arXiv:2610.17329cs.PFOct 2026

Manuscript Offprint

arXiv:2610.17329

DynaSPLIT: Strong tail-optimal scheduling for the M/G/n with heavy-tailed job sizes

Zhouzi Li, Mor Harchol-Balter, Alan Scheller-Wolf

Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.

informs. https://pubsonline.informs.org/journal/stsy

STOCHASTIC SYSTEMS

Vol. 00, No. 0, Xxxxx 0000, pp. 000–000

Submitted to Stochastic Systems

ISSN 1946-5238, EISSN 1946-5238

DynaSPLIT: Strong tail-optimal scheduling for the M/G/n with heavy-tailed job sizes

Zhouzi Li, Mor Harchol-Balter, Alan Scheller-Wolf

Carnegie Mellon University, zhouzil@andrew.cmu.edu, harchol@cs.cmu.edu, awolf@andrew.cmu.edu

Authors are encouraged to submit new papers to INFORMS journals by means of a style file template, which includes the journal title. However, use of a template does not certify that the paper has been accepted for publication in the named journal. INFORMS journal templates are for the exclusive purpose of submitting to an INFORMS journal and are not intended to be a true representation of the article's final published form. Use of this template to distribute papers in print or online or to submit papers to another non-INFORM publication is prohibited.

Abstract. We study the asymptotic response time tail in the M/G/n queue with heavy-tailed (regularly varying) job sizes. For this setting, strongly tail optimal policies are known only at lower load, where n - 1 servers suffice for stability. At higher load, the tail optimal scheduling has been open. This paper presents DynaSPLIT, the first strongly tail optimal policy at high load. Together with prior work, this result shows that strong tail optimality is achievable across the entire stability region of the M/G/n with heavy-tailed job sizes.