formulation and algorithm 18
A2.1 Variants of the formulation 18
A2.1.1 Half-space and corridor constraints 19
A2.1.2 Reference motions from learned policies 19
A2.2 Steering a generative planner 19
A3 Addendum to Section 3: theory and proofs 19
A3.1 Preliminaries 19
A3.1.1 Boundary chart 19
A3.1.2 Matrices, cone and bounds 20
A3.1.3 The structural assumption 23
A3.1.4 Step size and the cone solve 23
A3.2 Proof of Theorem 1 25
A3.2.1 Fixed degree 25
A3.2.2 Theorem 1: the continuous-time problem 27
A3.2.3 Global minimizers over under a condition on configurations 29
A3.3 Scope of the assumptions and stability 33
A4 Addendum to Section 4: experiments 34
A4.1 Experimental setup 34
A4.2 Synthetic experiments 36
A4.3 Maze navigation 38
A4.4 Collision-free obstacle avoidance in end-effector space 40
A4.5 Multi-robot motion planning 45
A4.6 Implementation details 56
A1 ADDENDUM TO SECTION 1: RELATED WORK AND FIGURE 1
A1.1 EXTENDED RELATED WORK
Relation to existing formulations. Collocation replaces each block by inequalities at sampled times (Hargraves & Paris, 1987); the control-polygon rule asks every coefficient to be nonnegative (Gao et al., 2018), which is sufficient for but conservative; convex decompositions (Deits &
Tedrake, 2015a; Marcucci et al., 2023) are exact for the decomposition rather than for the free space; semidefinite relaxations (Lasserre, 2001; Parrilo, 2003; Graesdal et al., 2026) certify a trajectory only when tight. We keep the original variables and free space, test the exact condition on each block, and approach the optimum of as the class is refined, within any constraint tolerance and exactly on stable instances (Theorem 1); under a condition on configurations (Assumption C) we also reach global minimizers over each fine enough spline class (Proposition 13).
Sampling-based planning and trajectory optimization. The two classical families both act on the nonconvex problem itself, and neither certifies global optimality. Sampling-based planners (LaValle, 1998; Karaman & Frazzoli, 2011) are probabilistically complete and, for RRT*, asymptotically optimal, but in probability and only to the robust optimum (Solovey et al., 2020), the least cost approached with a positive clearance, which can exceed the optimum. Trajectory optimizers instead discretize and hand the result to local nonlinear programming: direct collocation (Hargraves & Paris, 1987), covariant gradient descent (Zucker et al., 2013), sequential convexification (Schulman et al., 2014), and differentiable collision geometry (Tracy et al., 2023); this pipeline is fast and widely deployed but converges to a stationary point with no test for whether it is global. We keep this setting and add a proof of global convergence.
Convex decomposition and graphs of convex sets. A second line makes the problem tractable by convexifying the domain. IRIS inflates large obstacle-free convex regions (Deits & Tedrake, 2015a), then used for mixed-integer planning (Deits & Tedrake, 2015b); shortest-paths-in-graphs-of-convex-sets then plans over that decomposition as a mixed-integer convex program, solved through its convex relaxation and rounding (Marcucci et al., 2024; 2023), with subsequent work on scalability (Marcucci et al., 2025; Werner et al., 2026; 2025), on space-time variants for multiple robots (Tang et al., 2025), and on using the convex solution to warm-start nonconvex trajectory optimization (von Wrangel & Tedrake, 2024). These methods bound their optimality gap for the decomposition: the regions are a modelling choice made before optimizing, and a curve is admissible only if it respects them. Our guarantee is stated on the original free space, with no decomposition.
Learning-based planners. Diffusion models have recently been trained to sample trajectories directly, for single (Carvalho et al., 2023) and multiple (Shaoul et al., 2025) robots, with constraints imposed during sampling by projection (Luan et al., 2026) or by receding-horizon denoising (Giaretta et al., 2026). These amortize planning into fast learned sampling and represent several routes, but they enforce feasibility at sampled waypoints at best and produce no optimality certificate. We compare against them in §4; our contribution is a guarantee rather than a speedup, and the two can be combined (Appendix A2.2).
Convex relaxations of planning and control. Beyond Graesdal et al. (2026), several works apply semidefinite or moment-hierarchy relaxations (Shor, 1987; Lasserre, 2001; Parrilo, 2003) to planning and control problems and mostly report tight solutions empirically, rarely analysing when or why tightness holds. Teng et al. (2023) formulate kinodynamic motion planning on Lie groups as polynomial optimization and apply the moment hierarchy; Häring et al. (2024) study minimum-energy unicycle control with a semidefinite relaxation; Vega et al. (2025) apply the Shor relaxation to spacecraft manoeuvre planning with an ellipsoidal, probability-of-collision keep-out constraint; Mahajan et al. (2026) use it for real-time predictive control around ball-shaped obstacles on embedded hardware. Control problems with free timing (Yang et al., 2025; Dong et al., 2026) and contact-rich planning (Graesdal et al., 2024; Kang et al., 2025) have been relaxed in the same way, and a sum-of-squares surrogate guides contact-rich search (Wei & Dümbgen, 2026). Outside planning, such relaxations underlie certifiable estimation, for example registration and SLAM (Yang et al., 2021; Rosen et al., 2019; Papalia et al., 2024), which we do not review. In contrast to the planning and control work above, which mostly observes tightness empirically, we prove that a feasible descent method on the original nonconvex program, started from a fine grid, approaches the optimal cost of the original program as the class is refined, within any constraint tolerance (Theorem 1).
A1.2 INEXACT SAMPLED CHECKS AND THE DATA FOR FIGURE 1
Sampling and control-polygon tests are not exact. Sampling at a finite set is a strict relaxation. For any finite , choosing inside any gap between consecutive samples makes (of degree ) nonnegative at every sample and negative in between, with . So the sampled feasible set is in general a proper superset of at every and every degree; no finite sample is ever exact. Structurally, each is an extreme ray of the dual cone (12) of the cone (1d) of degree-2d nonnegative polynomials (indexed by degree, Appendix A3.1.2): if with , pairing with forces 's representing measure onto , so a continuum of extreme rays would be replaced by finitely many. The direction of the error is the unsafe one for a planner: the sampled problem gives a valid lower bound on the optimal cost of (P) when solved globally, but the curve it returns may penetrate the obstacle, and the margin violation is only : on a uniform grid a gap of width admits violations approaching for above (for a block the violation scales with , so holds at bounded speed and acceleration).
Requiring all Bernstein coefficients to be nonnegative is a strict restriction, and degree elevation does not close it. If vanishes at some , then since every entry of is strictly positive for every degree , nonnegative coefficients of would force with all terms nonnegative, hence and : no elevation degree ever works for a polynomial with an interior zero. This case arises here, because whenever a minimizer of (P) touches an obstacle at a time inside a piece, its avoidance polynomial has an interior double root. The smallest Bernstein-D coefficient of such a polynomial stays negative and decays only like : for it is exactly for even and for odd , so no elevation is ever enough. Approaching tangency the required degree likewise diverges: for , so that , the least with all Bernstein-D coefficients nonnegative satisfies ; in workspace terms for clearance . The avoidance condition is therefore carried exactly, as written in (1d).
Data for Figure 1. The figure shows two robots, A (left to right) and B (bottom to top), planned jointly with one degree-6 Bernstein segment each; each robot is a moving centre for the other (§1). The obstacles are three ellipses and a circle, each replaced by the smallest scaled ellipse containing its offset by the robot radius 0.055 (semi-axes raised by 0.055, then by up to 2%), so that the constraint on the robot's centre keeps the whole robot clear, and the robots keep their centres at least 0.11 apart. The cost is the smoothness objective of with (minimum acceleration), positions fixed at both ends ( ), and no steering constraint. Panel (2) imposes the constraints only at 8 sample times, ends included; panel (3) runs GlobMP with every constraint on all of [0, 1]. The instance has eight route classes (A passes each of the two coloured ellipses on either side, and either robot crosses first); one opening curve per class, restored and then refined by Algorithm 1, gives feasible KKT curves in five of them, with costs 1, 1.2, 5.3, 5.6 and 50.8 times the cheapest; panel (3) shows the cheapest and, in grey, the routes that take a different path in space.
A2 ADDENDUM TO SECTION 2: FORMULATION AND ALGORITHM
A2.1 VARIANTS OF THE FORMULATION
The experiments use four variants of the blocks of . Each is convex in the position or has a convex feasible set imposed exactly, so Proposition 10 covers all four. Theorem 1 covers the position blocks (ellipsoids, robot pairs, boxes and walls); the speed limit constrains and lies outside it.
Ellipsoidal obstacles. A weighted norm , , in the collision constraint, , keeps every block quadratic; with it describes an ellipsoid.
Several robots. Several robots are planned jointly by stacking their curves into one ; let select robot 's rows, so . For a robot of radius , a sphere of radius and centre is , , ; two robots are kept apart by with and , so that . The multi-robot experiments of §A4.5 use this separation.
Workspace box and speed limit. Box constraints use and (Appendix A4.6); a speed limit uses , where is the trajectory duration, so the physical velocity is . Both are affine or concave quadratic, so their feasible sets are convex.
A2.1.1 HALF-SPACE AND CORRIDOR CONSTRAINTS
Confining the curve to one side of a wall (a workspace bound, or a face of a corridor) is the constraint for all . The polynomial has degree , so its Bernstein coefficient vector (u the vector of ones) is raised to degree by the elevation map , :
Elevation rewrites one polynomial in a higher basis and changes nothing else, so (6) holds exactly when the wall is respected at every , and the block enters the same cone as the collision blocks. It is affine in , so its linearization is exact. An obstacle block is a squared length and a wall block a length, so the implementation divides each obstacle block by and each wall block by the workspace scale; since is a cone, this changes the numerics but not the feasible set.
A2.1.2 REFERENCE MOTIONS FROM LEARNED POLICIES
The reference of is a motion supplied by a learned planner or policy (one fixed proposal per solve), a demonstration or a classical planner. For positions at normalized times , we use the piecewise-linear interpolant
It need not have the derivatives required of , and it enters the steering constraint (Appendix A2.2). Relative action commands are first composed from the current configuration into absolute waypoints.
A2.2 STEERING A GENERATIVE PLANNER
Learned planners propose motion as waypoints. Diffusion and flow-matching planners (Janner et al., 2022; Carvalho et al., 2023; Shaoul et al., 2025; Giaretta et al., 2026) denoise an array of positions at fixed times, one model per map, with start and goal written into the array at every step. Constraints enter either as gradient guidance, which does not enforce them, or as a projection of the waypoints, which enforces them at the sampled times only; Figure 1 and Appendix A1.2 show what happens between samples. We use (P) as that projection, so the object the sampler carries is a polynomial trajectory whose every block is tested at every , and the generator is left untouched.
Given waypoints , the reference is their piecewise-linear interpolant (7), and the steering constraint of , for every , keeps the curve near the proposal (in the Robotarium runs, a tracking cost to replaces this constraint). Otherwise Algorithms 1–2 run as in §2.
A3 ADDENDUM TO SECTION 3: THEORY AND PROOFS
Appendix A3.1 sets up the chart, the matrices, the compactness facts, Assumption D, and the step-size and cone-solve bounds (Algorithms 2 and 3). Appendix A3.2 proves the fixed-degree result (Proposition 10) and Theorem 1, and, under Assumption C stated there, its counterpart at a fixed number of pieces (Proposition 13) and the degree refinement (Proposition 17); Appendix A3.3 discusses the assumptions and the stability of the optimal value.
A3.1 PRELIMINARIES
A3.1.1 BOUNDARY CHART
Lemma 3. If A has full column rank, then belongs to . If N is an orthonormal basis for , then ( ) is an affine isometry from onto , with inverse .
Proof of Lemma 3. Full column rank makes invertible, and multiplying the displayed anchor by gives . Any difference of two solutions has rows in and thus uniquely equals
. The inverse formula follows from . Finally, with the Frobenius norm, . The map and its inverse are continuous, so relative local minima and set membership transfer between the two coordinates.
A3.1.2 MATRICES, CONE AND BOUNDS
Polynomial cost, boundary, and constraint matrices. The costs we use are all of the quadratic form
with Q symmetric. The main-text cost is the case , ; the linear and constant terms cover tracking costs, and the gradient is ; the constraint blocks do not depend on the cost. For reference fitting, define and . Then (8) uses , , and . The reference need only be square-integrable. For the integrated squared-derivative objective in , let be the matrix with and use , , . The endpoint evaluation matrix is
The columns of B give the prescribed values in the same order.
For the signed quadratic derivative blocks used in the examples, let , , , and . Then
where is the vector of ones and the columns of are the Bernstein coefficients of the centre . Let denote the linear map that sends a symmetric matrix to the degree-2e Bernstein coefficients of . Then
Here . If the centre has higher degree, first elevate both coefficient representations to a common degree and use the corresponding linear derivative/elevation map in place of . Affine box blocks have degree , are raised to degree (Appendix A4.6), and have affine coefficient maps.
Properties of the cone. Write for the cone (1d) of degree , so , and for the polynomial with coefficients . All four properties of are immediate from (1d). It is an intersection of closed homogeneous half-spaces, hence a closed convex cone. It is pointed, since forces the polynomial to vanish, hence as is a basis. It has nonempty interior, since is a nonnegative partition of unity, so and any with carries the open -ball. And it is semialgebraic, by Tarski–Seidenberg applied to .
The dual cone, the set of vectors with nonnegative inner product with every element of , is
the nonnegative combinations of the evaluation vectors used in §2. This holds because is by definition the dual of that conic hull, the hull is closed (each element needs at most generators by Carathéodory, and bounds the total weight, so the generating data lie in a compact set), and the bipolar theorem (a closed convex cone is the dual of its own dual) applies.
Lipschitz bound for the restoration merit. For general coefficient maps on a compact convex region , set . Projection residuals are nonexpansive and , hence, with and bounds on and over and a Lipschitz constant of (computed below for spherical exclusions), and . The gradient therefore has Lipschitz constant at most , and summing over blocks bounds the full merit; the step scale of Appendix A3.1.4 uses the larger, also valid, constant with . The remaining calculation specializes to spherical position exclusions .
We now show that , the Lipschitz constant of the Jacobian of §2 as a function of the base point, is a fixed number, independent of . By the exact quadratic expansion of the coefficient map, the Jacobian of at a base point , applied to a direction , is
Take two base points and write . Then as well, since the obstacle-centring shift is a constant offset. Subtracting (13) at the two base points,
which is linear in and in F. Since is a fixed linear map,
so is Lipschitz on all of with constant , which depends only on . For a robot pair, both and enter through the difference of the two robots' rows, each at most times longer, so the constant gains a factor 2. Finally, restricting to the free coordinates through the chart of Lemma 3 composes this bound with the fixed linear map , and . Hence ( for a robot pair), an explicit constant that depends only on and not on any compact set .
Quadratic structure and curvature. For matrices X, Y of the same shape, is the Frobenius inner product.
Lemma 4. Fix the chart anchor and write (Lemma 3). Then, exactly, with no remainder,
Proof of Lemma 4. Let , so ; is symmetric. Then
since . By cyclicity of the trace,
Substituting into (8) and collecting the terms without into cost( ) gives the identity. Finally, with the rows of ,
Lemma 5. For and a full-column-rank , if and only if . For the derivative objective in with the endpoint data (9) and the chart basis of Lemma 3, for under Assumption B.
Proof of Lemma 5. For ,
which vanishes if and only if . If , then (14) vanishes only for , that is, (N has full column rank). Conversely, gives with .
For tracking, and for , with the polynomial with coefficients . For planning, ; let . By Lemma 9, and . If , then by Assumption B, a contradiction; so .
Hence the constants
are well defined, and by Lemma 4 they bound the curvature on all of , with no remainder term. For tracking with orthonormal , .
Compactness and existence on each component. Lemma 6 gives the compact sublevel sets used in the proof of Proposition 10. Lemmas 7 and 8 are not needed for the main results; they record that the feasible set splits into finitely many connected components, each with its own cheapest curve, which is why GlobMP is run from several seeds in §4.
Lemma 6. For any , writing in the chart of Lemma 3, is, under (Lemma 5), an ellipsoid in -coordinates centred at the unconstrained minimizer of cost on , hence a compact convex subset of .
Proof of Lemma 6. Let and , so and \mathbf{H} \mathbf{Z}^\star^\top = -\mathbf{V}^\top. Completing the square in Lemma 4,
because \text{tr}(\mathbf{H}\mathbf{Y}^\top\mathbf{Y}) = \text{tr}(\mathbf{H}\mathbf{Z}^\top\mathbf{Z}) + 2\langle\mathbf{V},\mathbf{Z}\rangle + \text{tr}(\mathbf{H}\mathbf{Z}^\star^\top\mathbf{Z}^\star). So is the unconstrained minimizer, and
with the coordinates of . As , the set of such is an ellipsoid: closed, convex, and bounded by (Lemma 4). The chart is an affine isometry (Lemma 3), which preserves these properties.
Lemma 7. Suppose every coefficient map is continuous and semialgebraic, that is, described by finitely many polynomial equations and inequalities (polynomial maps qualify). Consider the set of feasible curves, , identified with through the chart of Lemma 3. Then:
(i) Finitely many pieces. splits into finitely many separate pieces \mathcal{F}_1, \ldots, \mathcal{F}_\bar{c}, its connected components: two feasible curves lie in the same piece exactly when one can be deformed continuously into the other without leaving .
(ii) Each piece is closed. Each is closed in , and also open relative to (clopen in ).
(iii) The pieces are a positive distance apart. If is a nonempty compact subset of one piece , then every feasible curve outside that piece stays at distance at least from ; we set when has only the one piece.
Proof of Lemma 7. is closed, as a finite intersection of preimages of closed sets under continuous maps. It is semialgebraic: each and each is (the quantifier “for every ” is eliminated by the Tarski–Seidenberg theorem), and preimages and finite intersections preserve this (Bochnak et al., 1998).
(i) A semialgebraic set has finitely many connected components, each path connected (Bochnak et al., 1998).
(ii) A connected component is closed in its set, hence in since is closed. Its complement in is a finite union of closed components, so is also open in .
(iii) is closed by (ii) and disjoint from . If , then is continuous and positive on the compact set , so its minimum is positive.
Lemma 8. Assume and continuous coefficient maps. Then every connected component of the feasible set contains a cheapest curve: there is a with for every (it need not be unique; we fix one).
Proof of Lemma 8. Fix and let , with from Lemma 6. contains ; it is closed ( is closed and so is each of its components) and bounded ( is, as ). So the continuous cost attains its minimum on at some , and every has cost() > cost() ≥ cost().
Cumulative constraints and derivative-cost curvature. The finite-dimensional reduction of also admits scalar budget blocks. Write and let denote a budget block (1e). Its cone is , so its contribution to the restoration merit and gradient is
These formulas do not require the integrand to be polynomial in time. For a general integrand, differentiation under the integral is justified, for example, if it is measurable in time and, for almost every , in the trajectory arguments, with its value and first two composed z-derivatives dominated by integrable functions on each compact set of free coordinates.
For a single segment of degree with only start and goal fixed, the objective of has if and only if (the case of Assumption B): a free perturbation has zero derivative cost exactly when its degree is below , and among those vanishing at and the first nonzero one is , of degree 2. When the cost has free zero-curvature directions, compactness must be checked separately. Additional endpoint derivatives can remove these directions as in Lemma 9; adding them changes the boundary data of .
A3.1.3 THE STRUCTURAL ASSUMPTION
Assumption D (finite-dimensional representation). and , and every pointwise coefficient map and scalar cumulative map is on an open neighbourhood of the regions used in the analysis.
The quadratic obstacle and separation blocks, and budget blocks whose integrand meets the condition of Appendix A3.1.2, satisfy the smoothness part.
The degree condition makes A of full column rank, since its columns are independent Hermite interpolation conditions (Stoer & Bulirsch, 2002); N is an orthonormal basis of ker , and always. Under Assumption D, Assumption B is equivalent to for the derivative objective, with as in Lemma 4 (Lemmas 5 and 9).
Write for scalar polynomials of degree at most , with for , and for the Bernstein-d coefficient vector of a polynomial.
Lemma 9 (kernels). Let , let be the endpoint matrix of (9), and read each coefficient vector as the polynomial of degree at most it represents. The vectors with zero th-derivative cost are exactly the polynomials of degree below , and the vectors with zero endpoint data are exactly the multiples of :
Under Assumption D, the second space has dimension .
Proof of Lemma 9. Let be the polynomial with coefficients . Since and , if and only if , that is, .
means for . By Taylor's formula at 0 and at , and divide ; they are coprime, so
and conversely every such product has these zero data. The map is linear and injective on , whose dimension is .
A3.1.4 STEP SIZE AND THE CONE SOLVE
Step size. A valid conservative step scale, provided the step stays in a compact convex region R, is
Algorithm 3 Approximate projection onto by fully corrective nonnegative matching pursuit
Require: , degree , threshold , iteration budget
1: if then return
2: , , ,
3: for do
4:
5: if then break
6:
7:
8: ,
9: end for
10: return
where , and is the Lipschitz constant of the Jacobian of §2.
On a compact convex region containing both endpoints of a restoration step, the Lipschitz bound of Appendix A3.1.2 gives
for . The step must be kept in the region, which compactness does not do by itself, and constants taken over a ball around the unknown minimizer are not computable. Algorithm 2 keeps every nonzero residual, so omitted blocks have zero gradient and every update is a step on the full merit , the merit (2) in the coordinates . With exact cone projections and the region condition above, telescoping executed steps gives
The bound covers scalar cumulative blocks and does not need . It gives a small merit gradient, not feasibility: for the scalar block of one coordinate , near zero and although .
The cone solve and its accuracy. Algorithm 3 approximates the projection onto for any degree , with for block . By Moreau's identity it projects onto the dual cone with the atoms and adds times the result to ; is a numerical budget.
The normalized correlation gives the best decrease along a single nonnegative ray. It is not a polynomial in : if and , its interior stationary points satisfy . Evaluate the correlation at these roots and at the endpoints; an identically zero derivative means the correlation is constant.
A direct rate argument specializes the conic pursuit framework of Locatello et al. (2017). Let be an exact fully corrective iterate, (so in (3)), and measure the gap
which is nonnegative because is the nearest point of the cone.
For the normalized atoms , nonnegative entries summing to one give , so for the vector of ones . Since , it has an atomic representation of total weight at most .
Exact nonnegative least squares gives . Convexity then bounds by times the largest positive atom correlation. Adding that unit atom with its optimal nonnegative weight decreases the objective by half the squared correlation; full correction does at least as well. Hence
using , for exact maximization and weight solves without a stopping threshold; it gives neither a linear rate nor finite termination.
If the correlation test stops the loop at iteration , then . Strong convexity of the squared-distance objective gives projection error at most for the returned vector. Its polynomial values are at least , since that vector is . For these bound the error rather than give exact membership, and stopping on the budget gives neither bound. Proposition 10 and Theorem 1 assume an exact solve of the convex problem (5), which is not this cone projection; Algorithm 3 plays no role there.
A3.2 PROOF OF THEOREM 1
Throughout this subsection, the blocks are polynomial in , as the sphere, ellipsoid, pair and affine blocks, and budgets with polynomial integrands, are, and stands for . It uses the boundary chart (Lemma 3) and the compact cost sublevel sets (Lemma 6) of Appendix A3.1; the push maps that move a curve off the obstacles (Lemma 14) serve only Appendix A3.2.3 and the stability results of Appendix A3.3.
A3.2.1 FIXED DEGREE
Let denote the optimum of (P). Its collision blocks ( ) are polynomial and convex in the position, and its steering block, speed limit and (assumed convex) budgets have convex feasible sets, all imposed through .
GlobMP starts from the cheapest point of a grid. Take a box with a global minimizer of (P) in its interior, and let
in the rational chart of free control points described after the grid part below. The box may be the whole chart: f has compact sublevel sets with finitely many grid points, so a cheapest feasible grid point exists whenever one grid point is feasible. The start of Theorem 1 and Proposition 13 is this point for the class , with the whole chart and the blocks of the problem being solved; there counts the free control points per coordinate left by the boundary and junction equations.
Proposition 13 rests on the following result at fixed degree, which uses a constraint qualification on the control points. Theorem 1 uses only its inner-set and descent steps, which do not need Assumption E.
Assumption E (constraint qualification). For some , every with has a with .
Assumption E is Robinson’s condition (Robinson, 1976): some change of the control points makes every block strictly feasible to first order. It is needed only on this sublevel set, and on fine splines it follows from Assumption C (Appendix A3.2.3, Lemma 16).
Proposition 10 (GlobMP at fixed degree). Assume Assumptions D and B (so that ) and Assumption E, and use a step . Run the repair (5) from a feasible start of cost at most U. Then every iterate is feasible, each step lowers the cost by at least , and every limit point of the iterates is a KKT point of (P) (defined in the grid part of the proof). If the start is the cheapest feasible grid point and the grid spacing is small enough, then moreover the costs decrease to the optimum, , and every limit point is a global minimizer of (P).
The proof has a descent part and a grid part. With uniform feasible random starts, a run with globally minimizing limit points is obtained with probability one after finitely many starts (Corollary 11).
Proof of Proposition 10, descent part. We first show . Let be feasible, , with curves . For a collision block , convexity of gives
and the right side has coefficients (for a sphere the gap in (17) is exactly ). So for all ; the remaining blocks hold through . is closed, convex and contains , so (5) has exactly one solution.
is the projection of onto , characterized by
With and this gives
and since is -Lipschitz,
Summing over ,
so the steps tend to zero and the iterates stay in a compact sublevel set (Lemma 6).
Let ; then , and . Take from Assumption E at and , . Its linearized blocks,
and, for small , the blocks in hold strictly at . For and , is strictly feasible for , hence lies in for large . Using it in (18) at step and letting , then ,
so minimizes over . This convex problem is strictly feasible , so has Lagrange multipliers; with (Rockafellar & Wets, 1998, Thm. 6.14) (by Assumption E), where stacks the blocks in and is the product of their cones, and , denote the normal cones at , these are the KKT conditions (26) of (P) at .
Proof of Proposition 10, grid part. (i) Let be a global minimizer in the interior of and the vector of Assumption E at . For ,
The first term is in ; the second is times a point of int , so the ball of radius around it lies in for some ; so for small the sum is in int . By continuity, a ball has for small, and contains a grid point for small (every point is within of the grid in the rational chart, an affine bijection). Hence
and every limit point of is feasible with cost .
(ii) The extended cost on , elsewhere, is lower semicontinuous, semialgebraic and continuous on its closed domain ( is polynomial; the quantifier over is eliminated by Tarski–Seidenberg). So its Clarke critical points take finitely many values (Bolte et al., 2007, Cor. 9(ii)). A KKT point of (P) is a feasible with
and it is Clarke critical, since the right side lies in the normal cone of (Rockafellar & Wets, 1998, Thm. 6.14). Let be below and below the distance from to the next critical value, and, by (25), take with for . By the descent part, the costs decrease to a limit attained at KKT points, with
is a critical value, so , and every limit point is a global minimizer. The iterates are bounded, so they approach the compact set of global minimizers.
The chart of Lemma 3 has irrational entries in general. The control points that the boundary conditions (for a spline, also the junction conditions) leave free form a rational affine chart of the curve class: these conditions fix the others in terms of these and the data (for one segment, the data alone). For a single segment, a move of the free coordinates moves by the same amount in the Frobenius norm and the free coordinates have norm at most , which is all Proposition 17 uses of Lemma 3; for a spline class such as the chart is still an affine bijection, which is all the grid part of Proposition 10 needs. In both cases the membership test is exact in rational arithmetic for rational data and breakpoints, by the Sturm-sequence test stated before Proposition 17.
Corollary 11 (random starts). Assume the hypotheses of Proposition 10, with bounded. Draw starting points independently and uniformly at random from , run the exact repair (5) from each (each run understood in its infinite-iteration limit), and keep the cheapest limiting cost. There is a number , depending on the instance, such that after starts the kept cost is above with probability at most . So, with probability one, some run reaches globally minimizing limit points after finitely many starts.
Proof of Corollary 11. Part (i) of the grid part gives a ball in on which ; let be the ratio of its volume to that of . A start in the ball is feasible with cost below , which is all part (ii) uses, so its run reaches only global minimizers. By independence,
Uniform starts are drawn by rejection from , since membership in is decided exactly (rounding each draw to rationals finely enough keeps a positive probability of landing in the ball). The grid of Proposition 10, in contrast, has points: that proposition establishes global convergence, not an efficient search.
A3.2.2 THEOREM 1: THE CONTINUOUS-TIME PROBLEM
Let denote the cost of on . For a margin , the problem (\mathrm{P}_\infty^\tilde{r}) keeps the boundary data of and makes the replacements:
We write for its optimal value, when it is infeasible. For the position blocks of Appendix A2.1, an ellipsoid's radius is raised by in its own norm (a robot pair keeps the pair rule even when written as an ellipsoid block), and a wall or box face, written with a unit normal, is moved by towards its feasible side.
The clearance of the endpoints is the largest for which the start and goal positions are feasible for ; it is positive by Assumption A. We take below and below every obstacle and robot radius. Then, for , the radii , the separations and stay positive, so every block keeps the form of §2: the collision and pair blocks are convex in the position and the steering set is a ball. The endpoints keep a clearance of at least in .
The feasible sets shrink as grows, so is nondecreasing, and is feasible for . Whenever is feasible it has a minimizer, by the existence step of the proof of Proposition 17, which uses only a feasible curve and Assumption B. The chart, the coercivity step and the end correction borrowed from Appendix A3.2.3 do not use Assumption C either.
Lemma 12 (interpolation keeps a margin). Let and , and let be a curve that is feasible for the stricter problem and costs . Let be its piecewise Hermite interpolant of degree at the nodes , , the piecewise polynomial that matches and its first derivatives at every node. Then:
(a) costs no more than , , and stays uniformly close to it, ;
(b) if the two margins are far enough apart, (for an ellipsoid block, with the left side multiplied by ), then satisfies every constraint of the looser problem strictly at every instant, and if moreover , then ;
(c) if and minimizes , there are and , depending only on and the data, such that for a correction supported on the first and last two pieces makes a curve of with all the boundary data and , along which, under the condition of (b), every constraint of holds strictly at every instant.
Proof. (a) On a piece , the error and its first derivatives vanish at both ends. For any polynomial of degree below , integrations by parts give . So is orthogonal to on every piece, and
(a)
(b)

(c)
Figure 8: Proof of Theorem 1(ii) (drawn for ; otherwise Lemma 12(c) adds an end correction). (a) The cheapest curve (black) with the margin raised by (dotted circle) and its -piece interpolant (blue), which stays within of it (shaded) and so clears the obstacle grown by (grey). (b) In the free control points (green: feasible set; grey: cost levels and infeasible grid points), a feasible ball (blue) around the interpolant (blue open dot) contains a grid point (black), so the cheapest feasible grid point (orange) costs no more, and GlobMP descends from it (small dots: iterates; orange open dot: their limit, on the dashed cost level). (c) The resulting cost bounds, lowest at the bottom (dots as in (b)).
Taylor’s formula at the left node and the Cauchy–Schwarz inequality give
(b) By (a) and the condition, . The two problems differ by exactly this gap: each obstacle distance along stays along ; a separation (each robot moves less than the gap) stays ; a reference distance stays ; a wall offset stays . An ellipsoid norm enlarges the move by at most . The interpolant is of degree and matches to order at the endpoints, so for it lies in .
(c) Let . Curves with the data of order below and cost are bounded in (coercivity step of Proposition 17), hence equicontinuous; with the endpoint clearance , there is , depending only on and the data, such that every such curve feasible for has clearance (in margin units) on . So stays feasible for small and smooth supported in , and optimality gives : by du Bois-Reymond, is a polynomial of degree on , with derivatives at bounded in terms of , and the data ; norms on polynomials of bounded degree are equivalent). The same holds at .
For , Hermite interpolation reproduces on the first and last two pieces, and only the data of orders are missing: , with independent of , . The correction on of the proof of Lemma 15 (which does not use Assumption C), plus its mirror image at , has
so has all the data. and its derivatives up to order are at most ( depending on ), so moves the curve by for large , only where the clearance is . The cost increase at each end, with and the Cauchy–Schwarz inequality,
is , which gives ; is the least with .
Proof of Theorem 1. (i) For the blocks of keep the form of §2, and and the affine chart of hold without Assumption C (proof of Proposition 13). So the descent part of the proof of Proposition 10 applies: every iterate is feasible and (20) holds. exists once one grid point is feasible, as has compact sublevel sets.
(ii) (See Figure 8.) Let , take , from Lemma 12 ( if ), and
If , then gives , and . Let . The given curve is feasible for , so it has a minimizer with . As , Lemma 12 gives with all the boundary data, strictly feasible for , and . By continuity (the chart is an affine bijection), a closed ball around the free coordinates of is feasible for with cost below ; for small it contains a grid point, so
the lower bound because every iterate is feasible for with the boundary data. The threshold on h depends on N and the unknown minimizer, so Corollary 2 bounds N but not h.
(iii) With , is , and (31) with monotonicity of gives
A curve feasible for violates no constraint of by more than ( for a separation). Let with as in (ii), and let be a curve from or a minimizer of . These cost at most , so they are bounded in (coercivity, Proposition 17) and a subsequence converges weakly in , and uniformly with the derivatives below , to a curve with the boundary data that satisfies every constraint of (limits of the loosened inequalities). By weak lower semicontinuity,
so is a global minimizer. Applied to the minimizers, this gives , and the costs from , which lie in , tend to . For the position blocks of Appendix A2.1 the proof is the same, with (hence ) and multiplied by (Lemma 12).
Proof of Corollary 2. Item (i) is the case of the proof of Theorem 1(ii), which needs no end correction: the margin condition and the cost bound hold with . For item (ii), the choice of gives , so Theorem 1(iii) applies: the curves violate no constraint of by more than ( for a separation) and cost at most .
A3.2.3 GLOBAL MINIMIZERS OVER UNDER A CONDITION ON CONFIGURATIONS
Theorem 1 does not say that GlobMP reaches a global minimizer over a fixed class . It does for and large under the following condition.
Assumption C (free configurations). With as in §2, at every time and feasible position, some increases every active constraint: whenever .
Assumption C is the Mangasarian–Fromovitz condition on configurations; it rules out jamming and is used only at feasible positions within distance 1 of the points visited by curves of cost at most (Lemma 14 and the proof of Proposition 13). Under it, GlobMP from reaches global minimizers over every fine enough class ; the proof chains four results and is at the end of this subsection.
Proposition 13 (global minimizers over ). Under Assumptions A, B and C:
(i) There is such that, for every , GlobMP over on with the repair (5), a step ( computed for ) and the start with small enough produces curves feasible at every instant, with nonincreasing cost, and all its limit points are global minimizers over .
(ii) For , the optimal cost over satisfies with independent of , and as subsequences of these minimizers converge uniformly to global minimizers of .
Lemma 14 (pushing into the interior). Fix a time and let the be functions of the position, so that is the set of feasible positions. Assume Assumption C at this time: at every some direction increases all active constraints, whenever . Assume also that the start and goal positions are strictly feasible. Then for every compact there are numbers and, for each , a smooth map , a push, such that:
(a) is the identity near the start and goal positions;
(b) it raises every block value of a feasible point to at least : for all and all ;
(c) it moves points only by order : for every , with independent of ;
(d) a point within distance 1 of with for all has the whole open ball inside .
Proof. Let be the closed 1-neighbourhood of . For with active set , scale the vector of Assumption C to get and an open neighbourhood on which and (). By compactness, finitely many cover . Let be below every and below near the start and goal, take a partition of unity subordinate to the cover and a smooth cutoff equal to 0 near the start and goal and to 1 where some , and set
If and , then , so
Let be the time- flow of , a bound on , a bound on on the 2-neighbourhood of , and
A trajectory from moves at most ; along it while , and loses at most otherwise. So no can first reach 0, and it stays in and , which is (b); (a) holds as near the endpoints. For (c),
and the derivatives of up to order are bounded on uniformly in . For (d), on , so gives on . Only points of were used.
Lemma 15 (rate in the number of pieces). Write for the optimum over , whose curves carry the boundary data. Under the hypotheses of Proposition 13, the best spline with N pieces is almost as cheap as the best curve: there are C and , depending on the instance, such that for all
Proof of Lemma 15. because . For the upper bound, push a minimizer of (it exists by the existence step of Proposition 17) inward by and interpolate. For moving centres and reference, build the field of Lemma 14 on the compact set ( the 1-neighbourhood of a compact set containing ), with a partition of unity in and near and . The resulting maps are the identity near the endpoints, give , and - id has derivatives in up to order bounded by a constant times (as in Lemma 14(c)). Let . By the chain rule, each term of has a factor and at most one factor , so
with independent of , and is feasible (Lemma 14(d)). Let be the Hermite interpolant of . By (27) and (28),
With
q stays within of , hence is feasible, and costs at most . For , , which proves the claim with .
If , no constraint is active near the endpoints, so there and (first variation, as in Lemma 12(c)) and, for large , on the first and last two pieces; the missing data , , do not depend on . Let be the spline on with two unit pieces of degree , , zero derivatives of order at and , and for (Taylor polynomial on , ; Hermite join to on , ); as , is bounded uniformly in . Then on , with its mirror image at , supplies , moves the curve by inside the endpoint clearance, and, as in (29), raises the cost at each end by at most
Hence .
Lemma 16 (Assumption C gives Assumption E). Under the hypotheses of Lemma 15, fix any U. For all large enough N, every feasible curve of with cost at most U satisfies Robinson's condition: some change v of its control points makes every block strictly feasible to first order, as in Assumption E.
Proof of Lemma 16. Let be the space-time field of the proof of Lemma 15, on a compact set containing every curve of cost (bounded by coercivity, Proposition 17); it is , vanishes near the endpoints, and where . Let be feasible in with cost , and the Hermite interpolant of . By equicontinuity, for large the end pieces of lie where , so has zero boundary data and is an admissible change of control points. As , (28) gives
so where . Hence, for small , the piecewise polynomial , with coefficients , is where and elsewhere: its coefficients lie in int , which is Assumption E with .
The degree-refinement procedure. At level , take degrees satisfying Assumption D, and set
the grid spacing and a box of free control points (in the rational chart after the proof of Proposition 10) centred at zero.
Degree elevation keeps the previous output without changing its curve or cost. Algorithm 1 may stop after finitely many iterations, since a trial replaces its seed only when it is feasible and no more expensive.
Feasibility of each grid candidate and of each trial is tested exactly over , piece by piece, for rational piecewise-polynomial data and breakpoints. For a trial, its free control points in the rational chart are first rounded to rationals, and this rounded curve is the one kept. On each piece, Sturm sequences isolate the roots in the open interval of the piece within disjoint closed rational subintervals of it, with no root at their endpoints. The sign of the block is then checked at one rational point between consecutive isolating intervals, and between each end of the piece and its nearest interval (or at one interior rational point if there is no root). A piece on which the block vanishes identically passes.
Proposition 17 (degree refinement). Assume Assumptions A, B and C. Once Algorithm 4 has found a first feasible curve, its output costs never increase and converge to the optimum ; the optimum of (P) at degree d also decreases to ; and is attained by some curve. Every limit point of the output curves (weakly in , and uniformly together with the derivatives below k) is a global minimizer of .
Algorithm 4 Degree and seed refinement for (P∞)
Require: degrees with charts ( ), spacings , boxes ; levels ; finite iteration caps for Algorithm 1
1:
2: for do
3: curves from
4: if then add its degree- elevation to
5: if then continue
6:
7: , initialized at
8:
9:
10: end for
11: return
or no feasible curve found within the levels
Proof of Proposition 17. We use two properties, proved at the end: coercivity (curves with the boundary data and bounded cost are bounded in ) and the approach from inside (for every some curve with the boundary data costs at most and has every constraint bounded below by a positive number). The constraints need only depend continuously on and on derivatives of order below .
Existence: a minimizing sequence is bounded, so a subsequence converges weakly in and uniformly with the derivatives below ; the limit keeps the data and constraints, and is weakly lower semicontinuous.
Approximation: fix and from the approach from inside, and such that every curve with the boundary data within of in is feasible with cost . The Bernstein polynomials of converge in (Lorentz, 1986); correcting their boundary data by a Hermite polynomial of degree gives with the data and for . For a degree- curve with control points ,
since and the weights are nonnegative with sum one. In the rational chart (an isometry for one segment), rounding the free coordinates of to moves the curve in by at most
for large , and the grid point lies in , since the control points of are bounded independently of . So for the seed, hence the output, costs at most , and every output costs at least . The previous output, elevated, is a candidate at each level, so the costs never increase, and is nonincreasing and between and the output costs. Limit points of the outputs are feasible with cost , as in the existence step.
Coercivity: if with bounded cost, the normalized curves have th derivatives and boundary data tending to zero; by the compact embedding , a subsequence converges in , hence (the th derivatives tending to zero) in , to a polynomial of degree below and norm one whose derivatives of orders vanish at both ends. Under Assumption B it is zero (proof of Lemma 5), a contradiction.
Approach from inside: apply the space-time pushes of the proof of Lemma 15 to a minimizer . The pushed curve keeps the data, has , and costs at most . Smoothing and a small Hermite correction add at most and keep ; if , the end correction of Lemma 15 on a layer of width adds the data of orders at cost and moves the curve by , so for small the cost is below and .
Proof of Proposition 13. Let and let exceed the thresholds of Lemmas 15 and 16 with , so that for . By Lemma 16, Assumption E holds on the feasible curves of with cost , which contain the global minimizers over and all limit points from starts of cost . Assumption D enters Proposition 10 and Corollary 11 only through and an affine chart. On , : a spline with zero th derivative is one polynomial of degree below , which the zero boundary data annihilate (proof of Lemma 5). The boundary and junction equations are linear, consistent and of full column rank for every when (Hermite interpolation at the nodes) and for when (a middle piece of degree joins the end pieces), so the chart of Lemma 3 exists (for smaller , a feasible start makes the equations consistent, and an orthonormal basis of their null space gives the chart used by Theorem 1(i)). There
with N the orthonormal basis of this chart (to which is mapped) and Q block diagonal (each block times the cost matrix of one piece on ).
(i) Proposition 10 over , with the whole chart, gives limit points that are global minimizers over ; Corollary 11 gives the same for independent uniform feasible starts in a bounded box containing a global minimizer in its interior.
(ii) The bounds are Lemma 15. The minimizers over have bounded cost, hence are bounded in (coercivity); a subsequence converges weakly in and uniformly with the derivatives below to a feasible curve with the boundary data of order below and cost at most , a global minimizer of .
A3.3 SCOPE OF THE ASSUMPTIONS AND STABILITY
This subsection records which parts of Assumptions A and B the proofs need and which can be weakened, when the optimal value is stable, and when Assumption C, used only in Propositions 13 and 17 and in the linear stability bound below, holds and why Proposition 13 cannot drop it. Theorem 1 needs only Assumptions A and B.
Piecewise-polynomial data. Assumption A asks for continuous, piecewise-polynomial obstacle centres and reference, which covers the piecewise-linear reference (7) of a learned policy. The exact test and the critical-value step of the proof of Proposition 10 use polynomial data.
The cone test stays exact for rational data and breakpoints: on each interval of a common partition of into the pieces of the curve and of the data, the block is a polynomial in , and becomes the product of the cones of these intervals, still closed and convex. The problem over stays semialgebraic, which is all that step needs.
The push, the rate and Lemma 16 use only continuity of the centres and the reference: the field of Lemma 14 is a smooth partition of unity times fixed vectors, and continuity of and in is all its construction needs. Beyond the exact test, the proof of Theorem 1 uses only continuity of the data.
Bounded curves instead of Assumption B. Assumption B enters only through boundedness: curves of bounded cost are bounded. The descent step uses the upper curvature and not . When the steering constraint is present ( ), every feasible curve has , and the coercivity argument of Proposition 17 applies unchanged: a normalized sequence with vanishing th derivatives and vanishing sup norm cannot converge to a polynomial of norm one. So the conclusions of Theorem 1 and Proposition 13 hold with in place of Assumption B, with convex rather than strongly convex over and compactness supplied by the bounded feasible set.
Stability of the optimal value. is nondecreasing in and left-continuous on : if , minimizers of cost at most , and, as in the proof of Theorem 1(iii), a subsequence converges to a curve feasible for of cost at most (or if is infeasible). Hence has at most countably many jumps, all upward on the right. Let
By compactness, a curve along which every constraint holds strictly keeps a positive margin, so every method whose curves keep a positive clearance costs at least , the analogue of the robust optimum of Solovey et al. (2020). We call stable if ; with in place of 0, this holds at all but countably many .
On a stable instance, for some , so Theorem 1(ii) at (with ) gives curves feasible for with costs in , and if
within of . Bound (43) holds if Assumption C holds along one optimal curve (an open condition): the construction of Lemma 14 near that curve, used as in the proof of Lemma 15, gives a curve with every and cost at most , and is a margin of at least for a constant of the data. Theorem 1 then recovers the rate of Proposition 13(ii) with exactly feasible curves.
When Assumption C holds. It is needed only at feasible positions within distance 1 of curves of cost at most . It always holds for robots without obstacles, walls or steering: the direction , which spreads every robot away from the origin, gives
for every touching pair. Spreading about the centre of a single ball obstacle does the same for that obstacle and any number of robots.
For static constraints it holds for almost every choice of margins. Give block the radius . For each set of blocks, the map is polynomial, so by Sard's theorem almost every value is regular. At every configuration where exactly the blocks of are active, their gradients are then linearly independent, which implies Assumption C. There are finitely many sets , so the exceptional margins form a null set. For moving obstacles or a moving reference the same count suggests that, generically, the condition fails only at isolated points of space-time, and a cheapest curve may pass through one.
Proposition 13 cannot drop Assumption C. The condition is needed by the algorithm, not only by the proof. Take a point robot in , two discs of radius centred at , which touch at the origin, where Assumption C fails, and the cost with over (adding , , changes nothing below). The vertical line is feasible throughout. From with , the linearized set is
and the repair returns its apex . So the iterates halve their distance to the origin at every step and converge to it. The origin is not a KKT point, since the cost still decreases along the feasible line. A cheapest curve through a zero-width gap between two touching obstacles can stall GlobMP in the same way.
A4 ADDENDUM TO SECTION 4: EXPERIMENTS
A4.1 EXPERIMENTAL SETUP
This subsection summarizes the hardware, robot platforms and software shared across all experiments. GlobMP's runs below (D3IL aside, Appendix A4.4) are instances of (P), each built from blocks of , Appendix A2.1 or the maze keep-outs (44) of Appendix A4.3 and solved by Algorithms 1–2 under the protocol of its source. All reported baseline results are obtained from our own reproductions.
Hardware. The D3IL and maze baselines ran on a workstation with a 24-core Intel Core Ultra 9 285K at 3.7 GHz and one NVIDIA GeForce RTX 5090 (32 GB); the synthetic study of §4.1 and the multi-robot suite of §A4.5 ran on a shared node with two 32-core AMD EPYC 7502 CPUs and eight NVIDIA A100-PCIE GPUs (40 GB each), as did GlobMP's maze runs, so the maze times compare different machines. Training, sampling and model evaluation were performed on a single GPU. The RRT, GCS and SDP-MP baselines ran on CPU with each run pinned to fixed cores, and Algorithms 1–2 ran on CPU or GPU as stated with each experiment (for the synthetic study, in Appendix A4.2).

(a) Robot Platform
(b) operator Station
Figure 9: Robot platform and operator station. The operator’s finger joints come from Manus gloves and the wrist poses from VIVE trackers against two base stations; retargeting turns both into absolute joint targets for the 38 arm and hand joints of a Dexmate Vega-1 carrying two XHAND1 hands, sent at 30 Hz. Head and wrist cameras and the fingertip force sensors record alongside. The close-up is the same hand photographed on the bench and cut out of its background; the five fingertip pads, 120 taxels each, are tinted amber and the leader points at one of them; they are the only tactile surfaces the hand has, the thumb’s included. The palm and the finger links sense nothing. Only the resulting trajectories are used in this paper; none of the operator hardware is present at inference.
Robot platforms. The bimanual demonstrations are collected on the setup of Figure 9, using a Dexmate Vega-1 with two XHAND1 dexterous hands. Two ZED X One S cameras are mounted at the wrists and one ZED X Mini camera is mounted on the head. Teleoperation uses Manus gloves for hand target gestures and HTC VIVE trackers for wrist target poses. Only the resulting trajectories enter this paper; none of the teleoperation hardware is used at inference. Figure 10 shows the modalities, the task string, the camera images and the fingertip tactile arrays, at the instant the tissue box changes hands in the handover task.
The Robotarium experiments of §4.2 use the Georgia Tech Robotarium (Wilson et al., 2020), with its m arena, GRITSBot geometry, and differential-drive dynamics. The benchmark environments of §4.2 are adapted to the Robotarium workspace, with obstacles scaled by 0.85 (Cross-Room), 0.4 (Drop-Region), 0.2 (Corridor-Bay, eight posts) and 1.1 (Conveyor, with wider channels and a model retrained for them), represented virtually in the arena. The GRITS-Bots have physical radius 0.055 m, while planning uses an inflated radius m to account for tracking error, the testbed's barrier-certificate safety layer and the non-holonomic conversion of the plan. The planned trajectories are tracked through the Robotarium's single-integrator-to-unicycle controller, and an overhead camera records the executed motion. The virtual obstacles are overlaid from the corresponding map definitions, and clearance is evaluated from the robot trajectories tracked in the video after correcting for lens distortion. Across the four obstacle maps, no GlobMP robot comes closer than 0.06 m to an obstacle; the closest pass occurs on Conveyor and is shown in Figure 11; Figures 18–22, at the end of the appendix, show every method except PCD-LB (at zero in Figure 5) on each map.
Software. All experiments are based on PyTorch (2.13; 2.6 for Maze2D) for automatic differentiation, JAX 0.6.2 for DiRecT's SCP–ADMM projector, and IPOPT through Pyomo for the augmented-Lagrangian projection, under an external wall-clock cap. The RRT variants run through OMPL (Sucan et al., 2012); IRIS and GCS through Drake (Tedrake & the Drake Development Team, 2019); and the curve fits, SDP-MP and GlobMP's SQP polish through CVXPY (Diamond & Boyd, 2016) with Clarabel (Goulart & Chen, 2024). The multi-robot baselines build on MMD (Shaoul et al., 2025) (MIT), MDOC (He et al., 2026) (MIT) and DiRecT (Giaretta et al., 2026) (MIT), itself an extension of PROJECTED COUPLED DIFFUSION (Luan et al., 2026) (MIT). Every learned multi-robot, maze and D3IL baseline is trained from scratch under its source's protocol rather than scored from a released checkpoint.
PROMPT
“Pick up the tissue box from the shelf, hand it to the other hand, and place it on the other shelf.”
VISION
4 RGB streams, at 30 Hz; three shown, cropped

left hand
taxels, rise over the pre-contact baseline right hand
TACTILE

thumb
index
middle
ring
pinky

thumb
index
middle
ring
pinky
taxel force
counts, uncalibrated
thumb
index
middle
ring
pinky
every fingertip, over the whole episode
FORCE

time (s)
time (s)
Figure 10: Given modalities, at the instant the tissue box changes hands (one episode of the handover task, 27 s at 30 Hz). Prompt: the task string the policy is conditioned on, one per episode. Vision: three of the four RGB streams. Tactile: both hands at that same instant, five fingertip pads of 120 taxels each, every pad unrolled into its measurement grid, one square per taxel, shown as its rise over the pre-contact baseline on a stretched colour scale. Force: the same fingertip sensors over the whole episode, every finger on its own, one panel per hand. Both scales are the sensor's own counts, as measured: the hand reports integers and the vendor documents no conversion to newtons, so the counts carry no unit and the figure claims none. The load passes from the right hand to the left at the handover and falls when the box is placed.
A4.2 SYNTHETIC EXPERIMENTS
The synthetic study of §4.1 tests continuous-time feasibility, the cost of the returned curve, and scalability, on Problem 1 and a variant of it. Every instance is a minimum-derivative problem with snap cost , endpoint data , piecewise degree-9 polynomials, junctions and margin 0.005 m (added once to pair separations), so the piecewise conditions of Appendix A4.6 apply and the planning curve lies in the class of .
Problem 1 (robots exchanging places among spheres). robots, even, are stacked into one curve with values in and form exchanging pairs: in pair one robot moves from to and the other the reverse way along , with uniform on m and uniform on with m, consecutive pairs separated by 2.8 to (from the upper row of one to the lower row of the next). Every pair of robots carries a separation block ; Appendix A2.1), and every robot a ball block for each static sphere, with its centre, and its radius. Two spheres of radius uniform on m sit 0.3 to 0.9 radii below the first row, so the first robot's straight path enters both, and every start and goal clears them by 0.2 m. There is no workspace bound, so every inequality block has a nonconvex feasible set. Each exchanging pair, and each robot whose straight path enters or passes within 5 cm of a sphere, for that sphere, is passed on one of two sides, which gives 8 to 128 route classes per instance.

Figure 11: GlobMP on the Georgia Tech Robotarium: twelve GRITSBots on Conveyor in the m arena, at s. The paths the robots drove, starts (circles), goals (squares), and the virtual obstacles drawn from the map. The circle magnifies the run’s closest pass: 6 cm between the robot’s body and a belt.
The main comparison uses pieces and 20 instances at each of . The scaling study uses pieces, lower rows of consecutive pairs spaced apart with and one shared by all pairs, three spheres, and, from 2 to 200 robots, 10 seeds per size for GlobMP and 5 for the baselines. GlobMP's scaling runs start from the straight-line curve (Figure 3 reports only this stage; no route classes, polish or finishing step enter it) and are timed from process start to the first feasible curve, setup included, on CPU (Figure 3a) and separately on one A100 (28 s median at 200 robots). Blocks are counted per piece: at 200 robots, 19,900 pair and 600 robot-sphere blocks over 4 pieces give the 82,000 blocks of §4.1 and Figure 3c.
Methods. In the main comparison, GlobMP opens each route class with a waypoint path that passes every pair and every crossed sphere on the chosen side, runs Algorithms 1–2 (then an SQP polish and the finishing step of Appendix A4.6), and returns the cheapest feasible result over the classes. RRT-Connect and RRT* are the OMPL implementations (Kuffner & LaValle, 2000; Karaman & Frazzoli, 2011) in with the exact validity test (every pair at least apart, every robot outside every sphere); they sample in the rectangle spanned by the instance plus 3 m, since a sampling planner needs a bounded region, and get a 60 s budget (600 s in the scaling study). Their path is collision-free as a polyline but is not a curve of the class, so the returned curve is the cheapest collision-free fit among several (else the least colliding) on the true geometry (dense check, 0.1 mm tolerance): the minimum-snap interpolant through the path at the segment breakpoints, which cuts corners; fits that trade snap against the squared distance to the path; and minimum-snap fits kept within a corridor around the path wherever the current fit collides, with the corridor width set by the path's own clearance (Mellinger & Kumar, 2011; Richter et al., 2016), each on the path and on a shortcut version of it. GCS (Marcucci et al., 2023) works in the same joint space, where both collision sets are convex: robot a inside a sphere is and a colliding pair is . IRIS (Deits & Tedrake, 2015a) grows regions from seeds every 0.5 m along a 60 s RRT-Connect path (GCS budget 2400 s, 600 s in the scaling study), Drake's GCS trajectory optimization finds the minimum path-energy path through them (plus a time cost) with Bézier order 5, falling back to 3 and 2 where its convex solve fails numerically, and its curve is fitted in the same way. SDP-MP, the semidefinite relaxation of Graesdal et al. (2026) extended to pair blocks, is written on the same program in its own affine chart, so that the endpoint and junction conditions hold by construction; the per-segment form with lifted junctions stops with a numerical error in Clarabel from two segments on. The chart form is joint over all robots and segments, and each block must lie on each segment in the cone of polynomials nonnegative on of §2, written as sums of squares. On an obstacle-free instance it reproduces the exact minimum-snap optimum. Its rounded curve is the first-order part of the solution. The baselines run on CPU, one run per four pinned cores, and a run that returns nothing within one hour counts as a failure. GlobMP's route classes run on CPU in the same way at and on the first 10 instances at , and on A100 GPUs, four to ten runs per GPU, for the rest, so its times are totals of work rather than a like-for-like speed comparison.
Rate in the number of pieces. Figure 4 uses instance 0 of the main comparison with , degree 9, joins and the 0.5 cm margin, for and , and up to 12 ( ), 16 ( ), 24 ( ) and 32 ( ). All route-class runs converge to the same class, so is estimated by the cost GlobMP reaches from it: Algorithms 1–2, the SQP polish and the finishing step, from the waypoint path for and from the curve, refitted by least squares, for larger ; a run counts only at a KKT point that keeps the margin. The cost is evaluated in global time from the th-derivative coefficients, with the cost quadratic expanded around the obstacle-free minimizer (a change of chart): the expansion around the default chart point loses all digits beyond about 16 pieces at , and two starts agree to relative; Figure 4a floors at . Since keeps only the orders below , both values of share , estimated by the cheapest value at . Panel (c) takes , and margins (added once to the pair separation) from 0 to 5 cm, up to 10% of the smaller sphere radius (0.51 m; the other is 0.58 m); for the pair block stays inactive, at least 19 cm clear, so these are the margins of Theorem 1 (for it is active, so the curve in (c) raises the pair separation by , not , and is not ). Velocity ( ) wraps the spheres along arcs, and its finishing step reaches a KKT point only on some runs, each started from the waypoint path or the curve at : the panels show the runs that do, against and, in (c), the zero-margin cost, each estimated by the cheapest curve feasible on the true geometry ( and ).
A4.3 MAZE NAVIGATION
We examine whether the proposed formulation remains effective in a nonconvex maze. We consider the safe maze navigation benchmark of Xiao et al. (2025), following the setting reported by Giaretta et al. (2026). A point robot traverses the D4RL maze2d-large environment (Fu et al., 2020) between fixed endpoints while avoiding keep-out regions placed within the maze corridors. The state contains planar position and velocity, and the action is a planar force. A rollout is considered safe if the executed trajectory remains outside every keep-out region. We evaluate two settings, Broad, containing two keep-outs, and Narrow, containing six.
This benchmark combines both constraint constructions used in this paper. The maze walls form a union of cells and therefore define a disjunctive free space that cannot be represented by a single membership in . A breadth-first search on the cell graph selects a corridor in ms, after which the continuous trajectory is optimized and verified within the selected corridor. Each of the 12 corridor boxes along the route contributes four affine blocks (6) and one Bézier segment, with adjacent segments joined , resulting in 48 affine blocks. Each keep-out contributes one block (44), quadratic for and quartic for , beyond the quadratic blocks of . We use with pieces of degree 9, so Corollary 2(i) () does not apply here. The maze geometry is not learned. The baselines rely on the diffusion prior to remain within the maze and explicitly constrain only the keep-outs among the geometric constraints, whereas our formulation enforces the corridor boundaries through affine blocks and does not use a learned prior.
Baselines. We compare against ten diffusion planners, nine of them constrained: Diffuser (Janner et al., 2022), Classifier Guidance (Dhariwal & Nichol, 2021), Gradient Guidance (Chung et al., 2023), Projected Diffusion (Christopher et al., 2024), Primal–Dual and Augmented Lagrangian (Zhang et al., 2025), the SafeDiffuser variants RoS, ReS, and TVS (Xiao et al., 2025), and DiRecT (Giaretta et al., 2026), on the task setup of Giaretta et al. (2026). Methods requiring a nonlinear solver use IPOPT (Wächter & Biegler, 2006). The nine constrained methods impose the keep-out regions but leave satisfaction of the maze walls to the learned prior, and none guarantees feasibility in continuous time. Their constraints are enforced pointwise during sampling or projection, so feasibility holds at the sampled states rather than along the whole curve.
Training and environment details. Each keep-out region is represented by an ellipse or superellipse centred at with semi-axes and order ,
Table 1: Maze2D Broad, in the format of Giaretta et al. (2026)'s Table 5. Mean ± standard deviation. The four Gen. columns score the generated trajectory. Best value(s) in bold, Time excepted. All baselines are run here over 10 evaluation episodes, sampling from the same diffusion planner we train, so the values are measured rather than quoted; our rows are deterministic and report a single trajectory.
| Method | SR ↑ | Viol. ↓ | Score ↑ | Time(s) ↓ | Gen. SR ↑ | Gen. Viol. ↓ | Gen. AS ↓ | Gen. CS ↓ |
|---|---|---|---|---|---|---|---|---|
| Diffuser | 0.000 | 44.600 ± 11.298 | 1.612 ± 0.004 | 0.256 ± 0.099 | 0.000 | 39.700 ± 18.815 | 0.0396 ± 0.0022 | 0.4281 ± 0.0427 |
| Classifier Guidance | 0.100 | 27.800 ± 13.934 | 1.612 ± 0.004 | 0.548 ± 0.091 | 0.300 | 9.000 ± 11.340 | 0.0400 ± 0.0022 | 0.4352 ± 0.0552 |
| Gradient Guidance | 0.200 | 13.000 ± 6.885 | 1.613 ± 0.005 | 2.663 ± 0.107 | 1.000 | 0.000 ± 0.000 | 0.0404 ± 0.0023 | 0.4471 ± 0.0460 |
| Projected Diffusion | 0.400 | 38.500 ± 45.247 | 1.314 ± 0.463 | 103.729 ± 26.086 | 1.000 | 0.000 ± 0.000 | 0.0026 ± 0.0002 | 0.0092 ± 0.0024 |
| Primal-Dual | 0.000 | 30.600 ± 12.492 | 0.111 ± 0.320 | 4.426 ± 0.118 | 0.800 | 0.300 ± 0.640 | 20.1566 ± 0.3115 | 1.8145 ± 0.0146 |
| Augmented Lagrangian | 0.500 | 9.600 ± 10.394 | -0.025 ± 0.000 | 4.229 ± 0.212 | 0.000 | 9.900 ± 7.382 | 1.8568 ± 0.4291 | 1.1980 ± 0.0542 |
| SafeDiffuser-RoS | 0.000 | 59.900 ± 41.293 | 1.070 ± 0.562 | 145.924 ± 21.730 | 1.000 | 0.000 ± 0.000 | 0.0082 ± 0.0066 | 0.0115 ± 0.0043 |
| SafeDiffuser-ReS | 0.400 | 9.800 ± 8.600 | 0.655 ± 0.833 | 30.553 ± 2.242 | 1.000 | 0.000 ± 0.000 | 0.0039 ± 0.0048 | 0.0164 ± 0.0059 |
| SafeDiffuser-TVS | 0.400 | 42.400 ± 38.733 | 1.180 ± 0.625 | 100.873 ± 18.575 | 1.000 | 0.000 ± 0.000 | 0.0048 ± 0.0029 | 0.0117 ± 0.0056 |
| DiRecT | 1.000 | 0.000 ± 0.000 | 1.610 ± 0.004 | 7.746 ± 0.485 | 1.000 | 0.000 ± 0.000 | 0.0024 ± 0.0000 | 0.0080 ± 0.0003 |
| GlobMP (Ours), disc cover | 1.000 | 0.000 | 1.591 | 270.3 | 1.000 | 0.000 | 0.0009 | 0.0010 |
| GlobMP (Ours), exact e=4 | 1.000 | 0.000 | 1.629 | 32.8 | 1.000 | 0.000 | 0.0005 | 0.0001 |
The Broad setting uses one region with and one with , while all six keep-outs in Narrow use . Each region straddles a wall stub and extends into the corridor, and GlobMP's route touches the 0.4 margin of both keep-outs in Broad and of four of the six in Narrow, as illustrated in Figures 12 and 13. A single continuous-time diffusion model with a temporal UNet is used by all baselines. It is trained for 500,000 steps with Adam, batch size 256, on the D4RL maze2d-large-v1 dataset using min-max normalization. The learning rate is with PyTorch's cosine annealing ( steps, so periodic over training), the exponential moving average decay is 0.995, and the planning horizon is 384 steps. The model outputs a state-action trajectory. Dynamics are identified from the same dataset by ordinary least squares over 3,993,503 transitions and are imposed on the baselines as equality constraints. Because open-loop execution of the fitted linear model diverges over this horizon, all methods execute their planned trajectories using a proportional-derivative controller with proportional gain 5 and derivative gain 1.
Evaluation. We follow the protocol of Giaretta et al. (2026). Each baseline generates 10 i.i.d. trajectories conditioned on the same fixed endpoints, with each trajectory executed for at most 800 environment steps. We report SR, the fraction of collision-free rollouts; Viol., the mean number of steps spent inside a keep-out; Score, the D4RL normalized return; and Time, the planning time. The Gen. columns evaluate the generated trajectory before execution and additionally report acceleration smoothness, AS, and curvature smoothness, CS (not the constraint satisfaction of Appendix A4.5). Baseline values are means over 10 samples, whereas our method is deterministic and reports a single trajectory.
Tables 1 and 2 reveal an important difference between planning and execution. In Broad, several baselines generate trajectories with Gen. but lose safety during execution: Gradient Guidance falls to 0.20, SafeDiffuser-RoS to 0.00, and Projected Diffusion, SafeDiffuser-ReS and SafeDiffuser-TVS to 0.40. DiRecT is the only baseline that carries Gen. through execution. Both of our formulations maintain with zero violations before and after execution. The disc-cover formulation attains a score of 1.591, while the exact formulation improves the score to 1.629 and achieves the lowest AS and CS. Both satisfy the keep-out constraints for every .
The distinction becomes more pronounced in Narrow, where feasibility is difficult already at the planning stage. Gradient Guidance, SafeDiffuser-ReS and DiRecT are the only baselines reaching Gen. , and of these only DiRecT keeps it through execution; the other two fall to 0.10. Our trajectory maintains with zero violations, achieves a score of 1.625 compared with 1.615 for DiRecT, and obtains the lowest AS and CS, at a planning time of 90.0 s compared with 16.0 s for DiRecT (different machines, Appendix A4.1). That time is not a single descent: Algorithm 1 is within of its own final cost after 19 s and stops at 57 s (60 s cap), and an SQP polish then supplies the final of the cost (30 s, plus 3 s for the finishing step); letting Algorithm 1 run to its own stopping rule instead (532 s) changes neither the cost nor the score. A 20 s cap gives 32.8 s on Broad against 7.7 s for DiRecT. On both maps the returned trajectory satisfies the keep-out constraints at every , not only at the sampled states that the benchmark checks.
In Tables 1 and 2, several baselines lose safety between the generated plan and the executed rollout, whereas every GlobMP row is at 1.00 on both. Figures 12 and 13 show the executed rollouts of
Table 2: Maze2D Narrow, the six-keep-out setting. Mean ± standard deviation. The four Gen. columns score the generated trajectory. Best value(s) in bold, Time excepted. All baselines are run here over 10 evaluation episodes, sampling from the same diffusion planner we train, so the values are measured rather than quoted; our row is deterministic and reports a single trajectory.
| Method | SR ↑ | Viol. ↓ | Score ↑ | Time (s) ↓ | Gen. SR ↑ | Gen. Viol. ↓ | Gen. AS ↓ | Gen. CS ↓ |
|---|---|---|---|---|---|---|---|---|
| Diffuser | 0.000 | 94.100 ± 7.327 | 1.612 ± 0.004 | 0.260 ± 0.106 | 0.000 | 82.800 ± 16.726 | 0.0396 ± 0.0022 | 0.4281 ± 0.0427 |
| Classifier Guidance | 0.000 | 64.400 ± 14.908 | 1.619 ± 0.005 | 0.549 ± 0.104 | 0.000 | 27.700 ± 23.367 | 0.0402 ± 0.0023 | 0.4385 ± 0.0559 |
| Gradient Guidance | 0.100 | 21.700 ± 17.211 | 1.622 ± 0.006 | 2.607 ± 0.086 | 1.000 | 0.000 ± 0.000 | 0.0404 ± 0.0028 | 0.4475 ± 0.0535 |
| Projected Diffusion | 0.100 | 83.200 ± 158.026 | 1.057 ± 0.721 | 756.264 ± 166.998 | 0.800 | 4.800 ± 9.765 | 0.0145 ± 0.0225 | 0.0221 ± 0.0258 |
| Primal-Dual | 0.000 | 125.900 ± 114.102 | 0.103 ± 0.294 | 4.379 ± 0.138 | 0.000 | 11.400 ± 4.409 | 20.1512 ± 0.3103 | 1.8129 ± 0.0146 |
| Augmented Lagrangian | 0.000 | 222.200 ± 181.693 | -0.025 ± 0.000 | 4.394 ± 0.204 | 0.000 | 159.300 ± 40.020 | 2.5444 ± 0.6313 | 1.2043 ± 0.0519 |
| SafeDiffuser-RoS | 0.000 | 258.200 ± 206.817 | 0.927 ± 0.628 | 1215.129 ± 163.413 | 0.000 | 20.800 ± 7.859 | 0.5856 ± 0.0694 | 0.2983 ± 0.0335 |
| SafeDiffuser-ReS | 0.100 | 223.800 ± 230.466 | 0.808 ± 0.834 | 179.773 ± 90.523 | 1.000 | 0.000 ± 0.000 | 0.0350 ± 0.0569 | 0.0283 ± 0.0121 |
| SafeDiffuser-TVS | 0.000 | 266.300 ± 200.686 | 0.908 ± 0.622 | 559.372 ± 114.038 | 0.000 | 31.700 ± 19.990 | 0.0458 ± 0.0083 | 0.0306 ± 0.0076 |
| DiRecT | 1.000 | 0.000 ± 0.000 | 1.615 ± 0.003 | 15.957 ± 1.406 | 1.000 | 0.000 ± 0.000 | 0.0024 ± 0.0000 | 0.0084 ± 0.0008 |
| GlobMP (Ours), exact e=4 | 1.000 | 0.000 | 1.625 | 90.0 | 1.000 | 0.000 | 0.0006 | 0.0002 |
every method on the two maps. GlobMP keeps the left side of (44) at least 1.4, a margin of 0.4; the plan touches this margin exactly at its active contacts (minimum clearance on Broad and on Narrow). Tracking error takes the executed rollout up to 0.24 into the margin band, which is what the margin is for: the rollout stays outside every keep-out, and the benchmark counts zero violations.
A4.4 COLLISION-FREE OBSTACLE AVOIDANCE IN END-EFFECTOR SPACE
We evaluate GlobMP against the baselines on the constrained manipulation benchmark of Jia et al. (2024), with GlobMP as the projection step of DiRecT's own diffusion sampler. A planar end-effector must reach a goal region while avoiding a set of pillars (Figure 14). The state lies in and contains the current and desired positions, while the action lies in and specifies velocity. The initial position is fixed, the goal lies on , and safety requires the entire trajectory to remain outside every keep-out region. Circular keep-outs are represented by the quadratic block (10) at degree , while planar constraints use the affine block of §A2.1.1. GlobMP's plan is a chain of 15 straight segments ( joins, start fixed, end free) under DiRecT's own projection cost, which lies outside the curve class of Theorem 1.
Baselines. We run the ten diffusion planners of the maze benchmark (§A4.3), which cover soft guidance, projection, dual optimization, barrier-function guidance, and receding-horizon projection. Methods requiring a nonlinear solver use IPOPT (Wächter & Biegler, 2006).
Training and environment details. A continuous-time diffusion model with a temporal UNet is trained for 500,000 steps with Adam on the D3IL avoiding dataset using batch size 32, learning rate , PyTorch's cosine annealing ( steps, so periodic over training), and an exponential moving average with decay 0.995, at horizon . The same model is shared by all baselines, and constraints are introduced only during sampling, so no retraining is required when the constraint set changes. The original task, learned from 96 human demonstrations, contains six circular pillars, 0.05–0.06 m across. Following Giaretta et al. (2026), we introduce unseen test-time constraints by enlarging the first pillar from radius 0.03 m to 0.08 m and restricting lateral motion with two planar regions. We further activate three keep-outs of radius 0.02 m centred at (0.5, 0.16), (0.4, 0.175), and (0.6, 0.175), which are included in their release but disabled by default. The resulting problem contains ten circular keep-outs and two planar constraints. These constraints deliberately differ from the training distribution. Of the 96 demonstrations, 77 violate the enlarged pillar, 62 violate the planar constraints, and 53 violate the three additional keep-outs. The resulting free space contains four route classes, with a minimum passage width of 0.061 m.
Evaluation. We evaluate each method over 100 i.i.d. rollouts from the same initial position at seed 0, with at most 100 environment steps, planning horizon , and execution horizon of 4 steps. We report , the fraction of rollouts satisfying all constraints; , the fraction reaching the goal within the episode budget; Steps(Safe), the mean steps among safe rollouts; and Time, the mean computation time per replanning step. All values are obtained from our executions of the released implementations.
GlobMP rollout
baselines (10 runs)
inside a keep-out
keep-out
enforced margin
start
target
rollout end
Diffuser
× 10/10
Classifier Guid.
× 9/10
Gradient Guid.
× 8/10

Projected Diff.
× 6/10
Primal-Dual
× 10/10
Aug. Lagrangian
× 5/10

SafeDiffuser-RoS
× 10/10
SafeDiffuser-ReS
× 6/10
SafeDiffuser-TVS
× 6/10

DiRecT
clear
GlobMP (ours)
clear
GlobMP, inside the margin

Figure 12: Executed rollouts on Maze2D Broad, one panel per method, under the benchmark's PD controller. Baseline panels show all ten evaluation runs behind Table 1, unfiltered; GlobMP is deterministic and returns one. Stretches drawn dark and marked × are where the robot is inside a keep-out, and the badge counts the runs that entered one, which is of the table. Every baseline of the table appears, in the table's order, with GlobMP's exact e=4 row. The last cell magnifies every stretch where GlobMP runs inside the enforced margin, the region marked by the dashed box on its own panel: the continuous plan (dashed) is held off the keep-out by the margin, and the executed rollout (solid) dips into the margin band but stays outside the keep-out, which is what the margin is for.
GlobMP rollout
baselines (10 runs)
inside a keep-out
keep-out
enforced margin
start
target
rollout end
Diffuser
× 10/10
Classifier Guid.
× 10/10
Gradient Guid.
× 9/10

Projected Diff.
× 9/10
Primal-Dual
× 10/10
Aug. Lagrangian
× 10/10

SafeDiffuser-RoS
× 10/10
SafeDiffuser-ReS
× 9/10
SafeDiffuser-TVS
× 10/10

DiRecT
clear
GlobMP (ours)
clear
GlobMP, deepest margin pass

Figure 13: Executed rollouts on Maze2D Narrow, drawn as in Figure 12, over the ten evaluation runs behind Table 2. Only DiRecT and GlobMP keep every run outside the keep-outs; the keep-outs leave little of the corridor, and most baselines enter one on every run. So little is left that GlobMP's trajectory is inside the enforced margin along most of the route, so the last cell magnifies its deepest pass rather than every stretch.

(a) Environment

(b) As (P) sees it
(c) Safety rate against task success, 100 episodes per method

Figure 14: D3IL avoiding-v0. (a) The environment’s own view; the test-time constraints have no physical counterpart, so they appear only in (b). (b) The scene as GlobMP sees it, with all ten discs and both half-planes. (c) Safety rate against task success over 100 episodes, one point per method: a point at the lower right reaches the goal without avoiding, and only the upper right does both. Brackets as in Table 3.
GlobMP. We keep DiRecT's checkpoint, sampler, dynamics fit and evaluation, and replace only its projection: at every denoising step GlobMP projects the sampler's plan, minimizing DiRecT's own cost, onto plans whose straight-line motion between the 16 states clears every keep-out by the margin at every instant, not only at the states. The actions follow from the planned positions through the dynamics fit, so their limits (the environment clips each coordinate of a step to at most 1.25 cm, and never backwards) and their rate of change enter as linear blocks, and every planned action is within them; the benchmark's PD tracker (gains 5 and 1) corrects each executed action, which the environment may still clip. A plan that starts closer to a keep-out than the margin must win the margin back, by at most 1 cm per step. Within one plan the start state is fixed, so each projection starts from the previous one's solution, which is feasible when that projection succeeded.
Table 3 shows that safety and task completion do not necessarily coincide, and Figure 15 shows the rollouts behind it. Over 100 episodes at the same seed, GlobMP is safe in 0.95 of them and reaches the goal in 0.98, ahead of DiRecT (0.87 and 0.97), and every plan it returns is feasible at every instant. Over four seeds (400 episodes) GlobMP averages 0.865 and 0.97, on par with DiRecT's single seed, and it is slower: safe rollouts take 78 steps against 61, and each plan takes longer to compute. Projected Diffusion attains the next-highest safety rate at 0.45. In contrast, Gradient Guidance and SafeDiffuser-TVS reach the goal in 0.97 and 0.95 of episodes but achieve safety rates of only 0.24 and 0.02, respectively. The two metrics should therefore be interpreted jointly, since high task success may still correspond to frequent constraint violations.
For DiRecT, the remaining safety failures occur primarily during execution rather than planning. IPOPT converges on every solve and 815 of 819 generated plans are feasible; moreover, in 10 of the 13 unsafe episodes, every generated plan is feasible before execution. Thus, even when the planner satisfies the test-time constraints, tracking can still drive the executed trajectory outside the feasible
Diffuser SR 0.01

Primal-Dual SR 0.05
Classifier Guid. SR 0.00

Aug. Lagrangian SR 0.00
Gradient Guid. SR 0.24

SafeDiff-RoS SR 0.06
Projected Diff. SR 0.45

SafeDiff-ReS SR 0.24

SafeDiff-TVS SR 0.02

DiRecT SR 0.87

GlobMP (Ours) SR 0.95




pillars (6)
test-time (6)
safe rollout
violating rollout
Figure 15: All 100 rollouts of every method on D3IL avoiding-v0, from the common start (green), GlobMP last. A rollout is drawn red if it violates any of the twelve constraints under the benchmark's own predicate and navy otherwise, so the fraction of navy is the safety rate in the panel title. The six pillars belong to the environment; the six lavender regions are imposed only at test time.
set. As in Giaretta et al. (2026), these experiments evaluate inference-time constraint handling: the additional constraints are introduced only at test time and no method is retrained.
Table 3: D3IL avoiding-v0, in the format of Giaretta et al. (2026)'s Table 6, 100 episodes per method; mean ± standard deviation over episodes. Every value is our own execution of the released code from a single shared checkpoint. Bracketed rows required a non-default --guidance-last-steps 50 to run at all: at the default both crash the simulator. Bold-face marks the best safety rate and task success among the methods that enforce the constraints; the cost columns carry none. GlobMP is the projection step of DiRecT's sampler (replanning every 4 steps, 28 CPU workers for 50 episodes at a time), on the same seed; over four seeds it reaches 0.865 and 0.97.
| Method | SR ↑ | TS ↑ | Steps(Safe) ↓ | Time (s) ↓ |
|---|---|---|---|---|
| Diffuser (unconstrained) | 0.01 | 0.89 | 61.00±0.00 | 0.09±0.00 |
| Classifier Guidance | 0.00 | 0.01 | — | 0.17±0.02 |
| Gradient Guidance | 0.24 | 0.97 | 62.96±7.27 | 1.16±0.07 |
| Projected Diffusion | 0.45 | 0.79 | 65.18±8.09 | 7.16±3.11 |
| [Primal-Dual] | 0.05 | 0.00 | 100.00±0.00 | 0.74±0.02 |
| [Augmented Lagrangian] | 0.00 | 0.00 | — | 0.79±0.01 |
| SafeDiffuser-RoS | 0.06 | 0.20 | 67.50±6.55 | 7.34±0.18 |
| SafeDiffuser-ReS | 0.24 | 0.65 | 62.17±5.10 | 5.44±0.27 |
| SafeDiffuser-TVS | 0.02 | 0.95 | 58.50±1.50 | 5.26±0.09 |
| DiRecT | 0.87 | 0.97 | 61.38±4.84 | 3.72±0.33 |
| GlobMP (Ours) | 0.95 | 0.98 | 78.20±9.22 | 15.12±9.82 |
A4.5 MULTI-ROBOT MOTION PLANNING
We extend the multi-robot evaluation of §4.2 to a broader benchmark with eight environments, team sizes , and three test-time velocity caps (results in Figures 16–17). The benchmark follows Shaoul et al. (2025), with the velocity constraint of Luan et al. (2026) and the evaluation protocol of Giaretta et al. (2026). Six environments are from Shaoul et al. (2025); Corridor-Bay and Cross-Room are reconstructed from Liang et al. (2025). Start-goal pairs follow the sampling procedure of Shaoul et al. (2025), which places every endpoint at least from an obstacle of the source map (before the enlargement below) and from every other endpoint.
Problem setup. Each agent follows a planar Bézier trajectory, with one block per agent and obstacle and one per pair of agents at separation (§A4.6). Box obstacles use the affine blocks of §A2.1.1, one half-space per agent, segment and box, with the side selected by an independent grid seed.
The eight environments cover different forms of geometric and coordinated motion:
-
Empty contains no obstacles and isolates inter-agent coordination.
-
Basic and Dense contain ten and twenty scattered circular obstacles, respectively.
-
Conveyor contains two narrow corridors with opposing preferred traffic directions, requiring coordinated single-file motion.
-
Highways contains a central block and eight boundary blocks that leave a ring road with a preferred counterclockwise circulation.
-
Drop-Region contains four square obstacles and rewards pausing at drop-off points beside them.
-
Corridor-Bay contains three parallel channels joined by a narrow crossing, requiring teams to coordinate their passage.
-
Cross-Room contains a plus-shaped divider that forms four quadrants connected only through gaps near the workspace boundary.
The demonstrations associated with each environment encode its characteristic motion pattern, which is measured by the data-adherence metric DA; on Corridor-Bay and Cross-Room, which have no preferred pattern, DA is the start-to-goal distance divided by the path length.
In the normalized workspace , robots have radius on every map except Empty, where , with minimum pairwise separation . Obstacles are those of the source

Figure 16: Best-of-64 success rate for agents on every cell of the suite, one row per map and one column per velocity cap: an instance counts as solved when any of the 64 candidates a baseline samples is collision-free. This is the SR reported in Tables 4–11; our method still returns one trajectory.
GlobMP (Ours) ☐ PDM ☐ CD ☐ Diff. Policy ☐ PCD-LB ☐ PCD-SHD ☐ Final-projection ☐ DiRecT

Figure 17: Success of a single returned plan for agents, one panel per map, averaged over the three velocity caps: the first candidate each baseline samples, and the one trajectory our method returns. MDOC and MMD-CBS store no per-candidate data and are omitted. Figure 16 gives the best-of-64 counterpart.
maps, enlarged by 2.20 (Basic), 1.50 (Conveyor), 1.45 (Highways), 1.60 (Drop-Region), 1.15 (Corridor-Bay) and 1.10 (Cross-Room); Dense keeps its published sizes. Each environment is evaluated under Low, Medium, and High test-time velocity caps. In the order Low, Medium, High, these are (0.483, 0.571, 0.675) for Empty, (0.477, 0.567, 0.675) for Basic, (0.565, 0.617, 0.675) for Dense, (1.21, 1.46, 1.76) for Conveyor, (0.647, 0.783, 0.878) for Highways, (0.928, 1.13, 1.34) for Drop-Region, (1.21, 1.46, 1.76) for Corridor-Bay, and (0.928, 1.13, 1.34) for Cross-Room.
Baselines. We compare GlobMP against Diffusion Policy (Chi et al., 2023), CD, PCD-LB, and PCD-SHD (Luan et al., 2026), Final Proj. and DiRecT (Giaretta et al., 2026), MMD-CBS (Shaoul et al., 2025), and MDOC (He et al., 2026). Diffusion Policy provides the unguided reference; CD uses constraint guidance; PCD-LB and PCD-SHD augment guidance with projection; Final Proj. applies projection after sampling; MMD-CBS combines sampled single-agent motions through conflict-based search; DiRecT applies projection throughout denoising; and MDOC uses model-based diffusion optimal control. Each method is evaluated on the same start–goal instances.
Evaluation. We evaluate each method for on all eight maps and under the three velocity caps. For each (map, team size) pair, the same 20 initial configurations are shared across methods, and each sampling baseline generates 64 candidate trajectories per configuration (Final Proj. samples 128 on Empty and Cross-Room, scored on the first 64 and timed over all 128); MMD-CBS and MDOC return one plan, and GlobMP one trajectory. Following Giaretta et al. (2026), we report SR, the fraction of configurations with at least one collision-free trajectory; CS, the fraction of all trajectories satisfying the collision and kinematic constraints; Coll, the mean number of colliding agent pairs; DA, environment-specific motion-pattern adherence; and Time, wall-clock time per configuration in seconds. Tables 4–11 give SR and CS in percent; the text quotes them as fractions. A dash marks a quantity that was not measured or is not comparable, rather than a zero. GlobMP's CS checks collisions only, since none of its counted plans exceeds the cap. The other conventions are restated in each table's caption.
Figures 16–17 and Tables 4–11 summarize the results. We interpret DA together with feasibility, since adherence to the demonstrated motion pattern is not meaningful if the generated trajectory violates the constraints, consistent with the evaluation of Giaretta et al. (2026). At the Medium velocity cap, averaged across all maps and team sizes, GlobMP (Ours) attains a mean SR of 0.941,
Table 4: Multi-robot planning performance on Empty for Na ∈ {3,6,...,21} under the Low, Medium and High velocity caps. SR and CS measure trajectory feasibility, Coll reports inter-robot collisions, DA adherence to the environment-specific motion pattern, and Time the planning time per configuration: for GlobMP (Ours) the median over the configurations with the standard deviation as subscript, for the baselines the mean, so the two are not directly comparable. † marks a method that applies no velocity limit, so its three blocks report the same run; MMD-CBS also returns one plan per configuration rather than 64 candidates. A dash under Coll marks a count that is not commensurable with the others, as MDOC and MMD-CBS count colliding time steps where every other row counts agent pairs with any collision; MDOC’s CS is omitted because its plans that do not cover every agent were counted as feasible. MMD-CBS plans under 60 s per configuration and GlobMP (Ours) under 300 s per team. Low (vmax = 0.483) Medium (vmax = 0.571) High (vmax = 0.675) Na Method SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ 3 Diff. Policy† 65.0 48.2±46.5 0.67±0.77 0.999±0.001 0.5 65.0 48.2±46.5 0.67±0.77 0.999±0.001 0.3 65.0 48.2±46.5 0.67±0.77 0.999±0.001 0.5 CD† 100.0 1.1±4.4 0.14±0.28 0.517±0.149 1.0±0.1 100.0 7.1±20.2 0.14±0.28 0.517±0.149 1.1±0.1 100.0 20.5±26.1 0.14±0.28 0.517±0.149 0.5±0.0 MMD-CBS† 100.0 70.0±45.8 — 0.946±0.071 3.1±2.5 100.0 70.0±45.8 — 0.946±0.071 3.1±2.5 100.0 70.0±45.8 — 0.946±0.071 3.1±2.5 MDOC† 75.0 — — 0.572±0.400 39.0±6.1 75.0 — — 0.572±0.400 34.8±4.3 75.0 — — 0.572±0.400 39.6±4.8 PCD-LB 65.0 12.3±20.2 0.02±0.05 0.325±0.135 2.8±0.8 35.0 4.6±11.9 0.01±0.02 0.316±0.133 4.2±0.9 25.0 3.3±9.1 0.01±0.01 0.307±0.130 3.2±0.6 PCD-SHD 100.0 100.0±0.0 0.00±0.00 0.828±0.113 3.0±0.4 100.0 100.0±0.0 0.00±0.00 0.831±0.109 1.4±0.1 100.0 100.0±0.0 0.00±0.00 0.833±0.107 1.4±0.2 Final Proj. 100.0 100.0±0.0 0.00±0.00 0.998±0.003 3.7±0.3 100.0 100.0±0.0 0.00±0.00 0.998±0.003 2.0±0.5 100.0 100.0±0.0 0.00±0.00 0.998±0.003 3.7±0.5 DiRecT 100.0 100.0±0.0 0.00±0.00 0.993±0.018 31.5±0.6 100.0 100.0±0.0 0.00±0.00 0.993±0.018 31.4±0.5 100.0 100.0±0.0 0.00±0.00 0.993±0.017 31.0±1.3 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.933±0.149 4.0±17.1 100.0 100.0±0.0 0.00±0.00 0.934±0.149 4.0±6.3 100.0 100.0±0.0 0.00±0.00 0.984±0.043 0.2±0.1 6 Diff. Policy† 0.0 0.0±0.0 4.77±2.73 0.999±0.001 0.5 0.0 0.0±0.0 4.77±2.73 0.999±0.001 0.6 0.0 0.0±0.0 4.77±2.73 0.999±0.001 0.3 CD† 100.0 0.0±0.0 0.96±0.85 0.582±0.079 1.1±0.1 100.0 0.0±0.0 0.96±0.85 0.582±0.079 0.9±0.3 100.0 0.2±0.7 0.96±0.85 0.582±0.079 1.1±0.1 MMD-CBS† 80.0 15.0±35.7 — 0.879±0.065 30.3±21.2 80.0 15.0±35.7 — 0.879±0.065 30.3±21.2 80.0 15.0±35.7 — 0.879±0.065 30.3±21.2 MDOC† 0.0 — — 0.000±0.000 57.6±4.8 0.0 — — 0.000±0.000 58.2±4.8 0.0 — — 0.000±0.000 67.8±5.2 PCD-LB 5.0 0.1±0.3 1.01±0.73 0.299±0.050 3.8±0.7 0.0 0.0±0.0 1.04±0.72 0.300±0.056 5.8±1.1 0.0 0.0±0.0 1.08±0.69 0.302±0.060 2.3±0.3 PCD-SHD 100.0 99.8±0.5 0.00±0.00 0.608±0.073 4.3±1.4 100.0 100.0±0.0 0.00±0.00 0.612±0.071 2.0±0.3 100.0 100.0±0.0 0.00±0.00 0.613±0.068 1.6±0.1 Final Proj. 100.0 98.3±7.5 0.04±0.15 0.995±0.006 3.2±0.5 100.0 100.0±0.0 0.00±0.00 0.996±0.005 1.8±0.5 100.0 100.0±0.0 0.00±0.00 0.996±0.004 1.8±0.8 DiRecT 100.0 100.0±0.0 0.00±0.00 0.985±0.017 27.6±3.6 100.0 100.0±0.0 0.00±0.00 0.985±0.016 24.6±5.9 100.0 100.0±0.0 0.00±0.00 0.985±0.016 24.0±6.4 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.975±0.090 4.4±22.0 100.0 100.0±0.0 0.00±0.00 0.976±0.090 4.3±4.2 100.0 100.0±0.0 0.00±0.00 0.960±0.089 0.2±0.1 9 Diff. Policy† 0.0 0.0±0.0 9.22±3.01 0.999±0.001 0.6 0.0 0.0±0.0 9.22±3.01 0.999±0.001 0.6 0.0 0.0±0.0 9.22±3.01 0.999±0.001 0.6 CD† 15.0 0.0±0.0 3.80±1.33 0.569±0.075 1.1±0.1 15.0 0.0±0.0 3.80±1.33 0.569±0.075 0.5±0.1 15.0 0.0±0.0 3.80±1.33 0.569±0.075 1.1±0.1 MMD-CBS† 50.0 0.0±0.0 — 0.877±0.062 57.5±8.9 50.0 0.0±0.0 — 0.877±0.062 57.5±8.9 50.0 0.0±0.0 — 0.877±0.062 57.5±8.9 MDOC† 0.0 — — 0.000±0.000 83.3±5.9 0.0 — — 0.000±0.000 84.1±5.7 0.0 — — 0.000±0.000 97.4±7.2 PCD-LB 0.0 0.0±0.0 4.78±1.47 0.253±0.038 4.6±0.7 0.0 0.0±0.0 5.26±1.65 0.260±0.037 6.4±0.8 0.0 0.0±0.0 5.78±1.64 0.271±0.037 4.6±0.5 PCD-SHD 100.0 94.8±8.7 0.05±0.09 0.547±0.052 5.4±0.9 100.0 96.2±5.0 0.04±0.05 0.557±0.052 2.2±0.2 100.0 97.5±3.8 0.02±0.04 0.562±0.052 1.9±0.1 Final Proj. 100.0 99.4±2.1 0.01±0.04 0.993±0.006 4.1±0.5 100.0 100.0±0.0 0.00±0.00 0.995±0.005 2.2±0.5 100.0 100.0±0.0 0.00±0.00 0.995±0.004 2.1±0.8 DiRecT 100.0 100.0±0.0 0.00±0.00 0.972±0.020 33.5±7.9 100.0 100.0±0.0 0.00±0.00 0.973±0.020 33.3±7.9 100.0 100.0±0.0 0.00±0.00 0.974±0.019 33.2±8.0 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.989±0.062 6.1±19.5 100.0 100.0±0.0 0.00±0.00 0.990±0.062 4.7±1.9 100.0 100.0±0.0 0.00±0.00 0.932±0.116 0.4±0.2 12 Diff. Policy† 0.0 0.0±0.0 17.68±4.12 0.999±0.001 0.6 0.0 0.0±0.0 17.68±4.12 0.999±0.001 0.6 0.0 0.0±0.0 17.68±4.12 0.999±0.001 0.6 CD† 0.0 0.0±0.0 8.90±2.05 0.555±0.045 0.5±0.0 0.0 0.0±0.0 8.90±2.05 0.555±0.045 1.1±0.1 0.0 0.0±0.0 8.90±2.05 0.555±0.045 0.5±0.0 MMD-CBS† 0.0 0.0±0.0 — 0.961±0.022 67.5±4.9 0.0 0.0±0.0 — 0.961±0.022 67.5±4.9 0.0 0.0±0.0 — 0.961±0.022 67.5±4.9 MDOC† 0.0 — — 0.000±0.000 110.0±8.6 0.0 — — 0.000±0.000 111.2±8.5 0.0 — — 0.000±0.000 128.9±10.2 PCD-LB 0.0 0.0±0.0 11.68±1.53 0.259±0.038 5.8±0.8 0.0 0.0±0.0 13.11±1.52 0.265±0.038 8.0±1.0 0.0 0.0±0.0 14.36±1.63 0.279±0.040 3.1±0.4 PCD-SHD 100.0 74.0±15.1 0.27±0.19 0.515±0.047 7.1±1.4 100.0 80.6±13.5 0.18±0.13 0.521±0.043 2.9±0.5 100.0 81.6±12.9 0.17±0.13 0.524±0.040 2.3±0.1 Final Proj. 100.0 97.1±6.5 0.05±0.11 0.988±0.009 6.4±0.6 100.0 99.9±0.3 0.00±0.01 0.990±0.007 6.5±0.6 100.0 100.0±0.0 0.00±0.00 0.992±0.006 3.0±0.8 DiRecT 100.0 100.0±0.0 0.00±0.00 0.955±0.023 45.2±9.5 100.0 100.0±0.0 0.00±0.00 0.957±0.022 45.8±9.8 100.0 100.0±0.0 0.00±0.00 0.958±0.021 50.0±5.4 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.994±0.024 9.7±31.5 100.0 100.0±0.0 0.00±0.00 0.996±0.016 7.0±5.7 100.0 100.0±0.0 0.00±0.00 0.904±0.133 0.6±0.3 15 Diff. Policy† 0.0 0.0±0.0 26.96±5.94 0.999±0.001 0.6 0.0 0.0±0.0 26.96±5.94 0.999±0.001 0.6 0.0 0.0±0.0 26.96±5.94 0.999±0.001 0.3 CD† 0.0 0.0±0.0 15.53±2.54 0.587±0.059 1.2±0.1 0.0 0.0±0.0 15.53±2.54 0.587±0.059 0.9±0.3 0.0 0.0±0.0 15.53±2.54 0.587±0.059 1.2±0.1 MMD-CBS† 0.0 0.0±0.0 — 0.989±0.013 74.4±9.3 0.0 0.0±0.0 — 0.989±0.013 74.4±9.3 0.0 0.0±0.0 — 0.989±0.013 74.4±9.3 MDOC† 0.0 — — 0.000±0.000 139.2±10.6 0.0 — — 0.000±0.000 139.0±10.6 0.0 — — 0.000±0.000 153.1±12.1 PCD-LB 0.0 0.0±0.0 20.89±2.48 0.280±0.038 6.8±0.9 0.0 0.0±0.0 23.55±2.73 0.284±0.037 9.2±0.7 0.0 0.0±0.0 26.34±2.90 0.300±0.037 6.8±0.4 PCD-SHD 95.0 33.7±20.2 0.99±0.52 0.506±0.028 9.5±2.0 100.0 37.2±16.9 0.79±0.44 0.517±0.026 2.7±0.3 100.0 37.5±18.1 0.73±0.43 0.523±0.027 2.7±0.1 Final Proj. 100.0 82.8±26.1 0.60±1.61 0.975±0.013 5.2±0.4 100.0 94.7±13.7 0.13±0.38 0.979±0.011 8.5±2.0 100.0 98.9±3.4 0.02±0.07 0.982±0.010 4.2±0.8 DiRecT 100.0 100.0±0.0 0.00±0.00 0.926±0.028 61.9±11.6 100.0 100.0±0.0 0.00±0.00 0.930±0.025 68.1±0.6 100.0 100.0±0.0 0.00±0.00 0.932±0.024 46.4±18.9 GlobMP (Ours) 95.0 95.0±21.8 1.65±7.19 0.983±0.043 24.5±61.2 100.0 100.0±0.0 0.00±0.00 0.987±0.033 14.6±40.9 100.0 100.0±0.0 0.00±0.00 0.905±0.134 1.1±1.6 18 Diff. Policy† 0.0 0.0±0.0 39.06±6.29 0.999±0.001 0.7 0.0 0.0±0.0 39.06±6.29 0.999±0.001 0.7 0.0 0.0±0.0 39.06±6.29 0.999±0.001 0.7 CD† 0.0 0.0±0.0 22.94±1.70 0.565±0.049 1.2±0.1 0.0 0.0±0.0 22.94±1.70 0.565±0.049 0.6±0.0 0.0 0.0±0.0 22.94±1.70 0.565±0.049 1.2±0.1 MMD-CBS† 0.0 0.0±0.0 — 0.996±0.009 81.6±17.1 0.0 0.0±0.0 — 0.996±0.009 81.6±17.1 0.0 0.0±0.0 — 0.996±0.009 81.6±17.1 MDOC† 0.0 — — 0.000±0.000 171.7±13.7 0.0 — — 0.000±0.000 172.6±14.8 0.0 — — 0.000±0.000 185.6±17.7 PCD-LB 0.0 0.0±0.0 29.66±2.84 0.271±0.038 8.1±0.9 0.0 0.0±0.0 33.68±2.86 0.276±0.037 11.0±1.2 0.0 0.0±0.0 38.10±2.86 0.289±0.037 4.1±0.5 PCD-SHD 80.0 7.1±7.0 2.21±0.82 0.485±0.034 5.2±1.0 85.0 11.2±9.5 1.83±0.78 0.494±0.035 3.3±0.5 85.0 9.9±8.8 1.69±0.73 0.502±0.036 3.0±0.2 Final Proj. 95.0 67.3±36.5 1.60±2.70 0.966±0.015 13.6±0.6 100.0 85.0±28.5 0.45±0.95 0.971±0.012 10.2±3.0 100.0 95.4±11.3 0.08±0.24 0.975±0.011 5.8±0.8 DiRecT 100.0 99.1±4.1 0.00±0.00 0.901±0.025 38.0±0.6 100.0 99.1±3.7 0.00±0.00 0.907±0.024 38.2±0.6 100.0 99.2±3.4 0.00±0.00 0.911±0.023 38.2±0.6 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.977±0.047 27.5±51.1 100.0 100.0±0.0 0.00±0.00 0.984±0.034 15.0±25.0 100.0 100.0±0.0 0.00±0.00 0.876±0.161 1.6±1.9 21 Diff. Policy† 0.0 0.0±0.0 60.02±7.50 0.999±0.001 0.7 0.0 0.0±0.0 60.02±7.50 0.999±0.001 0.3 0.0 0.0±0.0 60.02±7.50 0.999±0.001 0.7 CD† 0.0 0.0±0.0 35.83±3.71 0.587±0.041 1.3±0.1 0.0 0.0±0.0 35.83±3.71 0.587±0.041 1.2±0.0 0.0 0.0±0.0 35.83±3.71 0.587±0.041 1.3±0.1 MMD-CBS† 0.0 0.0±0.0 — 1.000±0.000 82.4±9.9 0.0 0.0±0.0 — 1.000±0.000 82.4±9.9 0.0 0.0±0.0 — 1.000±0.000 82.4±9.9 MDOC† 0.0 — — 0.000±0.000 193.5±25.2 0.0 — — 0.000±0.000 192.8±25.2 0.0 — — 0.000±0.000 217.6±36.3 PCD-LB 0.0 0.0±0.0 45.06±2.97 0.255±0.026 9.9±1.5 0.0 0.0±0.0 51.43±2.86 0.260±0.022 13.2±1.8 0.0 0.0±0.0 57.66±3.16 0.273±0.020 9.3±0.8 PCD-SHD 10.0 0.2±0.7 5.13±1.31 0.467±0.028 6.8±1.5 15.0 0.2±0.6 4.10±1.05 0.480±0.024 4.3±0.6 10.0 0.4±1.2 3.64±0.92 0.491±0.023 3.6±0.2 Final Proj. 65.0 19.2±27.0 7.83±6.74 0.940±0.020 10.8±2.2 90.0 45.0±35.2 3.88±4.47 0.948±0.018 14.5±4.3 100.0 62.4±34.9 1.70±2.11 0.954±0.016 7.9±0.8 DiRecT 100.0 99.8±0.7 0.00±0.00 0.857±0.033 99.1±31.9 100.0 99.9±0.3 0.00±0.00 0.867±0.031 91.9±33.8 100.0 99.9±0.3 0.00±0.00 0.873±0.028 85.6±34.6 GlobMP (Ours) 75.0 75.0±43.3 17.15±30.27 0.972±0.055 72.7±81.0 95.0 95.0±21.8 4.50±19.62 0.972±0.050 31.2±46.6 100.0 100.0±0.0 0.00±0.00 0.839±0.185 3.1±3.8 48
Table 5: Multi-robot planning performance on Basic for Na ∈ {3,6,...,21} under the Low, Medium and High velocity caps. SR and CS measure trajectory feasibility, Coll reports inter-robot collisions, DA adherence to the environment-specific motion pattern, and Time the planning time per configuration: for GlobMP (Ours) the median over the configurations with the standard deviation as subscript, for the baselines the mean, so the two are not directly comparable. † marks a method that applies no velocity limit, so its three blocks report the same run; MMD-CBS also returns one plan per configuration rather than 64 candidates. A dash under Coll marks a count that is not commensurable with the others, as MDOC and MMD-CBS count colliding time steps where every other row counts agent pairs with any collision; MDOC’s CS is omitted because its plans that do not cover every agent were counted as feasible. MMD-CBS plans under 60 s per configuration and GlobMP (Ours) under 300 s per team. Low (vmax = 0.477) Medium (vmax = 0.567) High (vmax = 0.675) Na Method SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ 3 Diff. Policy† 30.0 13.0±29.6 0.35±0.64 0.998±0.001 0.3 30.0 13.0±29.6 0.35±0.64 0.998±0.001 0.3 30.0 13.0±29.6 0.35±0.64 0.998±0.001 0.3 CD† 80.0 0.0±0.0 0.05±0.08 0.611±0.138 1.1±0.0 80.0 0.0±0.0 0.05±0.08 0.611±0.138 0.4±0.0 80.0 0.4±1.0 0.05±0.08 0.611±0.138 1.1±0.1 MMD-CBS† 70.0 35.0±47.7 — 0.895±0.113 2.5±1.7 70.0 50.0±50.0 — 0.895±0.113 2.5±1.7 70.0 55.0±49.7 — 0.895±0.113 2.5±1.7 MDOC† 10.0 — — 0.090±0.269 33.4±4.5 10.0 — — 0.090±0.269 33.6±4.4 10.0 — — 0.090±0.269 33.5±4.6 PCD-LB 40.0 5.2±10.1 0.01±0.03 0.361±0.114 5.2±1.6 35.0 2.2±3.6 0.01±0.03 0.349±0.112 4.4±0.6 20.0 2.1±6.1 0.01±0.03 0.336±0.106 3.6±0.4 PCD-SHD 70.0 61.2±43.9 0.06±0.14 0.847±0.120 3.1±0.2 70.0 61.1±43.9 0.06±0.14 0.848±0.118 1.5±0.1 70.0 60.7±43.8 0.05±0.12 0.849±0.118 3.0±0.1 Final Proj. 100.0 95.1±21.5 0.00±0.00 0.964±0.050 4.0±0.7 100.0 95.1±21.5 0.00±0.00 0.969±0.043 4.0±0.8 100.0 95.1±21.5 0.00±0.00 0.973±0.037 2.2±0.8 DiRecT 100.0 99.8±1.0 0.00±0.00 0.925±0.098 26.3±6.4 100.0 95.6±19.1 0.00±0.00 0.930±0.093 26.8±6.5 100.0 95.5±19.4 0.00±0.00 0.931±0.092 27.7±7.3 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.878±0.169 2.1±2.0 100.0 100.0±0.0 0.00±0.00 0.851±0.184 0.2±2.0 100.0 100.0±0.0 0.00±0.00 0.987±0.026 0.0±0.1 6 Diff. Policy† 0.0 0.0±0.0 3.63±1.90 0.998±0.001 0.3 0.0 0.0±0.0 3.63±1.90 0.998±0.001 0.4 0.0 0.0±0.0 3.63±1.90 0.998±0.001 0.5 CD† 45.0 0.0±0.0 1.14±0.58 0.633±0.079 1.1±0.1 45.0 0.0±0.0 1.14±0.58 0.633±0.079 1.2±0.0 45.0 0.0±0.0 1.14±0.58 0.633±0.079 1.1±0.1 MMD-CBS† 45.0 0.0±0.0 — 0.797±0.102 9.3±9.6 45.0 5.0±21.8 — 0.797±0.102 9.3±9.6 45.0 10.0±30.0 — 0.797±0.102 9.3±9.6 MDOC† 0.0 — — 0.000±0.000 90.6±21.6 0.0 — — 0.000±0.000 69.7±5.3 0.0 — — 0.000±0.000 77.3±14.4 PCD-LB 0.0 0.0±0.0 0.69±0.50 0.360±0.064 6.4±0.9 0.0 0.0±0.0 0.72±0.44 0.347±0.056 4.9±0.5 0.0 0.0±0.0 0.78±0.43 0.336±0.051 1.8±0.1 PCD-SHD 45.0 22.2±33.5 0.46±0.35 0.773±0.084 3.3±0.2 50.0 21.4±33.1 0.45±0.33 0.777±0.082 3.2±0.1 60.0 20.8±31.9 0.44±0.31 0.780±0.079 3.1±0.1 Final Proj. 90.0 85.6±32.3 0.09±0.33 0.959±0.031 4.3±0.8 90.0 88.6±29.9 0.02±0.06 0.965±0.026 4.4±0.7 30.0 9.1±22.6 0.08±0.11 0.983±0.011 4.2±0.6 DiRecT 100.0 100.0±0.0 0.00±0.00 0.919±0.059 30.6±7.9 100.0 100.0±0.0 0.00±0.00 0.921±0.058 29.4±7.8 100.0 100.0±0.0 0.00±0.00 0.922±0.057 30.9±8.8 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.932±0.141 4.2±18.1 100.0 100.0±0.0 0.00±0.00 0.934±0.137 4.2±5.0 100.0 100.0±0.0 0.00±0.00 0.980±0.041 0.2±0.1 9 Diff. Policy† 0.0 0.0±0.0 6.58±2.27 0.999±0.001 0.3 0.0 0.0±0.0 6.58±2.27 0.999±0.001 0.3 0.0 0.0±0.0 6.58±2.27 0.999±0.001 0.3 CD† 0.0 0.0±0.0 2.86±1.16 0.630±0.065 0.5±0.1 0.0 0.0±0.0 2.86±1.16 0.630±0.065 1.2±0.0 0.0 0.0±0.0 2.86±1.16 0.630±0.065 1.1±0.1 MMD-CBS† 0.0 0.0±0.0 — 0.756±0.082 15.1±23.5 0.0 0.0±0.0 — 0.756±0.082 15.1±23.5 0.0 0.0±0.0 — 0.756±0.082 15.1±23.5 MDOC† 0.0 — — 0.000±0.000 92.2±17.8 0.0 — — 0.000±0.000 81.2±17.7 0.0 — — 0.000±0.000 74.6±5.1 PCD-LB 0.0 0.0±0.0 2.85±1.07 0.365±0.072 7.4±0.5 0.0 0.0±0.0 3.06±1.03 0.365±0.065 5.6±0.4 0.0 0.0±0.0 3.27±0.98 0.361±0.061 4.4±0.3 PCD-SHD 5.0 0.3±1.4 0.81±0.55 0.735±0.061 3.6±0.1 5.0 0.5±2.0 0.81±0.53 0.738±0.060 3.2±0.6 5.0 0.4±1.7 0.84±0.50 0.740±0.058 2.8±0.8 Final Proj. 85.0 76.3±38.4 0.11±0.24 0.949±0.027 5.7±0.7 85.0 78.4±38.7 0.06±0.21 0.957±0.023 3.1±0.7 85.0 79.0±38.6 0.05±0.20 0.962±0.020 5.8±0.7 DiRecT 100.0 99.0±4.4 0.01±0.04 0.903±0.050 46.6±13.9 95.0 93.9±22.0 0.01±0.04 0.902±0.051 47.1±14.1 95.0 94.0±21.9 0.01±0.04 0.907±0.046 42.6±12.5 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.969±0.100 4.4±8.8 100.0 100.0±0.0 0.00±0.00 0.969±0.099 4.3±1.2 100.0 100.0±0.0 0.00±0.00 0.972±0.055 0.3±0.1 12 Diff. Policy† 0.0 0.0±0.0 13.12±3.83 0.999±0.001 0.3 0.0 0.0±0.0 13.12±3.83 0.999±0.001 0.3 0.0 0.0±0.0 13.12±3.83 0.999±0.001 0.3 CD† 0.0 0.0±0.0 7.58±1.54 0.638±0.033 1.2±0.1 0.0 0.0±0.0 7.58±1.54 0.638±0.033 0.5±0.1 0.0 0.0±0.0 7.58±1.54 0.638±0.033 1.2±0.0 MMD-CBS† 0.0 0.0±0.0 — 0.797±0.027 9.5±18.8 0.0 0.0±0.0 — 0.797±0.027 9.5±18.8 0.0 0.0±0.0 — 0.797±0.027 9.5±18.8 MDOC† 0.0 — — 0.000±0.000 104.7±8.5 0.0 — — 0.000±0.000 113.0±6.5 0.0 — — 0.000±0.000 109.8±6.6 PCD-LB 0.0 0.0±0.0 7.89±1.38 0.340±0.044 8.6±0.8 0.0 0.0±0.0 8.44±1.23 0.336±0.044 3.1±0.3 0.0 0.0±0.0 8.87±1.18 0.334±0.043 4.9±0.4 PCD-SHD 0.0 0.0±0.0 1.98±0.70 0.713±0.052 3.9±0.2 0.0 0.0±0.0 1.93±0.69 0.718±0.051 3.7±0.1 0.0 0.0±0.0 1.97±0.65 0.721±0.049 3.8±0.1 Final Proj. 60.0 38.0±42.5 0.72±1.00 0.960±0.021 6.6±0.7 60.0 40.6±42.5 0.36±0.53 0.966±0.018 4.6±1.5 60.0 43.6±43.7 0.28±0.38 0.971±0.015 6.5±0.7 DiRecT 100.0 99.2±2.1 0.00±0.01 0.905±0.047 41.5±0.9 95.0 82.7±35.4 0.00±0.01 0.906±0.046 41.4±0.9 85.0 79.8±39.7 0.04±0.15 0.915±0.042 42.4±1.4 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.983±0.084 5.2±13.2 100.0 100.0±0.0 0.00±0.00 0.984±0.078 4.7±1.0 100.0 100.0±0.0 0.00±0.00 0.968±0.065 0.4±0.2 15 Diff. Policy† 0.0 0.0±0.0 22.25±4.65 0.999±0.001 0.3 0.0 0.0±0.0 22.25±4.65 0.999±0.001 0.3 0.0 0.0±0.0 22.25±4.65 0.999±0.001 0.4 CD† 0.0 0.0±0.0 13.94±2.28 0.625±0.038 1.2±0.1 0.0 0.0±0.0 13.94±2.28 0.625±0.038 1.2±0.1 0.0 0.0±0.0 13.94±2.28 0.625±0.038 1.2±0.0 MMD-CBS† 0.0 0.0±0.0 — — 6.6±3.5 0.0 0.0±0.0 — — 6.6±3.5 0.0 0.0±0.0 — — 6.6±3.5 MDOC† 0.0 — — 0.000±0.000 150.5±11.2 0.0 — — 0.000±0.000 165.2±13.5 0.0 — — 0.000±0.000 160.4±31.5 PCD-LB 0.0 0.0±0.0 14.53±2.15 0.324±0.037 9.2±1.2 0.0 0.0±0.0 15.91±2.00 0.320±0.032 6.8±0.6 0.0 0.0±0.0 17.16±1.99 0.321±0.026 5.3±0.4 PCD-SHD 0.0 0.0±0.0 3.93±1.17 0.674±0.039 4.3±0.2 0.0 0.0±0.0 3.89±1.14 0.679±0.038 4.1±0.1 0.0 0.0±0.0 3.84±1.12 0.682±0.037 4.2±0.2 Final Proj. 75.0 44.5±40.5 1.35±1.67 0.946±0.027 5.2±0.5 85.0 54.4±41.8 0.79±1.19 0.954±0.023 9.6±0.6 90.0 60.1±41.6 0.50±0.81 0.960±0.020 6.0±2.1 DiRecT 100.0 97.7±4.9 0.03±0.05 0.887±0.041 64.3±2.3 100.0 92.0±20.0 0.02±0.05 0.890±0.039 71.4±11.9 95.0 91.3±22.3 0.05±0.12 0.895±0.038 72.6±13.9 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 1.000±0.001 5.7±29.2 100.0 100.0±0.0 0.00±0.00 1.000±0.000 5.3±11.8 100.0 100.0±0.0 0.00±0.00 0.959±0.082 0.9±0.3 18 Diff. Policy† 0.0 0.0±0.0 28.87±4.75 0.999±0.001 0.4 0.0 0.0±0.0 28.87±4.75 0.999±0.001 0.5 0.0 0.0±0.0 28.87±4.75 0.999±0.001 0.4 CD† 0.0 0.0±0.0 21.88±2.51 0.642±0.035 0.6±0.2 0.0 0.0±0.0 21.88±2.51 0.642±0.035 1.3±0.1 0.0 0.0±0.0 21.88±2.51 0.642±0.035 1.3±0.0 MMD-CBS† 0.0 0.0±0.0 — 0.829±0.000 9.2±15.5 0.0 0.0±0.0 — 0.829±0.000 9.2±15.5 0.0 0.0±0.0 — 0.829±0.000 9.2±15.5 MDOC† 0.0 — — 0.000±0.000 149.1±10.6 0.0 — — 0.000±0.000 143.3±7.8 0.0 — — 0.000±0.000 142.9±7.8 PCD-LB 0.0 0.0±0.0 22.51±2.98 0.333±0.034 9.3±0.9 0.0 0.0±0.0 24.71±2.90 0.337±0.031 3.6±0.3 0.0 0.0±0.0 27.06±2.84 0.342±0.032 5.5±0.4 PCD-SHD 0.0 0.0±0.0 6.51±1.58 0.683±0.043 3.9±0.9 0.0 0.0±0.0 6.28±1.53 0.688±0.043 4.2±0.1 0.0 0.0±0.0 6.19±1.47 0.691±0.043 4.2±0.1 Final Proj. 65.0 19.4±30.9 2.66±2.15 0.941±0.029 12.1±0.7 65.0 22.1±32.5 1.84±1.67 0.949±0.025 12.0±0.6 65.0 24.5±32.3 1.48±1.35 0.956±0.021 7.3±2.0 DiRecT 100.0 92.6±11.6 0.06±0.11 0.881±0.045 93.6±18.4 90.0 78.4±36.7 0.21±0.39 0.888±0.044 92.6±16.9 90.0 77.4±37.0 0.31±0.60 0.893±0.042 84.1±7.1 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 1.000±0.000 6.4±22.9 100.0 100.0±0.0 0.00±0.00 1.000±0.000 5.3±4.2 100.0 100.0±0.0 0.00±0.00 0.953±0.079 1.0±0.5 21 Diff. Policy† 0.0 0.0±0.0 42.00±5.66 0.999±0.001 0.4 0.0 0.0±0.0 42.00±5.66 0.999±0.001 0.4 0.0 0.0±0.0 42.00±5.66 0.999±0.001 0.8 CD† 0.0 0.0±0.0 31.60±2.41 0.636±0.033 1.3±0.0 0.0 0.0±0.0 31.60±2.41 0.636±0.033 1.3±0.0 0.0 0.0±0.0 31.60±2.41 0.636±0.033 1.3±0.1 MMD-CBS† 0.0 0.0±0.0 — — 4.4±2.8 0.0 0.0±0.0 — — 4.4±2.8 0.0 0.0±0.0 — — 4.4±2.8 MDOC† 0.0 — — 0.000±0.000 165.5±10.3 0.0 — — 0.000±0.000 162.1±8.8 0.0 — — 0.000±0.000 162.7±8.7 PCD-LB 0.0 0.0±0.0 32.93±3.29 0.337±0.031 11.2±1.0 0.0 0.0±0.0 36.75±3.00 0.335±0.026 8.2±0.6 0.0 0.0±0.0 40.37±3.01 0.338±0.025 6.4±0.3 PCD-SHD 0.0 0.0±0.0 8.70±1.44 0.662±0.030 5.0±0.3 0.0 0.0±0.0 8.63±1.36 0.668±0.028 4.6±0.1 0.0 0.0±0.0 8.37±1.38 0.672±0.026 4.6±0.1 Final Proj. 25.0 7.7±20.9 4.65±4.26 0.946±0.026 15.1±0.6 40.0 8.7±21.3 3.21±2.92 0.954±0.023 11.8±3.7 35.0 9.5±21.0 2.42±2.03 0.960±0.020 15.1±0.7 DiRecT 100.0 93.9±8.7 0.06±0.10 0.875±0.039 109.4±9.7 95.0 60.2±38.2 0.11±0.13 0.880±0.038 101.1±21.0 85.0 54.4±43.5 0.64±0.70 0.894±0.040 78.0±0.8 GlobMP (Ours) 95.0 95.0±21.8 2.35±10.24 1.000±0.003 9.7±47.9 100.0 100.0±0.0 0.00±0.00 1.000±0.002 6.3±3.8 100.0 100.0±0.0 0.00±0.00 0.945±0.098 1.5±2.5 49
Table 6: Multi-robot planning performance on Dense for Na ∈ {3,6,...,21} under the Low, Medium and High velocity caps. SR and CS measure trajectory feasibility, Coll reports inter-robot collisions, DA adherence to the environment-specific motion pattern, and Time the planning time per configuration: for GlobMP (Ours) the median over the configurations with the standard deviation as subscript, for the baselines the mean, so the two are not directly comparable. † marks a method that applies no velocity limit, so its three blocks report the same run; MMD-CBS also returns one plan per configuration rather than 64 candidates. A dash under Coll marks a count that is not commensurable with the others, as MDOC and MMD-CBS count colliding time steps where every other row counts agent pairs with any collision; MDOC’s CS is omitted because its plans that do not cover every agent were counted as feasible. MMD-CBS plans under 60 s per configuration and GlobMP (Ours) under 300 s per team. Low (vmax = 0.565) Medium (vmax = 0.617) High (vmax = 0.675) Na Method SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ 3 Diff. Policy† 0.0 0.0±0.0 0.56±0.63 0.999±0.001 0.4 0.0 0.0±0.0 0.56±0.63 0.999±0.001 0.4 0.0 0.0±0.0 0.56±0.63 0.999±0.001 0.5 CD† 5.0 0.0±0.0 0.14±0.20 0.674±0.096 1.1±0.1 5.0 0.0±0.0 0.14±0.20 0.674±0.096 1.1±0.0 5.0 0.0±0.0 0.14±0.20 0.674±0.096 1.1±0.0 MMD-CBS† 0.0 0.0±0.0 — — 0.8±0.5 0.0 0.0±0.0 — — 0.8±0.5 0.0 0.0±0.0 — — 0.8±0.5 MDOC† 0.0 — — 0.000±0.000 34.0±5.3 0.0 — — 0.000±0.000 45.5±8.4 0.0 — — 0.000±0.000 50.9±17.6 PCD-LB 10.0 5.2±19.5 0.01±0.02 0.386±0.134 5.1±1.5 10.0 4.8±20.1 0.00±0.01 0.381±0.133 2.1±0.6 10.0 4.7±19.7 0.00±0.01 0.376±0.132 4.0±0.8 PCD-SHD 5.0 0.1±0.3 0.11±0.20 0.798±0.100 3.1±0.1 0.0 0.0±0.0 0.11±0.20 0.796±0.099 3.1±0.1 0.0 0.0±0.0 0.12±0.20 0.794±0.099 3.0±0.1 Final Proj. 45.0 19.2±35.9 0.11±0.27 0.983±0.021 5.1±0.7 45.0 19.2±35.9 0.10±0.27 0.984±0.019 5.1±0.8 45.0 19.2±35.9 0.09±0.24 0.986±0.017 5.1±0.8 DiRecT 50.0 22.2±36.6 0.04±0.11 0.928±0.073 36.2±9.4 50.0 22.0±36.8 0.04±0.10 0.928±0.073 37.1±11.0 50.0 21.9±36.7 0.02±0.09 0.928±0.073 37.9±10.4 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.980±0.087 4.0±8.0 100.0 100.0±0.0 0.00±0.00 0.864±0.153 0.2±5.7 100.0 100.0±0.0 0.00±0.00 0.989±0.024 0.2±0.1 6 Diff. Policy† 0.0 0.0±0.0 1.42±0.99 0.999±0.001 0.4 0.0 0.0±0.0 1.42±0.99 0.999±0.001 0.4 0.0 0.0±0.0 1.42±0.99 0.999±0.001 0.4 CD† 0.0 0.0±0.0 0.80±0.48 0.700±0.074 1.1±0.1 0.0 0.0±0.0 0.80±0.48 0.700±0.074 0.5±0.1 0.0 0.0±0.0 0.80±0.48 0.700±0.074 1.1±0.1 MMD-CBS† 0.0 0.0±0.0 — — 1.1±0.8 0.0 0.0±0.0 — — 1.1±0.8 0.0 0.0±0.0 — — 1.1±0.8 MDOC† 0.0 — — 0.000±0.000 66.0±9.4 0.0 — — 0.000±0.000 76.7±6.1 0.0 — — 0.000±0.000 63.7±15.4 PCD-LB 0.0 0.0±0.0 0.53±0.39 0.378±0.084 5.3±1.1 0.0 0.0±0.0 0.57±0.41 0.373±0.082 4.6±0.8 0.0 0.0±0.0 0.60±0.41 0.372±0.086 4.0±0.6 PCD-SHD 0.0 0.0±0.0 1.04±0.65 0.788±0.062 3.3±0.1 0.0 0.0±0.0 1.07±0.64 0.786±0.061 3.2±0.1 0.0 0.0±0.0 1.06±0.63 0.785±0.061 3.2±0.1 Final Proj. 30.0 8.3±20.9 0.16±0.24 0.980±0.013 4.2±1.4 30.0 9.0±22.4 0.10±0.14 0.981±0.012 5.6±0.8 30.0 9.1±22.6 0.08±0.11 0.983±0.011 5.6±0.5 DiRecT 35.0 13.0±26.8 0.04±0.08 0.922±0.046 44.0±12.8 35.0 13.2±26.9 0.03±0.07 0.923±0.046 47.7±14.0 35.0 13.4±27.2 0.02±0.07 0.923±0.045 47.4±14.6 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 1.000±0.000 4.2±5.9 100.0 100.0±0.0 0.00±0.00 0.915±0.143 4.1±2.0 100.0 100.0±0.0 0.00±0.00 0.985±0.051 0.2±0.1 9 Diff. Policy† 0.0 0.0±0.0 4.18±1.43 0.999±0.001 0.4 0.0 0.0±0.0 4.18±1.43 0.999±0.001 0.4 0.0 0.0±0.0 4.18±1.43 0.999±0.001 0.4 CD† 0.0 0.0±0.0 3.39±0.77 0.712±0.056 1.2±0.1 0.0 0.0±0.0 3.39±0.77 0.712±0.056 1.2±0.0 0.0 0.0±0.0 3.39±0.77 0.712±0.056 1.2±0.1 MMD-CBS† 0.0 0.0±0.0 — — 1.0±0.5 0.0 0.0±0.0 — — 1.0±0.5 0.0 0.0±0.0 — — 1.0±0.5 MDOC† 0.0 — — 0.000±0.000 82.2±12.5 0.0 — — 0.000±0.000 73.9±5.1 0.0 — — 0.000±0.000 77.0±6.6 PCD-LB 0.0 0.0±0.0 2.95±1.17 0.403±0.093 5.2±1.7 0.0 0.0±0.0 3.12±1.15 0.400±0.089 5.5±1.0 0.0 0.0±0.0 3.30±1.13 0.399±0.084 4.8±0.7 PCD-SHD 0.0 0.0±0.0 2.08±0.66 0.799±0.047 3.6±0.1 0.0 0.0±0.0 2.12±0.62 0.798±0.046 1.7±0.1 0.0 0.0±0.0 2.17±0.62 0.796±0.045 3.5±0.1 Final Proj. 15.0 8.8±25.7 0.46±0.63 0.984±0.010 8.2±0.7 15.0 8.8±25.7 0.36±0.52 0.985±0.009 5.6±2.1 15.0 8.8±25.7 0.34±0.50 0.987±0.009 8.4±0.7 DiRecT 25.0 11.1±26.4 0.15±0.18 0.939±0.034 74.7±22.0 25.0 11.1±26.7 0.12±0.14 0.940±0.033 58.3±13.7 20.0 11.2±26.9 0.09±0.13 0.940±0.033 53.8±0.9 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 1.000±0.000 4.3±15.9 100.0 100.0±0.0 0.00±0.00 0.938±0.129 4.3±12.5 100.0 100.0±0.0 0.00±0.00 0.984±0.037 0.3±0.1 12 Diff. Policy† 0.0 0.0±0.0 7.86±2.57 0.999±0.001 0.4 0.0 0.0±0.0 7.86±2.57 0.999±0.001 0.4 0.0 0.0±0.0 7.86±2.57 0.999±0.001 0.4 CD† 0.0 0.0±0.0 6.72±1.77 0.745±0.049 0.6±0.0 0.0 0.0±0.0 6.72±1.77 0.745±0.049 1.2±0.0 0.0 0.0±0.0 6.72±1.77 0.745±0.049 1.2±0.1 MMD-CBS† 0.0 0.0±0.0 — — 0.9±0.4 0.0 0.0±0.0 — — 0.9±0.4 0.0 0.0±0.0 — — 0.9±0.4 MDOC† 0.0 — — 0.000±0.000 111.9±6.7 0.0 — — 0.000±0.000 108.8±6.3 0.0 — — 0.000±0.000 114.3±6.4 PCD-LB 0.0 0.0±0.0 6.12±2.04 0.405±0.071 7.2±1.0 0.0 0.0±0.0 6.57±2.01 0.404±0.073 5.9±0.7 0.0 0.0±0.0 7.05±2.03 0.405±0.074 5.1±0.6 PCD-SHD 0.0 0.0±0.0 4.12±1.60 0.815±0.039 3.8±0.1 0.0 0.0±0.0 4.12±1.62 0.814±0.037 3.7±0.1 0.0 0.0±0.0 4.26±1.62 0.814±0.037 3.7±0.1 Final Proj. 0.0 0.0±0.0 1.10±1.28 0.985±0.009 10.1±0.7 0.0 0.0±0.0 1.00±1.19 0.986±0.008 6.3±1.8 0.0 0.0±0.0 0.92±1.18 0.987±0.007 10.1±0.7 DiRecT 0.0 0.0±0.0 0.49±0.41 0.940±0.029 68.9±1.6 0.0 0.0±0.0 0.40±0.39 0.941±0.029 69.3±5.5 0.0 0.0±0.0 0.33±0.39 0.942±0.029 74.8±12.7 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 1.000±0.000 4.3±18.6 100.0 100.0±0.0 0.00±0.00 0.992±0.054 4.3±11.5 100.0 100.0±0.0 0.00±0.00 0.972±0.073 0.3±0.1 15 Diff. Policy† 0.0 0.0±0.0 12.70±3.56 0.999±0.001 0.4 0.0 0.0±0.0 12.70±3.56 0.999±0.001 0.4 0.0 0.0±0.0 12.70±3.56 0.999±0.001 0.4 CD† 0.0 0.0±0.0 13.31±3.25 0.712±0.044 1.2±0.1 0.0 0.0±0.0 13.31±3.25 0.712±0.044 1.2±0.0 0.0 0.0±0.0 13.31±3.25 0.712±0.044 1.2±0.1 MMD-CBS† 0.0 0.0±0.0 — — 0.9±0.4 0.0 0.0±0.0 — — 0.9±0.4 0.0 0.0±0.0 — — 0.9±0.4 MDOC† 0.0 — — 0.000±0.000 155.2±7.7 0.0 — — 0.000±0.000 171.4±25.9 0.0 — — 0.000±0.000 133.6±10.9 PCD-LB 0.0 0.0±0.0 13.05±2.30 0.368±0.041 8.1±1.1 0.0 0.0±0.0 14.03±2.31 0.367±0.039 6.4±1.2 0.0 0.0±0.0 15.16±2.36 0.366±0.039 5.6±0.7 PCD-SHD 0.0 0.0±0.0 7.59±2.13 0.799±0.032 4.1±0.1 0.0 0.0±0.0 7.65±2.17 0.798±0.032 4.0±0.1 0.0 0.0±0.0 7.81±2.24 0.797±0.033 4.0±0.1 Final Proj. 0.0 0.0±0.0 1.55±1.38 0.979±0.007 12.8±3.3 0.0 0.0±0.0 1.23±1.21 0.980±0.007 14.7±0.7 0.0 0.0±0.0 1.06±1.02 0.982±0.006 14.6±0.7 DiRecT 0.0 0.0±0.0 0.75±0.68 0.922±0.023 113.1±16.3 0.0 0.0±0.0 0.53±0.48 0.923±0.023 114.6±19.5 0.0 0.0±0.0 0.36±0.36 0.923±0.023 102.4±7.6 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 1.000±0.000 4.6±33.3 100.0 100.0±0.0 0.00±0.00 0.982±0.069 4.5±15.1 100.0 100.0±0.0 0.00±0.00 0.974±0.071 0.4±0.2 18 Diff. Policy† 0.0 0.0±0.0 16.75±4.10 0.999±0.000 0.4 0.0 0.0±0.0 16.75±4.10 0.999±0.000 0.4 0.0 0.0±0.0 16.75±4.10 0.999±0.000 0.3 CD† 0.0 0.0±0.0 19.75±3.14 0.702±0.038 1.3±0.0 0.0 0.0±0.0 19.75±3.14 0.702±0.038 0.6±0.0 0.0 0.0±0.0 19.75±3.14 0.702±0.038 1.3±0.1 MMD-CBS† 0.0 0.0±0.0 — — 0.8±0.4 0.0 0.0±0.0 — — 0.8±0.4 0.0 0.0±0.0 — — 0.8±0.4 MDOC† 0.0 — — 0.000±0.000 147.2±8.4 0.0 — — 0.000±0.000 143.6±7.6 0.0 — — 0.000±0.000 143.0±8.6 PCD-LB 0.0 0.0±0.0 20.86±4.27 0.353±0.037 8.0±1.0 0.0 0.0±0.0 22.51±4.22 0.356±0.035 6.7±0.7 0.0 0.0±0.0 24.22±4.20 0.359±0.034 5.7±0.5 PCD-SHD 0.0 0.0±0.0 10.38±2.46 0.792±0.031 4.3±0.2 0.0 0.0±0.0 10.52±2.40 0.790±0.031 2.0±0.1 0.0 0.0±0.0 10.74±2.40 0.789±0.030 4.1±0.1 Final Proj. 0.0 0.0±0.0 2.43±1.79 0.984±0.007 14.1±3.8 0.0 0.0±0.0 2.01±1.52 0.985±0.006 17.3±0.7 0.0 0.0±0.0 1.75±1.40 0.986±0.006 9.2±0.7 DiRecT 5.0 0.1±0.3 0.79±0.60 0.936±0.022 124.6±10.6 5.0 0.1±0.3 0.65±0.52 0.937±0.022 107.4±20.5 0.0 0.0±0.0 0.54±0.52 0.937±0.022 89.8±1.3 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 1.000±0.000 5.0±20.7 100.0 100.0±0.0 0.00±0.00 0.972±0.090 4.8±10.4 100.0 100.0±0.0 0.00±0.00 0.972±0.069 0.5±0.2 21 Diff. Policy† 0.0 0.0±0.0 24.25±6.19 0.999±0.000 0.4 0.0 0.0±0.0 24.25±6.19 0.999±0.000 0.3 0.0 0.0±0.0 24.25±6.19 0.999±0.000 0.4 CD† 0.0 0.0±0.0 29.53±5.13 0.706±0.022 1.3±0.1 0.0 0.0±0.0 29.53±5.13 0.706±0.022 1.3±0.1 0.0 0.0±0.0 29.53±5.13 0.706±0.022 1.3±0.1 MMD-CBS† 0.0 0.0±0.0 — — 0.9±0.3 0.0 0.0±0.0 — — 0.9±0.3 0.0 0.0±0.0 — — 0.9±0.3 MDOC† 0.0 — — 0.000±0.000 165.3±8.7 0.0 — — 0.000±0.000 164.1±8.1 0.0 — — 0.000±0.000 160.9±8.6 PCD-LB 0.0 0.0±0.0 30.67±3.84 0.356±0.029 9.6±1.4 0.0 0.0±0.0 33.64±3.88 0.357±0.028 7.9±1.1 0.0 0.0±0.0 36.36±3.94 0.359±0.027 3.5±0.8 PCD-SHD 0.0 0.0±0.0 14.48±2.36 0.796±0.024 4.9±0.4 0.0 0.0±0.0 14.69±2.44 0.795±0.024 4.7±0.1 0.0 0.0±0.0 14.90±2.43 0.794±0.023 4.6±0.1 Final Proj. 0.0 0.0±0.0 4.31±3.10 0.982±0.007 23.1±0.7 0.0 0.0±0.0 3.68±2.74 0.983±0.007 23.1±0.7 0.0 0.0±0.0 3.20±2.45 0.984±0.006 16.5±5.1 DiRecT 0.0 0.0±0.0 1.36±0.97 0.931±0.019 120.1±1.0 0.0 0.0±0.0 1.06±0.78 0.932±0.019 120.0±1.1 0.0 0.0±0.0 0.62±0.57 0.933±0.019 120.2±0.7 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 1.000±0.000 5.1±43.5 100.0 100.0±0.0 0.00±0.00 0.978±0.081 5.0±26.0 100.0 100.0±0.0 0.00±0.00 0.970±0.071 0.9±0.3 50
Table 7: Multi-robot planning performance on Conveyor for Na ∈ {3,6,...,21} under the Low, Medium and High velocity caps. SR and CS measure trajectory feasibility, Coll reports inter-robot collisions, DA adherence to the environment-specific motion pattern, and Time the planning time per configuration: for GlobMP (Ours) the median over the configurations with the standard deviation as subscript, for the baselines the mean, so the two are not directly comparable. † marks a method that applies no velocity limit, so its three blocks report the same run; MMD-CBS also returns one plan per configuration rather than 64 candidates. A dash under Coll marks a count that is not commensurable with the others, as MDOC and MMD-CBS count colliding time steps where every other row counts agent pairs with any collision; MDOC’s CS is omitted because its plans that do not cover every agent were counted as feasible. MMD-CBS plans under 60 s per configuration and GlobMP (Ours) under 300 s per team. DA on this map scores an end-to-end traversal of one conveyor lane, which the uniformly drawn start and goal pairs almost never require; it is therefore below 0.07 for every method and does not separate them. Low (vmax = 1.21) Medium (vmax = 1.46) High (vmax = 1.76) Na Method SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ 3 Diff. Policy† 5.0 4.9±21.5 0.37±0.53 0.016±0.070 0.6 5.0 4.9±21.5 0.37±0.53 0.016±0.070 0.6 5.0 4.9±21.5 0.37±0.53 0.016±0.070 0.6 CD† 45.0 17.4±35.0 0.02±0.04 0.001±0.003 0.6±0.1 45.0 18.3±36.2 0.02±0.04 0.001±0.003 1.2±0.1 45.0 19.2±37.3 0.02±0.04 0.001±0.003 1.1±0.1 MMD-CBS† 20.0 20.0±40.0 — 0.000±0.000 1.3±0.7 20.0 20.0±40.0 — 0.000±0.000 1.3±0.7 20.0 20.0±40.0 — 0.000±0.000 1.3±0.7 MDOC† 5.0 — — 0.000±0.000 40.1±7.0 5.0 — — 0.000±0.000 36.4±2.6 5.0 — — 0.000±0.000 36.3±2.8 PCD-LB 70.0 36.2±42.5 0.01±0.03 0.004±0.016 3.0±0.1 65.0 37.1±43.6 0.01±0.02 0.004±0.016 3.1±0.1 65.0 36.8±43.5 0.01±0.02 0.004±0.017 3.1±0.1 PCD-SHD 10.0 9.5±28.4 0.01±0.03 0.003±0.011 2.1±0.7 10.0 9.5±28.4 0.01±0.02 0.002±0.010 3.0±0.1 10.0 9.6±28.9 0.01±0.02 0.002±0.009 3.0±0.1 Final Proj. 10.0 10.0±30.0 0.00±0.01 0.000±0.000 3.6±0.5 10.0 10.0±30.0 0.00±0.00 0.000±0.000 3.7±0.7 10.0 10.0±30.0 0.00±0.00 0.000±0.000 3.7±0.6 DiRecT 10.0 9.9±29.8 0.00±0.00 0.000±0.000 24.3±5.8 10.0 10.0±30.0 0.00±0.00 0.000±0.000 24.5±5.7 10.0 10.0±30.0 0.00±0.00 0.000±0.000 26.4±6.7 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.017±0.128 0.4±0.2 100.0 100.0±0.0 0.00±0.00 0.033±0.180 0.5±0.4 100.0 100.0±0.0 0.00±0.00 0.067±0.249 0.7±0.6 6 Diff. Policy† 0.0 0.0±0.0 1.22±1.04 0.000±0.000 0.6 0.0 0.0±0.0 1.22±1.04 0.000±0.000 0.6 0.0 0.0±0.0 1.22±1.04 0.000±0.000 0.6 CD† 5.0 0.1±0.3 0.25±0.29 0.008±0.032 1.2±0.1 5.0 0.1±0.3 0.25±0.29 0.008±0.032 1.2±0.1 5.0 0.2±0.7 0.25±0.29 0.008±0.032 1.1±0.1 MMD-CBS† 0.0 0.0±0.0 — — 1.5±1.1 0.0 0.0±0.0 — — 1.5±1.1 0.0 0.0±0.0 — — 1.5±1.1 MDOC† 0.0 — — 0.000±0.000 62.5±3.3 0.0 — — 0.000±0.000 82.6±23.1 0.0 — — 0.000±0.000 85.2±20.8 PCD-LB 25.0 6.1±14.7 0.85±0.74 0.006±0.013 2.8±0.7 40.0 7.8±16.5 0.72±0.60 0.007±0.013 3.1±0.4 45.0 13.5±20.5 0.44±0.34 0.007±0.014 3.3±0.1 PCD-SHD 0.0 0.0±0.0 0.10±0.18 0.001±0.006 3.3±0.1 0.0 0.0±0.0 0.06±0.09 0.001±0.006 3.2±0.1 0.0 0.0±0.0 0.03±0.05 0.001±0.005 3.2±0.1 Final Proj. 0.0 0.0±0.0 0.05±0.14 0.000±0.000 1.9±0.9 0.0 0.0±0.0 0.03±0.10 0.000±0.000 3.4±0.7 0.0 0.0±0.0 0.01±0.03 0.000±0.000 3.4±0.6 DiRecT 0.0 0.0±0.0 0.00±0.01 0.001±0.005 23.4±6.1 0.0 0.0±0.0 0.01±0.02 0.001±0.002 24.0±6.6 0.0 0.0±0.0 0.01±0.02 0.000±0.001 25.0±7.0 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.008±0.091 0.8±0.8 100.0 100.0±0.0 0.00±0.00 0.008±0.091 1.2±2.2 100.0 100.0±0.0 0.00±0.00 0.017±0.128 1.8±10.5 9 Diff. Policy† 0.0 0.0±0.0 3.16±1.58 0.006±0.024 0.6 0.0 0.0±0.0 3.16±1.58 0.006±0.024 0.3 0.0 0.0±0.0 3.16±1.58 0.006±0.024 0.3 CD† 0.0 0.0±0.0 1.47±0.91 0.000±0.002 0.6±0.1 0.0 0.0±0.0 1.47±0.91 0.000±0.002 1.1±0.1 0.0 0.0±0.0 1.47±0.91 0.000±0.002 1.1±0.1 MMD-CBS† 0.0 0.0±0.0 — — 1.8±1.1 0.0 0.0±0.0 — — 1.8±1.1 0.0 0.0±0.0 — — 1.8±1.1 MDOC† 0.0 — — 0.000±0.000 113.3±17.4 0.0 — — 0.000±0.000 97.2±18.9 0.0 — — 0.000±0.000 74.7±4.0 PCD-LB 0.0 0.0±0.0 4.20±1.42 0.004±0.008 3.5±0.1 10.0 0.4±1.4 3.09±1.02 0.004±0.010 3.5±0.1 25.0 2.4±5.4 1.54±0.57 0.005±0.011 3.5±0.1 PCD-SHD 0.0 0.0±0.0 0.13±0.16 0.003±0.014 3.6±0.1 0.0 0.0±0.0 0.08±0.10 0.003±0.014 3.6±0.1 0.0 0.0±0.0 0.05±0.06 0.003±0.014 3.6±0.1 Final Proj. 0.0 0.0±0.0 0.05±0.10 0.005±0.024 4.3±0.7 0.0 0.0±0.0 0.02±0.04 0.005±0.024 4.3±0.7 0.0 0.0±0.0 0.02±0.04 0.005±0.024 4.3±0.6 DiRecT 0.0 0.0±0.0 0.04±0.06 0.007±0.025 34.5±9.7 0.0 0.0±0.0 0.01±0.02 0.006±0.024 35.6±10.5 0.0 0.0±0.0 0.02±0.03 0.006±0.024 25.9±1.3 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.028±0.164 2.0±8.3 100.0 100.0±0.0 0.00±0.00 0.028±0.164 2.6±2.7 95.0 95.0±21.8 0.10±0.44 0.028±0.164 5.5±64.2 12 Diff. Policy† 0.0 0.0±0.0 6.33±2.50 0.012±0.029 0.6 0.0 0.0±0.0 6.33±2.50 0.012±0.029 0.6 0.0 0.0±0.0 6.33±2.50 0.012±0.029 0.6 CD† 0.0 0.0±0.0 3.96±1.28 0.018±0.026 1.2±0.1 0.0 0.0±0.0 3.96±1.28 0.018±0.026 1.2±0.1 0.0 0.0±0.0 3.96±1.28 0.018±0.026 0.6±0.0 MMD-CBS† 0.0 0.0±0.0 — — 1.9±1.6 0.0 0.0±0.0 — — 1.9±1.6 0.0 0.0±0.0 — — 1.9±1.6 MDOC† 0.0 — — 0.000±0.000 107.9±7.1 0.0 — — 0.000±0.000 120.6±5.3 0.0 — — 0.000±0.000 127.3±7.3 PCD-LB 0.0 0.0±0.0 9.25±1.68 0.005±0.007 3.7±0.1 0.0 0.0±0.0 7.14±1.37 0.005±0.007 1.9±0.2 0.0 0.0±0.0 3.76±0.86 0.005±0.006 3.7±0.5 PCD-SHD 0.0 0.0±0.0 0.62±0.51 0.013±0.022 3.9±0.1 0.0 0.0±0.0 0.37±0.32 0.012±0.022 3.9±0.1 0.0 0.0±0.0 0.19±0.18 0.012±0.022 1.8±0.2 Final Proj. 0.0 0.0±0.0 0.20±0.29 0.010±0.025 5.4±0.7 0.0 0.0±0.0 0.05±0.08 0.010±0.025 5.4±0.7 0.0 0.0±0.0 0.06±0.11 0.010±0.025 5.4±0.7 DiRecT 0.0 0.0±0.0 0.06±0.08 0.012±0.026 33.6±1.4 0.0 0.0±0.0 0.07±0.09 0.013±0.028 34.0±1.9 0.0 0.0±0.0 0.09±0.16 0.014±0.029 34.2±1.9 GlobMP (Ours) 90.0 90.0±30.0 0.85±2.55 0.042±0.200 3.3±91.3 95.0 95.0±21.8 0.45±1.96 0.037±0.190 5.7±72.9 90.0 90.0±30.0 0.60±1.80 0.033±0.180 13.3±79.3 15 Diff. Policy† 0.0 0.0±0.0 9.77±2.61 0.003±0.013 0.3 0.0 0.0±0.0 9.77±2.61 0.003±0.013 0.3 0.0 0.0±0.0 9.77±2.61 0.003±0.013 0.3 CD† 0.0 0.0±0.0 7.35±1.96 0.003±0.009 1.2±0.1 0.0 0.0±0.0 7.35±1.96 0.003±0.009 1.2±0.1 0.0 0.0±0.0 7.35±1.96 0.003±0.009 1.2±0.1 MMD-CBS† 0.0 0.0±0.0 — — 1.9±1.4 0.0 0.0±0.0 — — 1.9±1.4 0.0 0.0±0.0 — — 1.9±1.4 MDOC† 0.0 — — 0.000±0.000 155.4±11.8 0.0 — — 0.000±0.000 172.5±14.6 0.0 — — 0.000±0.000 174.3±27.4 PCD-LB 0.0 0.0±0.0 20.74±3.01 0.005±0.006 4.1±0.1 0.0 0.0±0.0 17.02±2.64 0.004±0.006 4.1±0.2 0.0 0.0±0.0 11.84±1.88 0.005±0.006 4.1±0.1 PCD-SHD 0.0 0.0±0.0 0.75±0.40 0.003±0.010 4.3±0.1 0.0 0.0±0.0 0.48±0.28 0.003±0.010 4.3±0.1 0.0 0.0±0.0 0.29±0.19 0.003±0.010 4.3±0.1 Final Proj. 0.0 0.0±0.0 0.49±0.42 0.003±0.015 3.7±0.7 0.0 0.0±0.0 0.23±0.25 0.003±0.015 6.9±0.7 0.0 0.0±0.0 0.18±0.24 0.003±0.015 6.0±1.6 DiRecT 0.0 0.0±0.0 0.14±0.15 0.003±0.013 44.0±1.3 0.0 0.0±0.0 0.16±0.12 0.003±0.013 44.9±2.2 0.0 0.0±0.0 0.18±0.15 0.003±0.013 47.2±5.5 GlobMP (Ours) 90.0 90.0±30.0 1.00±3.15 0.027±0.161 5.5±68.3 85.0 85.0±35.7 1.45±3.58 0.023±0.151 11.2±74.1 90.0 90.0±30.0 0.90±2.70 0.023±0.151 22.8±91.2 18 Diff. Policy† 0.0 0.0±0.0 15.01±3.59 0.000±0.000 0.3 0.0 0.0±0.0 15.01±3.59 0.000±0.000 0.3 0.0 0.0±0.0 15.01±3.59 0.000±0.000 0.3 CD† 0.0 0.0±0.0 12.92±1.90 0.003±0.006 1.2±0.1 0.0 0.0±0.0 12.92±1.90 0.003±0.006 1.2±0.2 0.0 0.0±0.0 12.92±1.90 0.003±0.006 1.2±0.0 MMD-CBS† 0.0 0.0±0.0 — — 1.4±0.9 0.0 0.0±0.0 — — 1.4±0.9 0.0 0.0±0.0 — — 1.4±0.9 MDOC† 0.0 — — 0.000±0.000 162.1±8.6 0.0 — — 0.000±0.000 156.7±7.6 0.0 — — 0.000±0.000 157.5±7.0 PCD-LB 0.0 0.0±0.0 35.56±3.24 0.002±0.003 4.2±0.2 0.0 0.0±0.0 28.42±2.79 0.002±0.003 4.3±0.1 0.0 0.0±0.0 19.50±1.96 0.003±0.004 2.8±0.9 PCD-SHD 0.0 0.0±0.0 1.18±0.69 0.003±0.004 4.4±0.1 0.0 0.0±0.0 0.80±0.52 0.003±0.004 4.4±0.1 0.0 0.0±0.0 0.55±0.37 0.002±0.004 4.4±0.1 Final Proj. 0.0 0.0±0.0 0.84±0.83 0.000±0.000 8.7±0.7 0.0 0.0±0.0 0.33±0.33 0.000±0.000 7.3±2.1 0.0 0.0±0.0 0.23±0.23 0.000±0.000 8.7±0.7 DiRecT 0.0 0.0±0.0 0.20±0.15 0.003±0.009 65.8±10.7 0.0 0.0±0.0 0.22±0.18 0.003±0.008 64.5±10.8 0.0 0.0±0.0 0.26±0.22 0.003±0.008 64.4±9.0 GlobMP (Ours) 90.0 90.0±30.0 1.85±5.55 0.047±0.212 12.4±89.4 85.0 85.0±35.7 2.75±6.77 0.044±0.206 14.2±102.5 75.0 75.0±43.3 3.60±6.61 0.039±0.193 36.0±118.0 21 Diff. Policy† 0.0 0.0±0.0 20.41±2.03 0.002±0.010 0.3 0.0 0.0±0.0 20.41±2.03 0.002±0.010 0.3 0.0 0.0±0.0 20.41±2.03 0.002±0.010 0.3 CD† 0.0 0.0±0.0 20.28±2.30 0.011±0.016 1.3±0.1 0.0 0.0±0.0 20.28±2.30 0.011±0.016 1.2±0.0 0.0 0.0±0.0 20.28±2.30 0.011±0.016 1.3±0.0 MMD-CBS† 0.0 0.0±0.0 — — 1.7±1.4 0.0 0.0±0.0 — — 1.7±1.4 0.0 0.0±0.0 — — 1.7±1.4 MDOC† 0.0 — — 0.000±0.000 182.3±8.9 0.0 — — 0.000±0.000 181.9±9.0 0.0 — — 0.000±0.000 163.8±8.1 PCD-LB 0.0 0.0±0.0 53.35±2.98 0.002±0.003 4.7±0.1 0.0 0.0±0.0 40.89±3.07 0.002±0.003 4.8±0.1 0.0 0.0±0.0 26.92±2.55 0.002±0.003 4.9±0.1 PCD-SHD 0.0 0.0±0.0 1.60±0.65 0.006±0.011 5.0±0.1 0.0 0.0±0.0 1.09±0.49 0.006±0.011 3.0±1.0 0.0 0.0±0.0 0.68±0.32 0.006±0.011 5.0±0.1 Final Proj. 0.0 0.0±0.0 0.98±0.65 0.003±0.010 11.5±0.9 0.0 0.0±0.0 0.43±0.32 0.003±0.010 10.8±1.3 0.0 0.0±0.0 0.28±0.19 0.003±0.010 11.4±0.7 DiRecT 0.0 0.0±0.0 0.20±0.14 0.006±0.013 89.0±12.7 0.0 0.0±0.0 0.21±0.11 0.007±0.015 84.7±5.9 0.0 0.0±0.0 0.22±0.13 0.007±0.015 89.1±11.6 GlobMP (Ours) 80.0 80.0±40.0 5.00±10.27 0.038±0.191 16.4±112.4 70.0 70.0±45.8 6.30±9.77 0.026±0.160 41.4±119.1 65.0 65.0±47.7 5.95±9.13 0.026±0.160 108.4±116.6 51
Table 8: Multi-robot planning performance on Highways for Na ∈ {3,6,...,21} under the Low, Medium and High velocity caps. SR and CS measure trajectory feasibility, Coll reports inter-robot collisions, DA adherence to the environment-specific motion pattern, and Time the planning time per configuration: for GlobMP (Ours) the median over the configurations with the standard deviation as subscript, for the baselines the mean, so the two are not directly comparable. † marks a method that applies no velocity limit, so its three blocks report the same run; MMD-CBS also returns one plan per configuration rather than 64 candidates. A dash under Coll marks a count that is not commensurable with the others, as MDOC and MMD-CBS count colliding time steps where every other row counts agent pairs with any collision; MDOC’s CS is omitted because its plans that do not cover every agent were counted as feasible. MMD-CBS plans under 60 s per configuration and GlobMP (Ours) under 300 s per team. Low (vmax = 0.647) Medium (vmax = 0.783) High (vmax = 0.878) Na Method SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ 3 Diff. Policy† 10.0 10.0±30.0 0.15±0.35 0.567±0.298 0.3 10.0 10.0±30.0 0.15±0.35 0.567±0.298 0.3 10.0 10.0±30.0 0.15±0.35 0.567±0.298 0.3 CD† 100.0 0.0±0.0 0.25±0.32 0.564±0.289 1.1±0.1 100.0 0.0±0.0 0.25±0.32 0.564±0.289 1.2±0.1 100.0 0.0±0.0 0.25±0.32 0.564±0.289 1.2±0.1 MMD-CBS† 90.0 45.0±49.7 — 0.567±0.318 3.8±3.2 90.0 55.0±49.7 — 0.567±0.318 3.8±3.2 90.0 55.0±49.7 — 0.567±0.318 3.8±3.2 MDOC† 15.0 — — 0.083±0.233 41.3±5.6 15.0 — — 0.083±0.233 37.2±3.4 15.0 — — 0.083±0.233 36.8±3.3 PCD-LB 0.0 0.0±0.0 0.02±0.02 0.565±0.293 3.5±0.4 0.0 0.0±0.0 0.05±0.11 0.564±0.292 3.0±0.2 0.0 0.0±0.0 0.05±0.13 0.564±0.292 3.0±0.1 PCD-SHD 100.0 89.8±15.8 0.09±0.17 0.561±0.281 2.8±0.1 100.0 90.9±13.8 0.08±0.14 0.562±0.279 2.8±0.1 100.0 90.4±13.7 0.08±0.14 0.562±0.279 2.8±0.1 Final Proj. 95.0 85.9±33.0 0.18±0.47 0.567±0.298 3.8±0.6 100.0 86.1±32.4 0.18±0.46 0.567±0.298 3.9±0.7 100.0 84.6±32.6 0.20±0.46 0.567±0.298 3.9±0.6 DiRecT 100.0 100.0±0.0 0.00±0.00 0.568±0.294 26.4±6.4 100.0 100.0±0.0 0.00±0.00 0.568±0.294 27.6±7.1 100.0 100.0±0.0 0.00±0.00 0.568±0.294 29.3±7.7 GlobMP (Ours) 95.0 95.0±21.8 0.00±0.00 0.583±0.493 0.2±15.3 100.0 100.0±0.0 0.00±0.00 0.567±0.496 0.3±0.2 100.0 100.0±0.0 0.00±0.00 0.550±0.497 0.2±0.2 6 Diff. Policy† 0.0 0.0±0.0 1.39±0.78 0.582±0.187 0.3 0.0 0.0±0.0 1.39±0.78 0.582±0.187 0.3 0.0 0.0±0.0 1.39±0.78 0.582±0.187 0.3 CD† 30.0 0.0±0.0 2.61±0.80 0.555±0.192 1.2±0.1 30.0 0.0±0.0 2.61±0.80 0.555±0.192 1.2±0.1 30.0 0.0±0.0 2.61±0.80 0.555±0.192 0.5±0.0 MMD-CBS† 75.0 0.0±0.0 — 0.558±0.219 32.0±16.7 75.0 0.0±0.0 — 0.558±0.219 32.0±16.7 75.0 0.0±0.0 — 0.558±0.219 32.0±16.7 MDOC† 0.0 — — 0.000±0.000 63.5±3.2 0.0 — — 0.000±0.000 121.4±150.4 0.0 — — 0.000±0.000 72.0±6.6 PCD-LB 0.0 0.0±0.0 0.26±0.26 0.539±0.205 3.6±0.5 0.0 0.0±0.0 0.19±0.16 0.540±0.204 1.6±0.1 0.0 0.0±0.0 0.15±0.15 0.540±0.203 3.1±0.1 PCD-SHD 100.0 52.6±20.0 0.59±0.34 0.561±0.180 3.0±0.1 100.0 52.8±21.6 0.59±0.35 0.562±0.182 2.6±0.7 100.0 53.3±21.7 0.57±0.36 0.563±0.183 2.9±0.5 Final Proj. 100.0 69.9±39.6 0.53±0.90 0.582±0.187 2.5±1.2 100.0 75.9±33.4 0.33±0.56 0.582±0.187 4.1±0.6 100.0 79.1±31.5 0.29±0.51 0.582±0.187 4.1±0.7 DiRecT 100.0 100.0±0.0 0.00±0.00 0.570±0.187 32.0±8.6 100.0 100.0±0.0 0.00±0.00 0.570±0.187 32.8±9.3 100.0 100.0±0.0 0.00±0.00 0.570±0.187 34.9±9.7 GlobMP (Ours) 80.0 80.0±40.0 0.10±0.44 0.575±0.494 0.7±68.6 100.0 100.0±0.0 0.00±0.00 0.567±0.496 0.6±10.0 100.0 100.0±0.0 0.00±0.00 0.567±0.496 0.7±0.7 9 Diff. Policy† 0.0 0.0±0.0 4.58±1.91 0.450±0.172 0.3 0.0 0.0±0.0 4.58±1.91 0.450±0.172 0.3 0.0 0.0±0.0 4.58±1.91 0.450±0.172 0.3 CD† 0.0 0.0±0.0 7.04±1.79 0.463±0.170 1.2±0.1 0.0 0.0±0.0 7.04±1.79 0.463±0.170 1.2±0.1 0.0 0.0±0.0 7.04±1.79 0.463±0.170 1.2±0.1 MMD-CBS† 5.0 0.0±0.0 — 0.478±0.186 59.0±9.8 5.0 0.0±0.0 — 0.478±0.186 59.0±9.8 5.0 0.0±0.0 — 0.478±0.186 59.0±9.8 MDOC† 0.0 — — 0.000±0.000 121.0±15.7 0.0 — — 0.000±0.000 91.0±13.2 0.0 — — 0.000±0.000 82.7±3.8 PCD-LB 0.0 0.0±0.0 1.29±0.58 0.469±0.162 4.4±0.4 0.0 0.0±0.0 1.26±0.55 0.469±0.161 3.4±0.5 0.0 0.0±0.0 1.28±0.56 0.469±0.160 3.5±0.1 PCD-SHD 80.0 9.9±14.2 2.60±0.95 0.460±0.166 3.3±0.1 90.0 10.8±15.0 2.38±0.89 0.461±0.166 3.4±0.1 90.0 10.9±13.2 2.33±0.93 0.462±0.166 3.4±0.1 Final Proj. 70.0 41.5±40.8 1.60±1.72 0.452±0.174 5.5±0.9 80.0 44.0±39.7 1.23±1.35 0.452±0.174 5.6±0.7 80.0 41.5±37.4 1.12±1.13 0.451±0.174 5.6±0.7 DiRecT 100.0 100.0±0.0 0.00±0.00 0.454±0.176 49.0±13.7 100.0 100.0±0.0 0.00±0.00 0.454±0.175 36.4±7.2 100.0 100.0±0.0 0.00±0.00 0.454±0.176 35.2±1.3 GlobMP (Ours) 65.0 65.0±47.7 1.00±1.76 0.450±0.497 2.5±127.9 100.0 100.0±0.0 0.00±0.00 0.467±0.499 1.1±5.4 100.0 100.0±0.0 0.00±0.00 0.483±0.500 1.2±13.1 12 Diff. Policy† 0.0 0.0±0.0 8.75±3.11 0.464±0.154 0.3 0.0 0.0±0.0 8.75±3.11 0.464±0.154 0.3 0.0 0.0±0.0 8.75±3.11 0.464±0.154 0.3 CD† 0.0 0.0±0.0 15.44±3.23 0.466±0.145 1.2±0.1 0.0 0.0±0.0 15.44±3.23 0.466±0.145 1.2±0.1 0.0 0.0±0.0 15.44±3.23 0.466±0.145 0.6±0.1 MMD-CBS† 0.0 0.0±0.0 — 0.450±0.150 61.2±0.9 0.0 0.0±0.0 — 0.450±0.150 61.2±0.9 0.0 0.0±0.0 — 0.450±0.150 61.2±0.9 MDOC† 0.0 — — 0.000±0.000 100.8±7.3 0.0 — — 0.000±0.000 124.5±6.1 0.0 — — 0.000±0.000 122.5±5.6 PCD-LB 0.0 0.0±0.0 5.02±0.76 0.456±0.140 4.4±0.4 0.0 0.0±0.0 6.04±0.83 0.457±0.140 3.7±0.2 0.0 0.0±0.0 6.68±0.77 0.459±0.140 3.7±0.1 PCD-SHD 20.0 0.6±1.3 5.75±1.94 0.468±0.142 3.6±0.1 20.0 0.5±1.1 5.46±1.97 0.469±0.142 3.6±0.1 20.0 0.9±2.0 5.23±1.77 0.469±0.142 3.7±0.1 Final Proj. 50.0 29.1±39.5 3.49±3.31 0.463±0.154 6.3±1.4 55.0 29.2±40.0 2.76±2.80 0.463±0.154 6.8±0.7 65.0 30.2±39.5 2.23±2.24 0.463±0.154 6.8±0.7 DiRecT 100.0 100.0±0.0 0.00±0.00 0.467±0.148 44.1±2.2 100.0 99.9±0.3 0.00±0.01 0.466±0.148 43.4±1.8 100.0 99.9±0.3 0.00±0.00 0.466±0.149 43.7±1.7 GlobMP (Ours) 60.0 60.0±49.0 3.45±4.99 0.467±0.499 25.2±102.3 100.0 100.0±0.0 0.00±0.00 0.492±0.500 2.1±24.5 100.0 100.0±0.0 0.00±0.00 0.458±0.498 2.2±12.3 15 Diff. Policy† 0.0 0.0±0.0 14.06±4.00 0.484±0.109 0.3 0.0 0.0±0.0 14.06±4.00 0.484±0.109 0.3 0.0 0.0±0.0 14.06±4.00 0.484±0.109 0.4 CD† 0.0 0.0±0.0 26.51±3.99 0.481±0.107 1.2±0.0 0.0 0.0±0.0 26.51±3.99 0.481±0.107 1.3±0.0 0.0 0.0±0.0 26.51±3.99 0.481±0.107 1.2±0.1 MMD-CBS† 0.0 0.0±0.0 — 0.483±0.111 63.0±2.1 0.0 0.0±0.0 — 0.483±0.111 63.0±2.1 0.0 0.0±0.0 — 0.483±0.111 63.0±2.1 MDOC† 0.0 — — 0.000±0.000 141.9±12.5 0.0 — — 0.000±0.000 168.6±16.0 0.0 — — 0.000±0.000 177.0±31.2 PCD-LB 0.0 0.0±0.0 11.99±1.72 0.485±0.110 5.1±0.6 0.0 0.0±0.0 14.72±1.73 0.485±0.109 4.2±0.3 0.0 0.0±0.0 16.38±1.74 0.486±0.109 2.8±1.0 PCD-SHD 0.0 0.0±0.0 10.01±2.01 0.480±0.106 3.3±0.9 0.0 0.0±0.0 9.49±1.89 0.481±0.106 4.0±0.1 0.0 0.0±0.0 9.22±1.82 0.481±0.105 4.1±0.1 Final Proj. 30.0 11.0±26.4 5.93±4.23 0.485±0.109 6.7±2.3 35.0 11.1±23.1 4.71±3.34 0.485±0.109 9.1±0.8 35.0 10.9±23.2 4.14±2.88 0.485±0.109 9.1±0.7 DiRecT 100.0 100.0±0.0 0.00±0.00 0.482±0.109 60.0±2.7 100.0 99.9±0.3 0.00±0.01 0.482±0.109 69.0±10.6 100.0 99.7±1.4 0.01±0.03 0.482±0.109 70.2±10.7 GlobMP (Ours) 30.0 30.0±45.8 9.00±7.40 0.487±0.500 300.1±136.1 100.0 100.0±0.0 0.00±0.00 0.467±0.499 2.1±74.3 100.0 100.0±0.0 0.00±0.00 0.467±0.499 2.6±61.0 18 Diff. Policy† 0.0 0.0±0.0 19.84±5.64 0.504±0.119 0.3 0.0 0.0±0.0 19.84±5.64 0.504±0.119 0.3 0.0 0.0±0.0 19.84±5.64 0.504±0.119 0.3 CD† 0.0 0.0±0.0 39.00±3.90 0.508±0.116 1.3±0.1 0.0 0.0±0.0 39.00±3.90 0.508±0.116 1.3±0.1 0.0 0.0±0.0 39.00±3.90 0.508±0.116 1.3±0.1 MMD-CBS† 0.0 0.0±0.0 — 0.503±0.121 64.8±2.5 0.0 0.0±0.0 — 0.503±0.121 64.8±2.5 0.0 0.0±0.0 — 0.503±0.121 64.8±2.5 MDOC† 0.0 — — 0.000±0.000 163.3±8.1 0.0 — — 0.000±0.000 159.7±7.1 0.0 — — 0.000±0.000 160.6±7.0 PCD-LB 0.0 0.0±0.0 20.39±2.78 0.511±0.110 5.0±0.5 0.0 0.0±0.0 25.36±2.89 0.511±0.109 4.2±0.2 0.0 0.0±0.0 28.30±2.87 0.511±0.108 4.1±0.1 PCD-SHD 0.0 0.0±0.0 15.17±2.97 0.508±0.114 4.1±0.1 0.0 0.0±0.0 14.31±2.75 0.509±0.114 4.1±0.1 0.0 0.0±0.0 14.20±2.61 0.509±0.113 4.2±0.1 Final Proj. 15.0 3.1±12.2 10.49±5.78 0.504±0.118 7.5±2.3 25.0 4.7±17.3 8.44±5.26 0.504±0.118 11.5±0.7 35.0 4.8±14.9 7.71±4.86 0.504±0.118 10.0±2.6 DiRecT 100.0 100.0±0.0 0.00±0.00 0.507±0.118 87.5±9.0 100.0 99.8±0.7 0.01±0.02 0.507±0.118 88.4±12.7 100.0 99.9±0.3 0.00±0.01 0.507±0.118 77.5±8.1 GlobMP (Ours) 0.0 0.0±0.0 19.10±5.20 0.503±0.500 300.1±0.3 90.0 90.0±30.0 2.85±8.79 0.525±0.499 9.2±101.2 90.0 90.0±30.0 3.55±10.66 0.519±0.500 4.3±101.1 21 Diff. Policy† 0.0 0.0±0.0 23.25±7.73 0.500±0.121 0.3 0.0 0.0±0.0 23.25±7.73 0.500±0.121 0.3 0.0 0.0±0.0 23.25±7.73 0.500±0.121 0.3 CD† 0.0 0.0±0.0 52.34±7.72 0.500±0.118 0.7±0.1 0.0 0.0±0.0 52.34±7.72 0.500±0.118 1.3±0.1 0.0 0.0±0.0 52.34±7.72 0.500±0.118 1.3±0.0 MMD-CBS† 0.0 0.0±0.0 — 0.502±0.122 66.3±4.0 0.0 0.0±0.0 — 0.502±0.122 66.3±4.0 0.0 0.0±0.0 — 0.502±0.122 66.3±4.0 MDOC† 0.0 — — 0.000±0.000 165.8±8.8 0.0 — — 0.000±0.000 183.6±8.1 0.0 — — 0.000±0.000 180.1±8.2 PCD-LB 0.0 0.0±0.0 33.40±2.61 0.502±0.113 5.5±0.8 0.0 0.0±0.0 40.60±3.30 0.502±0.113 4.7±0.3 0.0 0.0±0.0 44.22±3.72 0.502±0.113 4.7±0.1 PCD-SHD 0.0 0.0±0.0 19.55±3.93 0.500±0.115 4.5±0.1 0.0 0.0±0.0 18.93±3.44 0.500±0.115 4.6±0.1 0.0 0.0±0.0 18.51±3.52 0.500±0.115 4.7±0.1 Final Proj. 25.0 3.2±8.2 7.22±6.39 0.501±0.122 14.9±0.7 40.0 5.4±11.2 5.81±5.73 0.501±0.122 14.9±0.8 45.0 6.6±14.1 5.29±5.39 0.501±0.122 10.2±3.4 DiRecT 100.0 99.9±0.3 0.00±0.00 0.501±0.123 99.2±1.5 100.0 99.8±0.5 0.00±0.01 0.501±0.123 97.0±8.7 100.0 100.0±0.0 0.00±0.00 0.501±0.123 77.5±0.7 GlobMP (Ours) 15.0 15.0±35.7 20.90±11.92 0.502±0.500 300.1±68.7 55.0 55.0±49.7 11.35±14.57 0.519±0.500 35.2±143.5 65.0 65.0±47.7 10.75±15.56 0.507±0.500 19.1±136.7 52
Table 9: Multi-robot planning performance on Drop-Region for Na ∈ {3,6,...,21} under the Low, Medium and High velocity caps. SR and CS measure trajectory feasibility, Coll reports interrobot collisions, DA adherence to the environment-specific motion pattern, and Time the planning time per configuration: for GlobMP (Ours) the median over the configurations with the standard deviation as subscript, for the baselines the mean, so the two are not directly comparable. † marks a method that applies no velocity limit, so its three blocks report the same run; MMD-CBS also returns one plan per configuration rather than 64 candidates. A dash under Coll marks a count that is not commensurable with the others, as MDOC and MMD-CBS count colliding time steps where every other row counts agent pairs with any collision; MDOC’s CS is omitted because its plans that do not cover every agent were counted as feasible. MMD-CBS plans under 60 s per configuration and GlobMP (Ours) under 300 s per team. Low (vmax = 0.928) Medium (vmax = 1.13) High (vmax = 1.34) Na Method SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ 3 Diff. Policy† 0.0 0.0±0.0 0.13±0.34 0.139±0.175 0.3 0.0 0.0±0.0 0.13±0.34 0.139±0.175 0.3 0.0 0.0±0.0 0.13±0.34 0.139±0.175 0.3 CD† 45.0 5.2±21.7 0.11±0.32 0.000±0.001 0.5±0.0 45.0 11.9±24.6 0.11±0.32 0.000±0.001 1.0±0.2 45.0 22.2±34.5 0.11±0.32 0.000±0.001 1.2±0.0 MMD-CBS† 30.0 25.0±43.3 — 0.000±0.000 2.2±1.5 30.0 30.0±45.8 — 0.000±0.000 2.2±1.5 30.0 30.0±45.8 — 0.000±0.000 2.2±1.5 MDOC† 25.0 — — 0.000±0.000 42.7±6.5 25.0 — — 0.000±0.000 33.2±2.7 25.0 — — 0.000±0.000 38.6±3.8 PCD-LB 75.0 55.9±44.1 0.00±0.01 0.000±0.000 3.1±0.1 75.0 56.8±44.0 0.01±0.02 0.000±0.000 2.7±0.6 80.0 57.0±43.5 0.01±0.03 0.000±0.000 3.0±0.1 PCD-SHD 30.0 11.3±28.3 0.09±0.23 0.047±0.094 1.2±0.1 20.0 11.2±28.4 0.08±0.21 0.049±0.094 1.2±0.1 20.0 11.3±28.5 0.06±0.15 0.049±0.092 1.2±0.1 Final Proj. 95.0 86.2±26.3 0.11±0.28 0.194±0.211 3.4±0.5 95.0 86.2±26.4 0.11±0.28 0.204±0.215 3.6±0.6 100.0 96.1±5.1 0.01±0.03 0.234±0.215 3.6±0.6 DiRecT 100.0 97.5±8.1 0.03±0.09 0.114±0.149 24.6±6.3 100.0 96.3±12.5 0.04±0.13 0.115±0.150 26.2±6.6 100.0 100.0±0.0 0.00±0.00 0.115±0.150 26.2±6.9 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.083±0.276 0.3±0.1 100.0 100.0±0.0 0.00±0.00 0.083±0.276 0.5±0.2 100.0 100.0±0.0 0.00±0.00 0.083±0.276 0.4±0.2 6 Diff. Policy† 0.0 0.0±0.0 1.16±0.91 0.148±0.107 0.3 0.0 0.0±0.0 1.16±0.91 0.148±0.107 0.3 0.0 0.0±0.0 1.16±0.91 0.148±0.107 0.3 CD† 15.0 0.0±0.0 0.91±0.78 0.001±0.002 1.2±0.0 15.0 0.0±0.0 0.91±0.78 0.001±0.002 1.2±0.1 15.0 0.4±1.0 0.91±0.78 0.001±0.002 1.1±0.1 MMD-CBS† 0.0 0.0±0.0 — — 2.2±1.3 0.0 0.0±0.0 — — 2.2±1.3 0.0 0.0±0.0 — — 2.2±1.3 MDOC† 0.0 — — 0.000±0.000 62.9±3.7 0.0 — — 0.000±0.000 83.6±24.8 0.0 — — 0.000±0.000 83.0±17.9 PCD-LB 5.0 0.1±0.3 1.32±0.80 0.000±0.000 3.2±0.2 10.0 0.4±1.4 1.36±0.81 0.000±0.000 3.1±0.1 20.0 0.9±2.3 1.31±0.79 0.000±0.000 3.1±0.1 PCD-SHD 5.0 0.1±0.3 0.24±0.35 0.027±0.047 1.3±0.1 0.0 0.0±0.0 0.21±0.30 0.028±0.049 1.3±0.1 0.0 0.0±0.0 0.17±0.23 0.027±0.049 1.4±0.1 Final Proj. 100.0 47.8±35.8 0.56±0.55 0.161±0.127 3.4±0.6 90.0 45.7±37.1 0.57±0.50 0.168±0.127 3.4±0.6 100.0 62.5±32.4 0.33±0.40 0.212±0.137 3.4±0.7 DiRecT 100.0 98.2±6.1 0.02±0.06 0.073±0.106 24.9±6.8 100.0 97.8±6.2 0.02±0.06 0.075±0.106 25.7±6.8 100.0 99.8±0.7 0.00±0.01 0.076±0.107 26.7±7.4 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.117±0.321 0.6±0.3 100.0 100.0±0.0 0.00±0.00 0.125±0.331 0.9±1.1 100.0 100.0±0.0 0.00±0.00 0.133±0.340 1.1±3.6 9 Diff. Policy† 0.0 0.0±0.0 2.92±1.22 0.124±0.096 0.3 0.0 0.0±0.0 2.92±1.22 0.124±0.096 0.3 0.0 0.0±0.0 2.92±1.22 0.124±0.096 0.3 CD† 0.0 0.0±0.0 3.40±1.07 0.001±0.002 1.2±0.1 0.0 0.0±0.0 3.40±1.07 0.001±0.002 1.2±0.0 0.0 0.0±0.0 3.40±1.07 0.001±0.002 1.2±0.1 MMD-CBS† 0.0 0.0±0.0 — — 2.3±1.9 0.0 0.0±0.0 — — 2.3±1.9 0.0 0.0±0.0 — — 2.3±1.9 MDOC† 0.0 — — 0.000±0.000 108.4±21.4 0.0 — — 0.000±0.000 95.4±14.3 0.0 — — 0.000±0.000 83.7±3.8 PCD-LB 0.0 0.0±0.0 4.77±1.42 0.000±0.000 3.5±0.2 0.0 0.0±0.0 5.00±1.45 0.000±0.000 3.4±0.1 0.0 0.0±0.0 4.58±1.31 0.000±0.000 3.5±0.1 PCD-SHD 0.0 0.0±0.0 1.06±0.75 0.031±0.043 1.5±0.1 0.0 0.0±0.0 0.98±0.67 0.034±0.044 1.5±0.1 0.0 0.0±0.0 0.78±0.56 0.035±0.043 1.5±0.1 Final Proj. 50.0 17.3±31.9 1.92±1.82 0.180±0.109 4.3±0.7 40.0 13.0±26.5 2.00±1.72 0.209±0.118 3.9±1.1 80.0 32.2±32.6 1.22±1.33 0.244±0.123 4.4±0.7 DiRecT 90.0 74.3±35.6 0.28±0.40 0.080±0.084 37.2±9.7 95.0 69.5±37.5 0.34±0.44 0.081±0.085 30.0±6.7 100.0 99.6±1.4 0.00±0.01 0.082±0.086 31.1±7.7 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.061±0.240 1.3±0.4 100.0 100.0±0.0 0.00±0.00 0.067±0.249 2.0±2.7 95.0 95.0±21.8 0.35±1.53 0.067±0.249 2.1±66.9 12 Diff. Policy† 0.0 0.0±0.0 6.19±2.67 0.142±0.077 0.3 0.0 0.0±0.0 6.19±2.67 0.142±0.077 0.3 0.0 0.0±0.0 6.19±2.67 0.142±0.077 0.3 CD† 0.0 0.0±0.0 7.84±1.65 0.002±0.005 1.2±0.1 0.0 0.0±0.0 7.84±1.65 0.002±0.005 0.6±0.1 0.0 0.0±0.0 7.84±1.65 0.002±0.005 1.2±0.1 MMD-CBS† 0.0 0.0±0.0 — — 1.7±0.9 0.0 0.0±0.0 — — 1.7±0.9 0.0 0.0±0.0 — — 1.7±0.9 MDOC† 0.0 — — 0.000±0.000 110.6±10.0 0.0 — — 0.000±0.000 121.3±5.9 0.0 — — 0.000±0.000 107.6±5.6 PCD-LB 0.0 0.0±0.0 11.55±2.61 0.000±0.002 1.7±0.1 0.0 0.0±0.0 11.87±2.46 0.000±0.001 3.7±0.1 0.0 0.0±0.0 11.07±2.25 0.000±0.002 3.8±0.1 PCD-SHD 0.0 0.0±0.0 2.48±1.14 0.021±0.022 1.6±0.1 0.0 0.0±0.0 2.31±1.05 0.022±0.023 1.6±0.1 0.0 0.0±0.0 1.88±0.92 0.024±0.023 1.6±0.1 Final Proj. 10.0 0.8±3.1 4.75±2.81 0.175±0.078 5.4±0.7 5.0 0.7±3.1 4.67±2.64 0.206±0.089 5.4±0.7 30.0 10.5±24.4 2.49±1.41 0.255±0.096 5.4±0.7 DiRecT 55.0 32.3±37.5 1.09±0.78 0.054±0.048 41.0±10.3 55.0 30.4±37.4 1.21±0.85 0.056±0.050 45.0±12.0 100.0 98.4±2.7 0.02±0.03 0.057±0.051 47.4±12.7 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.067±0.249 2.0±8.3 100.0 100.0±0.0 0.00±0.00 0.071±0.257 3.2±1.6 95.0 95.0±21.8 0.50±2.18 0.071±0.257 4.0±78.9 15 Diff. Policy† 0.0 0.0±0.0 8.53±2.25 0.183±0.062 0.3 0.0 0.0±0.0 8.53±2.25 0.183±0.062 0.3 0.0 0.0±0.0 8.53±2.25 0.183±0.062 0.3 CD† 0.0 0.0±0.0 13.91±2.49 0.001±0.002 1.2±0.1 0.0 0.0±0.0 13.91±2.49 0.001±0.002 1.2±0.0 0.0 0.0±0.0 13.91±2.49 0.001±0.002 1.2±0.1 MMD-CBS† 0.0 0.0±0.0 — — 1.2±0.8 0.0 0.0±0.0 — — 1.2±0.8 0.0 0.0±0.0 — — 1.2±0.8 MDOC† 0.0 — — 0.000±0.000 158.3±11.1 0.0 — — 0.000±0.000 175.3±13.5 0.0 — — 0.000±0.000 167.0±72.6 PCD-LB 0.0 0.0±0.0 22.65±2.75 0.000±0.000 4.1±0.2 0.0 0.0±0.0 23.62±2.63 0.000±0.000 4.1±0.1 0.0 0.0±0.0 22.71±2.48 0.000±0.000 4.1±0.1 PCD-SHD 0.0 0.0±0.0 2.78±1.30 0.026±0.028 1.7±0.1 0.0 0.0±0.0 2.60±1.24 0.025±0.027 1.8±0.1 0.0 0.0±0.0 2.11±1.00 0.025±0.027 1.8±0.1 Final Proj. 15.0 3.2±12.9 5.40±2.82 0.211±0.071 7.0±0.7 15.0 2.0±7.8 5.43±2.64 0.254±0.074 4.7±1.8 50.0 7.0±18.1 2.96±1.97 0.285±0.076 7.0±0.7 DiRecT 70.0 41.2±40.4 1.16±1.06 0.083±0.037 57.0±14.4 65.0 38.3±40.2 1.28±1.12 0.085±0.036 51.8±7.9 100.0 97.5±7.6 0.03±0.08 0.087±0.036 52.8±7.9 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.047±0.211 2.3±2.3 100.0 100.0±0.0 0.00±0.00 0.063±0.244 4.3±3.1 100.0 100.0±0.0 0.00±0.00 0.067±0.249 11.8±18.1 18 Diff. Policy† 0.0 0.0±0.0 14.42±4.49 0.124±0.051 0.3 0.0 0.0±0.0 14.42±4.49 0.124±0.051 0.3 0.0 0.0±0.0 14.42±4.49 0.124±0.051 0.3 CD† 0.0 0.0±0.0 23.43±2.96 0.002±0.004 1.2±0.1 0.0 0.0±0.0 23.43±2.96 0.002±0.004 1.3±0.1 0.0 0.0±0.0 23.43±2.96 0.002±0.004 1.2±0.1 MMD-CBS† 0.0 0.0±0.0 — — 2.1±1.2 0.0 0.0±0.0 — — 2.1±1.2 0.0 0.0±0.0 — — 2.1±1.2 MDOC† 0.0 — — 0.000±0.000 166.5±9.9 0.0 — — 0.000±0.000 159.0±7.7 0.0 — — 0.000±0.000 142.2±7.0 PCD-LB 0.0 0.0±0.0 37.15±5.84 0.000±0.000 4.1±0.1 0.0 0.0±0.0 38.50±5.83 0.000±0.000 4.2±0.1 0.0 0.0±0.0 36.52±5.40 0.000±0.000 4.0±0.6 PCD-SHD 0.0 0.0±0.0 4.46±2.06 0.020±0.023 1.8±0.1 0.0 0.0±0.0 4.29±1.94 0.022±0.026 1.8±0.1 0.0 0.0±0.0 3.56±1.70 0.023±0.026 1.8±0.1 Final Proj. 10.0 1.5±4.8 8.88±5.02 0.140±0.049 8.6±0.8 10.0 0.9±2.6 8.67±4.89 0.166±0.052 7.4±1.7 10.0 0.7±2.2 5.66±2.88 0.199±0.066 8.6±0.7 DiRecT 60.0 31.9±37.5 2.05±2.15 0.059±0.043 68.0±9.8 55.0 30.5±37.9 2.19±2.27 0.060±0.042 64.9±9.0 100.0 91.6±15.7 0.11±0.22 0.062±0.042 64.4±8.0 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.056±0.229 3.6±9.4 100.0 100.0±0.0 0.00±0.00 0.056±0.229 9.5±7.6 90.0 90.0±30.0 2.15±6.45 0.067±0.249 24.2±86.0 21 Diff. Policy† 0.0 0.0±0.0 18.84±3.94 0.161±0.078 0.4 0.0 0.0±0.0 18.84±3.94 0.161±0.078 0.3 0.0 0.0±0.0 18.84±3.94 0.161±0.078 0.4 CD† 0.0 0.0±0.0 33.21±2.01 0.002±0.003 0.8±0.1 0.0 0.0±0.0 33.21±2.01 0.002±0.003 1.3±0.1 0.0 0.0±0.0 33.21±2.01 0.002±0.003 1.3±0.1 MMD-CBS† 0.0 0.0±0.0 — — 2.6±1.7 0.0 0.0±0.0 — — 2.6±1.7 0.0 0.0±0.0 — — 2.6±1.7 MDOC† 0.0 — — 0.000±0.000 185.4±9.2 0.0 — — 0.000±0.000 181.0±8.7 0.0 — — 0.000±0.000 178.6±8.8 PCD-LB 0.0 0.0±0.0 53.13±5.24 0.000±0.000 4.6±0.2 0.0 0.0±0.0 54.89±5.28 0.000±0.000 4.6±0.1 0.0 0.0±0.0 51.21±4.97 0.000±0.000 4.6±0.1 PCD-SHD 0.0 0.0±0.0 6.27±1.83 0.027±0.023 2.0±0.1 0.0 0.0±0.0 5.99±1.81 0.029±0.024 2.0±0.1 0.0 0.0±0.0 4.79±1.53 0.030±0.024 2.0±0.1 Final Proj. 0.0 0.0±0.0 14.01±6.39 0.160±0.079 8.4±2.8 0.0 0.0±0.0 13.54±6.03 0.194±0.084 11.9±0.8 10.0 0.2±0.7 8.83±4.51 0.232±0.086 11.8±0.7 DiRecT 20.0 12.2±26.9 3.57±2.00 0.062±0.041 89.9±13.2 20.0 9.7±23.9 3.73±2.03 0.066±0.043 78.6±1.2 100.0 88.0±10.0 0.14±0.12 0.070±0.046 79.9±1.2 GlobMP (Ours) 65.0 65.0±47.7 5.45±7.65 0.095±0.294 15.2±136.9 95.0 95.0±21.8 1.05±4.58 0.086±0.280 15.1±64.4 85.0 85.0±35.7 3.95±9.98 0.093±0.290 27.1±97.5 53
Table 10: Multi-robot planning performance on Corridor-Bay for Na ∈ {3,6,...,21} under the Low, Medium and High velocity caps. SR and CS measure trajectory feasibility, Coll reports interrobot collisions, DA adherence to the environment-specific motion pattern, and Time the planning time per configuration: for GlobMP (Ours) the median over the configurations with the standard deviation as subscript, for the baselines the mean, so the two are not directly comparable. † marks a method that applies no velocity limit, so its three blocks report the same run; MMD-CBS also returns one plan per configuration rather than 64 candidates. A dash under Coll marks a count that is not commensurable with the others, as MDOC and MMD-CBS count colliding time steps where every other row counts agent pairs with any collision; MDOC’s CS is omitted because its plans that do not cover every agent were counted as feasible. MMD-CBS plans under 60 s per configuration and GlobMP (Ours) under 300 s per team. Low (vmax = 1.21) Medium (vmax = 1.46) High (vmax = 1.76) Na Method SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ 3 Diff. Policy† 0.0 0.0±0.0 0.31±0.53 0.997±0.002 0.3 0.0 0.0±0.0 0.31±0.53 0.997±0.002 0.3 0.0 0.0±0.0 0.31±0.53 0.997±0.002 0.3 CD† 85.0 12.5±20.0 0.12±0.26 0.683±0.079 1.2±0.0 85.0 16.3±21.3 0.12±0.26 0.683±0.079 1.1±0.0 85.0 18.0±21.5 0.12±0.26 0.683±0.079 1.2±0.0 MMD-CBS† 45.0 45.0±49.7 — 0.890±0.068 5.7±6.5 45.0 45.0±49.7 — 0.890±0.068 5.7±6.5 45.0 45.0±49.7 — 0.890±0.068 5.7±6.5 MDOC† 10.0 — — 0.072±0.215 36.1±6.6 10.0 — — 0.072±0.215 36.4±2.9 10.0 — — 0.072±0.215 37.0±3.6 PCD-LB 10.0 0.5±1.7 0.02±0.06 — 3.0±0.0 10.0 0.5±2.1 0.01±0.05 — 3.1±0.1 20.0 1.5±3.8 0.01±0.03 — 3.1±0.1 PCD-SHD 45.0 25.9±36.9 0.06±0.09 — 1.9±0.8 50.0 26.9±38.0 0.07±0.12 — 3.1±0.1 40.0 26.9±38.5 0.06±0.09 — 3.1±0.1 Final Proj. 80.0 53.4±42.9 0.00±0.00 0.912±0.039 2.3±0.9 85.0 51.9±43.4 0.02±0.08 0.911±0.040 3.7±0.6 85.0 51.9±43.4 0.00±0.00 0.914±0.039 3.7±0.6 DiRecT 95.0 87.2±24.1 0.00±0.00 0.920±0.056 18.0±0.6 95.0 82.0±25.8 0.00±0.00 0.920±0.056 18.2±0.7 95.0 80.0±27.4 0.00±0.00 0.921±0.054 18.2±0.7 GlobMP (Ours) 95.0 95.0±21.8 0.05±0.22 0.914±0.070 0.7±65.2 95.0 95.0±21.8 0.05±0.22 0.918±0.069 0.9±65.2 95.0 95.0±21.8 0.05±0.22 0.920±0.068 0.7±65.2 6 Diff. Policy† 0.0 0.0±0.0 1.27±1.05 0.996±0.002 0.3 0.0 0.0±0.0 1.27±1.05 0.996±0.002 0.3 0.0 0.0±0.0 1.27±1.05 0.996±0.002 0.3 CD† 40.0 3.8±12.3 0.70±0.78 0.669±0.032 1.2±0.1 40.0 4.8±12.6 0.70±0.78 0.669±0.032 0.5±0.0 40.0 5.8±13.6 0.70±0.78 0.669±0.032 1.2±0.1 MMD-CBS† 50.0 35.0±47.7 — 0.880±0.034 13.5±13.0 50.0 50.0±50.0 — 0.880±0.034 13.5±13.0 50.0 50.0±50.0 — 0.880±0.034 13.5±13.0 MDOC† 0.0 — — 0.000±0.000 55.8±3.5 0.0 — — 0.000±0.000 74.4±18.6 0.0 — — 0.000±0.000 92.2±23.6 PCD-LB 0.0 0.0±0.0 0.84±0.63 — 1.4±0.2 0.0 0.0±0.0 0.66±0.47 — 3.3±0.1 0.0 0.0±0.0 0.39±0.30 — 3.4±0.1 PCD-SHD 40.0 18.4±34.0 0.44±0.47 — 3.2±0.1 40.0 19.1±33.2 0.39±0.39 — 3.2±0.1 50.0 19.2±33.2 0.32±0.28 — 3.2±0.1 Final Proj. 60.0 24.5±37.2 0.02±0.07 0.897±0.042 3.8±0.6 60.0 23.2±36.9 0.01±0.03 0.899±0.039 2.0±0.6 60.0 23.1±37.0 0.01±0.03 0.903±0.037 3.8±0.7 DiRecT 100.0 65.8±36.9 0.00±0.01 0.915±0.037 18.3±0.7 100.0 56.8±38.4 0.00±0.00 0.915±0.036 18.3±0.7 95.0 51.8±37.4 0.00±0.00 0.917±0.035 18.3±0.7 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.915±0.071 0.4±2.6 100.0 100.0±0.0 0.00±0.00 0.917±0.069 0.6±1.5 85.0 85.0±35.7 0.20±0.51 0.917±0.071 1.7±106.5 9 Diff. Policy† 0.0 0.0±0.0 3.48±1.58 0.997±0.001 0.3 0.0 0.0±0.0 3.48±1.58 0.997±0.001 0.6 0.0 0.0±0.0 3.48±1.58 0.997±0.001 0.3 CD† 0.0 0.0±0.0 2.86±1.16 0.698±0.034 1.2±0.1 0.0 0.0±0.0 2.86±1.16 0.698±0.034 1.2±0.1 0.0 0.0±0.0 2.86±1.16 0.698±0.034 1.2±0.1 MMD-CBS† 5.0 0.0±0.0 — 0.901±0.039 22.1±32.2 5.0 0.0±0.0 — 0.901±0.039 22.1±32.2 5.0 5.0±21.8 — 0.901±0.039 22.1±32.2 MDOC† 0.0 — — 0.000±0.000 117.4±19.9 0.0 — — 0.000±0.000 98.4±14.9 0.0 — — 0.000±0.000 82.5±4.3 PCD-LB 0.0 0.0±0.0 2.66±1.28 — 3.6±0.1 0.0 0.0±0.0 2.05±0.97 — 3.6±0.1 0.0 0.0±0.0 1.13±0.50 — 3.7±0.1 PCD-SHD 5.0 0.5±2.4 1.54±0.58 — 3.6±0.1 10.0 0.9±3.4 1.19±0.42 — 3.6±0.1 10.0 1.0±3.8 1.04±0.34 — 3.7±0.1 Final Proj. 75.0 22.0±28.3 0.03±0.03 0.886±0.024 4.9±0.6 70.0 19.5±27.8 0.03±0.09 0.889±0.025 4.9±0.7 70.0 19.5±27.8 0.00±0.01 0.894±0.024 2.6±0.6 DiRecT 95.0 76.7±36.3 0.00±0.00 0.919±0.024 25.0±0.8 90.0 67.1±34.6 0.00±0.00 0.920±0.024 25.0±0.7 90.0 60.2±34.5 0.00±0.00 0.922±0.023 25.0±0.9 GlobMP (Ours) 95.0 95.0±21.8 0.35±1.53 0.911±0.064 1.8±69.7 75.0 75.0±43.3 1.10±2.07 0.909±0.066 2.4±128.5 75.0 75.0±43.3 0.85±1.53 0.912±0.064 12.5±126.4 12 Diff. Policy† 0.0 0.0±0.0 5.98±1.89 0.997±0.001 0.6 0.0 0.0±0.0 5.98±1.89 0.997±0.001 0.3 0.0 0.0±0.0 5.98±1.89 0.997±0.001 0.3 CD† 0.0 0.0±0.0 5.62±1.27 0.694±0.024 1.2±0.1 0.0 0.0±0.0 5.62±1.27 0.694±0.024 1.2±0.1 0.0 0.0±0.0 5.62±1.27 0.694±0.024 0.6±0.1 MMD-CBS† 0.0 0.0±0.0 — 0.921±0.000 5.1±12.7 0.0 0.0±0.0 — 0.921±0.000 5.1±12.7 0.0 0.0±0.0 — 0.921±0.000 5.1±12.7 MDOC† 0.0 — — 0.000±0.000 108.7±7.5 0.0 — — 0.000±0.000 124.3±6.0 0.0 — — 0.000±0.000 128.6±6.3 PCD-LB 0.0 0.0±0.0 7.83±1.80 — 3.8±0.1 0.0 0.0±0.0 5.87±1.42 — 4.0±0.1 0.0 0.0±0.0 3.64±0.99 — 1.9±0.2 PCD-SHD 5.0 0.1±0.3 2.98±1.29 — 3.9±0.1 5.0 0.1±0.3 2.48±1.12 — 2.0±0.1 0.0 0.0±0.0 2.15±0.97 — 4.0±0.1 Final Proj. 45.0 16.4±29.4 0.09±0.10 0.878±0.036 6.1±0.7 40.0 15.5±30.9 0.04±0.08 0.882±0.035 6.1±0.6 40.0 15.4±31.0 0.00±0.00 0.887±0.033 6.1±0.7 DiRecT 95.0 63.2±37.9 0.00±0.01 0.921±0.027 31.1±0.7 95.0 54.1±38.4 0.00±0.00 0.923±0.026 31.1±0.7 95.0 49.1±39.8 0.00±0.00 0.925±0.024 31.1±0.7 GlobMP (Ours) 85.0 85.0±35.7 1.15±2.74 0.903±0.067 4.5±105.6 75.0 75.0±43.3 1.75±3.05 0.905±0.068 8.4±127.3 70.0 70.0±45.8 1.75±2.77 0.908±0.066 17.1±130.8 15 Diff. Policy† 0.0 0.0±0.0 10.78±2.90 0.996±0.001 0.3 0.0 0.0±0.0 10.78±2.90 0.996±0.001 0.3 0.0 0.0±0.0 10.78±2.90 0.996±0.001 0.3 CD† 0.0 0.0±0.0 10.72±2.10 0.686±0.021 1.2±0.0 0.0 0.0±0.0 10.72±2.10 0.686±0.021 1.2±0.1 0.0 0.0±0.0 10.72±2.10 0.686±0.021 1.2±0.1 MMD-CBS† 0.0 0.0±0.0 — 0.844±0.000 8.1±17.6 0.0 0.0±0.0 — 0.844±0.000 8.1±17.6 0.0 0.0±0.0 — 0.844±0.000 8.1±17.6 MDOC† 0.0 — — 0.000±0.000 164.4±13.3 0.0 — — 0.000±0.000 175.2±19.9 0.0 — — 0.000±0.000 171.8±26.1 PCD-LB 0.0 0.0±0.0 18.53±1.79 — 4.3±0.1 0.0 0.0±0.0 15.04±1.50 — 4.4±0.1 0.0 0.0±0.0 10.75±1.19 — 4.4±0.1 PCD-SHD 0.0 0.0±0.0 5.32±1.80 — 4.3±0.1 0.0 0.0±0.0 4.44±1.50 — 4.3±0.1 0.0 0.0±0.0 3.73±1.21 — 4.4±0.1 Final Proj. 40.0 5.2±13.1 0.22±0.24 0.851±0.030 4.3±1.0 30.0 6.7±17.7 0.08±0.13 0.858±0.030 7.8±0.7 30.0 7.0±18.3 0.02±0.04 0.863±0.028 7.8±0.7 DiRecT 100.0 60.2±30.4 0.00±0.01 0.904±0.018 40.4±0.7 95.0 39.7±33.0 0.00±0.00 0.906±0.017 40.4±0.7 90.0 33.6±32.8 0.00±0.00 0.908±0.017 40.5±0.9 GlobMP (Ours) 75.0 75.0±43.3 2.85±4.99 0.892±0.074 3.9±127.2 65.0 65.0±47.7 3.70±5.45 0.895±0.072 36.9±133.7 65.0 65.0±47.7 3.15±4.63 0.899±0.072 93.9±129.5 18 Diff. Policy† 0.0 0.0±0.0 15.87±4.43 0.996±0.001 0.3 0.0 0.0±0.0 15.87±4.43 0.996±0.001 0.3 0.0 0.0±0.0 15.87±4.43 0.996±0.001 0.3 CD† 0.0 0.0±0.0 16.96±3.44 0.684±0.022 1.3±0.1 0.0 0.0±0.0 16.96±3.44 0.684±0.022 1.3±0.1 0.0 0.0±0.0 16.96±3.44 0.684±0.022 1.3±0.1 MMD-CBS† 0.0 0.0±0.0 — 0.898±0.016 8.5±18.7 0.0 0.0±0.0 — 0.898±0.016 8.5±18.7 0.0 0.0±0.0 — 0.898±0.016 8.5±18.7 MDOC† 0.0 — — 0.000±0.000 147.2±7.4 0.0 — — 0.000±0.000 157.6±7.0 0.0 — — 0.000±0.000 159.9±7.2 PCD-LB 0.0 0.0±0.0 30.77±4.62 — 4.4±0.1 0.0 0.0±0.0 24.93±3.85 — 4.5±0.1 0.0 0.0±0.0 18.60±2.71 — 4.6±0.1 PCD-SHD 0.0 0.0±0.0 8.11±2.72 — 4.4±0.1 0.0 0.0±0.0 6.79±2.30 — 4.4±0.1 0.0 0.0±0.0 5.77±1.97 — 4.5±0.1 Final Proj. 20.0 6.6±18.2 0.38±0.36 0.837±0.040 10.2±0.7 20.0 6.6±15.8 0.09±0.09 0.846±0.038 8.8±2.0 20.0 5.5±13.1 0.02±0.03 0.853±0.038 10.2±0.8 DiRecT 90.0 43.4±34.4 0.03±0.04 0.902±0.026 53.3±0.9 90.0 30.7±30.5 0.00±0.00 0.905±0.025 53.3±0.9 85.0 23.4±28.2 0.00±0.00 0.908±0.025 53.1±0.7 GlobMP (Ours) 65.0 65.0±47.7 6.05±8.70 0.883±0.071 28.6±135.8 60.0 60.0±49.0 7.85±10.09 0.892±0.070 11.2±143.1 40.0 40.0±49.0 9.95±8.68 0.894±0.068 300.0±137.3 21 Diff. Policy† 0.0 0.0±0.0 20.72±5.04 0.997±0.001 0.3 0.0 0.0±0.0 20.72±5.04 0.997±0.001 0.3 0.0 0.0±0.0 20.72±5.04 0.997±0.001 0.3 CD† 0.0 0.0±0.0 24.06±3.00 0.692±0.016 1.3±0.0 0.0 0.0±0.0 24.06±3.00 0.692±0.016 0.8±0.2 0.0 0.0±0.0 24.06±3.00 0.692±0.016 1.3±0.0 MMD-CBS† 0.0 0.0±0.0 — 0.954±0.015 19.8±41.4 0.0 0.0±0.0 — 0.954±0.015 19.8±41.4 0.0 0.0±0.0 — 0.954±0.015 19.8±41.4 MDOC† 0.0 — — 0.000±0.000 183.7±8.7 0.0 — — 0.000±0.000 180.8±8.7 0.0 — — 0.000±0.000 179.5±8.6 PCD-LB 0.0 0.0±0.0 42.63±4.11 — 5.0±0.2 0.0 0.0±0.0 34.30±3.31 — 5.1±0.2 0.0 0.0±0.0 26.27±2.54 — 4.4±1.1 PCD-SHD 0.0 0.0±0.0 10.66±3.55 — 4.8±0.1 0.0 0.0±0.0 9.02±2.99 — 4.9±0.1 0.0 0.0±0.0 7.59±2.61 — 2.5±0.2 Final Proj. 25.0 8.2±21.8 0.70±0.81 0.832±0.033 13.0±0.8 30.0 6.7±19.6 0.23±0.30 0.840±0.032 9.6±2.9 35.0 6.7±19.5 0.07±0.12 0.846±0.032 13.1±0.8 DiRecT 100.0 52.2±29.1 0.04±0.06 0.906±0.024 68.5±0.7 100.0 35.5±29.5 0.00±0.00 0.910±0.022 68.5±0.7 85.0 26.8±29.7 0.00±0.00 0.913±0.021 68.5±0.7 GlobMP (Ours) 45.0 45.0±49.7 12.90±12.22 0.886±0.077 300.0±141.1 60.0 60.0±49.0 8.45±10.77 0.900±0.068 33.5±137.9 70.0 70.0±45.8 5.60±8.79 0.899±0.071 83.2±116.2 54
Table 11: Multi-robot planning performance on Cross-Room for Na ∈ {3,6,...,21} under the Low, Medium and High velocity caps. SR and CS measure trajectory feasibility, Coll reports interrobot collisions, DA adherence to the environment-specific motion pattern, and Time the planning time per configuration: for GlobMP (Ours) the median over the configurations with the standard deviation as subscript, for the baselines the mean, so the two are not directly comparable. † marks a method that applies no velocity limit, so its three blocks report the same run; MMD-CBS also returns one plan per configuration rather than 64 candidates. A dash under Coll marks a count that is not commensurable with the others, as MDOC and MMD-CBS count colliding time steps where every other row counts agent pairs with any collision; MDOC’s CS is omitted because its plans that do not cover every agent were counted as feasible. MMD-CBS plans under 60 s per configuration and GlobMP (Ours) under 300 s per team. Low (vmax = 0.928) Medium (vmax = 1.13) High (vmax = 1.34) Na Method SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ SR↑ CS↑ Coll↓ DA↑ Time↓ 3 Diff. Policy† 0.0 0.0±0.0 0.30±0.55 0.985±0.007 0.6 0.0 0.0±0.0 0.30±0.55 0.985±0.007 0.5 0.0 0.0±0.0 0.30±0.55 0.985±0.007 0.5 CD† 20.0 5.6±15.6 0.02±0.05 0.662±0.070 1.1±0.0 20.0 9.3±25.5 0.02±0.05 0.662±0.070 1.1±0.1 20.0 10.1±27.3 0.02±0.05 0.662±0.070 1.1±0.0 MMD-CBS† 10.0 10.0±30.0 — 0.887±0.049 0.7±0.4 10.0 10.0±30.0 — 0.887±0.049 0.7±0.4 10.0 10.0±30.0 — 0.887±0.049 0.7±0.4 MDOC† 0.0 — — 0.000±0.000 37.9±2.4 0.0 — — 0.000±0.000 36.2±2.5 0.0 — — 0.000±0.000 35.4±2.6 PCD-LB 55.0 16.6±30.6 0.05±0.17 — 2.7±0.2 45.0 15.6±30.8 0.05±0.15 — 1.5±0.1 45.0 16.3±30.6 0.04±0.14 — 1.5±0.1 PCD-SHD 10.0 4.0±16.3 0.00±0.01 — 2.0±0.6 10.0 3.8±15.3 0.00±0.01 — 1.6±0.4 10.0 4.0±16.3 0.00±0.01 — 1.5±0.1 Final Proj. 5.0 2.7±11.9 0.01±0.02 0.910±0.035 4.4±0.9 5.0 2.7±11.9 0.01±0.01 0.907±0.035 4.4±0.9 5.0 2.7±11.9 0.00±0.01 0.909±0.035 2.4±1.0 DiRecT 10.0 5.0±21.1 0.03±0.08 0.899±0.038 33.1±6.8 10.0 5.0±21.1 0.00±0.01 0.902±0.038 30.4±8.1 10.0 4.8±20.8 0.00±0.00 0.904±0.038 29.1±8.4 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.804±0.142 0.4±0.3 100.0 100.0±0.0 0.00±0.00 0.802±0.133 0.4±0.3 100.0 100.0±0.0 0.00±0.00 0.809±0.143 0.6±0.7 6 Diff. Policy† 0.0 0.0±0.0 1.59±0.98 0.985±0.004 0.6 0.0 0.0±0.0 1.59±0.98 0.985±0.004 0.6 0.0 0.0±0.0 1.59±0.98 0.985±0.004 0.6 CD† 10.0 1.2±5.4 0.40±0.41 0.671±0.041 1.1±0.1 10.0 3.2±14.0 0.40±0.41 0.671±0.041 0.5±0.1 10.0 3.7±16.0 0.40±0.41 0.671±0.041 1.1±0.0 MMD-CBS† 5.0 0.0±0.0 — 0.849±0.000 1.0±1.1 5.0 0.0±0.0 — 0.849±0.000 1.0±1.1 5.0 0.0±0.0 — 0.849±0.000 1.0±1.1 MDOC† 0.0 — — 0.000±0.000 66.3±3.8 0.0 — — 0.000±0.000 64.4±6.6 0.0 — — 0.000±0.000 61.7±6.2 PCD-LB 25.0 8.6±22.8 1.01±0.48 — 2.7±0.7 20.0 7.7±22.1 1.07±0.46 — 2.5±0.5 40.0 7.7±21.9 1.01±0.46 — 1.9±0.1 PCD-SHD 0.0 0.0±0.0 0.17±0.26 — 2.1±0.6 0.0 0.0±0.0 0.14±0.20 — 2.1±0.7 0.0 0.0±0.0 0.12±0.16 — 1.8±0.1 Final Proj. 0.0 0.0±0.0 0.08±0.12 0.906±0.029 3.9±0.9 0.0 0.0±0.0 0.07±0.11 0.902±0.030 3.9±0.9 0.0 0.0±0.0 0.06±0.09 0.903±0.031 3.9±0.8 DiRecT 0.0 0.0±0.0 0.07±0.14 0.908±0.031 24.5±7.3 0.0 0.0±0.0 0.03±0.11 0.908±0.033 24.4±7.3 0.0 0.0±0.0 0.01±0.02 0.909±0.034 27.1±7.2 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.783±0.133 1.2±52.1 100.0 100.0±0.0 0.00±0.00 0.786±0.136 1.5±1.3 100.0 100.0±0.0 0.00±0.00 0.787±0.133 2.7±2.3 9 Diff. Policy† 0.0 0.0±0.0 3.23±1.34 0.985±0.003 0.6 0.0 0.0±0.0 3.23±1.34 0.985±0.003 0.6 0.0 0.0±0.0 3.23±1.34 0.985±0.003 0.3 CD† 0.0 0.0±0.0 1.42±0.71 0.659±0.030 1.1±0.1 0.0 0.0±0.0 1.42±0.71 0.659±0.030 1.1±0.1 0.0 0.0±0.0 1.42±0.71 0.659±0.030 1.1±0.1 MMD-CBS† 0.0 0.0±0.0 — — 1.0±0.8 0.0 0.0±0.0 — — 1.0±0.8 0.0 0.0±0.0 — — 1.0±0.8 MDOC† 0.0 — — 0.000±0.000 94.2±4.1 0.0 — — 0.000±0.000 92.9±3.9 0.0 — — 0.000±0.000 93.0±6.6 PCD-LB 0.0 0.0±0.0 3.96±1.41 — 2.1±0.4 0.0 0.0±0.0 4.11±1.38 — 3.1±0.7 0.0 0.0±0.0 3.68±1.18 — 2.2±0.1 PCD-SHD 0.0 0.0±0.0 0.28±0.27 — 2.0±0.1 0.0 0.0±0.0 0.26±0.22 — 2.1±0.1 0.0 0.0±0.0 0.22±0.16 — 2.0±0.1 Final Proj. 0.0 0.0±0.0 0.14±0.17 0.895±0.032 2.8±0.8 0.0 0.0±0.0 0.11±0.13 0.891±0.034 5.1±0.9 0.0 0.0±0.0 0.08±0.10 0.893±0.034 5.1±1.0 DiRecT 0.0 0.0±0.0 0.20±0.26 0.902±0.027 35.4±9.8 0.0 0.0±0.0 0.06±0.08 0.906±0.028 36.8±9.8 0.0 0.0±0.0 0.02±0.03 0.908±0.027 38.5±9.6 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.782±0.133 2.3±1.1 100.0 100.0±0.0 0.00±0.00 0.783±0.124 3.3±3.0 100.0 100.0±0.0 0.00±0.00 0.782±0.132 7.3±20.9 12 Diff. Policy† 0.0 0.0±0.0 7.06±2.70 0.985±0.003 0.3 0.0 0.0±0.0 7.06±2.70 0.985±0.003 0.6 0.0 0.0±0.0 7.06±2.70 0.985±0.003 0.6 CD† 0.0 0.0±0.0 4.08±1.26 0.663±0.020 1.2±0.1 0.0 0.0±0.0 4.08±1.26 0.663±0.020 1.2±0.1 0.0 0.0±0.0 4.08±1.26 0.663±0.020 0.6±0.1 MMD-CBS† 0.0 0.0±0.0 — — 1.1±1.2 0.0 0.0±0.0 — — 1.1±1.2 0.0 0.0±0.0 — — 1.1±1.2 MDOC† 0.0 — — 0.000±0.000 122.0±5.3 0.0 — — 0.000±0.000 110.7±5.9 0.0 — — 0.000±0.000 108.8±4.8 PCD-LB 0.0 0.0±0.0 9.93±1.54 — 3.4±0.9 0.0 0.0±0.0 10.31±1.59 — 2.4±0.1 0.0 0.0±0.0 9.16±1.46 — 4.5±0.1 PCD-SHD 0.0 0.0±0.0 0.60±0.36 — 4.2±0.1 0.0 0.0±0.0 0.53±0.26 — 2.4±0.3 0.0 0.0±0.0 0.46±0.26 — 4.1±0.8 Final Proj. 0.0 0.0±0.0 0.41±0.42 0.881±0.026 5.4±2.1 0.0 0.0±0.0 0.33±0.32 0.876±0.028 7.5±1.0 0.0 0.0±0.0 0.33±0.28 0.877±0.029 7.5±0.9 DiRecT 0.0 0.0±0.0 0.44±0.48 0.898±0.020 49.1±12.6 0.0 0.0±0.0 0.10±0.14 0.900±0.020 49.2±12.6 0.0 0.0±0.0 0.04±0.05 0.902±0.020 49.8±12.5 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.773±0.140 3.1±57.3 100.0 100.0±0.0 0.00±0.00 0.778±0.135 5.8±11.5 100.0 100.0±0.0 0.00±0.00 0.778±0.140 9.8±42.3 15 Diff. Policy† 0.0 0.0±0.0 9.58±2.09 0.985±0.003 0.6 0.0 0.0±0.0 9.58±2.09 0.985±0.003 0.6 0.0 0.0±0.0 9.58±2.09 0.985±0.003 0.6 CD† 0.0 0.0±0.0 6.69±1.73 0.662±0.016 1.2±0.1 0.0 0.0±0.0 6.69±1.73 0.662±0.016 1.2±0.1 0.0 0.0±0.0 6.69±1.73 0.662±0.016 1.2±0.1 MMD-CBS† 0.0 0.0±0.0 — — 1.0±0.9 0.0 0.0±0.0 — — 1.0±0.9 0.0 0.0±0.0 — — 1.0±0.9 MDOC† 0.0 — — 0.000±0.000 140.7±6.7 0.0 — — 0.000±0.000 134.0±6.8 0.0 — — 0.000±0.000 134.2±6.1 PCD-LB 0.0 0.0±0.0 20.03±2.29 — 3.0±0.6 0.0 0.0±0.0 20.97±2.25 — 2.9±0.1 0.0 0.0±0.0 19.26±1.97 — 3.0±0.4 PCD-SHD 0.0 0.0±0.0 0.84±0.37 — 3.9±1.1 0.0 0.0±0.0 0.78±0.35 — 2.4±0.1 0.0 0.0±0.0 0.68±0.31 — 2.4±0.1 Final Proj. 0.0 0.0±0.0 0.59±0.46 0.872±0.019 7.9±2.4 0.0 0.0±0.0 0.51±0.37 0.867±0.020 11.2±0.9 0.0 0.0±0.0 0.44±0.31 0.868±0.020 8.8±2.8 DiRecT 0.0 0.0±0.0 0.64±0.50 0.892±0.014 68.2±15.4 0.0 0.0±0.0 0.20±0.24 0.894±0.014 69.0±15.5 0.0 0.0±0.0 0.07±0.08 0.896±0.014 75.8±12.1 GlobMP (Ours) 100.0 100.0±0.0 0.00±0.00 0.774±0.142 3.9±23.9 100.0 100.0±0.0 0.00±0.00 0.772±0.134 9.2±44.7 95.0 95.0±21.8 0.80±3.49 0.775±0.139 21.9±62.5 18 Diff. Policy† 0.0 0.0±0.0 13.49±2.49 0.985±0.002 0.3 0.0 0.0±0.0 13.49±2.49 0.985±0.002 0.6 0.0 0.0±0.0 13.49±2.49 0.985±0.002 0.3 CD† 0.0 0.0±0.0 11.98±2.21 0.665±0.016 1.2±0.1 0.0 0.0±0.0 11.98±2.21 0.665±0.016 1.2±0.1 0.0 0.0±0.0 11.98±2.21 0.665±0.016 1.2±0.1 MMD-CBS† 0.0 0.0±0.0 — — 0.9±0.6 0.0 0.0±0.0 — — 0.9±0.6 0.0 0.0±0.0 — — 0.9±0.6 MDOC† 0.0 — — 0.000±0.000 161.4±7.5 0.0 — — 0.000±0.000 199.2±11.4 0.0 — — 0.000±0.000 173.8±8.0 PCD-LB 0.0 0.0±0.0 32.89±2.64 — 3.1±0.2 0.0 0.0±0.0 34.26±2.78 — 5.7±0.5 0.0 0.0±0.0 31.50±2.87 — 3.4±0.1 PCD-SHD 0.0 0.0±0.0 1.07±0.63 — 3.2±0.1 0.0 0.0±0.0 0.99±0.57 — 2.9±0.2 0.0 0.0±0.0 0.88±0.43 — 3.3±0.1 Final Proj. 0.0 0.0±0.0 0.56±0.38 0.869±0.016 14.9±0.9 0.0 0.0±0.0 0.45±0.33 0.865±0.017 11.6±3.7 0.0 0.0±0.0 0.38±0.26 0.866±0.018 14.9±0.9 DiRecT 0.0 0.0±0.0 1.02±0.65 0.900±0.012 89.6±24.7 0.0 0.0±0.0 0.27±0.21 0.903±0.012 104.4±3.8 0.0 0.0±0.0 0.09±0.06 0.905±0.011 58.6±25.2 GlobMP (Ours) 95.0 95.0±21.8 1.00±4.36 0.789±0.134 8.1±96.3 95.0 95.0±21.8 1.00±4.36 0.791±0.130 11.1±61.9 100.0 100.0±0.0 0.00±0.00 0.779±0.130 60.5±84.3 21 Diff. Policy† 0.0 0.0±0.0 20.13±3.78 0.985±0.002 0.7 0.0 0.0±0.0 20.13±3.78 0.985±0.002 0.7 0.0 0.0±0.0 20.13±3.78 0.985±0.002 0.7 CD† 0.0 0.0±0.0 18.02±3.46 0.659±0.017 1.2±0.0 0.0 0.0±0.0 18.02±3.46 0.659±0.017 0.6±0.1 0.0 0.0±0.0 18.02±3.46 0.659±0.017 1.3±0.0 MMD-CBS† 0.0 0.0±0.0 — — 1.1±0.9 0.0 0.0±0.0 — — 1.1±0.9 0.0 0.0±0.0 — — 1.1±0.9 MDOC† 0.0 — — 0.000±0.000 214.2±10.8 0.0 — — 0.000±0.000 229.0±40.8 0.0 — — 0.000±0.000 188.8±17.4 PCD-LB 0.0 0.0±0.0 47.76±4.94 — 3.8±0.3 0.0 0.0±0.0 50.44±4.95 — 4.0±0.4 0.0 0.0±0.0 46.76±4.28 — 6.1±1.6 PCD-SHD 0.0 0.0±0.0 2.04±0.52 — 3.9±0.1 0.0 0.0±0.0 1.97±0.41 — 3.3±0.1 0.0 0.0±0.0 1.75±0.36 — 3.4±0.2 Final Proj. 0.0 0.0±0.0 1.34±1.05 0.842±0.021 17.5±4.4 0.0 0.0±0.0 1.08±0.87 0.837±0.022 20.4±1.0 0.0 0.0±0.0 0.90±0.71 0.837±0.024 16.0±4.8 DiRecT 0.0 0.0±0.0 1.52±0.87 0.883±0.018 80.9±35.1 0.0 0.0±0.0 0.37±0.35 0.886±0.018 57.5±0.7 0.0 0.0±0.0 0.15±0.12 0.889±0.017 57.5±0.7 GlobMP (Ours) 85.0 85.0±35.7 5.30±13.46 0.765±0.146 14.4±116.6 75.0 75.0±43.3 9.80±17.31 0.753±0.139 197.1±116.2 90.0 90.0±30.0 4.35±13.07 0.761±0.138 98.2±103.0 55 ahead of DiRecT at 0.601, Final Proj. at 0.419, PCD-SHD at 0.211, CD at 0.132, MMD-CBS at 0.121, PCD-LB at 0.063, MDOC at 0.025 and Diffusion Policy at 0.020.
Performance generally decreases as the number of robots increases, although the effect depends strongly on the environment. At the Medium cap, DiRecT maintains on Empty and Highways at every team size and at least 0.90 on Basic, but at most 0.50 on Dense. Conveyor and Cross-Room separate the methods most sharply: the best baseline is PCD-LB, at 0.65 and 0.40 on Conveyor and 0.45 and 0.20 on Cross-Room for and 6, and from no baseline exceeds 0.10, while GlobMP (Ours) stays at 1.00 through on Cross-Room and ranges from 1.00 to 0.70 on Conveyor. Drop-Region and Corridor-Bay provide intermediate difficulty, with DiRecT attaining mean values of 0.70 and 0.95, respectively; DiRecT exceeds GlobMP on Corridor-Bay from (at least 0.90 against 0.60 to 0.75) and on Highways at (1.00 against 0.90 and 0.55), and edges it on Empty at (1.00 against 0.95). Changing the velocity cap has a comparatively small effect (four of the nine rows, marked , ignore it), except for DiRecT on Drop-Region, which reaches 1.00 at every team size only under the High cap, and for GlobMP on Highways, whose Low-cap SR falls from 0.80 at to 0.60 at and whose cells from hit the planning budget (0.30, 0 and 0.15), suggesting that environment geometry and coupled collision avoidance dominate the difficulty of the harder instances.
The GlobMP (Ours) rows use the same shared instances across all eight maps, all velocity caps, and all 168 experimental cells, with a 300 s planning budget per team; MMD-CBS has 60 s per configuration. Planning times are measured with one thread per job, pinned to four CPU cores. Cells that reach the full 300 s budget were repeated on an idle machine and showed the same behaviour, so these cases reflect planning difficulty, not resource contention: on Highways at the Low cap for and on Corridor-Bay at (High) and (Low).
The suite's success rate is a best-of-64 quantity: an instance counts as solved when any of the 64 candidates a baseline samples is collision-free, whereas our method returns one trajectory. Figure 17 therefore scores every method with per-candidate data on the success of a single returned plan, and Figure 16 shows the best-of-64 success rate the tables report.
A4.6 IMPLEMENTATION DETAILS
This subsection lists how GlobMP is run in the experiments: the curve class of each experiment, the settings of Algorithm 2, the cone solve, and the checks of the implementation.
Curve class. Table 12 gives the degree, the cost order and the boundary order of each experiment; the synthetic study uses 7 pieces (4 in the scaling study). The synthetic study uses the minimum-snap class of the baselines it is compared against (); the multi-robot tasks prescribe only where each robot starts and stops, so they fix position and velocity () and minimize acceleration (); Maze2D uses . In every row , so Assumption B holds, and every degree is at least , so the synthetic class is that of Theorem 1, with rate ; Maze2D joins its pieces , a subclass. Every row starts from heuristic seeds rather than the grid start and restores with Algorithm 2 rather than the exact repair (5); the multi-robot rows add a speed limit, and Maze2D adds corridor blocks, each box binding one piece, and keep-out blocks outside (), so the theorem certifies no row's cost as optimal. No steering experiment (Section 4.3, Appendix A4.4) is in the class either.
Table 12: Curve class of each planning experiment.
| Experiment | Section | degree d | k | l |
|---|---|---|---|---|
| Synthetic study | §4.1 | 9 | 4 | 4 |
| Multi-robot suite | §A4.5 | 9 | 2 | 1 |
| Robotarium | §4.2 | 12 | 2 | 1 |
| Maze2D | §A4.3 | 9 | 2 | 2 |
Piecewise curves. With knots , and on piece , the curve is and . The endpoint conditions of order and the (or smoother) continuity conditions at the junctions are linear in the stacked control points, so gives the same orthonormal chart as for one piece, with . The cost matrix is (with the equal knots used here, the implementation drops the constant factor), and the constraint blocks are built piece by piece with the derivative scaling . With these junctions the curves lie in , and a zero-cost perturbation is a polynomial of degree below , zero when .
Restoration (Algorithm 2). The provable step (Appendix A3.1.4) is too small to be practical, so the implementation calibrates the step: it starts at , caps it at for the current merit value , halves it until the merit (2) decreases, and then grows it by a factor 1.3 (on Maze2D and the Robotarium, Barzilai–Borwein steps, halved until the merit is below its largest value over the last ten steps); blocks within their tolerance are left out of the merit and its gradient, so and above are over the remaining blocks and the bound of Appendix A3.1.4 does not cover these steps. In the implementation, line 3 of Algorithm 2 uses one tolerance per block: a curve is accepted when every block satisfies , with for a ball, pair or moving-ball block whose radius is inflated by , for a box, and otherwise.
Cone solve. Each projection onto uses Moreau's decomposition and fully corrective nonnegative matching pursuit (Algorithm 3), with the block rescaled to unit norm. The implementation maximizes the unnormalized correlation (Algorithm 3 normalizes it, and the rate of Appendix A3.1.4 is for that version), a polynomial in , at the real roots of its derivative and the two endpoints (by Bernstein branch-and-bound above degree 24), then refits the nonnegative weights and drops atoms whose weight reaches zero; it stops at the relative threshold . The active-set weight solve keeps linearly independent atoms, so at most ( for a collision block of degree ); the solve also stops after rounds.
Finishing step. In the synthetic study, the minimum-snap curvature ratio (15), in the chart of of Proposition 13, at makes first-order descent slow along flat directions, so each main-comparison run is finished by Newton's method on the first-order conditions and the active contact equations. An interior contact at a time contributes and ; the unknowns are the free control points, the contact times and the multipliers; contacts with negative multipliers are dropped and the system is solved again. This step lowered the cost by a further factor of 2 to 3; the reported curves pass the dense recheck, but the step is numerical and is not covered by the theory. As in Maze2D ( A4.3), the step follows an SQP polish of the output of Algorithm 1, also outside the theory.
Several robots. The free control points of all robots are stacked; the robots share , and , and hence A, N and the cost matrix, and each has its own boundary data. There is one collision block per robot and obstacle and one per pair of robots, the latter the obstacle block applied to the difference curve at the separation radius, so Algorithms 1 and 2 are unchanged. Each block reads the control points of one or two robots only, so the gradient of Algorithm 2 costs a fixed amount per block.
Workspace bounds. A bound is two nonnegativity conditions with Bernstein coefficients and . Since , a degree-d coefficient vector is raised to degree by , so these blocks share the collision blocks' cone and are affine in .
Checks of the implementation. Each of the following holds to machine precision on the benchmark instances: reproduces the Bernstein coefficients of ; the chart satisfies and ; reproduces ; the cost matches up to the dropped factor; and the cone test is exact in both directions, returning zero for collision-free curves and a positive value, increasing with the penetration depth, for colliding ones.

MMD-CBS
PCD-SHD
Final Proj.

DiRecT
GlobMP (ours)

Figure 18: Hardware execution on Empty: every method except PCD-LB, twelve GRITSBots on the Georgia Tech Robotarium. The tracking controller and the virtual obstacles are those of Appendix A4.1. Each panel reports one execution of the ring instance by the method named above it: a single overhead frame, with the trajectories recovered from the video drawn over it, each marked by a circle at its start and a square at its terminal state. A robot is counted as being in collision when its footprint overlaps an obstacle region. The frame shown is the midpoint of the tracked window for an execution in which no robot overlaps a region at any time, and otherwise the frame at which the number of overlapping robots is maximal; only the midpoints are therefore proportional to the duration of an execution. Empty carries no obstacles, so no execution can overlap a region and the panels differ only in the routing of the exchange, with midpoints at 25 s for GlobMP, 27 s for PCD-SHD, 28 s for Final Proj., 29 s for DiRecT, 34 s for CD and 57 s for MMD-CBS.

MMD-CBS
PCD-SHD
Final Proj.

DiRecT
GlobMP (ours)

Figure 19: Hardware execution on Drop-Region: the same methods, with the protocol of Figure 18. Three of the six methods complete the exchange with no footprint overlap: MMD-CBS (midpoint frame at 61 s), DiRecT (31 s) and GlobMP (31 s). For the remaining three the panel shows the frame of maximal overlap: two of the twelve robots overlap a keep-out region under Final Proj. (40 s), three under CD (43 s) and five under PCD-SHD (23 s). PCD-SHD is additionally the only execution on this map whose robots do not reach their goals; its terminal states lie well away from the goal ring. This map discriminates least among the four maps with obstacles, and the discrimination that remains lies in when the overlaps occur rather than in how many robots they involve.

MMD-CBS
PCD-SHD
Final Proj.

DiRecT
GlobMP (ours)

Figure 20: Hardware execution on Conveyor: the same methods, with the protocol of Figure 18. The three belts sit in the middle of the arena and leave two gaps between them, so the exchange requires an ordering of the team as well as a route; the executions differ principally in that ordering. GlobMP completes the instance with no footprint overlap (midpoint frame at 37 s). PCD-SHD and DiRecT each leave five of the twelve robots overlapping a belt at their frames of maximal overlap, 44 s and 65 s respectively, the latter being the latest frame on this map. CD and Final Proj. leave all twelve overlapping, at 40 s and 48 s: both traverse the belts as a single block, so the entire team is inside a region at one instant. MMD-CBS returned no plan on this map; its robots therefore remain on the start ring, and its panel is marked rather than scored, since counting overlaps for a team that never moved would record a success where no trajectory was produced.

MMD-CBS
PCD-SHD
Final Proj.

DiRecT
GlobMP (ours)

Figure 21: Hardware execution on Corridor-Bay: the same methods, with the protocol of Figure 18. As on Drop-Region, three methods complete the exchange with no footprint overlap: PCD-SHD (midpoint frame at 45 s), DiRecT (32 s) and GlobMP (26 s). The remaining three overlap the keep-out regions at their frames of maximal overlap: three of the twelve robots under MMD-CBS (42 s), four under Final Proj. (78 s), the latest frame of maximal overlap in this gallery, and eight under CD (49 s). Final Proj. remains clear for the first minute and overlaps only as the team disperses towards its goals, whereas CD overlaps from early in the execution. MMD-CBS, which returns no plan on two of the other maps, produces one here and brings nine of the twelve robots through without overlap.

MMD-CBS
PCD-SHD
Final Proj.

DiRecT
GlobMP (ours)

Figure 22: Hardware execution on Cross-Room: the same methods, with the protocol of Figure 18. The cross occupies the centre of the arena and leaves four corner regions connected only along the walls, so the exchange must be routed around the arms; a team that advances directly towards its goals enters one of them. GlobMP is the only method that completes the instance with no footprint overlap (midpoint frame at 26 s). At their frames of maximal overlap, six of the twelve robots overlap the cross under DiRecT (37 s) and seven under PCD-SHD (41 s); both route part of the team around the arms and lose the remainder. CD and Final Proj. leave all twelve overlapping, at 38 s and 34 s. MMD-CBS returned no plan on this map as well, so its panel again shows the untouched start ring and is marked rather than scored. With Conveyor, this is the map on which the margin between GlobMP and the baselines is largest under hardware execution.