arXiv:2610.21352cs.CEOct 2026

Manuscript Offprint

arXiv:2610.21352

Product Costing in Data Pipelines

Li Peng, Jie You, Feng Shi, Yihang Wu, Jianxin Wang, Weiran Liu, Xinyu Peng, Junhua Wang, Lei Zhang, Lin Qu, Xiaohui Yu, Kui Ren, Jinfei Liu

LI PENG, State Key Laboratory of Blockchain and Data Security, Zhejiang University; Alibaba Group, China

JIE YOU, Alibaba Group, China

FENG SHI, Central South University, China

YIHANG WU, State Key Laboratory of Blockchain and Data Security, Zhejiang University, China

JIANXIN WANG, Central South University, China

WEIRAN LIU, Alibaba Group, China

XINYU PENG*, Zhejiang University; Alibaba Group, China

JUNHUA WANG, Alibaba Group, China

LEI ZHANG, Alibaba Group, China

LIN QU, Alibaba Group, China

XIAOHUI YU, York University, Canada

KUI REN, State Key Laboratory of Blockchain and Data Security, Zhejiang University, China

JINFEI LIU, State Key Laboratory of Blockchain and Data Security, Zhejiang University; Hangzhou High-Tech Zone (Binjiang) Blockchain and Data Security Research Institute, China

Large data-intensive enterprises spend millions of dollars monthly running data pipelines. Apportioning this cost back to individual products, known as product costing, is a prerequisite for data pricing and cost recovery. However, this process is fundamentally more challenging than physical manufacturing costing due to the unique characteristics of data pipelines, including the non-rivalrous nature of data that complicates the costing formulation, the prevalence of cyclic dependencies that distort the accuracy of results, and the massive scale of pipelines that leads to computational intractability.

In this paper, for the first time, we formalize the problem of product costing in data pipelines as a manufacturing cost of data products (MCDP) problem to overcome the non-rivalrous nature of data. To solve MCDP, we propose CostApp, a hybrid algorithm that achieves both exactness and scalability, even for cyclic and massive-scale pipelines. CostApp performs a dimensionality reduction by isolating cyclic dependencies via a feedback arc set (FAS). It aggregates costs onto a compact set of key vertices using a scalable iterative approach, transforming the intractable computational problem into a reduced linear system that can be solved exactly and efficiently by a basic matrix-based method. Experiments on both real-world data and synthetic data show that CostApp scales to process a production pipeline with over 28 million entities within an hour while preserving exactness, supporting pipelines up to 102×10^2 \times larger than the direct matrix-based baseline.

CCS Concepts: • Information systems → Extraction, transformation and loading.

Additional Key Words and Phrases: Data Pipelines, Data Costing, Cost Apportionment, Data Pricing

∗^{*}Corresponding author.

Authors' Contact Information: Li Peng, State Key Laboratory of Blockchain and Data Security, Zhejiang University; Alibaba Group, China, jerry.pl@alibaba-inc.com; Jie You, Alibaba Group, China, youjie.yj@alibaba-inc.com; Feng Shi, Central South University, China, fengshi@csu.edu.cn; Yihang Wu, State Key Laboratory of Blockchain and Data Security, Zhejiang University, China, yhwu_is@zju.edu.cn; Jianxin Wang, Central South University, China, jxwang@mail.csu.edu.cn; Weiran Liu, Alibaba Group, China, weiran.lwr@alibaba-inc.com; Xinyu Peng, Zhejiang University; Alibaba Group, China, steven.pengxy@alibaba-inc.com; Junhua Wang, Alibaba Group, China, junhua.wjh@alibaba-inc.com; Lei Zhang, Alibaba Group, China, zongchao.zl@taobao.com; Lin Qu, Alibaba Group, China, xide.ql@taobao.com; Xiaohui Yu, York University, Canada, xhyu@yorku.ca; Kui Ren, State Key Laboratory of Blockchain and Data Security, Zhejiang University, China, kuiren@zju.edu.cn; Jinfei Liu, State Key Laboratory of Blockchain and Data Security, Zhejiang University; Hangzhou High-Tech Zone (Binjiang) Blockchain and Data Security Research Institute, China, jinfeiliu@zju.edu.cn.

367:2

Li Peng et al.

Figure

Fig. 1. An illustration of data pipelines. ⋈\bowtie, π\pi denotes a join and project operation in SQL, respectively. vi(−1)v_i^{(-1)} represents the version of data entity viv_i from the previous day, while entities without superscripts denote the current day's version.

ACM Reference Format:

Li Peng, Jie You, Feng Shi, Yihang Wu, Jianxin Wang, Weiran Liu, Xinyu Peng, Junhua Wang, Lei Zhang, Lin Qu, Xiaohui Yu, Kui Ren, and Jinfei Liu. 2026. Product Costing in Data Pipelines. Proc. ACM Manag. Data 4, 6, Article 367 (December 2026), 37 pages. https://doi.org/10.1145/3856362