arXiv:2610.21239cs.ROOct 2026

Manuscript Offprint

arXiv:2610.21239

CLIS-MPPI: Closed-Loop Model Predictive Path Integral Control With Initial-State Sampling Under Execution Delay

Zidong Liu, Xu Chen

Zidong Liu 1^{1} and Xu Chen †,1^{\dagger,1}

Abstract—Sampling-based motion planning such as Model Predictive Path Integral (MPPI) control has become attractive for robotics due to its ability to handle nonlinear dynamics and non-smooth objectives without gradient information, while leveraging parallel rollout computation for real-time performance. However, in real-world robotic systems, the optimized control input is often applied after a non-negligible planning delay, causing a mismatch between the state used in forward simulation and the actual state at control execution, which can significantly degrade planning accuracy and may even lead to unsafe behavior such as collisions. This paper proposes Closed-Loop MPPI with Initial-State Sampling (CLIS-MPPI), which explicitly addresses execution-time state mismatch by modeling planning delay as a distribution over plausible execution-time initial states, performing rollout optimization from sampled initial states, and applying a rollout-based local feedback correction during control execution. The proposed method is validated through real-world experiments on a 6-DoF UR5e manipulator in a narrow-passage task involving obstacle avoidance and end-effector target reaching. Across 5 real-world runs of the same task, standard MPPI collided in 2 runs, whereas CLIS-MPPI remained collision-free in all 5 runs. Averaged over all collision-free runs for each method (3 for MPPI and 5 for CLIS-MPPI), CLIS-MPPI reduced the average task completion time from 25.4 s to 24.4 s and the average end-effector path length from 0.456 m to 0.425 m. It also reduced the overall joint-position and joint-velocity root mean square errors (RMSEs) from 0.100 rad and 0.108 rad/s to 0.017 rad and 0.011 rad/s, respectively. These results demonstrate improved safety, planning-execution consistency, and motion smoothness.

I. INTRODUCTION

With the rapid growth of computing hardware, sampling-based motion planning methods [1], [2], especially Model Predictive Path Integral (MPPI) control [3], have emerged as a powerful framework for real-time robotic motion planning and control. MPPI repeatedly samples stochastic control rollouts, performs forward simulation, evaluates trajectory costs, and refines the control sequence through a path-integral weighted update over a receding horizon. Compared with traditional gradient-based model predictive control (MPC) [4], MPPI does not require differentiable cost functions, making it particularly suitable for robotic systems with nonlinear dynamics, obstacle-rich environments, and complex nonsmooth objectives [5]. Furthermore, unlike learning-based methods such as reinforcement learning [6], which typically depend on large-scale offline training, MPPI is a fully online planning method and can leverage GPU-parallelized rollout computation [7] to enable real-time decision-making.

Figure

Fig. 1. Illustration of execution-time state mismatch in the ii-th planning cycle. At planning time tiplant_i^{\text{plan}}, MPPI optimizes using the measured state xirefx_i^{\text{ref}}. During the delay window, the robot continues executing the previous control ui−1u_{i-1}. Consequently, when the newly planned control uiu_i actually becomes effective at tisendt_i^{\text{send}}, the system state has already evolved to xiapply≠xirefx_i^{\text{apply}} \neq x_i^{\text{ref}}.

Despite these advantages, the performance of MPPI in real-world robotic systems can be significantly degraded by execution-time delay. In particular, the quality of MPPI critically depends on the accuracy of its forward simulation and cost evaluation, since both are used to determine the control update at each planning cycle. However, forward simulation is typically the most computationally expensive step in MPPI, and the resulting planning latency can introduce a substantial mismatch between the state used for optimization and the state at which the optimized control is actually applied. As illustrated in Fig. 1, at planning time tiplant_i^{plan}, MPPI starts forward simulation from the measured robot state xirefx_i^{ref}, and the rollout costs are evaluated based on this state. During the planning interval τi\tau_i, however, the robot continues executing the previous control command ui−1u_{i-1}. Consequently, when the newly optimized control uiu_i becomes effective at tisendt_i^{send}, the actual robot state has already evolved to xiapply≠xirefx_i^{apply} \neq x_i^{ref}. As a result, the control command uiu_i is no longer applied to the state on which it was optimized, leading to a delay-induced state mismatch. This issue becomes particularly critical in high-frequency control settings or when the robot operates with large control actions, where even a small planning delay may produce a significant state deviation. In safety-critical tasks such as obstacle avoidance in narrow spaces, such mismatch can cause severe performance degradation and even collisions, despite the fact that the planned rollouts themselves are collision-free during forward simulation.

To address the delay-induced state mismatch, we propose closed-loop MPPI with initial-state sampling (CLIS-MPPI), as illustrated in Fig. 2. The key idea is to explicitly convert execution delay into an initial-state uncertainty at each planning cycle, and to compensate for the resulting mismatch

†^{\dagger}: corresponding author.

1^{1}Department of Mechanical Engineering, University of Washington, Seattle, WA, USA. {liuzd, chx}@uw.edu through a closed-loop control update. Instead of assuming that the control optimization starts from a single measured state, CLIS-MPPI samples a distribution of perturbed initial states around the currently measured state to represent the possible system evolution during the planning interval. For each sampled initial state, perturbed control sequences are generated and parallel forward simulations are performed to obtain rollout trajectories and their associated costs. Based on the weighted rollout distribution, a nominal state-control trajectory is constructed, from which a local feedback gain is further extracted in a rollout-based manner. The final control input is then computed as a closed-loop combination of the MPPI feedforward update and a state-feedback correction term. In this way, the proposed method enables the applied control command to better match the actual robot state at execution time, thereby improving consistency between planning and execution, motion smoothness, and safety in delay-sensitive real-world tasks.

In contrast to standard MPPI, which assumes immediate actuation after planning and samples only control perturbations from a single planning state, CLIS-MPPI replaces this assumption with a distribution over plausible execution-time initial states, jointly samples both initial-state and control perturbations, and augments the control update with rollout-based feedback correction.