Manuscript Offprint
arXiv:2610.24435Energy-optimal scheduling for clocked reversible computing
Michael C. Thumann and David Soloveichik
The University of Texas at Austin, Austin, Texas 78712, USA
Computational dissipation may arise from both information erasure and finite-time operation, although both contributions can in principle be avoided in the absence of space and time constraints. Logically reversible computation can replace erasure with ancilla cleanup, and slow adiabatic protocols can eliminate any excess finite-time dissipation. Under limited memory and in finite time, however, choosing reversible cleanup over erasure requires additional dissipative operations, creating a semi-reversible energy–memory–time tradeoff. We formulate this tradeoff at a fixed operating point of an externally clocked thermally coupled computer, where reversible checkpoint moves and local irreversible erasures have specified effective prices and . Their ratio selects an energy-optimal semi-reversible schedule under a checkpoint-memory bound by trading reversible moves against erasures. For a sequential computation whose dependency graph is a line, we derive an exact separator recurrence and prove that an asymptotically optimal schedule repeats a strictly reversible block followed by one local erasure. Coupling this scheduling theorem to a stochastic-thermodynamic constitutive model shows how temperature, primitive duration, memory, and device-dependent operation costs determine whether the optimal schedule uses reversible cleanup, elective erasures, or erasure at every disposal.
I. INTRODUCTION
How little energy can a computation dissipate under physical constraints? Koomey et al. found that computations per kilowatt-hour improved by roughly a factor of two every 1.5 years for more than six decades [1]. That historical trend does not, however, identify the constraints that will ultimately govern further improvements. One such constraint is information erasure.
Landauer’s foundational analysis showed that logically irreversible information loss carries a minimum heat-dissipation cost at nonzero temperature [2]. Although erasure may appear unavoidable when repeated computations use a finite collection of gates and registers, Bennett showed how uncomputing a computation after reversibly copying its output restores the ancillas to their initial state, removing the need to erase them [3].
Bennett's direct history-saving construction retains the intermediate states needed to run the computation backward, so its memory use grows with the computation length. Reversible pebbling reduces this requirement by strategically interleaving computation, uncomputation, and recomputation. We consider line computations, which pass through a sequence of complete states, each computed from just one predecessor state. Any Turing machine or logic circuit becomes a line computation when a checkpoint (a saved copy of its complete state) is taken at fixed intervals of steps or circuit layers [4]. The line description ignores finer dependency structure, such as parts of the state that can progress independently, which could be exploited by pebbling a directed acyclic graph (DAG), but we choose to analyze it for its generality. For a line computation with S working-state registers in addition to the permanently available input, the farthest node admitting an erasure-free clean finish, ending with only the output checkpoint present, is [4, 5]. We call this limit the memory wall. At the wall, each additional pebble doubles the reachable length, while the number of reversible moves grows by nearly a factor of three , so avoiding erasure may quickly become expensive.
Thinking about reversible computing machines, Bennett distinguished ballistic, fully Brownian, and externally clocked Brownian regimes of reversible computation [6, 7]. Ballistic machines require isolation from thermal noise, and fully Brownian machines advance by a biased random walk with a stochastic completion time. The externally clocked regime instead remains coupled to a thermal environment while a control protocol drives each operation over a fixed clock period. We focus on this latter regime and, to avoid confusion with stochastic models, use the term “externally clocked thermally coupled computer”. In the slow adiabatic limit of an arbitrarily long clock period, logically reversible operations approach zero dissipation [3, 8]. Once a clock period is specified, however, finite-time energetic costs must be supplied by stochastic thermodynamics or another constitutive model [9–13], and both reversible steps and erasures incur excess work. Under bounded memory, avoiding erasure requires additional reversible moves, so the energy-minimizing schedule must balance reversible computation and uncomputation against erasure.
We formulate this line-graph scheduling problem for computations with uniform checkpoint width and uniform local operation prices. For a specified hardware operating point , let and be the effective prices of one reversible checkpoint move and one local checkpoint erasure. For a schedule , let count re-
Bennett’s construction uses three equal-cost recursive phases, giving an exact factor of three and leaving the extra pebble available in phase 1 unused. See Eq. (4).
versible moves and count local erasures. The fixed-price compilation problem is
where is the feasible schedule set at line length n and checkpoint bound S. Once the operating point is fixed, the relative price
sets the exchange rate between erasures and reversible moves, and it alone selects the optimal schedule.
A hardware-relaxed problem adds an outer minimization over the operating point,
The feasible schedule set depends on H only through the memory budget, which fixes S. The outer minimization in Eq. (2) can lower the total computational cost, but once the device is built, its protocols and their durations are fixed, and Eq. (1) is the remaining problem of choosing among valid schedules at given prices. For example, in adiabatic superconducting logic, reversible quantum-flux-parametron operations supply a finite-time reversible move cost [14, 15], while information-disposal operations supply a distinct erasure cost [15, 16], and clocked quantum-dot cellular automata [17, 18] and fully adiabatic CMOS [19] offer similar realizations. More generally, stochastic thermodynamics, device measurements, or another physical model can supply the two effective prices without changing the underlying scheduling problem.
The scheduling problem here builds on the work of Knill, who formulated the time-optimal bounded-space reversible line game as a dynamic program [5]. Bennett's time-space tradeoff has also been analyzed in Refs. [20, 21]. Erasure as a pebbling resource goes back to Li and Vitányi, who traded time and space against the number of irreversible erasures, taking erasures as the energy cost of adiabatic computation [22], and to Li, Tromp, and Vitányi, who bounded how many pebbles a given number of erasures can save [23]. Their springboard construction erases one checkpoint per block of nodes and runs Bennett's recursive schedule within each block. Measurement-based uncomputation plays a similar irreversible role in the spooky pebble game [24]. In these games, irreversible operations are traded against space, and reversible moves count only toward run time. Here both carry prices at a fixed operating point, and we find the schedule that minimizes their weighted sum, with checkpoint space bounded and erasure unconstrained. We call this priced pebble game semi-reversible in the sense of Demaine et al. [25], who define the energy complexity of an algorithm as the number of bits destroyed, counting reversible operations as energetically free, as they are in the adiabatic limit. In that accounting, erasure can save time or space but not energy, whereas in the priced pebble game, energy optimization can favor erasure even when an erasure-free schedule fits within the memory constraint.
We derive an exact separator recurrence for the priced pebble game and use it to find the optimal schedule at any length. In a long computation, most of the schedule lies far from the endpoints, in what we call the bulk. There the recurrence reduces to choosing the best length for a strictly reversible block, and we prove that an optimal schedule simply repeats that block, following each with one erasure. Below , erasure at every disposal is optimal and additional checkpoint memory provides no energy savings. As increases, successive thresholds select longer reversible blocks until the block reaches nodes, where it then coincides with the springboard construction of Ref. [23], except with a time-optimal schedule inside each block. Section VI maps the abstract prices to temperature, primitive duration, and device-dependent finite-time coefficients using a stochastic-thermodynamic constitutive model.
The semi-reversible priced pebble game permits three moves [23]:
• A reversible computation places a pebble on node i at cost only while node is pebbled.
• A reversible uncomputation removes a pebble on node i at cost only while node is pebbled.
• An irreversible erasure removes any pebble on node at cost , regardless of whether its predecessor is present.
A winning schedule starts with no active pebbles and ends with only node n pebbled. In the fully reversible game, S pebbles can reach node if intermediate pebbles may be left behind [23], but a clean winning schedule is possible only up to the memory wall, .
Normalizing the prices in the game by assigns unit cost to the two reversible moves and the dimensionless price to erasures. Throughout, we assume that resets are local and that discarded checkpoints are uniformly distributed over their values, so that the quasistatic reset cost is . In the quasistatic limit,
(a) No erasure

(b) Erase every checkpoint

(c) Elective erasures

FIG. 1. Three n = 4 schedules. Each wire carries one node, orange wires are live checkpoint bits, and black bundles marked are blank ancillas. Panel (a) uses reversible uncomputation, panel (b) erases each old checkpoint immediately, and panel (c) uses one elective erasure.
a fixed reset designed for uniformly distributed checkpoints costs on any input, and its excess over the generalized Landauer cost is dissipated as mismatch cost [26]. The generalized Landauer cost can be smaller. It depends on the checkpoint distribution, on correlations with other stored states [26, 27], and on external side information [28]. Once an algorithm and input distribution are specified, algorithm- and data-specific resets may lower the erasure price [29] and shift the optimal schedule.
From here on, we fix the hardware operating point and write . To connect the pebble game to individual bits and reversible, conservative circuits [8], we assume that every checkpoint contains the same number of bits, b. A working-memory budget of M bits then allows
simultaneously active checkpoints. Figure 1 illustrates the circuit-level interpretation of fully reversible, semi-reversible, and fully irreversible schedules. The mixed schedule in panel (c) shows that well placed erasures can reduce the number of reversible steps.
III. EXACT SCHEDULE OPTIMIZATION AT FIXED PRICES
With the game and its prices fixed, let be the minimum dimensionless cost of a winning priced schedule on an interval of length n with space bound S. The base cases are
The first case is the forced placement of node 1, while the second expresses the fact that advancing beyond node 1 requires simultaneously holding a predecessor and a new pebble.
Knill’s dynamic program for the bounded-space fully reversible pebble game [5] gives the recurrence
(4)
where is the minimum number of reversible moves in the strictly reversible schedule. The base cases are again and for . The three terms in Eq. (4) correspond to the three-phase schedule
in which an intermediate node m is chosen as the furthest intermediate node that the lowest pebble achieves at any time. An optimal schedule need not run these phases one after another, since moves below and above m can interleave. Knill showed, however, that projecting the moves onto the nodes below and above m splits any optimal schedule into the three subproblems, so the phases can always be run in sequence at no extra cost [5]. In sequential form, phase 1 uses only nodes below m, phase 2 only nodes above m, and phase 3 again only nodes below m. Phases 1 and 2 are recursive subproblems with m as the output and the input, respectively, and phase 3 is the time reverse of a schedule that builds m. Phase 1 has all S pebbles available. Phases 2 and 3 have only S - 1, because the pebble on m is held as the input during phase 2 and the pebble on n is held as the output during phase 3.
We prove that the priced pebble game inherits this separator structure, but phase 3 can now remove m either by reversible uncomputation at cost or by erasure at cost . Theorem 1 takes the cheaper of the two. Erasures inside phases 1 and 2 appear as phase-3 choices at deeper levels of the recurrence.
Theorem 1 (Priced separator recurrence). For and ,
(5)
The lower bound requires the projection argument to survive erasure. Appendix A proves that any optimal priced schedule can be transformed into a valid projection form, and thus a sequential three-phase form without increasing its cost or move count (Lemmas 3 and 4).
Proof. For the upper bound, fix . In phase 1, compute node on the lower interval using an optimal priced schedule with space . This costs . In phase 2, hold fixed and compute the upper interval , treating as the permanent predecessor of . After reindexing, this is a priced schedule of length using at most active pebbles, and so costs .
At this point the only active pebbles are m and n. In phase 3, dispose of m. Either erase m directly at cost , or reversibly uncompute the lower block with the remaining pebbles while n is held fixed. Run backwards, reversible cleanup is a schedule that builds m with S - 1 pebbles, so the cheapest reversible cleanup costs . It follows that for every m,
Minimizing over m gives the upper bound. The lower bound is the statement of Lemma 4, proven in Appendix A.
Combining the upper and lower bounds proves the recurrence.
For fixed , tabulating the recurrence through line length N and checkpoint budget S requires time and storage, including the table for F. When several schedules have the same energy, we report one with the smaller move count . If that quantity also ties, we report the schedule with more erasures. Neither convention changes the minimum cost.
IV. FINITE-LENGTH SCHEDULE REGIMES
The recurrence Eq. (5) recovers two limiting regimes in closed form. First consider the case . For , the only feasible separator is
giving the optimal schedule as a two-pebble erasure glider. The costs are
For , the recurrence leads to
Since any two-pebble schedule remains legal when more pebbles are available, for all n and . Unlike the strictly reversible game, the priced game faces no memory wall.
At the opposite extreme, suppose and . Then the strictly reversible full compute-uncompute schedule is feasible at the optimal cost . In the separator recurrence this regime is the minimizing choice at every level.
Between these extremes, limited memory forces a choice between recomputation and erasure. Whenever pebbles are available, and the output lies beyond the memory wall, , every winning schedule contains at least one erasure. Let be the fewest erasures of any winning schedule, so that up to the wall and beyond it. Price and memory then divide the plane into the regimes of Fig. 2(a), labeled by the optimal erasure count . For , erasure is cheaper than reversible removal, so every disposal is erased and the optimum is the two-pebble erasure glider with . For , any erasures beyond are elective. They are chosen on energetic grounds even though a schedule with fewer erasures exists. The optimal erasure count never increases with , and for large enough it reaches . There the optimum is the minimum-erasure schedule, which is erasure-free below the wall and contains only the number of unavoidable erasures above it.
The same tradeoff can be viewed in move-count space. Let be the set of attainable pairs . Figure 2(b) shows its supported frontier. As increases, the selected point moves toward fewer erasures and more reversible work.
V. THE BULK OPTIMUM
While the recurrence in Eq. (5) gives the exact finite-length optimum, long computations have a simpler structure. Away from the endpoints, a periodic schedule attains the optimal cost per step, with each period a strictly reversible block followed by a single erasure.
Suppose the only stored checkpoint is a boundary node x. A strict period of length B holds x fixed, uses the remaining S - 1 pebbles to compute node while reversibly cleaning every intermediate checkpoint, and then erases x. Node becomes the boundary for the next period (Fig. 3). The reversible part of the period is a fully reversible schedule of length B with S - 1 pebbles, so it costs and is feasible only for
the clean-finish limit of S - 1 pebbles. The erasure costs . One period therefore advances the computation by B nodes at a cost per node of
The block length trades off two effects: while increasing the block length spreads the single erasure cost over more
(a) Optimal-schedule regimes, S = 8

(b) Exact schedule frontier, n = 128, S = 8
FIG. 2. Exact schedule structure at . (a) Optimal erasure count in the plane, from the exact recurrence on a 241-point logarithmic price grid, with as defined in the text. The dashed line marks the memory wall . (b) Supported reversible-move/erasure frontier at the memory wall . Color indicates a representative price that selects each supported schedule.

FIG. 3. Two interior periods of the optimal bulk schedule for and , where and . Each period uses at most four live pebbles, performs nine reversible moves, erases the old boundary once, and relabels the output as the next input. Thus interior periods have , , and normalized cost . The protected global input and final output contribute only a bounded endpoint correction.
nodes, the reversible cost per node grows because cleaning a longer block with fixed memory requires more recomputation. The best block length and the resulting density are
Which block length wins depends on the erasure price. Comparing two lengths in Eq. (6), the longer block is preferred when
For , is optimal and , so every old checkpoint is erased immediately. Increasing selects progressively longer strict blocks until reaches . At , repeating the block reproduces the springboard schedule of Ref. [23], except that each period cleans up with Knill's time-optimal reversible moves rather than the of Bennett's recursive schedule.
Lemma 1 (Strict-partition domination). Consider a priced schedule constructed recursively by Eq. (5) that advances B nodes with space k, uses R reversible moves, and contains I internal erasures. There is an ordered composition separated by erasures
Every part obeys . The reversible work obeys
The proof (Appendix B) inducts over the tree of separators generated by Eq. (5).
(a) Finite computations,

(b) Finite computations,
(c) Bennett's construction, long-computation limit

FIG. 4. Optimal schedule compared with simpler strategies. (a), (b) Cost per step at for and 50 using the exact optimum of Eq. (5), the repeated optimal block of Theorem 2 ( and 22), the best minimum-erasure schedule (the optimum), and erasing every checkpoint (the two-pebble glider). The dashed line marks the memory wall . (c) The bulk cost of Bennett's construction [4] relative to the exact bulk optimum at . We repeat Bennett's recursive construction in blocks and erase the boundary checkpoint between consecutive blocks. At each erasure price we choose the number of segments per level and the recursion depth that give the lowest cost per node. Shaded bands mark the selected .
Theorem 2 (Exact repeated-strict-block bulk optimum). For every and ,
Consequently as . Repeating a minimizing strict block , followed by one local erasure, attains this exact bulk density.
Proof. Let . For any , take an optimal schedule from Theorem 1. By Lemma 1 it splits into parts, each a feasible strict block, with . Including one boundary erasure,
(12)
For the upper bound, let and , with . Computing the remainder and then strict periods gives
For the matching lower bound, we set . We prove for every by induction on . The case follows from and nonnegative costs. For , let minimize Eq. (5) and set . If , then , so the separator is erased. The induction hypothesis and Eq. (12) give
If , Eq. (12) gives . Dropping the other nonnegative terms in the recurrence and using again gives
The upper and lower bounds prove Eq. (11).
Because the endpoint correction is bounded, the cost per step approaches as , and Fig. 4(a),(b) shows the repeated block approaching the exact optimum within a few periods. For comparison, the figure also shows the minimum-erasure schedule, which is the optimum, and the schedule that erases every checkpoint. At the former can cost more than the latter, so insisting on reversibility can cost more than abandoning it.
Figure 4(c) compares the bulk optimum with periods built from Bennett's construction [4], the classic reversible time-space tradeoff, in its general form with k segments per recursion level. With h levels, it advances nodes using reversible moves and pebbles. We choose k and h to fit within S-1 pebbles and minimize the bulk density at each price. A single level is a plain compute-uncompute of nodes, which matches the optimum whenever . At intermediate prices, Bennett's construction costs up to several times the optimum. Once grows large, both schedules use blocks near and the erasure term dominates, so they agree again.
VI. FROM OPERATION PRICES TO PHYSICAL WORK
Modern stochastic thermodynamics provides a broad framework for analyzing the entropic costs of computational processes [30]. Considering externally clocked thermally coupled devices whose clock and control protocols are fixed across a computation, we can map protocol timesteps to our relative prices to find the corresponding physical work. All candidate schedules are therefore compared at the same primitive duration , although their total completion times may differ because they contain different numbers of operations.
For fixed endpoints and a time-rescaled protocol in the linear-response regime, the leading mean excess work has the form [9]. Let be the finite-time coefficient per erased bit and the coefficient of one reversible checkpoint move. Both coefficients may themselves depend on temperature [9], though we suppress that dependence in the notation below, because the schedule optimization depends on the hardware only through . As stated in Sec. II, we assume that a discarded checkpoint is uniformly distributed over its values and that resets are local, so they cannot exploit correlations with retained states. The quasistatic checkpoint reset cost is then the total Landauer cost
and we take the same reset price at every checkpoint location. Algorithm- or data-specific resets can do better [29], but this uniform cost keeps the schedule algorithm-independent. On the linear-response validity domain we take
where may depend on both the checkpoint width b and the gates being implemented. In this model the operating point of Sec. I is , with the coefficients and fixed by the device.
Finite-time erasure models provide realizations of the term [10, 31, 32], and experiments on colloidal bits measure an erasure cost approaching the Landauer value with the same correction [33, 34]. Outside D, the cost law depends on the device dynamics and allowed controls [35–37].
The induced relative price is
Thus, at fixed temperature, increasing makes erasure more expensive relative to reversible cleanup. An abstract crossover at which the optimal block length changes, given by Eq. (9) for the two competing lengths, therefore occurs at the primitive duration , where jumps (Fig. 5(a)). We restore units to find the finite-length minimum energy is
Theorem 2 then gives the exact bulk work per simulated step as
(15)
Within this model, at every primitive duration, with the bound approached at short durations or low temperatures. If , erasing every checkpoint is optimal whenever , where and is independent of S, because extra checkpoint memory does not help the two-pebble glider. If , the model never makes erasure cheaper than a reversible move. Figure 5 uses , so the boundary is at .
In the opposite, slow-driving limit, reversible excess work vanishes, but old boundary checkpoints must still be erased at least once every steps. Since , Eq. (15) is bounded below by and above by its value at . Both bounds converge as to the floor
(a) Exact bulk block selection
(b) Fixed-clock energy density

primitive duration
primitive duration
FIG. 5. Exact fixed-period bulk optimum for under Eq. (13), with and the illustrative validity domain . (a) Optimal strict-block length . Dotted lines mark . At an exact crossover several block lengths tie. The curve breaks ties by minimizing the operation density , and open markers show the shortest tied block. At the curve displays . (b) Corresponding normalized bulk work. The dashed line marks , at ; to its left every optimal non-output disposal is an erasure and additional checkpoint memory does not lower the work, and reversible removals may tie on the line itself. This is an illustrative slice of the general hardware-dependent phase diagram.
which sets the plateaus in Fig. 5(b). Without a time constraint (see Appendix C), the outer minimization in Eq. (2) therefore favors the slowest possible clock at fixed temperature.
VII. DISCUSSION
We have determined the exact tradeoff between reversible checkpoint moves and local erasures for a line computation with bounded memory and fixed operation prices. The separator recurrence gives the finite-length optimal schedule, while optimal schedules in the bulk of long computations are attained by repeating one strictly reversible block followed by one local erasure.
At a fixed hardware operating point, the platform supplies , , and a checkpoint-memory budget. Changing the hardware operating point can reduce the cost of reversible operations toward the adiabatic slow-driving limit, but at a fixed operating point, reversible cleanup need not minimize energy. Elective erasure can be energy optimal, since logically reversible operations will dissipate energy when performed in finite time. The scheduling results apply to any device model that supplies the assumed uniform operation prices.
Wolpert et al. call for understanding how energy cost trades off against time, memory, and other traditional computational resources, and attribute the gap between actual and minimal dissipation to physical constraints on real computers [38]. Demaine et al. similarly identify lower bounds on time-space-energy tradeoffs as a major open direction for semi-reversible computing [25]. For line computations in the pebble model, Theorems 1 and 2 give such a tradeoff exactly. Real computers face many physical constraints, including clocks, memory, and limited connectivity. Two of them, a fixed clock period and bounded checkpoint memory, already force a nonzero dissipation per step here, even though logically reversible operation is available. The result is algorithm-independent because we assume uniform checkpoint widths and operation prices, uniformly distributed checkpoint contents, and local resets.
A more detailed thermodynamic analysis requires a specified algorithm, input distribution, and physical implementation [39, 40], which would also fix the generalized Landauer cost of each reset. Allowing the bit width and gate depth to vary along the computation, or computing on a specific DAG, adds scheduling complexity. We also neglect routing costs, external clocking costs, and bit storage costs.
To maximize computational throughput per watt, spatial parallelization can be paired with slower computation up to the limits set by the serial portions of the dependency structure, as quantified by Amdahl's law [41]. Once parallelization is exhausted, the remaining serial parts can be represented as line computations using complete-state checkpoints, to which the scheduling result here applies. Appendix C introduces a wall-clock deadline, which sets each schedule's primitive duration , so its operation costs depend on its total number of moves. Jointly optimizing parallelization, clock period, and checkpoint scheduling remains an open direction.
ACKNOWLEDGMENTS
M.C.T. was supported by a Department of Defense National Defense Science and Engineering Graduate (ND-SEG) Fellowship. This material is based upon work supported by the Air Force Office of Scientific Research under award number FA9550-23-F-0014 in the amount of $136,200. D.S. is supported by a Schmidt Sciences Polymath Award.
Appendix A Separator normal form
The three-phase construction in the main text gives an upper bound on the optimal cost. It computes a checkpoint at m, advances from m to n, and then disposes of m. This appendix proves the matching lower bound. Even a schedule that interleaves work on both sides of m must pay for the same three subproblems, for a suitable choice of m. The proof adapts Knill's proof of Eq. (4) [5, Theorem 2.1] to allow for erasures. We rearrange erasures and reversible moves without increasing cost so that an upper pebble remains present during the phase-3 lower-block cleanup. Cleanup containing erasures is treated separately because it cannot always be reversed.
The key question is how much memory the cleanup has. If the lower block is cleaned reversibly while an upper-block pebble is present, cleanup has at most pebbles and costs at least . We must therefore rule out any advantage from starting this cleanup while the upper block is still empty, when all S pebbles would be available. Lemmas 2 and 3 show that an optimal schedule can avoid this situation. Lemma 4 then bounds separately the cost of building the separator, computing above it, and cleaning below it. These are three disjoint sets of moves that make up the three phases. They need not be three consecutive stretches of time in the original schedule.
Throughout, is the set of active pebbles after move , excluding the permanent input at node 0, with . We call a schedule optimal if it has minimum cost and, among schedules of that cost, the fewest moves. Counting moves rules out unnecessary detours even when .
Lemma 2 (Lower-block bypass). Let , , and . Suppose satisfies
Among legal priced schedules on this lower block from to P, with space bound S and m protected from erasure, there is an optimal one that never visits .
Proof. The hypotheses imply , so . Choose an optimal schedule with as few visits to as possible, and suppose it visits . Since , there is a next move. Node is protected from erasure, its predecessor is absent, and no nodes above are available. The only legal next move is therefore to add node 1.
The move entering must remove some . It cannot add , since adding requires , which would then still be present. Thus the two moves are
If , they return to the same configuration and can be deleted, which contradicts optimality.
If , removing q must be an erasure, because is absent. Replace the two moves by
The intermediate configuration has three pebbles, which allows. The replacement has the same cost and move count but one fewer visit to , again a contradiction.
Lemma 3 (Clean-handoff normal form). For , , and , there is an optimal winning schedule in which, whenever with , the next move places a pebble at .
Proof. Call a time with , , a bad hand-off at index if the next move is on . The only possible move above from this configuration is the placement of , so it is sufficient to exclude bad hand-offs.
Suppose, for contradiction, that every optimal winning schedule has a bad handoff. Choose one whose largest bad-handoff index m is as small as possible. Let t be its last bad handoff at index m, and let v be the first move above m after t. Such a move must occur to reach n.
From time until just before move , the upper block is empty, since and is the first upper move after . Move therefore adds . Write and . Since the upper block is empty and is legal,
If , the moves between and return the schedule to . There is at least one such move because is a bad handoff, so deleting them contradicts optimality. Hence . Then , which gives and .
Keep only the lower-block moves in the prefix before v, preserving their order. This gives a legal schedule from to P, because lower moves do not depend on upper pebbles and removing upper moves can only reduce occupancy. To make m a protected output of this shortened schedule, delete each placement of m except the last, together with the removal of m that follows it. These deletions are legal because m is a predecessor only of , which does not appear in the shortened schedule. The result has no greater cost or move count and never erases m.
This shortened schedule satisfies the hypotheses of Lemma 2. Replace it by an optimal one that reaches P without visiting , and append the original suffix beginning with move v. The result is a legal winning schedule that is at least as good as the original, so it is also optimal.
The new prefix contains no visit to and no node above m, so any bad handoff in it has index below m. The unchanged suffix contains no bad handoff at m, because t was the last one, and none above m, because m was the largest index. The new schedule is optimal, so by assumption it has a bad handoff, and every bad handoff it has lies below m. This contradicts the choice of m. □
Lemma 4 (Separator decomposition). For , , and ,
Proof. By Lemma 3, there is an optimal winning schedule in which, whenever with , the next move places a pebble at . Let be its final time, so and . An earlier visit to or a return to would let the schedule be shortened, so is nonempty and different from for .
Choosing the separator. Track the leftmost occupied node and take its largest value before completion,
Since , , so . Since , the lower block contains at least one pebble at every intermediate time. Let , and let be the last time before at which , so that
The upper block is also occupied at . Otherwise , and Lemma 3 makes the next move add . That would give and at a later time before , which contradicts the choice of . The upper block also cannot become empty again before . If it did, the upper-block moves from its first occupation through that return would take it from empty back to empty. Lower moves never depend on upper pebbles, so deleting those upper moves would give a legal winning schedule with no greater cost and fewer moves. Hence is occupied at every time from to .
We partition the moves into three sets. These are the lower-block moves up to , all upper-block moves, and the lower-block moves after . Each move belongs to exactly one set, and we bound their respective costs.
-
Building the lower checkpoint. Keep only the lower-block moves up to time . They form a legal lower-block schedule from to using at most pebbles. As in the proof of Lemma 3, delete each placement of except the last, together with the removal of that follows it. This protects from erasure without increasing cost, so these moves cost at least .
-
Computing the upper block. Keep all moves on in their original order and treat as their permanent input. Every reversible move at originally had present, and an erasure needs no predecessor. All other predecessor conditions lie within . This gives a legal priced schedule from the empty upper block to . Because the lower block is occupied at every intermediate time, the upper block subproblem uses at most pebbles. Relabeling as therefore shows that these moves cost at least .
-
Cleaning the lower block. The remaining lower-block moves form a sequence . It starts from and ends with the lower block empty, since . We consider two cases.
(i) If U contains an erasure, it costs at least , the price of erasing m directly, because every move has nonnegative cost. No mixture of further erasures and reversible moves can bring the cleanup below this.
(ii) If contains no erasure, every move of is reversible. Each is made after , while is occupied, so the lower block holds at most pebbles throughout . Reversing the order of the moves and swapping placements with removals gives a legal construction of from , because a reversible move needs the same predecessor in both directions. An erasure may not have a legal reverse, because its predecessor can be absent. Hence a reversible costs at least .
With the two cases at hand, we have shown that costs at least .
Adding the three bounds yields
This holds for the separator chosen from , so it also holds with the right-hand side minimized over all .
Lemma 4 shows that interleaving moves cannot reduce the cost below Eq. (5). Together with the three-phase construction in the main text, this proves Theorem 1.
Appendix B Strict-partition proof
We use two standard monotonicities of the reversible cost [5, Observation 2.2(ii)–(iii)]:
(a \leq m).
(B1)
The merge step below also uses Knill's reversible separator recurrence [5, Theorem 2.1].
Proof of Lemma 1. Induct on the separator tree. The one-node schedule is the base case. Suppose the root separator splits . Let the left (phase 1) and right (phase 2) subproblems have data at space and at space , and apply the induction hypothesis to both.
If the separator is erased in phase 3, take the left parts followed by the right parts, with the erased separator m as the boundary between them. Promoting the right parts from space to cannot increase their reversible cost by Eq. (B1). Given , the composition then has parts and strict cost at most .
If the separator is cleaned reversibly, its cleanup costs and . Let be the last left part and the first right part. Feasibility gives and . The space- induction hypothesis also gives , and thus . The Knill recurrence and Eq. (B1) give
(B2)
So the actual cleanup pays for merging the two boundary parts into . All remaining right parts can be promoted to space . The resulting composition has parts, total length , and strict cost at most .
Appendix C Scheduling under a fixed completion time
The main text compares schedules at a fixed primitive period . Suppose instead that a serialized computation must finish by an externally imposed time , with every primitive in the selected schedule uniformly retimed. If a schedule uses erasures and reversible moves, write . The cost of any fixed schedule decreases with , so an optimal schedule uses the entire available time, . We restrict to schedules with , so that .
Substitution into Eq. (13) gives
Recalling that is the set of attainable count pairs for , the exact serialized fixed-completion-time problem is
Since the objective increases with both I and R, the optimum is a Pareto-minimal pair in . Each schedule runs at its own period , however, so the optimum need not minimize the fixed-price cost at any single .
[1] J. Koomey, S. Berard, M. Sanchez, and H. Wong, Implications of Historical Trends in the Electrical Efficiency of Computing, IEEE Annals of the History of Computing 33, 46 (2011).
[2] R. Landauer, Irreversibility and Heat Generation in the Computing Process, IBM Journal of Research and Development 5, 183 (1961).
[3] C. H. Bennett, Logical Reversibility of Computation, IBM Journal of Research and Development 17, 525 (1973).
[4] C. H. Bennett, Time/Space Trade-Offs for Reversible Computation, SIAM Journal on Computing 18, 766 (1989).
[5] E. Knill, An analysis of Bennett's pebble game (1995), arXiv:math/9508218.
[6] C. H. Bennett, The thermodynamics of computation—a review, International Journal of Theoretical Physics 21, 905 (1982).
[7] C. H. Bennett, Notes on Landauer's principle, reversible computation, and Maxwell's Demon, Studies in History and Philosophy of Science Part B: Studies in History and Philosophy of Modern Physics 34, 501 (2003).
[8] E. Fredkin and T. Toffoli, Conservative logic, International Journal of Theoretical Physics 21, 219 (1982).
[9] D. A. Sivak and G. E. Crooks, Thermodynamic Metrics and Optimal Paths, Physical Review Letters 108, 190602 (2012).
[10] K. Proesmans, J. Ehrich, and J. Bechhoefer, Finite-Time Landauer Principle, Physical Review Letters 125, 100602 (2020).
[11] Y.-Z. Zhen, D. Egloff, K. Modi, and O. Dahlsten, Universal bound on energy cost of bit reset in finite time, Physical Review Letters 127, 190602 (2021).
[12] J. S. Lee, S. Lee, H. Kwon, and H. Park, Speed limit for a highly irreversible process and tight finite-time Landauer's bound, Physical Review Letters 129, 120603 (2022).
[13] T. Kamijima, K. Funo, and T. Sagawa, Finite-time thermodynamic bounds and trade-off relations for information processing, Physical Review Research 7, 013329 (2025).
[14] N. Takeuchi, Y. Yamanashi, and N. Yoshikawa, Reversibility and energy dissipation in adiabatic superconductor logic, Scientific Reports 7, 75 (2017).
[15] T. Yamae, N. Takeuchi, and N. Yoshikawa, Minimum energy dissipation required for information processing using adiabatic quantum-flux-parametron circuits, Journal of Applied Physics 135, 063902 (2024).
[16] Q. Herr, Landauer-Limited Dissipation in Quantum-Flux-Parametron Logic (2025), arXiv:2504.04284 [physics.app-ph].
[17] C. Lent and P. Tougaw, A device architecture for computing with quantum dots, Proceedings of the IEEE 85, 541 (1997).
[18] C. S. Lent, M. Liu, and Y. Lu, Bennett clocking of quantum-dot cellular automata and the limits to binary logic scaling, Nanotechnology 17, 4240 (2006).
[19] M. P. Frank, R. W. Brocato, B. D. Tierney, N. A. Missert, and A. H. Hsia, Reversible computing with fast, fully static, fully adiabatic CMOS, in 2020 International Conference on Rebooting Computing (ICRC) (IEEE, 2020) arXiv:2009.00448.
[20] R. Y. Levine and A. T. Sherman, A note on Bennett's time-space tradeoff for reversible computation, SIAM Journal on Computing 19, 673 (1990).
[21] R. Královič, Time and space complexity of reversible pebbling, RAIRO - Theoretical Informatics and Applications 38, 137 (2004).
[22] M. Li and P. Vitányi, Reversibility and adiabatic computation: trading time and space for energy, Proceedings of the Royal Society of London. Series A: Mathematical, Physical and Engineering Sciences 452, 769 (1996).
[23] M. Li, J. Tromp, and P. Vitányi, Reversible Simulation of Irreversible Computation by Pebble Games, Physica D: Nonlinear Phenomena 120, 168 (1998), arXiv:quant-ph/9703009.
[24] N. Kornerup, J. Sadun, and D. Soloveichik, Tight bounds on the spooky pebble game: recycling qubits with measurements, Quantum 9, 1636 (2025).
[25] E. D. Demaine, J. Lynch, G. J. Mirano, and N. Tyagi, Energy-Efficient Algorithms, in Proceedings of the 2016 ACM Conference on Innovations in Theoretical Computer Science, ITCS '16 (Association for Computing Machinery, New York, NY, USA, 2016) pp. 321–332.
[26] A. Kolchinsky and D. H. Wolpert, Dependence of integrated, instantaneous, and fluctuating entropy production on the initial state in quantum and classical processes, Physical Review E 104, 054107 (2021).
[27] D. H. Wolpert and A. Kolchinsky, Thermodynamics of computing with circuits, New Journal of Physics 22, 063047 (2020).
[28] P. Faist, F. Dupuis, J. Oppenheim, and R. Renner, The minimal work cost of information processing, Nature Communications 6, 7669 (2015).
[29] M. P. Frank, Foundations of Generalized Reversible Computing, in Reversible Computation, edited by I. Phillips and H. Rahaman (Springer International Publishing, Cham, 2017) pp. 19–34.
[30] D. H. Wolpert, The stochastic thermodynamics of computation, Journal of Physics A: Mathematical and Theoretical 52, 193001 (2019).
[31] P. R. Zulkowski and M. R. DeWeese, Optimal finite-time erasure of a classical bit, Physical Review E 89, 052140 (2014).
[32] K. Proesmans, J. Ehrich, and J. Bechhoefer, Optimal finite-time bit erasure under full control, Physical Review E 102, 032105 (2020).
[33] A. Bérut, A. Arakelyan, A. Petrosyan, S. Ciliberto, R. Dillenschneider, and E. Lutz, Experimental verification of Landauer's principle linking information and thermodynamics, Nature 483, 187 (2012).
[34] Y. Jun, M. Gavrilov, and J. Bechhoefer, High-precision test of Landauer's principle in a feedback trap, Physical Review Letters 113, 190601 (2014).
[35] A. Kolchinsky and D. H. Wolpert, Work, Entropy Production, and Thermodynamics of Information under Protocol Constraints, Physical Review X 11, 041024 (2021).
[36] A. Zhong and M. R. DeWeese, Limited-control optimal protocols arbitrarily far from equilibrium, Physical Review E 106, 044135 (2022).
[37] S. Dago, S. Ciliberto, and L. Bellon, Adiabatic computing for optimal thermodynamic efficiency of information processing, Proceedings of the National Academy of Sciences 120, e2301742120 (2023).
[38] D. H. Wolpert, J. Korbel, C. W. Lynn, F. Tasnim, J. A. Grochow, G. Kardes, J. B. Aimone, V. Balasubramanian, E. De Giuli, D. Doty, N. Freitas, M. Marsili, T. E. Ouldridge, A. W. Richa, P. Riechers, É. Roldán, B. Rubenstein, Z. Toroczkai, and J. Paradiso, Is stochastic thermodynamics the key to understanding the energy costs of computation?, Proceedings of the National Academy of Sciences 121, e2321112121 (2024).
[39] A. Yadav, M. Yousef, and D. Wolpert, Minimal thermodynamic cost of computing with circuits (2025), arXiv:2504.04031 [cond-mat.stat-mech].
[40] A. Yadav, F. Caravelli, and D. Wolpert, Entropy production bounds for systems running computer programs, PNAS Nexus 5, pgag116 (2026).
[41] M. Konopik, T. Korten, E. Lutz, and H. Linke, Fundamental energy cost of finite-time parallelizable computing, Nature Communications 14, 447 (2023).