arXiv:2610.27159cs.AIOct 2026

Manuscript Offprint

arXiv:2610.27159

Learned Control Variates for Rare Grid-Outage Estimation at Electric Vehicle Charging Stations

Sulyman Iyanda, Mansur Arief

Sulyman Iyanda

Industrial and Systems Engineering Department

King Fahd University of Petroleum and Minerals

Dhahran, Saudi Arabia

sulymaniyanda@gmail.com

Mansur Arief

Industrial and Systems Engineering Department

King Fahd University of Petroleum and Minerals

Dhahran, Saudi Arabia

mansur.arief@kfupm.edu.sa

Abstract—Public charging of electric vehicles (EVs) adds a large and synchronized load to the distribution feeders. In most networks, it is rare for charging demand, weather, and local grid conditions to overload a feeder at the same time. When it does happen, the consequences can be severe: an overloaded feeder stresses its transformers and can trigger cascading outages across a city. Planners who design for high reliability therefore need to estimate very small outage probabilities. To that end, plain Monte Carlo estimation with an expensive grid simulator can require a prohibitively large number of runs for this task. To reduce the number of runs, we propose a control variate (CV) built from a learned classifier of the outage, trained on cheap observable features such as temperature and load forecasts. We show that for any binary learner, the variance reduction is an explicit function of its recall and false-positive rate. Furthermore, we show that control variate based on a Gaussian proxy of the load loses its effect as outages become rarer, while a learner with non-vanishing precision keeps removing a fixed fraction of the variance even in the extreme rare-event regime. We verify these results in numerical experiments using a feeder-overload simulator across three orders of magnitude of outage probability and obtain that even weak learner with a single feature can remove a quarter of the variance, while a boosted-tree learner is able to remove about 60%. We then apply the estimator to the feeder network of Surabaya, Indonesia, in which the Gaussian load model leaves every feeder three to seven times the one-day-in-ten-years blackout target. At the same simulation budget, planning the reserve with the learned CV and a 95% confidence limit reduces the city-wide blackout days by a third compared with Monte Carlo point estimates. These results show that learned control variates can help planners design distribution grids that stay reliable against rare outages.

Index Terms—electric vehicle charging, grid reliability, rare-event simulation, control variates, variance reduction, machine learning

I. INTRODUCTION

Electric vehicle (EV) charging is becoming one of the largest new loads on distribution networks. Uncoordinated charging raises the peak demand and could push feeders and transformers beyond their ratings on the few days when charging coincides with a high ambient temperature, a demand forecast miss, or a storm [1]–[4]. Hosting-capacity studies of distribution networks with EV charging stations show that the binding constraint is the loading on a small number of such extreme days [5]. In cities where the grid already operates with little reserve, one such day could result in a local outage, in which public charging stations are among the first loads to be shed or to lose supply [6], [7].

Traditionally, the planning literature on charging stations treats an outage as a service failure, in which vehicles arrive, the station is out of service, and revenue is lost [8]. The consequences of a feeder overload, however, go beyond the station. An overloaded feeder that trips its protection moves its load onto the neighbouring feeders, while transformers that run hot age faster. A sequence of such local events is the mechanism through which large blackouts begin [9], [10]. For example, the August 2003 blackout in North America started from a small number of overloaded lines and cost several billion US dollars [11]. Hence, for a candidate charging station, the grid operator needs to know the probability that its charging load, together with the other loads on the feeder, causes an overload on a given day. Reliability planning works with such probabilities at levels of 10−310^{-3} to 10−610^{-6} per period. The classical loss-of-load criterion of one day in ten years, for instance, corresponds to 2.7×10−42.7 \times 10^{-4} per day [12].

Estimating such a small probability is a rare-event simulation problem. A feeder model with thermal limits, protection logic and stochastic EV arrivals is expensive to run. The Monte Carlo (MC) estimate using nn samples with a target probability θ\theta has relative standard error (1−θ)/(nθ)\sqrt{(1-\theta)/(n\theta)}, which means a 10% relative error at 95% confidence requires about 400/θ400/\theta runs, i.e., four million runs at θ=10−4\theta = 10^{-4}. Earlier work on robust charging-station design [8] is able to reduce this cost with a control variate (CV) built from a Gaussian proxy of the electricity load. This construction, however, assumes that the modeler already knows a Gaussian variable that is strongly correlated with the outage. In practice however, it is often impractical to obtain such proxy. Furthermore, as we show in this paper, such a proxy loses its effect as outages become rarer.

To that end, we propose in this paper to replace the assumed proxy by a learned one. Cheap features that are observable before the expensive simulation is run, such as the temperature anomaly, the day-ahead load forecast and a storm flag, are often available. A classifier trained on a modest number of simulator runs can then predict, though imperfectly, whether the simulator will report an overload. We show that such a classifier only needs to be a weak learner [13], whose value as a control variate is determined by its recall and precision only. We also show that, with a suitable training design, the learner keeps its effect at every rarity level.

In sum, our main contributions are as follows. First, we provide an exact variance formula for the CV estimator built from any binary learner, together with the rare-event limit 1−recall×precision1 - \text{recall} \times \text{precision} of its variance ratio (Theorem 1, Corollary 1). Second, we derive a ceiling on the variance reduction of any learner, which is set by the features, and a proof that a Gaussian proxy loses its effect as the outage becomes rarer (Theorem 2, Proposition 1). Third, we show the exact variance of the estimator with an estimated coefficient and an unlabelled pool, the cost-optimal split between simulator runs and feature draws (Theorem 3), and a training design that keeps the learner informative in the tail (Proposition 2). Finally, we demonstrate using a simulation study that compares plain MC, the Gaussian proxy, a weak learner, a strong learner and the Bayes-posterior ceiling at outage probabilities from 10−310^{-3} to 10−610^{-6} based on a case study on the Surabaya network [8], which quantifies how the load model and the precision of the estimate change the reserve on each feeder and the blackout days the city would experience.

References (45)