Manuscript Offprint
arXiv:2610.27272Certifying Repeatable Entry-Replay Witnesses for COBOL-to-Java Migration
Andras L. Ferenczi , Mariya Bessonov, Allwyn Ponnudurai
Chandrakanth R. Mamillapalli, Krishna K. Maddula, Krishna K. Lingamneni
American Express
Abstract—Producing synthetic data for comparison testing a migrated COBOL application is a major challenge that agentic migrations face today. Our prior paper, the Agentic Method for Deterministic Validation of Legacy Code Migration, presents a deterministic oracle to facilitate such migrations, the Locksmith Loop. We now propose a novel method for achieving high branch and paragraph coverage through generated synthetic end-to-end test cases, by means of entry-replay test-case certification by observing the code execution trace on a surrogate COBOL program that mocks external interactions via a chronological external-operation tape. We applied our method to a very large COBOL program with 33,429 lines of code to generate 849 synthetic end-to-end test cases covering 2,973/3,806 source branches (78.1%) and 989/1,033 main-AST paragraphs (95.7%). Using the Locksmith Loop's projected-agreement validation, the generated Java code matched the COBOL surrogate on the specified observations across all 849 certified synthetic end-to-end test cases. During the campaign we detected 61 defects and fixed the Java generator accordingly. To test whether the coding agent could silently introduce business logic bugs, we seeded 450 defects into the Java code, such as deleted writes, deleted paragraph calls, and altered rounding, to verify how many of these would be detected by the gating methodology. The gate detected 47.6%, including all deleted writes and paragraph calls in executed code, but was unable to detect the rounding and precision defects.
Index Terms—legacy migration, COBOL, differential testing, test generation, deterministic replay, translation validation
I. INTRODUCTION
Agentic legacy migration projects need deterministic methods for validating migrated behavior. Frequently, lack of documentation and test data makes it difficult to validate parity between the legacy code (COBOL, in our case) and the new migrated Java code. Unit tests go only so far as to validate local functionality, and integration tests can go only so far as to minimally validate functionality. Even with comprehensive quality assurance user testing, there is a limited guarantee that the system will work as expected with the COBOL code being the ground truth.
The Locksmith Loop [1] provides two methods for generating witnesses (synthetic end-to-end test cases): the Witness Search (input-space exploration) and the Mutation (parity-preserving code mutation). The Locksmith Loop provided a witness generation method demonstrated on a 4,114-line, 142-paragraph COBOL codebase. This paper evaluates a methodological successor to the Locksmith Loop on a 33,429-line, 1,033-paragraph program.
We focus in this research on a novel approach for witness discovery while reusing the Locksmith Loop agentic method for checking projected agreement between the migrated Java code and the surrogate COBOL codebase on certified witnesses. It is important to clarify that the method does not guarantee production functional parity. It is nevertheless helpful for discovering behavioral differences that might otherwise not be identified.
We ask: RQ1: can our method grow the coverage of the COBOL surrogate, and how does coverage accumulate as the certified catalog grows? RQ2: how does the source-outcome set of the final certified catalog differ from that of the retained local-search corpus? RQ3: how many seeded translation defects does the certified gate detect under the observation projection (Section III), and where does detection fail? RQ4: what kinds of COBOL-to-Java migration bugs did the repeatable certification method expose, and how many repairs did each kind require? RQ5: what are the guarantees and the limits of our witness certification process?
III. SOURCE-REPLAY-CERTIFIED WITNESS METHOD
We define H as the frozen harness (rulebook) that guides the end-to-end process. This includes the rules for resetting the working storage and database to their initial state (for example, the initial 500 records) so that witnesses all see the same exact setup, the rules for which entry values a witness may set and where, how external operation calls are matched against the tape and overlaid onto physical record layouts, what gets instrumented and counted as in scope, what counts
- Construct candidate (no coverage).
Observe concrete transitions. Lift them toward entry.
Output: witness or a named refusal.
candidate
- Certify on compiled source.
Reset the complete harness and replay w.
Pass: stable source signature and conforming tape.
Output: hash-bound certificate and coverage credit.
certificate
- Validate generated Java.
Replay the unchanged certified witness.
Pass: Java matches the declared source projection.
Target-only repairs return to this gate.
Fig. 1. The workflow has three noninterchangeable claims: candidate construction, source certification, and target agreement.
as an accepted terminal outcome, and the normalizers used when comparing runs. Figure 1 shows the steps involved in the process, including: candidate construction, source certification, and target validation. We also define a witness as , where is a list of permitted program entry values and is the chronological tape of operation keys paired with supplied outcomes from external interactions (database, including IMS DL/I segment calls, message queue, file transfer, etc.). We evaluate a run as , with B being the set of branch directions that include IF, EVALUATE, PERFORM UNTIL, SEARCH, and conditional handlers; r is the return code of the program (for example, RETURN-CODE = 0); a is whether the program abended (e.g., INVALID KEY / SIZE ERROR); D is the display (console) output; Q is the paragraph trace (recorded upon entry into a paragraph); O is the trace of the external calls, such as a database call, message queue interaction, a subprogram CALL, etc. This is helpful for verification of behavior parity mismatches, such as translation bugs that can be missed in the final state. F is the final dataset state; the state of the dataset following the witness propagation has to match between the compared codebases. S is the declared final program state (the value of the variables at the moment the program terminates); J is the list of consumed tape indices.
(1)
In Eq. (1), and are the certified COBOL run and the Java run of the same witness , and is the normalized comparison projection, accounting for syntax differences between the two programming languages. It drops , since COBOL's branching structure has no faithful Java counterpart; keeps and as-is (constant here, since only zero-return executions are certified); and normalizes (for cosmetic formatting differences), reduced to first-occurrence order (for structural translation differences), and (for naming-convention differences between COBOL and Java call identifiers). , , and are compared exactly, without normalization. Although is not compared, it is used for source certification and coverage accounting in Eq. (2). Let be the emitted source-direction universe and its reviewed exclusions. Only fresh certified source runs contribute , the certified branch set for witness :
Thus full scoped coverage, source certification, and target agreement are three distinct claims.
The procedure in Fig. 2 takes as inputs a goal g, such as a source direction/branch outcome and p, the paragraph in which the goal lives. T is a table with each row representing entries for a recovered paragraph unit, , which is a COBOL paragraph plus all its internal calls to other paragraphs via PERFORM/PERFORM THRU. A row in T will have the input state (e.g., ITEM-ID, WAREHOUSE-CODE), the local tape (e.g., [1] DB2-LOOKUP:7734 → {STOCK-QTY : 120, STATUS : "IN-STOCK}), observed directions (e.g., 2100-CHECK-INVENTORY: IF WS-QTY < WS-ORDER-QTY → TRUE), executed edges (e.g., 2000-VALIDATE-ORDER → 2100-CHECK-INVENTORY (PERFORM); 2100-CHECK-INVENTORY → 2110-LOOKUP-ITEM (PERFORM)), successor entry state (e.g., WS-VALIDATION-RESULT = "REJECTED-OUT-OF-STOCK"), and a backpointer (e.g., → Row #4182, the row this exploration run was chained from). Initially, T starts empty and the tool makes educated guesses by looking at the code (e.g., IF-statements) plus data that existing witnesses have. The guesses that actually work are inserted into T. We then check at line 3 whether we get rows in T that fire the goal. For example, p = 2100-CHECK-INVENTORY and g is "the IF WS-QTY < WS-ORDER-QTY check evaluates TRUE" (i.e., the out-of-stock branch). Lines 8 to 16 are doing the backward-lifting walk through paragraphs until it reaches the entry point. At line 10, DEMANDOBSERVE makes an attempt to fetch the rows satisfying the condition, however, if none found, it will attempt to generate new rows to meet the ask. Line 14 picks one row from the candidates satisfying edge e, conditioned by an H policy, and prepends it to the list, and in line 15 R gets updated with whatever requirements the upstream step needs. Also, now p is updated to q for the next iteration. Lines 17 to 25 are the refinement loop. It runs up to H.refineCap, a fixed cap. Based on , MATERIALIZE produces on line 18 a candidate witness consisting of the entry input values (drawn from the earliest link in the chain, informed by R) and a single sequential tape stitched together from each row's local tape/environment data along the chain. Next, on line 19 REPLAY runs the compiled COBOL surrogate ( ) injecting w's entry values while consuming w's tape, producing the COBOL execution , which is then retained at line 20. Lines 21 to 23 break from the loop if is accepted per the harness rules and branches covered by include the original goal, g. REFINE at line 24 analyzes the failure of the current execution (using the fresh evidence in , together with the accumulated table T) and re-defines the requirement R and the chain for the next attempt. Line 26 tests whether the goal is absent from the branch set of the final refinement attempt, and if so line 27 returns the refusal, regardless of whether earlier attempts in the loop might have hit the goal but failed the acceptance check on that particular iteration. The FRESHREPLAY at line 29 is necessary to ensure that the witness still meets the goal under a fresh replay ( ) in which H is reset to initial condition. Line 30 verifies that the witness reproduces the same behavior on this second, independent run as it did during refinement — not merely that both runs terminated successfully. SOURCESIG captures all deterministic elements of E except J (which is checked separately via TAPEOK on line 31): (B, r, a, D, Q, O, F, S). Line 33 returns a certification (hash-bound to w and ) covering the compiled surrogate, harness configuration, and
1: procedure CONSTRUCTANDCERTIFY(g, p) 2: SEEDANDFORWARDCLOSE(H) 3: ROWSFIRING(T[p], g) 4: if then 5: return REFUSE(NO-FIRING) 6: end if 7: 8: while ENTRY do 9: CHOOSEPREDECESSOR(p, H) 10: DEMANDOBSERVE(q, e, R, T, H) 11: if then 12: return CLASSIFYREFUSAL(q, e, R) 13: end if 14: 15: REQUIREDINPUTS(M, q); 16: end while 17: for to H.refineCap do 18: MATERIALIZE(R, , H) 19: REPLAY( , w, H) 20: RETAINOBSERVATIONS(T, ) 21: if ACCEPTED( , H) and .B then 22: break 23: end if 24: REFINE(R, , , T, H) 25: end for 26: if .B then 27: return REFUSE(REFINEMENT-CAP) 28: end if 29: FRESHREPLAY( , w, H) 30: stable (SOURCESIG( , H) = SOURCESIG( , H)) 31: tapeOK TAPEOK( , w, H) TAPEOK( , w, H) 32: if ACCEPTED( , H) and stable and tapeOK then 33: return HASHBIND(w, ) credit only .B 34: end if 35: return REJECT(SOURCE-CERTIFICATE) 36: end procedure
Fig. 2. Witness construction and source certification. Internal runs add facts but never coverage; only the fresh replay earns credit.
the witness itself. Should any of these change afterward, the prior certification is nullified; a mismatch signals that the other witnesses also have to be re-verified. Procedure NEXTOUTCOME in Fig. 3 scans row 's tape forward from the last consumed index to find the next entry applicable to external call , under harness ; it marks that entry used and returns its overlaid outcome, or fails if no applicable entry remains.
Per Fig. 2, the flow entails finding a row in T that fires the branch when going after it. What is not explicitly shown here is that the agent may also take a certified witness and tweak its entry values or the tape to go after an uncovered branch. Skipping the T lookup does not mean skipping any of the checks: such candidates still face the same replay, fresh-replay, stability, and TAPEOK gates before earning coverage credit.
IV. EVALUATION
A. Setup
As in the Locksmith Loop [1], we used a production-like COBOL program, here eight times larger (33,429 lines). We instrumented the source's decision constructs and mocked all external interactions (mediated files, database operations, subprograms), correctly handling binary, packed-decimal, redefined, and repeated record layouts along the way. We compiled
1: procedure NEXTOUTCOME(c, M, H) 2: for to do 3: if APPLICABLE(H, c, M.tape[i].key) then 4: M.last i; append i to M.used 5: return OVERLAY(c, M.tape[i].outcome) 6: end if 7: end for 8: return FAIL(MISSING-MATCH) 9: end procedure
Fig. 3. Chronological external-outcome tape matching. Matching moves forward; a missing applicable entry fails replay.
it using GnuCOBOL 3.2.0 on an Arm workstation, targeting OpenJDK 17. Unlike the Locksmith Loop, we did not leverage any test data, but instead generated inputs based on the COPYBOOK structures used by the program.
F holds the final contents of the output files generated by each run in the certified runtime. The remaining output files are served by the mocked I/O layer, so J and O check their operations but not their payloads.
Agent governance. We used commercial LLM-based coding agents to propose witnesses and repairs. The models and agent harnesses were upgraded several times as new versions became available during the campaign. Certification, replay, tape matching, and the comparison are deterministic code that every agent output must pass. An author reviewed the repairs in the surrogate, mock, and capture oracle and accepted them only after the full catalog re-certified.
Sections IV-B–IV-E answer RQ1–RQ4, Section IV-F reports cost, and Section V answers RQ5.
B. Coverage (RQ1)
In the end we covered 2,973/3,806 source branches (78.1%), and 989/1,033 main-AST paragraphs (95.7%). This does not mean that either of the uncovered paragraphs or branches is unreachable, but rather reflects the fact that we intentionally stopped construction once main-AST paragraph coverage passed a 95% target. Even with a “perfect” deterministic match under the declared observation projection, there could exist undetected subtle defects hiding in the code, as quantified in Section IV-D and Table II. For example, the Java code might write the wrong value somewhere in the middle of the program run but then overwrite it with the correct value. Table III reports the full case measurements.
Certified branch and paragraph coverage reached 47.8% and 73.5% after 50 witnesses, which represent only 6% of the catalog. We attribute this to shared validation paragraphs and common error handling routines. Coverage rose to 68.3% branch and 89.9% paragraph after 400 witnesses, and to 78.1% and 95.7% after 849 (Fig. 4). Figures 6 and 7 show how the final paragraph coverage is distributed across the recovered graph and its depth ranks.
Of the 44 unentered main-AST paragraphs, 27 occur at condensation rank zero, making this the largest remaining structural concentration.
No customer data were used in any experiment during the campaign.

Fig. 4. Certified coverage as the catalog grows, measured every 50 witnesses and at 805 and 849.
The other 17 unentered paragraphs are sparsely distributed through ranks 1–20, rather than forming a shallow coverage cutoff.
Figure 5 decomposes the aggregate certified branch coverage in Table III by source decision construct.

Fig. 5. Certified branch coverage by source decision construct. The aggregate is 2,973/3,806 outcomes (78.1%) across 849 entry-replay-certified witnesses.
PERFORM UNTIL outcomes had the highest measured coverage (92.2%), while conditional handlers had the lowest (71.4%); IF, SEARCH, and EVALUATE remained between 76.7% and 78.7%.
C. Corpus Comparison (RQ2)
The agent persisted 133,261 distinct isolated observation rows, most of them redundant or from failed attempts. Separately, 872 whole local/boundary cases were retained as the frozen reporting corpus, covering 2,860 branch outcomes. The certified catalog covered 2,973, with 2,505 shared between them; 468 appear only in the certified catalog and 355 only in the frozen corpus.
D. Fault Detection (RQ3)
To verify our method’s ability to detect unwanted silent business logic changes the agent could potentially introduce, we derived ten mutation operators based on Fig. 9, limited to ten by the cost of finding reliable locations where these

Fig. 6. Scale overview of the recovered graph: 1,033 main-AST paragraphs and 2,029 resolved transfers. Nodes are arranged by longest-path rank in the strongly connected component condensation; filled nodes are the 989 paragraphs entered by certified witnesses. The dense view shows aggregate structure, not evidence about any individual path.
TABLE I MEASURED RUNTIME OF THE FINAL 849-WITNESS VALIDATION GATE. THIS MEASUREMENT EXCLUDES WITNESS CONSTRUCTION, SOURCE COMPILATION, JAVA GENERATION, AND JAVA COMPILATION AND IS NOT AN END-TO-END CONSTRUCTION-COST MEASUREMENT.
| Stage | Runs | Wall clock |
|---|---|---|
| Fresh source replay and capture | 849 | 239.826 s |
| Precompiled Java catalog replay | 849 | 502.846 s |
| Combined measured validation gate | 1,698 | 742.672 s |
operators reside. Our coding agent then created a site search function that looks up the generated Java code to list where every operator can apply (a total of 27,218 candidate sites). We then used a fixed seed to pick 45 sites per operator, a total of 450 sites. Each version of the compiled Java code contained a single mutation. We then replayed the witnesses
TABLE II OBSERVED PROJECTION SIGNATURES AND SCOPE ACROSS 849 WITNESSES. BRANCH PROFILES ARE REPORTING-ONLY.
| Measure | Value |
|---|---|
| Distinct source branch profiles (not compared) | 807 |
| Distinct combined compared projections | 514 |
| Distinct final output-dataset images | 316 |
| Distinct external-operation key sequences | 306 |
| Distinct first-occurrence paragraph traces | 322 |
| Distinct normalized display sequences | 179 |
| Distinct return/abend outcomes | 1 |
| Unpaired write/rewrite payloads | 36,362 |
| Calls with uncompared request arguments | 44,993 |
that reach each mutated line, while stayed fixed. Mutants were killed if disagreement was found under . REDEFINES layout mutants have no executable line: they replay all 849 witnesses and count as reached if a witness enters a paragraph
TABLE III FROZEN CASE-STUDY MEASUREMENTS. AGENT ROWS ARE DESCRIPTIVE WORKLOAD ACCOUNTING ONLY.
| Measure | Value |
|---|---|
| COBOL source lines | 33,429 |
| Unique main-AST paragraphs | 1,033 |
| Emitted source branch outcomes | 3,806 |
| Covered source branch outcomes | 2,973/3,806 |
| Certified witnesses | 849 |
| Source-replay checks passed | 849/849 |
| Entered main-AST paragraphs | 989/1,033 |
| Entered procedure-copybook labels | 88/131 |
| Unentered with a resolved static caller | 17 (7 non-EXIT) |
| Unentered with no resolved static caller | 27 (20 non-EXIT) |
| Agent requests | 1,067 |
| Agent new tokens | 203 M |
| Certified operation-tape entries | 199,906 |
| External operations in the snapshots | 199,906 |
| Certified tapes matching observed trace length | 849/849 |
| Observed operations/witness (median; IQR; max) | 244; 209–280; 477 |
| Interleaved traces / immediate A-B-A | 849/849; 799/849 |
| Certified source branch coverage | 2,973/3,806 (78.1%) |
| Certified main-AST paragraph coverage | 989/1,033 (95.7%) |
| Java agreement under | 849/849 |

Fig. 7. Entered and unentered main-AST paragraphs by longest-path rank in the recovered graph's strongly connected component condensation. Coverage is not a shallow prefix; unentered paragraphs occur throughout the depth.
that names the overlaid field or its group, so this rule affects only the reached/unreached split. The gate killed 214 of 450 mutants (Table IV), 206 of them in code the witnesses reach. No rounding or precision mutant was killed. Of 32 sampled survivors, 6 were equivalent and 26 needed inputs that no witness reaching the site carries.
E. Repair Ledger (RQ4)
We maintained a ledger to keep track of a filtered set of defects encountered and repaired, in the Java or, when a disagreement traced back to them, in the surrogate, mock, or capture oracle, including deterministic disagreements that were consistently recurring rather than one-offs, bugs that occurred in shared code and thus affected multiple witnesses/branches, and defects that were clearly identifiable rather than a collection of small scattered tweaks. The final results can be seen in Fig. 9. Excluding transient bugs, the ledger holds 69 durable repairs: 61 in the Java and 8 in the surrogate, mock, or capture oracle, none of which touched the program's logic. The ledger was filtered and classified retrospectively, so its counts show which kinds of defects the method exposed, not a defect rate.

Fig. 8. (a) Covered source outcomes by number of covering witnesses. (b) Java agreement at each replay checkpoint, ending at 849/849. The dashed line marks catalog growth from 213 to 849 witnesses, not a regression.
TABLE IV SEEDED JAVA-ONLY MUTANTS, 45 PER OPERATOR. REACHED: A CERTIFIED WITNESS EXECUTES THE MUTATED LINE (FOR OVERLAYS, ENTERS A PARAGRAPH NAMING THE FIELD). THE GATE ALSO KILLED 8 UNREACHED REDEFINES MUTANTS (214 OF 450 OVERALL).
| Operator | Reached | Killed | Rate |
|---|---|---|---|
| Deleted WRITE/REWRITE | 43 | 43 | 100% |
| Deleted PERFORM | 40 | 40 | 100% |
| Negated condition | 42 | 39 | 93% |
| Deleted assignment/MOVE | 38 | 26 | 68% |
| Relational operator flip | 43 | 22 | 51% |
| REDEFINES overlay offset | 19 | 6 | 32% |
| Off-by-one OCCURS subscript | 37 | 11 | 30% |
| AND/OR connector swap | 45 | 13 | 29% |
| Packed-decimal sign | 37 | 6 | 16% |
| Arithmetic precision/rounding | 35 | 0 | 0% |
| Total | 379 | 206 | 54% |
F. Validation Loop and Cost
The Java replay used the chronological tape matcher in Fig. 3 and the normalization contract in Eq. (1). As soon as diverged from at any point, the agent would repair, recompile, re-deploy the Java code and re-run the same witnesses until . Figure 8 shows the dependency of progress on full catalog repairs, as previously passing witnesses may fail post-repair. Table I reports the runtime of the final gate: about 12 minutes for all 849 witnesses. Although we tracked the spend of 203 million tokens across 1,067 agent requests, these benchmarks cannot directly be

Fig. 9. Sixty-nine ledgered repair causes by semantic layer; annotations list each bar's mechanisms from left to right.
attributed to algorithmic per-witness spend. The resources allocated included fixes to the reusable Java code generator that made it progressively better over time; it also included tape, runtime, COBOL mock, and parity repairs. Additionally, as the experiment spun across several weeks, the agent models were also uplifted, and hence the token consumption and caching methodologies, as well as costs, changed accordingly.
V. DISCUSSION AND THREATS TO VALIDITY
Certification guarantees repeatable source replay and target agreement under only (RQ5). It does not guarantee production equivalence or any behavior outside . As we only certified successful runs, error scenarios were excluded. Transient storage was also not tracked. To assess the risk of the coding agent introducing unintended business logic changes, we performed a mutation study (Section IV-D) that showed 47.6% fault detection. Our normalization process may also miss genuine parity failures. The GnuCOBOL compiler may not be 100% identical to the original mainframe compiler; for example, ASCII versus EBCDIC mismatches or compiler defects may go unnoticed. For branching we used a limited set of probes: IF, EVALUATE, PERFORM UNTIL, SEARCH, and conditional handlers, which may not be a comprehensive list of inflection points. Future enhancements include a more comprehensive set of branching instrumentation, boundary-directed witness construction, and field-level payload comparison. Although our method does not guarantee 100% code compatibility, we expect it to substantially reduce the number of defects prior to an integration testing phase.
As an engineering campaign that was carried out over time, it leveraged evolving agentic functionality that, in the course of the processing, fixed Java generator bugs, the mock layer, and the certification tools. As a result, it was impossible to establish a “like-for-like” equivalence with the Locksmith Loop witness method. Accordingly, we make no claim of a quantified improvement over the Locksmith Loop witness-generation approach; we report only the coverage achieved on this subject.
Entry-replay certification establishes that the COBOL surrogate and migrated Java agree for the certified witnesses under ; it does not establish identical internal behavior.
VI. CONCLUSION
We describe in this paper entry-replay certification, a novel method for gradually discovering repeatable entry witnesses starting with local isolated discovery and backward lifting. We were able to generate 849 certified witnesses covering 2,973/3,806, or 78.1% of all source branches, and 989/1,033, or 95.7% of the paragraphs, of a 33,429-line production-like COBOL program. A repair ledger supplied useful information about challenges encountered in this migration. The gate exposed 61 Java defects during the campaign and detected 47.6% of seeded mutants, but no rounding or precision defects, since the witnesses rarely exercise value boundaries. We verified feasibility of the solution by creating repeatable source certification and reached COBOL-to-Java agreement for the certified witnesses under the declared observation projection.
DATA AVAILABILITY
The COBOL source, fixtures, witnesses, and generated code are confidential.
REFERENCES
[1] A. Ferenczi, J. Docherty, M. Bessonov, M. Findlay, and K. Lingamneni, "Agentic method for deterministic validation of legacy code migration," arXiv preprint arXiv:2607.28271, 2026.
[2] M. Harman, L. Hu, R. M. Hierons, J. Wegener, H. Sthamer, A. Baresel, and M. Roper, “Testability transformation,” IEEE Transactions on Software Engineering, vol. 30, no. 1, pp. 3–16, 2004.
[3] P. Godefroid, N. Klarlund, and K. Sen, “DART: Directed automated random testing,” in Proceedings of PLDI, 2005, pp. 213–223.
[4] N. Stephens, J. Grosen, C. Salls, A. Dutcher, R. Wang, J. Corbetta, Y. Shoshitaishvili, C. Kruegel, and G. Vigna, “Driller: Augmenting fuzzing through selective symbolic execution,” in Proceedings of NDSS, 2016.
[5] H. Peng, Y. Shoshitaishvili, and M. Payer, “T-Fuzz: Fuzzing by program transformation,” in Proceedings of the IEEE Symposium on Security and Privacy, 2018, pp. 697–710.
[6] R. Baldoni, E. Coppa, D. C. D'Elia, C. Demetrescu, and I. Finocchi, "A survey of symbolic execution techniques," ACM Computing Surveys, vol. 51, no. 3, pp. 50:1–50:39, 2018.
[7] S. G. Elbaum, H. N. Chin, M. B. Dwyer, and J. Dokulil, “Carving differential unit test cases from system test cases,” in Proceedings of the 14th ACM SIGSOFT International Symposium on Foundations of Software Engineering, 2006, pp. 253–264.
[8] D. Saff, S. Artzi, J. H. Perkins, and M. D. Ernst, “Automatic test factoring for Java,” in Proceedings of the 20th IEEE/ACM International Conference on Automated Software Engineering, 2005, pp. 114–123.
[9] A. Kumar, D. Saha, T. Yasue, K. Ono, S. Krishnan, S. Hans, F. Satoh, G. Mitchell, and S. Kumar, “Automated validation of COBOL to Java transformation,” in Proceedings of ASE, 2024, pp. 2415–2418.
[10] S. Hans, A. Kumar, T. Yasue, K. Ono, S. Krishnan, D. Sondhi, F. Satoh, G. Mitchell, S. Kumar, and D. Saha, “Automated testing of COBOL to Java transformation,” in Companion Proceedings of FSE, 2025, pp. 227–237.
[11] K. Etemadi, B. Mohammadi, Z. Su, and M. Monperrus, “Mokav: Execution-driven differential testing with LLMs,” Journal of Systems and Software, vol. 230, p. 112571, 2025.
[12] T. Y. Chen, F.-C. Kuo, H. Liu, P.-L. Poon, D. Towey, T. H. Tse, and Z. Q. Zhou, “Metamorphic testing: A review of challenges and opportunities,” ACM Computing Surveys, vol. 51, no. 1, pp. 4:1–4:27, 2018.
[13] A. Pnueli, M. Siegel, and E. Singerman, “Translation validation,” in Proceedings of TACAS, 1998, pp. 151–166.
[14] E. W. Dijkstra, “Guarded commands, nondeterminacy and formal derivation of programs,” Communications of the ACM, vol. 18, no. 8, pp. 453–457, 1975.
[15] V. Chvátal, “A greedy heuristic for the set-covering problem,” Mathematics of Operations Research, vol. 4, no. 3, pp. 233–235, 1979.
[16] M. J. Harrold, R. Gupta, and M. L. Soffa, “A methodology for controlling the size of a test suite,” ACM Transactions on Software Engineering and Methodology, vol. 2, no. 3, pp. 270–285, Jul. 1993.