Manuscript Offprint
arXiv:2610.17949Latency-Aware Uplink NOMA-MEC with PASS: A Feasibility-First Resource Allocation Framework
Sepehr Abolhasani *, Saba Asaad †, S. Mohammad Razavizadeh *, and Jiguang He ‡
- School of Electrical Engineering, Iran University of Science and Technology (IUST), Tehran, Iran
† Department of Electrical and Computer Engineering, University of Toronto, Toronto, Canada
‡ School of Computing and Information Technology, Great Bay University, Dongguan 523000, China
Abstract—Meeting hard task-completion deadlines for many simultaneously offloading users is the binding challenge in mobile-edge computing (MEC). As the user count grows, the transmit power required to satisfy every deadline within per-user budgets rises until no feasible allocation exists. We take a feasibility-first view of this K-user problem in an uplink non-orthogonal multiple access (NOMA) MEC system served by a pinching-antenna system (PASS), whose radiating points establish strong line-of-sight (LoS) links that lower the received-power requirement. We formulate a latency-constrained joint optimization of transmit powers, CPU frequencies, and antenna configuration. We then derive a closed-form least-power feasibility test: the componentwise-least allocation meeting every deadline. It certifies feasibility with the largest attainable margin to the power budgets and defines a practical quality-of-service (QoS)-feasibility outage metric, the probability that no allocation meets all deadlines within budget. We solve the problem with a three-block alternating-optimization algorithm that is provably monotone-convergent and has polynomial complexity. Numerical results show that the proposed scheme sustains deadline feasibility at user loads where equal-power, orthogonal multiple access (OMA), and single-antenna baselines fail or degrade sharply, each by a mechanism predicted directly from the system model, whereas the proposed design degrades gracefully. Stress tests further show that feasibility is sustained under order-of-magnitude budget reductions, and that the pinching-antenna array itself enables constrained-budget operation. The result is a scalable, closed-form-initialized design for deadline-feasible offloading.
Index Terms—Pinching-antenna systems, uplink non-orthogonal multiple access, mobile-edge computing, latency-aware resource allocation, computation offloading, feasibility.
I. INTRODUCTION
The proliferation of Internet-of-Things (IoT) devices and latency-sensitive applications has imposed demands on communication and computation resources. Mobile-edge computing (MEC) addresses the limited computational capability of such devices by offloading tasks to edge servers co-located with base stations (BSs), thereby reducing processing latency and backhaul overhead [1]. Under hard per-task deadlines, however, the coexistence of many devices sharing limited spectrum makes it increasingly difficult to complete every task in time: as the user count grows, the transmit power required to meet all deadlines within per-user budgets increases to the point where no feasible allocation exists. Sustaining this deadline feasibility as the system scales, rather than optimizing efficiency alone, is the central challenge we address.
Non-orthogonal multiple access (NOMA) mitigates the spectrum bottleneck by letting users share the same time-frequency resource via superposition coding and successive interference cancellation (SIC), thereby improving aggregate offloading throughput [1]. Its performance is nonetheless limited by the user–BS channel quality, which can be severely degraded by path loss and blockage, especially at high frequencies. Reconfigurable intelligent surfaces (RIS) reshape the propagation environment passively but may suffer from a double path-loss effect and often require a large number of elements to provide substantial gain [1]. Fluid and movable antennas reposition elements within a limited region [2], [3], but their wavelength-scale range limits their ability to combat large-scale path loss or serve widely distributed users.
Pinching-antenna systems (PASS) have recently emerged as a versatile evolution of flexible-antenna technology [4]. Dielectric waveguides are deployed across the coverage area, and small dielectric clips (pinching antennas) radiate at configurable positions along them. Because the waveguide loss is far below free-space path loss at the same frequency, a strong line-of-sight (LoS) link can be established to nearby users by positioning the radiating points [5], making PASS inherently robust against blockage and path loss [6]. Recent works have studied uplink rate maximization for PASS [7] and energy-efficiency maximization in NOMA uplink PASS [8]; learning-based energy minimization and delay minimization for pinching-antenna NOMA-MEC [9], [10] and deep reinforcement learning (DRL)-based latency minimization for PASS-assisted MEC [11] have also been reported.
Closest to our setting, two recent works study pinching-antenna NOMA-MEC: [9] solved a two-user, single-antenna case using DRL to minimize energy, and [10] minimized the maximum task delay via bisection-based alternating optimization. To our knowledge, a general framework for the K-user case remains unexplored, and these works optimize energy or delay rather than characterizing feasibility, the ability to meet every deadline within budget, as the user count scales. Neither provides a closed-form least-power feasibility characterization or an outage characterization, and both rely on numerical or learned solvers rather than an analytical guarantee. This combination is compelling precisely for feasibility: PASS lowers each user's received-power requirement, NOMA enables simultaneous access, and provisioning radiating points
© 2026 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, including reprinting/republishing this material for advertising or promotional purposes, collecting new collective works for resale or redistribution to servers or lists, or reuse of any copyrighted component of this work in other works.
and configuring powers and computation can extend the range of user counts for which every deadline can be met. Our contributions are as follows.
-
We formulate a latency-constrained joint optimization of transmit powers, CPU frequencies, and pinching-antenna configuration for uplink PASS-NOMA-MEC under hard task-completion deadlines, with energy efficiency as the objective and the deadlines as feasibility constraints.
-
We derive a closed-form least-power feasible initialization (Proposition 1): the componentwise-least allocation meeting every deadline for a given system configuration, which certifies feasibility with the largest margin to the power budgets and yields an exact pure-offload feasibility test for that configuration. This test provides the basis for the QoS-feasibility outage metric used throughout.
-
We solve the problem by a three-block alternating-optimization algorithm that guarantees monotonic improvement of the objective and has polynomial complexity, and whose least-power initializer provides an effective starting point in the deadline-binding regime.
-
We show by simulation that the proposed design sustains zero observed QoS-feasibility outage over a wide range of user counts and degrades gracefully, tolerates order-of-magnitude budget reductions, and that the antenna array, not the power allocation alone, enables constrained-budget operation. Across all three studies it remains feasible in regimes where equal-power, OMA, and single-antenna baselines have already collapsed.
The remainder of this paper is organized as follows. Section II presents the system model and problem formulation; Section III develops the algorithm; Section IV reports simulation results; Section V concludes.
A. PA Channel Model
Each PA extracts a fraction of the guided wave. The coupling length is restricted to , being the waveguide coupling coefficient, so that the split coefficient sweeps monotonically over : the endpoint gives , the full-radiation (matched) condition of [12], while gives . On this branch, the map is a bijection. The effective split coefficient of the -th PA [12] is
Pinching Antenna 1 Pinching Antenna n Pinching Antenna N

Fig. 1. Uplink PASS-NOMA-MEC system model.
Let be the UE k-PA n distance and the in-guide PA n-feed distance. The effective uplink channel coefficient of UE k is
where , is the waveguide loss coefficient, , and . By Lorentz reciprocity of the passive waveguide, the downlink extraction cascade of [12] also describes the uplink insertion cascade, so (2) follows from the first-order coupling-cascade approximation. Since the waveguide loss is far below free-space path loss, placing a radiating point near a user establishes a strong LoS link. This link lowers the received-power requirement and thereby improves feasibility.
B. Uplink NOMA with Fixed SIC Order
All users transmit simultaneously over the same band; the BS applies SIC. The geometry is actuated once per reconfiguration epoch and held fixed thereafter. The decoding order is set at the initial configuration, with users relabeled so that , and is kept throughout the optimization; the rates (3) are achievable under any fixed order, and optimizing the order jointly with the other variables is left to future work. Under this fixed order, the SINR and offloading rate of UE are
with the transmit power of UE and the noise power. Holding the order fixed keeps the rates smooth in within the epoch.
C. Computation and Latency Model
UE holds a task of size bits with hard deadline , and splits the execution between local processing and remote offloading in parallel. With local CPU frequency , workload cycles/bit, and local rate , the resulting completion time is , so task completion within the deadline is equivalent to
Constraint (4) ties feasibility directly to task size and deadline, rather than to a fixed minimum-rate threshold; the offload split is implicit in it and not introduced as a separate variable.
D. Power and Energy Efficiency
UE consumes , with the switched-capacitance coefficient and a fixed circuit power. The infrastructure consumes a fixed RF-chain power and a server power for aggregate offloaded throughput , where is non-decreasing and convex; the specific form used in simulations is given in Section IV. The total system power is
and the computation energy efficiency, with , is (bits/Joule).
E. Problem Formulation
We formulate the joint configuration as an energy-efficiency maximization problem subject to per-user deadline and system constraints. The problem can be written as
Here (6b) is the per-user power budget, (6c) the task-completion deadline, (6d) the transmit-power and CPU limits, (6e) the PA placement and minimum-spacing constraints, and (6f) the coupling-length branch and a per-epoch change limit that bounds how far each coupling length can be re-actuated between epochs. Problem is a non-convex fractional program: the objective is fractional, the geometry enters the SINRs non-convexly, and makes the denominator non-convex.
Under hard deadlines, feasibility of (6b)–(6d) is prior to the objective: a configuration that meets every deadline within budget must exist before efficiency can be optimized. Section III shows that the least-power feasible point provides a natural initialization for the energy-efficiency formulation and is especially useful in the deadline-binding regime, which governs the feasibility behavior in Section IV.
III. PROPOSED ALGORITHM
is non-convex, but its variables split into three blocks solved separately: the joint power/CPU block (p, f), where and stack the per-user transmit powers and CPU frequencies, the PA-position block , and the coupling-length block . We solve by alternating optimization (AO) over these blocks, initialized at a least-power feasible point that we characterize first, because it underpins the design's feasibility behavior.
A. Least-Power Feasible Initialization
Feasibility of the hard deadline (6c) within the power budget (6b) is a prerequisite to optimizing efficiency. The following result gives, in closed form, the minimum-power point that meets every deadline in the pure-offload case and a corresponding feasibility test.
Proposition 1 (Least-power feasible initialization). With , constraint (6c) is equivalent to the linear system in the received powers , where . Its componentwise-least solution is
Setting yields a feasible point if and only if
and this condition is necessary and sufficient for feasibility in the pure-offload case , in which every user offloads its entire task with no local computation.
The proof follows by exponentiating (6c) at and solving the resulting triangular system by downward recursion ( , ); the least-element property follows by induction. Because is the componentwise-least feasible point, the powers maximize the slack to the effective power budgets . Hence (8) certifies feasibility with maximal margin. When a common nonzero clock is admitted, the recursion applies verbatim with replaced by and by , the rescue clocks being capped at the CPU-frequency budget implied by (6b); if no clock makes (8) hold, the trial is declared a QoS-feasibility outage.
B. Joint Power and CPU-Frequency Block
Fixing the geometry, the power/CPU subproblem maximizes the ratio with (concave, by the telescoping identity for the uplink NOMA sum-rate [13]) and the total power of (5), subject to the deadline (6c) and box constraints. Power and CPU are solved jointly rather than as two separate blocks, because the deadline (6c) couples and additively within a single per-user constraint, so an independent split risks one variable invalidating the other's feasibility. The denominator is non-convex because , though convex and non-decreasing, is composed with the concave aggregate rate. The fractional objective is handled by a Dinkelbach procedure [14] combined with successive convex approximation [15], alternating between the two variable groups. With fixed, the deadline (6c) reduces to the linear received-power constraint ; the server term is convexified by linearizing the concave rate at the current iterate, so the resulting power sub-step is convex. With fixed, the Dinkelbach objective separates per user into the concave , while (6c) and (6b) reduce to with and ; hence the exact update is . The ratio is updated by the standard Dinkelbach rule, updates are accepted only on non-decrease of , and feasibility is preserved across iterations.
C. PA-Position and Coupling-Length Blocks
With (p, f) fixed, the geometry blocks improve the effective channels subject to the placement, spacing, branch, and change-rate constraints of (6e)–(6f). Both and enter non-convexly through (2); each is optimized by proximal successive convex approximation (SCA) [15]. At iterate , each rate term (with denoting or ) is replaced by the first-order surrogate at minus a proximal term ; since is -smooth on the compact domain , the descent lemma makes this surrogate a global concave minorant for , so the resulting strictly concave subproblem yields a monotone, feasibility-preserving update. The proximal weight is set by backtracking, and updates are accepted only on non-decrease of . The position block is preceded by a grid search to escape poor stationary points, and the coupling block uses a backtracked step. Each geometry update is accepted only if it preserves feasibility.
D. Overall Algorithm, Convergence, and Complexity
Algorithm 1 summarizes the procedure: the allocation is initialized by Proposition 1; if (8) fails after the rescue clocks, an outage is declared; otherwise the three blocks alternate until the energy-efficiency increment falls below a tolerance.
Theorem 1. The sequence generated by Algorithm 1 is monotonically non-decreasing and convergent.
Monotonicity holds because each block preserves or increases : each convex-surrogate step is accepted only on non-decrease, so no block lowers the objective; the sequence is bounded above (finite power budgets), hence convergent. With , , the outer-AO, Dinkelbach, and SCA iteration counts, the grid size, and each surrogate solved by an interior-point method ( in the n block variables), the per-run cost is polynomial in K and N:
Algorithm 1 Feasibility-First Joint Resource Allocation
Require: Trial ; parameters of Table I
Ensure: (p, f, , ), or OUTAGE
1: Initialize geometry: equispaced , ; fix SIC order by (Sec. II)
2: Least-power feasibility (Prop. 1): compute by (7), set
3: if (8) then
4: feasible;
5: else
6: for (rescue clocks) do
7: recompute , with ; if (8) holds then feasible; break
8: end for
9: if no clock feasible then return OUTAGE
10: end if
11: repeat
12: Step 1 (power/CPU): update (p, f) by Dinkelbach with SCA [14], [15]
13: Step 2 (positions): grid search then SCA [15] on ; accept only if non-decreasing
14: Step 3 (coupling): backtracked SCA on ; accept only if non-decreasing
15: until increment
16: return (p, f, , )
IV. SIMULATION RESULTS AND DISCUSSION
A. Setup and QoS-Feasibility Outage
We evaluate the design under the parameters of Table I, with PAs unless stated otherwise. Each Monte Carlo trial places users independently and uniformly in the service region with task sizes Mbit and a common deadline ms; rates are reported in Mbit/s with . The server power follows the cubic model . We compare four schemes: the proposed design (Algorithm 1); single-PA, a lone fully-radiating antenna optimized by the same engine; OMA-MEC, interference-free TDMA; and equal-power, without power control, each evaluated by the same outage criterion.
Definition 1 (QoS-feasibility outage). For feasible set of under trial , the QoS-feasibility outage probability is
,
(10)
estimated by , the fraction of trials for which the test (8), at the initialized geometry with and the rescue clocks, fails. A passing trial is certified feasible, so , with equality when restricted to pure offloading.
is the complement of the task-completion probability standard in deadline-constrained MEC and is distinct from
TABLE I SIMULATION PARAMETERS
| Parameter | Value |
|---|---|
| Carrier , bandwidth | 28 GHz, 100 MHz |
| Waveguide length , height | 20 m, 3 m |
| PA count (swept) | |
| UE count (swept) | |
| UE region | m, m |
| Waveguide loss , coupling | 0.08 Np/m, 15.7 rad/m |
| Task size , deadline | Mbit, 50 ms |
| CPU cycles/bit | |
| , , | , 100 mW, 1 W |
| , , | 200 mW (nominal), 500 mW, 1 GHz |
| , | , 100 cyc/bit |
| Noise power | -90 dBm over (incl. 4 dB NF) |

Fig. 2. QoS-feasibility outage (left axis) and energy efficiency of the proposed design (right axis) versus number of users (average over 500 trials per point).
SINR outage; all reported outage values are therefore conservative.
B. Feasibility versus Number of Users
Fig. 2 reports QoS-feasibility outage versus (average over 500 trials per point), the central result of this paper. We sweep , since NOMA requires at least two superposed users. The proposed design admits all users with zero observed outage through and degrades gracefully thereafter (2.4% at , 27.6% at ), the onset occurring only when the aggregate received-power requirement of (7), with , exceeds the budget for the weakest user. The baselines collapse earlier, each by a distinct and model-predicted mechanism.
Equal power fails between and : without power control the first-decoded rate is , which falls from 41.5 Mbit/s at to 26.3 Mbit/s at , crossing the 40 Mbit/s deadline floor and producing 71.4% then 98.4% outage. OMA-MEC fails between and : equal time-sharing compresses each user's slot to , inflating the per-user requirement to , which breaches the 200 mW budget (63% outage at K = 8). The single fully-radiating PA is the most robust baseline, nearly matching the proposed design through K = 8 (0.6%), but its single path cannot serve the far, high-demand users as K grows, yielding 22.8% and 72.4% outage at K = 10 and K = 12. The right axis reports the energy efficiency, the quantity maximizes: highest at light load, it decreases as K grows since more users share the fixed infrastructure power. The design thus optimizes its stated objective while sustaining feasibility, the governing metric of this work.

Fig. 3. QoS-feasibility outage versus per-user power budget at (average over 500 trials per point).
C. Feasibility under Power-Budget Stress
Fig. 3 fixes and sweeps the per-user power budget , tracing the feasibility margin of Proposition 1 directly: as shrinks, the least-power point breaches the budget for more trials, so outage rises. The proposed design degrades gracefully, its outage never exceeding even as the budget is cut by an order of magnitude (from 200 to ), because the multi-antenna configuration distributes the received-power requirement. The single-antenna design matches it at generous budgets but collapses under stress (62.2% at ), isolating the feasibility contribution of the pinching-antenna array; OMA and equal power already fail on most trials (67.4% and 99.8%) at the nominal budget.
D. Feasibility versus Array Size
The preceding results fix the antenna array and vary the load; we now fix the load and vary the array. Fig. 4 sweeps the number of pinching antennas at under constrained budgets. A single element () cannot serve the eight users at either budget (outage is ), whereas adding antennas drives feasibility up sharply: at mW outage falls to at and at , and at mW it falls to at and at . The mechanism is that of Proposition 1:

Fig. 4. QoS-feasibility outage versus number of pinching antennas N at K = 8 (average over 500 trials per point).
each additional radiating point lowers the per-user received-power requirement , enlarging the margin to the budget so that the least-power test holds for more trials. This isolates the feasibility contribution of the pinching-antenna array itself, distinct from the power allocation. The gain saturates beyond at the tighter budget, where the residual outage is budget- rather than array-limited. The array size improves feasibility, while fine positioning and coupling refine the energy-efficiency operating point within the feasible set; feasibility itself is governed by the least-power test of Proposition 1 and the number of radiating points.
E. Convergence and Complexity
At K = 8, Algorithm 1 terminates in a median and maximum of two outer iterations with no monotonicity violation, agreeing with Theorem 1; the efficiency increment was contained almost entirely in the first joint power/CPU update, consistent with the near-optimality of the least-power initializer under the binding deadlines (6c). With these small iteration counts, the polynomial per-run cost (9) solves a full trial in a fraction of the per-epoch reconfiguration timescale.
V. CONCLUSION
We studied deadline-constrained computation offloading in an uplink NOMA-MEC system served by a pinching-antenna system, framing the design around feasibility: sustaining every user's hard task-completion deadline within per-user power budgets as the number of users grows. We formulated the joint optimization of transmit powers, CPU frequencies, and antenna configuration with energy efficiency as the objective and the deadlines as constraints, and derived a closed-form least-power feasible initialization that certifies feasibility with the largest attainable margin to the power budgets and yields a QoS-feasibility test. A three-block alternating-optimization algorithm with proven monotone convergence and polynomial complexity completes the solution. Numerical results showed that the proposed design admits all users with zero QoS-feasibility outage through K = 8 and degrades gracefully thereafter, whereas equal-power, OMA, and single-antenna baselines fail earlier. Stress tests further showed that the design sustains feasibility under order-of-magnitude budget reductions and that the pinching-antenna array itself enables constrained-budget operation. Unlike recent DRL [9], [11] and delay-minimizing [10] PASS-MEC designs, our framework offers a K-user feasibility certificate.
ACKNOWLEDGMENT
The work of Jiguang He is partially supported by the Funding Program for High-Level Overseas-Educated Talents (Grant No. RCXMA26001) and the Guangdong Provincial Project (Grant No. 2024QN11X433).
REFERENCES
[1] Q. Wang, F. Zhou, H. Hu, and R. Q. Hu, “Energy-efficient design for IRS-assisted MEC networks with NOMA,” in 2021 13th International Conference on Wireless Communications and Signal Processing (WCSP), 2021, pp. 1–6.
[2] Y. Zuo, J. Guo, B. Sheng, C. Dai, F. Xiao, and S. Jin, “Fluid antenna for mobile edge computing,” IEEE Communications Letters, vol. 28, no. 7, pp. 1728–1732, 2024.
[3] L. Zhu, W. Ma, and R. Zhang, “Movable antennas for wireless communication: Opportunities and challenges,” IEEE Communications Magazine, vol. 62, no. 6, pp. 114–120, 2024.
[4] A. Fukuda, H. Yamamoto, H. Okazaki, Y. Suzuki, and K. Kawai, "Pinching antenna—using a dielectric waveguide as an antenna," NTT DOCOMO Technical Journal, vol. 23, no. 3, pp. 5–12, Jan. 2022.
[5] Y. Liu, H. Jiang, X. Xu, Z. Wang, J. Guo, C. Ouyang, X. Mu, Z. Ding, A. Nallanathan, G. K. Karagiannidis, and R. Schober, "Pinching-antenna systems (PASS): A tutorial," IEEE Transactions on Communications, vol. 74, pp. 4881–4918, 2026.
[6] D. Tyrovolas, S. A. Tegos, P. D. Diamantoulakis, S. Ioannidis, C. K. Liaskos, and G. K. Karagiannidis, “Performance analysis of pinching-antenna systems,” IEEE Transactions on Cognitive Communications and Networking, vol. 12, pp. 590–601, 2026.
[7] S. A. Tegos, P. D. Diamantoulakis, Z. Ding, and G. K. Karagiannidis, “Minimum data rate maximization for uplink pinching-antenna systems,” IEEE Wireless Communications Letters, vol. 14, no. 5, pp. 1516–1520, 2025.
[8] M. Zeng, X. Li, J. Wang, G. Huang, O. A. Dobre, and Z. Ding, “Energy-efficient resource allocation for NOMA-assisted uplink pinching-antenna systems,” IEEE Wireless Communications Letters, vol. 14, no. 11, pp. 3695–3699, 2025.
[9] Y. Ma, W. Huang, Z. Ding, D. K. C. So, and V. Bhatia, “Joint optimization in pinching-antenna-assisted NOMA-MEC systems via DRL,” IEEE Wireless Communications Letters, vol. 15, pp. 2493–2497, 2026.
[10] Y. Ai, X. Mu, P. Si, and Y. Liu, “Delay minimization in pinching-antenna-enabled NOMA-MEC networks,” IEEE Communications Letters, vol. 30, pp. 962–966, 2026.
[11] Z. Hu, R. Zhong, X. Mu, D. Li, and Y. Liu, “PASS-enhanced MEC: Joint optimization of task offloading and uplink PASS beamforming,” in Proc. IEEE Int. Conf. Commun. (ICC), 2026, pp. 1–6.
[12] S. Asaad, C. Ouyang, A. Bereyhi, and Z. Ding, “Dynamic and static energy efficient design of pinching antenna systems,” in ICC 2026 - IEEE International Conference on Communications, 2026, pp. 1–6.
[13] M. Zeng, X. Li, G. Li, W. Hao, and O. A. Dobre, “Sum rate maximization for IRS-assisted uplink NOMA,” IEEE Communications Letters, vol. 25, no. 1, pp. 234–238, 2021.
[14] W. Dinkelbach, “On nonlinear fractional programming,” Management Science, vol. 13, no. 7, pp. 492–498, 1967.
[15] G. Scutari, F. Facchinei, and L. Lampariello, “Parallel and distributed methods for constrained nonconvex optimization—part i: Theory,” IEEE Transactions on Signal Processing, vol. 65, no. 8, pp. 1929–1944, 2017.