Manuscript Offprint
arXiv:2610.11006Non-Clairvoyant Scheduling is Hard Even for Trees
Abstract
We study online scheduling of parallel jobs on m identical processors. Jobs arrive over time, and each job J is modeled as a directed acyclic graph (DAG) whose vertices are subjobs. Each subjob requires one unit of processing on a single processor, and an edge requires u to complete before v can be processed. The goal is to design an online algorithm that minimizes the maximum flow time, i.e., the maximum time between the arrival and completion of any job.
We focus on non-clairvoyant online algorithms, which do not know a job's DAG when it arrives. Instead, the DAG is revealed online: a subjob becomes known only when it is ready, that is, after all its predecessors have completed. First-In-First-Out (FIFO) is a natural non-clairvoyant algorithm that prioritizes ready subjobs from earlier-arriving jobs. Agrawal, Moseley, Newman, and Pruhs (SPAA 2024) [6] showed that FIFO has competitive ratio even when every job is an out-tree. They further showed that FIFO is -competitive in several natural settings and asked whether this bound holds in general. They also raised the question of whether a different non-clairvoyant algorithm exists that is -competitive.
We answer both questions in the negative by proving a lower bound of for every non-clairvoyant online algorithm. Here, opt denotes the maximum flow time of an optimal offline schedule. In particular, every non-clairvoyant algorithm has competitive ratio on some instance with opt . The lower bound holds even when every job is an out-forest.
We complement these lower bounds with an asymptotically optimal non-clairvoyant algorithm. A simple argument shows that FIFO is -competitive. However, FIFO can have competitive ratio even when opt = . To handle instances with small opt, we design a new Small-Frontier-First algorithm that is -competitive. Combining the two algorithms yields an -competitive non-clairvoyant algorithm.
1 Introduction
We consider the fundamental problem of scheduling parallel programs which arrive online on a parallel machine with m identical processors. Each job is modeled as a directed acyclic graph (DAG) where vertices represent tasks (sequential strands of instructions) and edges represent dependences between these tasks. This is a
Owen Druzgal
University of Michigan
Ann Arbor, Michigan, USA
Jinhao Zhao
Washington University in St. Louis
St. Louis, Missouri, USA
natural model for a large class of parallel programs; for instance, programs that are constructed using fork-join parallelism (also called dynamic multithreading) which is supported by parallel programming languages such as Cilk dialects [12], OpenMP [24], and Intel's TBB [26]. In this setting, the structure of the DAG is often not known in advance and is revealed online as the job is processed. In particular, a vertex is ready to be executed when all its predecessors have been executed and the scheduler only finds out about the existence of a vertex when it is ready. Therefore, the scheduler must be non-clairvoyant; it doesn't know anything about the jobs when they arrive; vertices are revealed when they become ready and the scheduler must proceed with this limited information.
We study the setting where these parallel jobs arrive online over time, the scheduler must operate non-clairvoyantly, and the goal is to minimize the maximum flow time or maximum latency — that is, the maximum time between the arrival of a job and its completion. Minimizing maximum flow time is a standard quality of service metric since it optimizes for the worst-case quality of service over all jobs. The problem of minimizing maximum flow time has been studied for sequential jobs [7] and parallel jobs in several different models of parallelism [4, 21, 25].
Intuitively, a scheduler for this metric should “prioritize” old jobs and this intuition turns out to be the correct one for most settings. A First-In-First-Out (FIFO) scheduler operationalizes this intuition; it schedules all ready vertices (tasks) of the oldest job first and then the vertices of the second oldest job and so on until all m processors are busy or it runs out of ready vertices. For sequential jobs (each job is a chain of vertices) on a single machine, FIFO is optimal [9], while for sequential jobs on m identical processors, FIFO is -competitive [9, 20]. Similarly, for fully parallelizable jobs, it is also optimal on m identical processors.
The problem of minimizing maximum flow for parallel DAG jobs was first studied in [4], where the authors show that FIFO is -competitive given times the speed of the optimal algorithm. The question of how to optimize maximum flow on DAGs without speed augmentation was studied in [6] and the authors provide some partial answers. First, in a somewhat counterintuitive result, they show that FIFO is -competitive even on jobs that can be represented as out-trees, which form a simpler class than general DAGs. In the same paper, they provide an -competitive algorithm for out-trees if the entire structure of the tree is revealed to the scheduler when the job arrives. They also provide a somewhat positive result for FIFO, namely, for a restricted setting of batched jobs, FIFO is -competitive, where opt is the
Supported in part by NSF grants 2216971, 2106699, and 2107280.
Supported by NSF award CCF-2327011.
maximum flow time provided by the optimal algorithm. However, the best achievable competitive ratio for non-clairvoyant scheduling of DAGs (or even trees) without additional speed remained completely open.
In this paper, we resolve this important open question, mostly in the negative direction. Our main result shows that no non-clairvoyant scheduler can achieve a competitive ratio asymptotically better than , even for trees. The main theorem of the paper is the following:
THEOREM 1. Every deterministic online non-clairvoyant scheduler and every randomized online non-clairvoyant scheduler against an oblivious adversary have a competitive ratio of even for trees.
This result is quite surprising. Maximum flow is generally an easier objective than other quality of service objectives such as average flow time and stretch. For instance, for sequential jobs on a single machine, minimizing average flow time non-clairvoyantly (without knowing the processing times of each job when it arrives) has competitive ratio lower bounds of for deterministic non-clairvoyant schedulers and for randomized schedulers against an oblivious adversary, where is the number of jobs [22]. Moreover, on identical machines, even when processing times are revealed on release, every deterministic or randomized online scheduler has competitive ratio lower bounds of and , where is the ratio of the largest to the smallest processing time [19]. Thus, without speed augmentation, no constant competitive ratio is possible for average flow time even for sequential jobs. In contrast, FIFO is constant-competitive without speed for maximum flow [9, 20]. Therefore, a priori one might imagine that some non-clairvoyant algorithm could work for maximum flow without speed, at least for jobs with a simple dependence structure like trees or forests.
In addition, in [6], the authors show an upper bound for FIFO for batched arrivals of jobs. Say that opt is the maximum flow provided by the optimal scheduler. If jobs only arrive at intervals of opt—that is, sets of jobs arrive at time 0, opt, 2 opt, ..., with no arrivals in between—then FIFO provides a competitive ratio of for general DAG jobs (not just trees). We expected that this result could generalize to nonbatched arrivals since one can delay the arrivals of jobs to the next multiple of opt by increasing the maximum flow time of the optimal algorithm only by a factor of 2. The authors of the paper indicate that their analysis techniques do not generalize to the nonbatched setting and one would need additional insights to generalize the result. Our lower bound shows that, in fact, these results cannot generalize. It is counterintuitive, however, that batched arrivals give an exponential advantage to FIFO in terms of the achievable competitive ratio.
We also prove matching upper bounds. We design a new non-clairvoyant scheduler that is a combination of FIFO (which by itself provides a competitive ratio of ) and an algorithm called Small-Frontier-First which tries to execute bottleneck vertices in DAGs in order to reveal parallelism quickly (and by itself achieves a competitive ratio of ) and show the following result.
THEOREM 2. There is a deterministic non-clairvoyant algorithm for online DAG scheduling with competitive ratio .
FIFO alone does not attain the preceding guarantee. Indeed, although FIFO is -competitive, it is not -competitive. In particular, there are instances with on which FIFO has competitive ratio .
THEOREM 3. FIFO provides a competitive ratio of even if opt (the maximum flow time provided by the optimal scheduler) is a constant.
Finally, we return to the batched-arrival setting discussed above, in which jobs arrive only at times 0, opt, 2 opt, ..., and determine its optimal competitive ratio. Using essentially the argument of Agrawal, Moseley, Newman, and Pruhs [6], but with a more careful analysis, we sharpen their upper bound to and prove a matching lower bound.
THEOREM 4. The optimal competitive ratio for non-clairvoyant online scheduling in the batched-arrival setting is . FIFO achieves the upper bound.
Together with previous work, this reveals a sharp threshold in the arrival spacing. Let denote the spacing between consecutive batches.
| Arrival Spacing | Competitive Ratio | Source |
|---|---|---|
| opt for any fixed | This paper | |
| This paper | ||
| opt for any fixed | FIFO with speed augmentation [4] |
Thus, the table reveals a somewhat surprising phenomenon: as the arrival spacing crosses opt, the best achievable competitive ratio changes from linear in opt below the threshold, to logarithmic at the threshold, and to constant above it.
For an integer , the adversary releases a job at each time . Each job is a layered out-forest with subjobs. Each layer is either wide, with subjobs, or narrow, with one subjob, except possibly for a smaller final layer. Importantly, each layer has a key subjob that is the predecessor of every subjob in the next layer; all other subjobs are leaves. The instance is designed to have : a clairvoyant offline scheduler knows each key subjob in advance; therefore it can execute it early to reveal parallelism quickly and keep processors busy.
A non-clairvoyant algorithm faces two difficulties:
-
The algorithm cannot identify the key. The adversary chooses it among the last subjobs processed, so the algorithm finishes a layer before learning the next.
-
The algorithm cannot see whether future layers are wide or narrow. The adversary chooses each layer's type when the layer is initially revealed.
To be more precise, the construction uses out-forests; but the main point is that each vertex has at most 1 parent.
SRPT is optimal if the processing times are known on arrival [28].
The adversary can force all alive jobs to encounter narrow layers simultaneously, causing an idle processor slot. These losses accumulate into backlog until some job has large flow time, giving the lower bound.
Lower Bound for Batched Arrivals. In the batched setting, jobs are released at times 0, opt, 2 opt, ... To construct a lower-bound instance with opt(I) = L, we release one job every L timesteps and must give OPT a way to finish each job before the next arrives. Since the total work of each job is mL, OPT must keep all processors busy at all times. Therefore, while one processor advances through the keys, the other m - 1 processors must always have leaves to process. This forces us to maintain a prefix property: every prefix of a job contains at least as many wide layers as narrow layers. The adversary can still choose the layer order adaptively and force idle slots, but it must respect this additional constraint. The resulting geometric argument gives an lower bound. A complementary record-backlog argument shows that FIFO is -competitive: at a record-high backlog, the number of unfinished batches is logarithmic because their sequential progress grows geometrically with age. Together with FIFO's bound, this gives the optimal ratio.
FIFO: A Simple Upper Bound. FIFO's guarantee follows from a win-win between processing work and making sequential progress. Whenever fewer than m processors are busy, fewer than m jobs are alive. Each job contains at most opt work, so the backlog is bounded. During fully busy periods, FIFO processes work at least as fast as the optimal schedule; together, these observations bound the backlog by . Now fix a job. Every timestep either uses all processors on this job and jobs released no later, or processes every ready subjob of this job, shortening its longest remaining path. The former steps are bounded by the backlog divided by m, and the latter by opt. Thus FIFO has maximum flow time and competitive ratio .
Why FIFO Fails When OPT Is Small. A natural question is whether FIFO is constant-competitive when opt = O(1). Surprisingly, it can still have competitive ratio , even when each job consists of just one or two sequential subjobs followed by parallel leaves. FIFO prioritizes older leaves over younger sequential work. The adversary arranges that, when the leaves are exhausted, the remaining jobs' parallel work is not yet ready. With few jobs alive, this forces idle processors. Repeating these losses produces large waiting times, even though every job has constant depth. The optimal schedule avoids these losses by processing younger jobs' sequential work alongside older jobs' leaves, finishing every job in constant time.
Small-Frontier-First: Unlock Parallelism Early. FIFO's weakness suggests advancing sequential work before older parallel work has run out. Our Small-Frontier-First algorithm groups arrivals from 2 opt-length windows into batches and works in rounds. In each round, it processes the current ready frontier of every small batch, meaning one with at most m ready subjobs, and fills spare capacity with work from the oldest large batch. Each batch is small in at most opt rounds, since every such round shortens its remaining path, and at most one large batch becomes small per round. Hence round lengths and the number of small batches are . A round with a large batch is full; otherwise only these small batches remain, so the remaining work is . Younger small batches cause only interruptions, giving an ratio. Doubling removes the assumption that opt is known and, together with FIFO, yields the matching ratio.
2 Preliminaries
We now formally define the main problem studied in this paper: online DAG scheduling on multiple processors with the objective of minimizing maximum flow time.
Jobs and Instances. In the DAG Scheduling problem there are identical unit-speed processors. There are discrete timesteps . An instance of DAG Scheduling consists of jobs together with a release time for each . Each job is a directed acyclic graph whose vertices are unit-processing-time subjobs. For subjobs , a directed edge encodes the constraint that subjob can be processed only after is processed.
Constraints on the Schedule. A valid schedule S of the instance I assigns each subjob of a timestep in subject to the following constraints:
(1) (Release Time Constraints) For every subjob we have .
(2) (Precedence Constraints) For every edge in , we have .
(3) (Processor Constraints) For every , the number of subjobs (across various jobs) such that is at most . Figure 1 shows two valid schedules for two jobs released at the same time on three processors.
A subjob is ready at time if , has not yet been processed, and every predecessor of has been processed before time . A job is alive at time if and it has at least one unprocessed subjob. The age of an alive job at time is .
Maximum Flow Objective. Let S be a valid schedule of jobs . For a job , let be the last timestep in which some subjob of is processed. We define the completion time of under S as . The flow time of is
and the maximum flow time of S is . Our objective is to find a valid schedule minimizing .
Online Setting and Competitive Ratio. In the online setting, the scheduling algorithm does not know future job arrivals. At each timestep t, it irrevocably selects at most m ready subjobs to process.
For an instance I, let denote an optimal offline schedule and define
A deterministic online algorithm ALG is c-competitive if, for every instance I,
A randomized online algorithm is c-competitive if, for every fixed instance I, we have , where the expectation is over the internal randomness of ALG.
Intuitively, we set the completion time to because processing during timestep occupies the interval and therefore finishes only at time .


| 0 | 1 | 2 | 3 | 4 | 5 | |
|---|---|---|---|---|---|---|
| A | C | F | d | f | g | |
| B | D | b | e | |||
| a | E | c |
| 0 | 1 | 2 | 3 | 4 | |
|---|---|---|---|---|---|
| A | B | C | D | F | |
| a | b | e | E | d | |
| c | f | g |
Figure 1: Two DAG jobs released at time 0, with two valid schedules on three processors. The maximum flow time is 6 in the left schedule and 5 in the right.
Non-Clairvoyant Online Algorithms. We are particularly interested in non-clairvoyant online algorithms. Such an algorithm has the property that the set of subjobs that it schedules at time t is a function only of:
(1) the release times of jobs released by time t; and
(2) the subjobs that have become ready by time and precedence relations among them.
In particular, the decision at time cannot depend on subjobs that have not yet become ready or on precedence relations involving such subjobs.
First-In-First-Out (FIFO) is the canonical non-clairvoyant algorithm. At each timestep, FIFO processes ready subjobs, prioritizing those belonging to earlier-released jobs and breaking ties arbitrarily. If fewer than subjobs are ready, it processes all of them.
Residual DAGs and Basic Properties of opt. We introduce some additional notation that will be useful in our analysis. For a schedule S, the residual DAG of a job at time t is the subgraph of induced by the subjobs that have not been processed before timestep t. We let denote the number of subjobs in this residual DAG, called the remaining work of at time t, and let denote the number of subjobs on a longest directed path in the residual DAG, called the longest remaining path. When the schedule is clear from context, we omit the superscript S.
When the instance is clear from context, we write opt := opt(I). We will repeatedly use the following simple consequences of the definition of opt.
PROPOSITION 5. For every instance with optimal maximum flow time opt:
(1) every directed path in a job contains at most opt subjobs;
(2) every job contains at most opt subjobs; more generally, for integers , the jobs released during timesteps contain at most subjobs in total.
PROOF. The subjobs on a directed path must be processed sequentially. Since every job completes within opt timesteps of its release under OPT, every directed path contains at most opt subjobs.
Similarly, a job can receive at most opt units of processing during the opt timesteps between its release and completion, so every job contains at most opt subjobs.
More generally, every job released during timesteps must be completed by time under OPT. Hence all such work is processed during timesteps , which contain exactly processor slots.
3 Lower Bound for Non-Clairvoyant Algorithms
We now prove Theorem 1 using a hard instance consisting of out-forest jobs. The key weakness of non-clairvoyance that we exploit is that, among many ready subjobs, the algorithm cannot distinguish leaves from subjobs with many children, whose completion can unlock substantial future parallelism. In the worst case, it may therefore postpone exactly those subjobs. Our construction exploits this uncertainty: the offline optimum knows the full DAGs and can keep the processors essentially fully utilized, while any non-clairvoyant algorithm is periodically forced to incur idle processor-time because it delays the subjobs that would have exposed enough new work to keep all processors busy.
Lower Bound Instance. Given any deterministic non-clairvoyant algorithm ALG, we construct an instance on which the competitive ratio of the algorithm is . We later extend this lower bound to randomized algorithms.
Fix a sufficiently large integer divisible by 16, and let
For , job is released at time . Each job is an out-forest containing exactly subjobs, partitioned into layers. Each layer, except possibly the last, is either wide, containing subjobs, or narrow, containing a single subjob. The exact sequence of wide and narrow layers is not fixed in advance; instead, the adversary determines adaptively whether each newly exposed layer is wide or narrow. Every layer has one distinguished subjob, called the key subjob. The key subjob is the unique predecessor of every subjob in the next layer, while all other subjobs in the layer are leaves. See Figure 2 for an example of such a job.
Choosing the Key Subjob. When a job arrives, ALG sees only its first layer. Each subsequent layer becomes ready when the key subjob of the current layer is processed. In every wide layer, the adversary chooses as key one of the last subjobs processed by ALG. The adversary can always do this because ALG is non-clairvoyant and cannot tell which subjob in the layer is the key. Thus, for every job, ALG finishes each layer before the next becomes ready.
Choosing the Layer Sizes. We now describe how the adversary adaptively fixes the layer sizes in order to force ALG to leave processor slots idle at regular intervals. We call timesteps epoch . Epochs are called forcing epochs, and the first timesteps of each forcing epoch form its forcing interval.
The first layer of every job is wide. Whenever a subsequent layer becomes ready, the adversary makes it narrow if the current time lies in the first forcing interval during which that job is alive. At all other times, it makes the layer wide if at least subjobs remain; if fewer than remain, the adversary places all remaining subjobs in one final layer.

Figure 2: A layered job with wide and narrow layers. The labeled key subjob at the top of each layer is the unique predecessor of every subjob in the next layer. All other subjobs are leaves.
LEMMA 6. The instance I produced above satisfies .
PROOF. Each job contains mL subjobs, and therefore has flow time at least L in any schedule.
We next give a schedule with maximum flow time at most 2L. First observe that every job has at most L layers. During the first forcing interval in which a job is alive, at most L/2 narrow layers can be created, since the interval has length L/2 and at most one new layer can become ready in each timestep. Every other layer contains 2m subjobs, except possibly for one final smaller layer, so there are at most L/2 such layers. Hence every job has at most L layers in total.
Consider the following offline schedule. During epoch i, reserve one processor for . This processor repeatedly processes the key subjob of the current layer until all layers have become ready, and then processes arbitrary ready subjobs of . Since has at most L layers, by the end of epoch i all of its subjobs are ready, and the reserved processor has processed exactly L subjobs of .
During epoch , the other processors process the remaining subjobs of , while the reserved processor begins processing . Thus every job completes by time , at most 2L timesteps after being released at time . Therefore .
The next lemma shows that, as long as at most c jobs are alive, each forcing interval causes ALG to waste some processor capacity.
LEMMA 7. Let i < n be a forcing epoch. If every alive job has age less than cL at the beginning of epoch i, then the forcing interval of epoch i contains an idle processor-time slot.
PROOF. Immediately after is released, let q be the number of alive jobs. Since each has age less than cL, we have , and this is the first forcing interval of every such job. Each job initially has at most one ready layer, of size at most 2m, and every later layer that becomes ready during the interval is narrow. Thus ALG processes at most subjobs from each job, and hence
Here bounds the first term, and bounds the second. The forcing interval contains mL/2 processor-time slots and no further job arrivals. Therefore at least one processor-time slot is idle.
DETERMINISTIC CASE. Let be the total unfinished work immediately before time , so . Each epoch releases mL work and contains mL processor-time slots, so . Suppose, for contradiction, that every job has flow time less than cL. Then Lemma 7 applies to every forcing epoch, and at least one processor-time slot is idle in each such epoch. Hence for every forcing epoch i.
The forcing epochs among the first epochs are , so there are exactly of them. It follows that . On the other hand, at time , every job released by time has age at least and hence must be complete. Thus only the last jobs can remain unfinished, giving , a contradiction.
Therefore some job has flow time at least cL. By Lemma 6, the instance has optimal maximum flow time . Hence ALG has competitive ratio , proving the theorem.
We now extend the lower bound to randomized non-clairvoyant algorithms via Yao’s principle.
RANDOMIZED CASE. By Yao’s principle, it suffices to construct a distribution over fixed instances under which every deterministic non-clairvoyant algorithm has expected competitive ratio .
The Hard Distribution. Let I be the finite family of fixed instances that can arise from the adaptive construction above as the behavior of the deterministic algorithm varies, and let . Sample N instances independently and uniformly from I. We place the sampled instances one after another, shifting their release times so that the first job of each sample is released 2cL timesteps after the last job of the preceding sample.
Every instance in the support of this distribution has optimal maximum flow time at most 2L. Indeed, by Lemma 6, each sampled instance can be scheduled with maximum flow time at most 2L, and the 2cL gap between consecutive samples prevents these schedules from overlapping.
Fix a deterministic non-clairvoyant algorithm ALG. Consider the ith sampled instance, conditioned on all jobs from the first samples having flow time less than cL. By the separation between samples, all earlier jobs are complete before the ith sample begins. Conditioned on the history so far, the continuation of ALG is again a deterministic non-clairvoyant algorithm. By the deterministic lower bound, there is therefore at least one instance in I that forces flow time at least cL. Since the ith sample is uniform over the N instances in I, this occurs with conditional probability at least 1/N.
Thus the probability that none of the samples forces flow time at least is at most . Hence, with probability, ALG incurs maximum flow time at least . Since every instance in the support has opt = , every deterministic non-clairvoyant algorithm has expected competitive ratio . By Yao's principle, the same lower bound holds for randomized non-clairvoyant algorithms.
4 An Optimal Non-Clairvoyant Algorithm
We prove matching upper bounds using two ingredients. FIFO has competitive ratio , while a round-based algorithm has competitive ratio . We first analyze the latter algorithm assuming that opt is known and then remove this assumption by doubling.
4.1 FIFO is -Competitive
We now show that FIFO has -competitive ratio.
THEOREM 8 (FIFO UPPER BOUND). The competitive ratio of FIFO is at most .
The proof rests on a simple observation. Whenever at least m jobs are alive, each has a ready subjob, so FIFO keeps all m processors busy. FIFO therefore processes work at the maximum possible rate, and hence no slower than the optimal schedule. We can use this observation to show that the total remaining work never grows beyond a threshold.
Let denote the total remaining work of the jobs alive under FIFO (including subjobs not yet revealed) at time t.
LEMMA 9. At every integer time t, we have opt.
PROOF. If fewer than m jobs are alive after the releases at time t, then Proposition 5 bounds their total remaining work by opt and the claim holds.
Suppose otherwise that at least m jobs are alive at time t. Let be the first timestep such that at least m jobs are alive at every time from s through t. The minimality of s gives opt (where by convention). By Proposition 5, the jobs released from timestep s through t contain at most subjobs. FIFO is fully busy during timesteps , and therefore processes subjobs. Hence
PROOF OF THEOREM 8. Fix a job J released at time r, let C be its completion time. Let G be the jobs released by time r, including J.
Call a timestep from r through C-1 full if FIFO processes subjobs of jobs in G on all m processors, and partial otherwise. Let F and P be the numbers of full and partial timesteps, respectively. It suffices to bound F and P.
In every partial timestep, FIFO processes every ready subjob of J. Every longest path in the residual DAG begins at a ready subjob, so the longest remaining path of J decreases by at least one. Its initial length is at most opt by Proposition 5, and hence .
Every full timestep processes m subjobs belonging to jobs in G, and every partial timestep processes at least one subjob of G. Thus
The second inequality follows from Lemma 9. Therefore, by (1) and , we conclude
□
4.2 Small-Frontier-First: An -Competitive Algorithm
The lower-bound construction above uses instances in which optimal maximum flow time is large. Assuming we are given a priori value of opt, we now show a non-clairvoyant algorithm, Small-Frontier-First (SFF), that is -competitive when opt is bounded.
THEOREM 10. Given opt, there is a deterministic non-clairvoyant algorithm SFF for online DAG scheduling on m identical processors with .
Arrival batches. For each integer , the jobs released in the 2 opt-length window form a batch , whose DAG is the disjoint union of those jobs. A batch becomes eligible at its eligibility time opt and is admitted at the first round boundary at or after . A batch is considered older than a batch if their eligibility times give .
LEMMA 11 (BATCH BOUNDS). Each batch has at most 3m opt subjobs and depth at most opt. For integers , at most batches become eligible in , and together they hold at most total subjobs.
PROOF. The depth of a batch is the number of vertices on the longest directed path of its DAG. Since each batch consists of jobs released in a 2 opt-length window, Proposition 5 gives depth at most opt and at most 3m opt subjobs.
A batch is eligible in only when its 2 opt-length window ends within that interval, so the windows of all such batches lie within and hold at most subjobs by Proposition 5. Consecutive batch windows are 2 opt apart, so at most can become eligible in the interval.
The algorithm. We construct blocks of consecutive steps called rounds. A round's endpoints are its boundaries. SFF acts only at boundaries. At a boundary, an unfinished admitted batch is small if it has at most m ready subjobs and large otherwise. These labels use only the subjobs ready at that boundary and are recomputed each round. SFF performs the following routine each round.
Small-Frontier-First Algorithm – single-round routine
1: Admit all eligible batches. 2: Let P be the ready subjobs of the small batches. 3: Let be the oldest large batch, if one exists. 4: if then 5: Process P in a fixed order over steps. 6: In the last step, fill free processors from , if possible. 7: else 8: if exists then 9: Process m ready subjobs of for one step. 10: else 11: Leave all processors idle for one step.
Rounds begin at time step 0. Before any batch becomes eligible, every round is a single idle step. SFF holds P and fixed for the full round. Subjobs and batches that arrive during a round are deferred to the next round; consequently, an individual round has length , a round with a large batch must be fully busy, and any round has at most one idle step.
Progress in a round. The analysis builds on two observations.
(1) A batch B can be small at the start of at most opt rounds. In each round, SFF processes all of its ready subjobs, so every longest path loses a vertex and a batch's depth drops by one whenever it is small. Thus at most m opt subjobs of a batch are processed over all rounds in which it is small.
(2) At most one batch may turn from large to small per round boundary, since only is processed among large batches.
LEMMA 12 (ROUND BOUNDS). Each round begins with at most 4 opt small batches and lasts at most 4 opt steps.
PROOF. A round starting with small batches has length at most , because . We seek to show opt by induction on rounds.
Assume each earlier round had length at most 4 opt. Then the opt rounds preceding a boundary time span at most time steps, in which at most batches become eligible (Lemma 11).
Fix some batch B which is small at boundary time t. If B became eligible in this window, it is one of the aforementioned 2 opt +1 batches. Otherwise, B was present at the beginning of all opt preceding rounds. Since B is small for at most opt rounds before finishing, B was large at the start of some previous round, and turned from large to small at one of the preceding boundaries. Since this can happen to at most one batch per boundary, over all q small batches this gives .
LEMMA 13 (REMAINING WORK). At every round boundary, the total remaining work of eligible batches, including unrevealed subjobs, is at most .
PROOF. Let be the total remaining work at boundary , after all batches eligible by are admitted. With no large batch, Lemma 12 leaves at most 4 opt batches, each with at most 3m opt work by Lemma 11, so .
Otherwise, let be the latest boundary with no large batch, which always exists since no batch is eligible at time 0. We have by the previous argument. The round at has at most one idle step, and all rounds after but preceding are fully busy, so at least work is processed in . Any batch admitted after became eligible in , so Lemma 11 gives that at most work is admitted. Remaining work rises only with admissions and falls only by processing, so the terms cancel giving
PROOF OF THEOREM 10. Fix a batch B admitted at boundary time a with completion time C, and set . The batches eligible at a gain no further work and hold at most work together (Lemma 13).
For every , let be the total number of processors SFF allocates to these batches during the interval . Since they gain no work after ,
Each of the remaining processors is either idle or servicing a younger batch. A younger batch is served only while it is small for at most opt work over its lifetime, or as the large filler batch . Since is the oldest large batch, a younger is only chosen when is small. Furthermore, a step is idle only in rounds with no large batch, where is also small. At most younger batches become eligible in (Lemma 11) and is small in at most opt rounds, so
It then follows that
which gives . The same bound applied to every finite prefix of unfinished rounds forces to complete, and completes within steps after it is admitted. A job of is released at most 2 opt steps before the batch becomes eligible and is admitted at most 4 opt later (Lemma 12), then finishes with the rest of batch , thus its flow time is at most
4.3 Combining FIFO and Small-Frontier-First
We now show Theorem 2 by constructing a scheduler which combines FIFO and SFF and removes the assumption that we know opt.
By Theorem 8, FIFO is -competitive. By Theorem 10, SFF is -competitive when supplied an upper bound on opt. For any integer , replacing opt by B in the analysis of SFF gives a modified algorithm with maximum flow at most . Every job has depth at most B, and jobs released in an interval of length have at most work, so all bounds in that analysis are valid. Then running both under a doubling guess yields an algorithm that does not require knowledge of opt and is -competitive.
The combined algorithm. By Theorems 8 and 10 and the previous observation, we may fix a constant such that on every instance , whenever and . The algorithm runs in phases, each carrying an integer guess of opt and running a fresh instance of , then FIFO once . At the start of a phase, each unfinished job is represented by the DAG obtained by deleting all completed subjobs. Future jobs retain their original DAGs. treats the phase's start as its own time 0, and presents each job at global artificial release time , or equivalently at local time .
Combined Non-Clairvoyant Algorithm
1: Set and begin a phase. 2: For each unfinished or future job, set . 3: Run if ; otherwise, run FIFO permanently. 4: At each time, first record all completions. 5: An SFF phase fails if an unfinished job has age at least . 6: On failure, set and begin a new phase.
PROOF OF THEOREM 2. Assume I is nonempty, so . All artificial releases in the initial phase occur after its start. If a phase with guess b fails at some time s, every unfinished job has age at most and under the new guess , each such job has artificial release . Future jobs have artificial releases after s, so each fresh starts before any of its artificial releases. Shift an optimal schedule of I forward by and restrict it to the subjobs remaining at the start of the phase. This is a feasible schedule for the phase instance, since restricting to the residual DAGs only removes subjobs and precedence constraints, and it finishes each job within opt of its artificial release. Thus, a phase’s optimum is at most opt.
Once guarantees each job finishes by age , so an SFF phase never fails. Then a failure requires , and since each guess doubles a failed one, . Finitely many guesses lie below , so FIFO eventually runs or some SFF phase never fails and every job completes.
Every guess satisfies opt and , so and opt . A job completed under SFF has flow time at most opt . Under FIFO, opt, so its flow time is at most opt opt . Thus opt , and the ratio is .
5 FIFO Can be Bad Even When opt = O(1)
We next show that FIFO can have competitive ratio even when opt is constant.
THEOREM 14 (FIFO LOWER BOUND WITH CONSTANT OPTIMUM). There exists an instance I in which every job is an out-tree and
The high-level idea is to construct an instance where an optimal schedule keeps all processors busy, while FIFO is repeatedly forced to leave a processor idle.
The hard instance. Set . For each , release job at time . Each job has exactly 3m subjobs and is one of the following types, illustrated in Figure 3:
• A short job consists of a root with leaf children.
- A long job consists of a root whose unique child, called its middle subjob, has leaf children.
short job
long job

3m - 1 leaves

3m - 2 leaves
Figure 3: The two job types. Labeled vertices are the root r and, in a long job, the middle subjob u; unlabeled vertices represent leaves.
The adversary initially reveals only the root of each job and assigns its type adaptively. If FIFO schedules at least one root in timestep t, the adversary adaptively assigns types as follows:
(i) If the set also contains a middle subjob, declare every job whose root is selected short.
(ii) Otherwise, declare every job whose root is selected long.
If these roots are processed in timestep t, the corresponding children become ready and are revealed at time . Note that this adaptive choice is valid as FIFO is non-clairvoyant.
CLAIM 15 (SMALL OPTIMUM). The instance I generated above maintains that .
PROOF. We describe a schedule with maximum flow time at most 6. Consider the job released at time . During timesteps , , , we reserve one processor for and process its root and then one ready subjob in each of the next two timesteps. Its remaining subjobs are then ready leaves. During timesteps , , , the other processors finish these leaves while the reserved processor processes , if it exists. Thus has flow time at most six: its last subjob is processed by timestep , so its completion time is at most .
The adversary ensures that ready leaves belong to the oldest jobs, so FIFO processes them first. Moreover, when leaves are ready, no middle subjob is ready. Once FIFO has processed all leaves, it leaves a processor idle in the next timestep.
CLAIM 16. Suppose every job has flow time less than T. Then:
(i) every job with a ready leaf is older than every other job with an unprocessed root;
(ii) if a leaf is ready, then no middle subjob is ready; and
(iii) every block of consecutive timesteps contains a timestep in which FIFO leaves a processor idle.
PROOF. Since jobs are released three timesteps apart, among any m alive jobs the oldest has age at least and hence flow time greater than T. Thus fewer than m jobs are alive at every time.
We prove (i) and (ii) by induction on time. Both trivially hold at time 1. Suppose (i) and (ii) both hold at time t. We show that they hold for time .
If a leaf is ready at time t, then by the induction hypothesis (i), FIFO processes leaves before roots; by (ii), no middle subjob is ready. Thus every job whose root is processed in timestep t is declared long by the adversary's second rule and reveals only its middle subjob at time . If some leaves remain after timestep t, no root was processed, so at time these leaves still precede all unprocessed roots and no middle subjob is ready. Otherwise, no leaf is ready at time , so (i) and (ii) hold trivially.
If no leaf is ready at time t, each alive job has one ready root or middle subjob. Since fewer than m jobs are alive, FIFO processes all of these subjobs in timestep t. If a middle subjob runs in that timestep, every job whose root runs is declared short, so all jobs alive at time t reveal leaves at time . Otherwise, every job whose root runs is declared long, so only middle subjobs will be revealed at time .
Any root released at time belongs to a younger job. Hence (i) and (ii) hold at time in both cases.
It remains to prove (iii). Consider a maximal run of timesteps with ready leaves. At its start there are at most leaves, since fewer than m jobs are alive and each has 3m subjobs. By (i) and (ii), no new leaf is revealed during the run. FIFO processes m leaves in every timestep except possibly the last, so the run lasts at most timesteps. Whenever no leaf is ready, each alive job has exactly one ready root or middle subjob. Since fewer than m jobs are alive, FIFO processes all of them and leaves a processor idle. Thus every block of consecutive timesteps contains a timestep with an idle processor.
PROOF OF THEOREM 14. Suppose, for contradiction, that every job has flow time less than T. At time 3i, the first i jobs have been released and contain 3mi subjobs, while only timesteps 1, ..., 3i - 1 have been processed. Their remaining work is therefore m plus the number of idle processor slots in these timesteps.
By part (iii) of Claim 16, this idle-slot count increases in every block of timesteps. However, fewer than m jobs are alive, each with at most 3m remaining work, so the total remaining work is always at most , a contradiction.
Therefore , while Claim 15 gives , completing the proof.
6 Optimal Analysis of Batched Arrivals
We now turn to the batched-arrival setting, in which jobs are released only at times 0, opt, 2 opt, ... Agrawal, Moseley, Newman, and Pruhs [6] proved that FIFO is -competitive in this setting. We give a somewhat simpler proof with a tighter analysis and prove a matching lower bound for every non-clairvoyant algorithm. Together with FIFO's guarantee from Theorem 8, these results determine the optimal competitive ratio up to constant factors, proving Theorem 4.
6.1 Upper Bound
We now prove the upper bound in Theorem 4. Fix a batched instance I and write opt := opt(I). We show that
Merge all jobs released at time opt into a batch . By Proposition 5, each batch contains at most opt subjobs. For opt, let be the remaining work of under FIFO. We call a timestep prefix-idle for if FIFO processes fewer than subjobs from , and let be the number of such timesteps before time . Because FIFO prioritizes older batches, in every prefix-idle timestep it processes every ready subjob of .
The following somewhat counterintuitive key lemma is due to Agrawal et al. [6].
LEMMA 17. If is unfinished at time , then
In particular, .
PROOF. In every prefix-idle timestep, FIFO processes every ready subjob of . Thus the longest remaining path of every unfinished job in decreases by at least one. As every initial path has length at most opt by Proposition 5, we have .
Moreover, after such timesteps, every remaining subjob has at least predecessors on some directed path. Hence an optimal schedule cannot process any remaining subjob before time opt and must process all remaining work by time opt + opt. The claimed bound follows from the fact that at most subjobs can be processed in these opt timesteps.
For each , let be FIFO's unfinished work immediately before the batch at time opt is released. We call opt a strict record time if for every .
LEMMA 18. Suppose h opt is a strict record time. If exactly q of the earlier batches still contain unfinished work immediately before is released, then
PROOF. Order the unfinished batches from oldest to newest. For the th batch, let be its remaining work and let be its number of prefix-idle timesteps by time opt. We first show that, for every ,
The th batch has age at least opt. When it arrived, its prefix contained less than opt work because opt is a strict record time. Every timestep that is not prefix-idle removes units of this work. Hence
Since , rearranging and applying Lemma 17 gives
which proves (2).
As the are integers, the recurrence above yields . As the oldest batch is unfinished, Lemma 17 gives , and the result follows.
PROOF OF THE UPPER BOUND IN THEOREM 4. The case opt = 1 is immediate, so assume opt ≥ 2 and set . At every strict record time, at most batches are unfinished, each with at most opt subjobs. It follows that opt for every .
Fix a batch . At its release, it and all earlier batches have at most opt unfinished work. Until completes, every timestep either processes units of this prefix or is prefix-idle for . There are at most opt timesteps of the first type and, by Lemma 17, at most opt of the second. Thus every job in has flow time at most opt, giving an competitive ratio. Combining this with FIFO's bound from Theorem 8 proves the theorem.
6.2 Lower Bound
We now prove the lower bound in Theorem 4. This bound matches the preceding FIFO guarantee and reveals a sharp contrast with general arrivals: restricting releases to multiples of opt reduces the optimal dependence on opt from linear to logarithmic.
More precisely, fix and an integer , and set . We construct, for every deterministic non-clairvoyant algorithm ALG, a fixed finite batched-arrival instance I satisfying
Since , we have .
The extension to randomized algorithms follows by constructing a hard distribution through repeated copies of this instance and applying Yao's lemma, as in the proof of Theorem 1.
The Jobs. We use a construction similar to that in Section 3. Let . The instance I is the following. For , one job is released at time . We call timesteps epoch i. Each job is a layered out-forest with key subjobs defined as before, except that each wide layer now contains subjobs. Each job has exactly wide layers and narrow layers, and hence exactly subjobs.
The adversary chooses the order of the wide and narrow layers adaptively, subject to the following prefix condition: every prefix of a job contains at least as many wide layers as narrow layers. This condition ensures that the optimal maximum flow time is exactly L, as shown next.
LEMMA 19. The constructed instance I satisfies .
PROOF. Each job has mL subjobs, so . We now show that each job can be processed entirely within its release epoch, thus showing . In the jth timestep of that epoch, process the key of layer j and non-key leaves.
Let and count the wide and narrow layers among the first layers. The preceding keys make all these layers available. Each wide layer contributes non-key leaves, and earlier timesteps have processed of them. Thus the number of ready non-key leaves is
The schedule is therefore valid and finishes every job in exactly L timesteps, proving .
The Adversary. As in Section 3, the adversary chooses the key subjob of each wide layer so that ALG finishes the entire layer before the next layer becomes ready. It remains to describe how the adversary adaptively chooses the order of wide and narrow layers.
Choosing the Layer Order. The adversary chooses the layer order so as to force ALG to leave processor slots idle. At the beginning of each epoch, call a job active if it still has an unfinished or unused wide layer (a wide layer that is not yet exposed), and passive otherwise. For each active job , let count its wide subjobs processed in the current epoch.
After each timestep, let be the number of timesteps remaining in the epoch. An active job becomes passive once or it has no wide layers remaining. While a job is active, its next layer is wide; once it becomes passive, its next layers are narrow for the remainder of the epoch.
If an idle processor slot occurs, the adversary has achieved its goal for the epoch. For the remainder of that epoch, whenever a new layer becomes ready, it is made wide whenever a wide layer remains, and narrow otherwise. At the beginning of the next epoch, the active/passive labels and counters are reset.
We next verify that the adversary’s adaptive choices are always consistent with the required job structure.
CLAIM 20. At every time and for every job, the sequence of layers fixed so far satisfies the prefix condition: every prefix contains at least as many wide layers as narrow layers.
PROOF. We prove the claim by induction over epochs. Revealing a wide layer cannot violate the prefix condition.
If a job becomes passive because all wide layers are exhausted, the remaining layers are narrow and the prefix condition is immediate. Otherwise, suppose it becomes passive with D timesteps remaining, so . Then ALG has processed subjobs from at least D wide layers during the epoch. Since no narrow layers are added while the job is active, the current prefix has surplus at least D wide layers. Thus at least D narrow layers remain, and at most D further layers can become ready before the epoch ends. Making these layers narrow therefore preserves the prefix condition.
After an idle processor slot occurs, placing all remaining wide layers immediately before all remaining narrow layers also preserves the condition.
The next lemma shows that, as long as at most c jobs are alive in an epoch, the threshold rule cannot keep all m processors busy for an entire epoch.
LEMMA 21. Every epoch that begins with at most c alive jobs contains an idle processor-time slot.
PROOF. Suppose, for contradiction, that every timestep in the epoch is full. Let be the number of jobs that are active at the beginning of the epoch. For each such job , let be the number of timesteps remaining when the job either becomes passive or completes. Note that is well defined: if the job does not complete earlier, then it becomes passive by the end of the epoch since the threshold is automatic when . Without loss of generality, index the jobs so , and set .
For , let denote the number of wide subjobs processed during the final timesteps of the epoch. We derive a recurrence on by giving a lower and an upper bound on .
Lower Bound on . Since every processor is busy, exactly m subjobs are processed in each timestep. At most one of these can be a narrow subjob from each alive job, and there are at most c alive jobs. Hence at least wide subjobs are processed in every timestep, giving
Upper Bound on . Consider a job . One timestep before it becomes passive or completes, there are timesteps remaining and the job is still active. Hence . In the next timestep, at most additional wide subjobs of this job can be processed. Thus job processes fewer than wide subjobs while active.
After a job becomes passive, no new wide layer is given to it, so it can process at most one additional wide layer, contributing at most b wide subjobs. Summing over all jobs gives
Combining (3) and (4),
Since and , we have , and therefore
Solving this recurrence yields . Taking and using gives
which is a contradiction, and thus the epoch contains an idle processor time slot.
PROOF OF THE LOWER BOUND IN THEOREM 4. Suppose every job has flow time less than cL. Then at most c jobs are alive at each epoch's start, so Lemma 21 guarantees an idle processor-time slot in every epoch.
Each epoch releases mL work but processes at most mL - 1, leaving at least n = cmL unfinished work after n epochs. Yet every job released by time must have completed by time nL, leaving at most c - 1 jobs and unfinished work, a contradiction.
Thus some job has flow time at least cL; Lemma 19 completes the proof.
7 Related Work
We now review some closely related work.
Scheduling parallel programs which can be modeled as DAGs has been studied extensively. For a single job, if the structure is known, trees can be scheduled optimally using several algorithms while minimizing makespan for general DAGs is NP-hard when the number of processors is part of the input . However, several theoretically good and practical schedulers have been designed such as greedy schedulers and work-stealing schedulers .
In the setting where multiple jobs share a parallel machine, called the multiprogrammed setting, there has been both theoretical and practical work [1, 2, 8, 15]. Flow-time metrics have also been studied in a different non-clairvoyant precedence-constrained scheduling setting, though both its information model and objectives differ from the dynamic-multithreaded DAG model studied here [13, 27]. In the context of flow-time objectives, most of this work is in the context of speed augmentation where an s-speed c-competitive algorithm achieves a competitive ratio of c when given processors s times the speed of the optimal schedule. Speed augmentation has long been a central tool for obtaining guarantees in non-clairvoyant scheduling [11, 17, 22]. An algorithm is scalable if, for every fixed , it is -speed competitive with a ratio depending only on . Agrawal et al. [4] show that FIFO is scalable for DAG jobs. Scalable algorithms have also been designed for other flow-time objectives such as average flow time [3] and throughput [5].
A closely related model of parallel jobs is the speedup curves model [21, 25]. In this model, the job has phases of parallelism and in phase i, the job has work and completes work given m processors. Generally, is a non-decreasing sublinear function to indicate that getting additional processors is never harmful and that there is decreasing marginal benefit for each additional processor given to a job. The speedup curves model and the DAG model are fundamentally different; algorithmic and impossibility results do not appear to translate from one to another. For instance, given speed, FIFO is -competitive for DAGs [4], but no non-clairvoyant algorithm can be -competitive in the speedup curves model [25]. Interestingly, the scheduler that achieves this result is not FIFO; FIFO is a very bad scheduler for the non-clairvoyant setting in the speedup curves model.
Without extra speed, all non-clairvoyant algorithms have an unbounded competitive ratio in the speedup curves model [21]. The distinction between the models is important for interpreting these lower bounds. In the speedup curves model, one source of difficulty is inter-job allocation: a non-clairvoyant scheduler does not know a job's current speedup curve and may allocate many processors to a job that cannot use them effectively. In the DAG model, the scheduler sees each job's ready vertices and therefore knows its currently available parallelism. However, this information does not reveal which ready vertices will expose additional parallelism. Our lower-bound construction exploits this uncertainty in intra-job scheduling: delaying these vertices creates periods of low parallelism, whereas a clairvoyant scheduler can process them early and overlap work across jobs.
8 Conclusions
This paper essentially closes the problem of non-clairvoyant scheduling of DAG jobs for maximum flow time without speed augmentation; even for trees, the achievable competitive ratio is shown to be where is the number of processors and is the maximum flow time achieved by the optimal offline algorithm. We either need speed augmentation or we must know the structure of dependencies when the job arrives in order to get better results. For trees, one can achieve -competitiveness [6] if the structure is known on arrival. An important open question is whether structural information allows us to get a constant or even a logarithmic competitive ratio for general DAGs, or even for natural subclasses such as series-parallel DAGs. More generally, what partial information—such as advice about the critical path or coarse information about future parallelism—is sufficient to recover a good competitive ratio?
Acknowledgments
The second and third authors thank Nikhil Bansal for several insightful discussions about the problem. All four authors thank Nikhil Bansal and Kirk Pruhs for bringing the two groups together after discovering their independent work on the problem.
AI Disclosure
OpenAI's ChatGPT 6 Astra was used extensively in the development of this work. The authors first developed the lower-bound construction for batched arrivals. Building on this construction, ChatGPT 6 generated and refined the arguments leading to the tight upper and lower bounds for general non-clairvoyant scheduling. AI tools were used in finding references and preparing the manuscript. The authors are responsible for all content in the paper.
References
[1] Kunal Agrawal, I-Ting Angelina Lee, Jing Li, Kefu Lu, and Benjamin Moseley. 2019. Practically Efficient Scheduler for Minimizing Average Flow Time of Parallel Jobs. In Proceedings of the 33rd IEEE International Parallel and Distributed Processing Symposium. IEEE, Piscataway, NJ, USA, 134–144. doi:10.1109/IPDPS.2019.00024
[2] Kunal Agrawal, Charles E. Leiserson, Yuxiong He, and Wen-Jing Hsu. 2008. Adaptive Work-Stealing with Parallelism Feedback. ACM Transactions on Computer Systems 26, 3 (2008), 7:1–7:32. doi:10.1145/1394441.1394443
[3] Kunal Agrawal, Jing Li, Kefu Lu, and Benjamin Moseley. 2016. Scheduling Parallel DAG Jobs Online to Minimize Average Flow Time. In Proceedings of the 27th Annual ACM-SIAM Symposium on Discrete Algorithms (SODA). 176–189. doi:10.1137/1.9781611974331.ch14
[4] Kunal Agrawal, Jing Li, Kefu Lu, and Benjamin Moseley. 2016. Scheduling Parallelizable Jobs Online to Minimize the Maximum Flow Time. In Proceedings of the 28th ACM Symposium on Parallelism in Algorithms and Architectures (SPAA). 195–205. doi:10.1145/2935764.2935782
[5] Kunal Agrawal, Jing Li, Kefu Lu, and Benjamin Moseley. 2018. Scheduling Parallelizable Jobs Online to Maximize Throughput. In LATIN 2018: Theoretical Informatics (Lecture Notes in Computer Science, Vol. 10807). Springer, 755–776. doi:10.1007/978-3-319-77404-6_55
[6] Kunal Agrawal, Benjamin Moseley, Heather Newman, and Kirk Pruhs. 2024. Scheduling Out-Trees Online to Optimize Maximum Flow. In Proceedings of the 36th ACM Symposium on Parallelism in Algorithms and Architectures (SPAA). Association for Computing Machinery, New York, NY, USA, 77–88. doi:10.1145/3626183.3659955
[7] Christoph Ambühl and Monaldo Mastrolilli. 2005. On-line Scheduling to Minimize Max Flow Time: An Optimal Preemptive Algorithm. Operations Research Letters 33, 6 (2005), 597–602. doi:10.1016/j.orl.2004.10.006
[8] Nimar S. Arora, Robert D. Blumofe, and C. Greg Plaxton. 1998. Thread Scheduling for Multiprogrammed Multiprocessors. In Proceedings of the Tenth Annual ACM Symposium on Parallel Algorithms and Architectures. Association for Computing Machinery, New York, NY, USA, 119–129. doi:10.1145/277651.277678
[9] Michael A. Bender, Soumen Chakrabarti, and S. Muthukrishnan. 1998. Flow and Stretch Metrics for Scheduling Continuous Job Streams. In Proceedings of the 9th Annual ACM-SIAM Symposium on Discrete Algorithms (SODA). 270–279.
[10] Robert D. Blumofe and Charles E. Leiserson. 1999. Scheduling Multithreaded Computations by Work Stealing. J. ACM 46, 5 (1999), 720–748. doi:10.1145/324133.324234
[11] Jeff Edmonds. 2000. Scheduling in the Dark. Theoretical Computer Science 235, 1 (2000), 109–141. doi:10.1016/S0304-3975(99)00186-0
[12] Matteo Frigo, Charles E. Leiserson, and Keith H. Randall. 1998. The Implementation of the Cilk-5 Multithreaded Language. In Proceedings of the ACM SIGPLAN 1998 Conference on Programming Language Design and Implementation. Association for Computing Machinery, New York, NY, USA, 212–223. doi:10.1145/277650.277725
[13] Naveen Garg, Anupam Gupta, Amit Kumar, and Sahil Singla. 2019. Non-Clairvoyant Precedence Constrained Scheduling. In 46th International Colloquium on Automata, Languages, and Programming (ICALP) (LIPIcs, Vol. 132). 63:1–63:14. doi:10.4230/LIPIcs.ICALP.2019.63
[14] Ronald L. Graham. 1969. Bounds on Multiprocessing Timing Anomalies. SIAM J. Appl. Math. 17, 2 (1969), 416–429. doi:10.1137/0117039
[15] Yuxiong He, Wen-Jing Hsu, and Charles E. Leiserson. 2008. Provably Efficient Online Nonclairvoyant Adaptive Scheduling. IEEE Transactions on Parallel and Distributed Systems 19, 9 (2008), 1263–1279. doi:10.1109/TPDS.2008.39
[16] T. C. Hu. 1961. Parallel Sequencing and Assembly Line Problems. Operations Research 9, 6 (1961), 841–848. doi:10.1287/opre.9.6.841
[17] Bala Kalyanasundaram and Kirk Pruhs. 2000. Speed is as Powerful as Clairvoyance. J. ACM 47, 4 (2000), 617–643. doi:10.1145/347476.347479
[18] Jan Karel Lenstra and A. H. G. Rinnooy Kan. 1978. Complexity of Scheduling under Precedence Constraints. Operations Research 26, 1 (1978), 22–35. doi:10.1287/opre.26.1.22
[19] Stefano Leonardi and Danny Raz. 2007. Approximating Total Flow Time on Parallel Machines. J. Comput. System Sci. 73, 6 (2007), 875–891. doi:10.1016/j.jcss.2006.10.018
[20] Monaldo Mastrolilli. 2003. Scheduling to Minimize Max Flow Time: Offline and Online Algorithms. In Fundamentals of Computation Theory (Lecture Notes in Computer Science, Vol. 2751). Springer, 49–60. doi:10.1007/978-3-540-45077-1_6
[21] Benjamin Moseley, Ruilong Zhang, and Shanjiawen Zhao. 2022. Online Scheduling of Parallelizable Jobs in the Directed Acyclic Graphs and Speed-up Curves Models. Theoretical Computer Science 938 (2022), 24–38. doi:10.1016/j.tcs.2022.10.005
[22] Rajeev Motwani, Steven J. Phillips, and Eric Torng. 1994. Non-Clairvoyant Scheduling. Theoretical Computer Science 130, 1 (1994), 17–47. doi:10.1016/0304-3975(94)90151-1
[23] R. R. Muntz and E. G. Coffman. 1970. Preemptive Scheduling of Real-Time Tasks on Multiprocessor Systems. J. ACM 17, 2 (1970), 324–338. doi:10.1145/321574.321586
[24] OpenMP Architecture Review Board. 2013. OpenMP Application Program Interface, Version 4.0. https://www.openmp.org/wp-content/uploads/OpenMP4.0.0.pdf
[25] Kirk Pruhs, Julien Robert, and Nicolas Schabanel. 2010. Minimizing Maximum Flowtime of Jobs with Arbitrary Parallelizability. In Approximation and Online Algorithms (WAOA 2010). 237–248. doi:10.1007/978-3-642-18318-8_21
[26] James Reinders. 2010. Intel Threading Building Blocks: Outfitting C++ for Multi-Core Processor Parallelism. O'Reilly Media, Sebastopol, CA, USA.
[27] Julien Robert and Nicolas Schabanel. 2008. Non-clairvoyant Scheduling with Precedence Constraints. In Proceedings of the 19th Annual ACM-SIAM Symposium on Discrete Algorithms (SODA). 491–500. doi:10.1145/1347082.1347136
[28] Linus Schrage. 1968. Letter to the Editor—A Proof of the Optimality of the Shortest Remaining Processing Time Discipline. Operations Research 16, 3 (1968), 687–690. doi:10.1287/opre.16.3.687