The Hidden Look-Ahead: Point-in-Time Leakage in Electricity Market Data

Abdelkrim Alfalah

Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.

Abstract

Empirical studies of electricity prices routinely state that their models use only information available at the time of the trading decision. For weather-driven forecasts drawn from commercial archives, this condition is harder to meet than it appears, and whether it holds can change over time. We identify three timing pitfalls. A forecast run is labelled by the issue time of its weather model, but becomes available hours later and keeps changing after publication. Auction gates follow local clock time, while archives use UTC. Outturn series are revised after publication without earlier values being kept. Using the timestamps of 128,656 forecast runs from ten weather-model configurations, matched to the day-ahead and first intraday auction gates in Great Britain over 2022–2026, we find that selecting “the latest run issued before the gate” picks a run not yet published at the gate on more than 99% of delivery days for six of the ten configurations at one of the two gates. For GFS at the day-ahead gate, the share is 0.6% in winter and 99.8% in summer. The exposure also shifts as publication delays drift, and an action margin of a few minutes can cost a full six-hour forecast cycle. The wrongly selected inputs differ materially from those available at the gate, but their apparent accuracy gain ranges from −9% to +24% across variables, models, gates and seasons, so its effect cannot be assumed and must be measured. We argue that point-in-time correctness is a dynamic property of the data pipeline, and propose a protocol that audits it from timestamps before any model is fitted.

1 Introduction

Electricity in Great Britain, as in most European markets, is traded for physical delivery through a sequence of auctions held on the day before delivery and on the delivery day itself, followed by continuous intraday trading. With a growing share of wind and solar generation, the information that moves prices between these auctions is increasingly weather-driven: forecasts of wind output, solar output and demand, updated several times a day as new numerical weather prediction runs become available (Weron, 2014; Lago et al., 2021). Empirical studies of day-ahead and intraday prices therefore rely heavily on such forecasts as explanatory variables.

A study of this kind is only informative about trading decisions if each feature was available when the corresponding decision had to be taken. This point-in-time condition is easy to state and, as we show, easy to violate. Forecast archives make it so: runs are indexed by the time their weather model was initialised, and the obvious query, “the latest run issued before the gate closure”, returns runs that were published only hours later. Sequential auctions make the problem sharper, because each gate closure defines a different information set, a few hours apart.

The problem concerns reconstructed history, not live trading. A system operating at the gate can only see runs that have been published, so it cannot look ahead. Leakage arises when the past is rebuilt from a complete archive, as in backtests, model training and empirical research, which then receive fresher or later-revised inputs than any participant had. Its most direct consequence is a training-serving skew: a model trained on runs that were not yet available at the gate receives older runs in production, and can perform worse for no visible reason.

This paper examines how point-in-time forecast datasets are constructed, and how often a natural construction fails. We match the publication timestamps of 128,656 forecast runs to the gate closures of the Great Britain day-ahead and intraday auctions over 2022–2026, and measure how often each of three selection rules uses information that was not yet available.

The paper makes four contributions. First, we identify and formalise three timing pitfalls: confusing a run's issue time with its publication time; stating gate closures in UTC when the auctions follow local clock time; and using outturn series that are revised after publication without the earlier values being retained. We distinguish two mechanisms: the use of runs that had not been published, and exposure to values revised after the gate. Second, we measure the resulting exposure on a large commercial archive. For six of the ten configurations, selecting the latest run issued before the gate picks an unpublished run on more than 99% of delivery days at one of the two gates. The exposure depends on the weather-model configuration, the gate and the season, not on the variable forecast, and it shifts as publication delays drift and as the ac-tion margin crosses thresholds as short as 5 minutes. Third, we show that the wrongly selected inputs differ materially from those available at the gate, but that their effect on apparent forecast accuracy ranges from negative to strongly positive, so it cannot be assumed. Fourth, we propose a protocol, validated by direct observation of publication times, that audits a dataset from timestamps before any model is fitted. Together, the results support one thesis: point-in-time correctness is a dynamic property of the data pipeline, not a one-off check.

The remainder of the paper is organised as follows. Section 2 reviews related work. Section 3 describes the auction setting and defines the life cycle of a forecast run and the three selection rules. Section 4 describes the data. Section 5 reports the results for forecast runs, including how much the wrongly selected inputs differ from those available at the gate, and Section 6 extends the analysis to prices and outturns. Section 7 sets out the recommended protocol, Section 8 discusses limitations and future work, and Section 9 concludes.