Manuscript Offprint
arXiv:2610.07600Beyond No-Good Benders Cuts: Exact Realizability for Discretely Tunable Clock Trees
Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.
Boxiang Song and Keren Zhu
College of Integrated Circuits and Micro-Nano Electronics
Fudan University, Shanghai, China
Abstract—Useful-skew schedules can satisfy timing constraints yet remain unrealizable by a fixed clock tree with discrete tuning choices. We formulate this mismatch as exact membership in a finite relative-latency set and develop a checkable feedback interface between the scheduler and the tree model. Arithmetic certificates explain unrealizable targets, while tree-specific contraction reduces the structural size of the exact relations projected onto selected sinks. These relations become realizability cuts that can exclude more candidates than a no-good on the same certificate support, including discrete holes that linear inequalities cannot separate. Controlled experiments confirm fewer oracle calls and faster projection construction. They also expose important limits: globally minimum certificates can cost more than they save, compact arithmetic feedback can fail on non-parity obstructions, and direct monolithic optimization remains faster on the tested additive models. The contribution is an exact, independently verifiable scheduler–tree interface, rather than a claim of universal solver acceleration or physical signoff.
Index Terms—clock trees, useful skew, discrete optimization, infeasibility certificates, logic-based Benders decomposition
I. INTRODUCTION
Clock-skew scheduling trades arrival times against setup and hold margins [1]. Prescribed-skew synthesis constructs a topology or route for a schedule [2]–[4], whereas useful-skew flows may replace exact targets with ranges or upper bounds [5], [6]. A different question arises after topology and tuning options are frozen: which schedules can the remaining discrete choices realize exactly? Even a target inside the convex hull of realizable schedules can be impossible.
We study this finite-model gap through logic-based Benders decomposition (LBBD) [7]. The scheduler proposes a latency vector; the tree oracle returns a tuning witness or a checkable explanation and a valid cut (Fig. 1). Generic combinatorial Benders cuts and conflict extraction already strengthen point no-goods [8], [9]; their benefit must be weighed against explanation cost [10]. Our specialization is the combination of finite edge-domain proofs, laminar tree contraction, and exact sink-projection feedback. Irreducible conflicts are not necessarily minimum-cardinality certificates.
The contributions are: an exact relative-latency model with a sharp two-sink complexity boundary; a sound and complete arithmetic certificate system; and tree-specific projection cuts with an oracle-call separation from no-goods. Same-model experiments isolate cut strength, projection compilation, and end-to-end cost. Fewer oracle calls do not imply faster closure;

Fig. 1. Exact scheduler–tree feedback. Rejected targets generate sound linear, congruence, or projected-relation cuts; a feasible target has a tuning witness. All guarantees refer to the declared finite model.
the evaluation retains both resource limits and unfavorable comparisons.
Targets are integer vectors with . This is an additive, single-corner model, not a signoff timing model. For selected sinks , write . With , exact propagation starts from and adds the finite set at each edge, merging duplicate states. Induction yields the finite Minkowski sum ; predecessor records recover a tuning witness. Intermediate state counts can be exponential. Enumeration also finds the nearest vector: for , .
Theorem 1. Exact membership is weakly NP-complete even for two sinks with binary edge libraries.
Proof. An edge assignment is a polynomial witness. Give one sink fixed latency zero and the other a chain with libraries . Relative target B is realizable exactly when the positive integers have a subset summing to B. Reachable-sum dynamic programming is pseudo-polynomial.
For a star, membership simplifies to . If each shifted set has at most elements, any empty intersection is witnessed by at most sets: choose one set and, for each of its elements, a set omitting it. The bound is tight for with . Thus pairwise checks are insufficient, as demonstrate. Finding the smallest empty subfamily is NP-hard by complementation from set cover.
Theorem 2 (Laminar projection contraction). For , group edges by , discard , and replace each remaining group by its library sumset. The resulting model preserves and has at most effective edge groups.
Proof. All edges in one group have the same column ; their Minkowski terms combine exactly by sumset addition. The discarded columns are zero. Descendant sets form a laminar family on , with at most nonempty members; removing gives the bound.
Structural projection size depends on the selected sinks, not on full-tree depth or edge count. The sumset cardinalities can nevertheless grow exponentially; the theorem does not imply polynomial-time projection.
III. CERTIFICATES AND SCHEDULER CUTS
A. Checkable Unrealizability
Choose sinks and constrained edges . Restrict columns to , re-anchor, and delete the zero reference coordinate. Retain finite domains on and relax every omitted relevant edge to any real delay. Let contain the relaxed columns. For each retained assignment , the certificate stores
with the reference coordinate omitted and integer . Support is ; trace length is a separate cost.
Theorem 3. The certificate system is sound and complete for unrealizability in (1); exhaustive support search returns a global minimum.
Proof. Equation (2) rules out every real completion of every retained assignment, and relaxing domains can only enlarge the model. Conversely, retain all relevant edges. For an unrealizable target every residual is nonzero, is empty, and is a proof. The support family is finite, so exhaustive search with safe cardinality pruning finds a minimum.
The constructor computes rational left-nullspace bases and clears denominators. The independent verifier checks assignment coverage, recomputes residuals, and checks both dot products. The verifier certifies infeasibility, not global minimality; the latter requires exhaustive search. Both search and explicit traces may be exponential.

Fig. 2. Measured separation family on logarithmic axes. Point and core no-goods coincide at 2N calls; exact projection uses two throughout. This controlled family illustrates cut strength, not runtime speedup.
B. From Explanations to Realizability Cuts
The master contains and objective . For a translation-invariant linear form , independent edge choices give the exact support bound . If , the cut is valid. Congruence cuts instead restrict to its exact reachable residues modulo . Neither bounded arithmetic search is complete.
The complete fallback uses Theorem 2 to compute the projected relation . Its exact MILP encoding is
This is a table constraint in a finite-domain master. All three cut families preserve every vector in ; cuts are admitted only when they reject the current target. Repeated separation therefore preserves the feasible optimum. The implemented hierarchy tries support-two linear forms, congruences through support four with moduli 2–12, then linear forms through support four, before minimum-certificate projection.
A certificate-core no-good rejects only the current projected value; exact projection retains only reachable values on the same support. Their accepted sets satisfy
This is set dominance, not runtime dominance. Linear cuts cannot separate holes inside : two libraries realize skews but not 1. More strongly, let and minimize over integer . Point and one-coordinate core no-goods reject all interior points before a feasible call, requiring calls. Exact projection needs only two calls; linear-only feedback stalls.
IV. EVALUATION
A. Common-Model Protocol
The cut-isolation suite uses 160 distinct four-sink trees: four topologies, four library patterns, and ten seeds. Each supplies
(a) Structural reduction

(b) Exact projection time
Fig. 3. Laminar contraction on 48 exact projections. (a) Full-tree edges reduce to two to four effective groups; markers may overlap. (b) Repeated vector-only projection time, including grouping and sumsets. Logarithmic axes; the shaded region below the diagonal favors contraction. This is a projection-stage ablation, not an end-to-end speedup.
TABLE I CUT STRENGTH AND SIZE ON 320 WORKLOADS. CENTER/DEEP COLUMNS: MEAN CALLS ON 160 WORKLOADS EACH. PAYLOAD: MEAN SCALAR COUNT OVER ALL 320. DASHES AVOID CONDITIONAL MEANS FOR STALLED STRATEGIES.
| Feedback | Solved | Center | Deep | Payload |
|---|---|---|---|---|
| Point no-good | 320/320 | 15.06 | 882.73 | 447.89 |
| Certificate-core | 320/320 | 3.77 | 16.56 | 18.73 |
| Linear only | 80/320 | - | - | - |
| Linear → proj. | 320/320 | 2.75 | 4.46 | 95.86 |
| Cert. projection | 320/320 | 2.74 | 3.81 | 105.29 |
| Compact hierarchy | 320/320 | 3.02 | 5.49 | 82.41 |
| Full-domain control | 320/320 | 2.00 | 2.00 | 880.45 |
a center hole and a maximum-depth stress hole, yielding 320 workloads. Strategies share an objective-ordered enumerative master and exact oracle; certificate strategies share global minimum certificates. Every cut is checked against all reachable vectors. All complete strategies attain the same optimum. Projection beats point no-good in 295 workloads and ties in 25, with no loss. Table I separates center and deepest-hole policies; linear-only feedback stalls on 240/320 workloads. Payload counts stored coefficients, residues, or projected coordinates, summed over cuts per workload. Full-domain feedback achieves two calls but stores a much larger relation; the hierarchy reduces payload while taking more calls than certificate projection. The hierarchy emits 337 linear, 635 congruence, and 69 projection cuts; the scalar-count proxy excludes solver-specific presolve. Figure 2 independently checks the analytic call counts. These controlled holes measure cut strength, not industrial prevalence.
A separate suite uses 32 center-hole workloads with integer setup/hold-form masters, anchored objectives, and SciPy/HiGHS. Every method receives one warmup and five fresh-state runs in seeded shuffled order. Times include relation construction, model building, cut validation, and solving; generation and process startup are excluded. All 1,280 runs match independently enumerated optima. Monolithic uses one-hot edge choices; table uses one-hot reachable vectors; MDD uses flow through layered reachable states. These are common-solver encodings, not implementations of the CP propagators in [11], [12]. Deletion-MUS uses an irreducible conflict; its subset checks count toward time.
TABLE II SAME-SOLVER RESULTS ON 32 MASTERS. TIMES INCLUDE PREPROCESSING AND USE FIVE MEASURED REPETITIONS.
| Method | Calls | Total ms | Peak binaries |
|---|---|---|---|
| Point no-good | 2.97 | 19.28 | 11.8 |
| Deletion-MUS core | 2.50 | 11.20 | 3.4 |
| Minimum-cert. core | 2.31 | 11.18 | 2.9 |
| Certificate projection | 2.28 | 9.15 | 13.2 |
| Compact hierarchy | 2.31 | 7.61 | 3.2 |
| Monolithic exact | 1 solve | 2.46 | 14.2 |
| Exact table | 1 solve | 13.35 | 194.1 |
| Layered MDD | 1 solve | 18.78 | 336.2 |
B. Performance and Structural Ablation
Table II shows that compact feedback is fastest among decomposed methods, but monolithic embedding is fastest overall. Bold times mark the best decomposed and direct methods. The interface is therefore an alternative for separated scheduler/oracle architectures, not a universal replacement for direct optimization.
The contraction ablation covers 48 projections on balanced, caterpillar, and clustered trees with 16/32 sinks, selected support two/three, one/four edge subdivisions, and binary/ternary libraries. Both paths compute vectors without witnesses, with one warmup and five alternating measured repetitions. All 48 projected sets agree exactly. Full trees with 20–248 edges contract to 2–4 groups, with median projection-only speedup (range ; Fig. 3). Certificate-search cost is excluded from this isolated ablation.
All 320 initial targets have minimum certificates passing independent verification: support ranges from four to eight and traces from 4 to 243 assignments. Table III covers 24 general-tree cases through 32 sinks: monolithic and the hierarchy solve 24/24; minimum-certificate projection solves 22/24 under a
TABLE III GENERAL-TREE SCALING: SIX INSTANCES PER SIZE. MONOLITHIC AND HIERARCHY SOLVE EVERY INSTANCE. *MINIMUM-PROJECTION TIME INCLUDES ONLY COMPLETED INSTANCES; THE 32-SINK SUBSET DIFFERS.
| Sinks | Completed / 6 | Mean time (ms) | |||
|---|---|---|---|---|---|
| DP | Min-proj. | Mono. | Min-proj.* | Hier. | |
| 4 | 6/6 | 6/6 | 1.51 | 7.16 | 5.20 |
| 8 | 6/6 | 6/6 | 1.35 | 33.16 | 5.95 |
| 16 | 0/6 | 6/6 | 3.37 | 672.77 | 14.04 |
| 32 | 0/6 | 4/6 | 4.09 | 1816.28 | 75.00 |
TABLE IV NON-PARITY STRESS: INSTANCES SOLVED IN ALL THREE 5-S RUNS. TIMEOUTS REMAIN IN EACH DENOMINATOR.
| Method | Pair / 9 | Triple / 9 | Total / 18 |
|---|---|---|---|
| Point no-good | 0 | 0 | 0 |
| Deletion core | 9 | 0 | 9 |
| Minimum-cert. projection | 9 | 4 | 13 |
| Compact hierarchy | 3 | 3 | 6 |
| Deletion-core projection | 9 | 7 | 16 |
| Monolithic | 9 | 9 | 18 |
10-s budget. All 12 explicit-DP cases at 16/32 sinks hit the 250,000-state cap. These libraries are all-even, allowing one congruence cut in every hierarchy run; this favorable structure is not representative of all discrete holes.
C. Stress Beyond Parity
We embed pair-gap and three-way obstructions into three tunable backgrounds at 8/16/32 sinks. All terminal libraries cover every residue modulo 2–12, so no linear-form congruence with those moduli rejects the initial target. Stored midpoint witnesses place the target inside the exact convex hull; every full-tree sink pair in each three-way case is feasible. These are controlled constructions, not independent physical samples.
All iterative methods share a bottom-up fixed-target membership oracle and the same HiGHS master. Six methods run three times on 18 instances, each with a 5-s budget after common backend warmup. Independent gadget lower bounds and full-tree assignments certify the optimum; every successful run matches it. All 138 timeouts remain in the 324-run denominator.
Minimum-certificate projection solves 13/18, versus 16/18 for projection on cheaper deletion cores and 6/18 for the compact hierarchy (Table IV). Monolithic solves all 18. Successful triple-core projections can contain thousands of tuples; deletion-projection's two failures occur during master solving. Minimum support and compact-cut priority do not guarantee fast closure. Solved subsets differ, so conditional time averages are not used to rank these methods.
D. Physical Scope
Two OpenROAD case studies [13] use GCD and AES trees with 35 and 562 original sinks. Each freezes placement and characterizes four buffer sites over 81 choices, exposing discrete holes and support-four certificates. On 100 adjacent-hole queries, nonlinear feedback and point no-good both need two calls: no call-count advantage is observed. Alternatives were not independently detailed-routed, and the GCD flow skips optional timing repair. Coupling, slew, load dependence, and multi-corner variation are outside the additive model; no signoff claim follows.
V. CONCLUSION
Arithmetic certificates and laminar projection contraction provide an exact, checkable interface for discrete clock-tree realizability. Projection improves elimination over same-support no-goods, while experiments delimit its practical value: explanation cost, relation size, and unsuccessful compact-cut search can dominate. Direct embedding remains the strongest tested end-to-end baseline.
REFERENCES
[1] J. P. Fishburn, “Clock skew optimization,” IEEE Transactions on Computers, vol. 39, no. 7, pp. 945–951, 1990.
[2] I. S. Kourtev and E. G. Friedman, “Synthesis of clock tree topologies to implement nonzero clock skew schedule,” IEE Proceedings – Circuits, Devices and Systems, vol. 146, no. 6, pp. 321–326, 1999.
[3] C.-W. A. Tsao and C.-K. Koh, “UST/DME: A clock tree router for general skew constraints,” in Proceedings of the IEEE/ACM International Conference on Computer-Aided Design, 2000, pp. 400–405.
[4] S. Held, B. Korte, J. Massberg, M. Ringe, and J. Vygen, “Clock scheduling and clocktree construction for high performance ASICs,” in Proceedings of the IEEE/ACM International Conference on Computer-Aided Design, 2003, pp. 232–240.
[5] R. Ewetz, “A clock tree optimization framework with predictable timing quality,” in Proceedings of the Design Automation Conference, 2017, pp. 72:1–72:6.
[6] N. Uysal, W.-H. Liu, and R. Ewetz, “Latency constraint guided buffer sizing and layer assignment for clock trees with useful skew,” in Proceedings of the Asia and South Pacific Design Automation Conference, 2019, pp. 761–766.
[7] J. N. Hooker and G. Ottosson, “Logic-based benders decomposition,” Mathematical Programming, vol. 96, no. 1, pp. 33–60, 2003.
[8] G. Codato and M. Fischetti, “Combinatorial benders’ cuts for mixed-integer linear programming,” Operations Research, vol. 54, no. 4, pp. 756–766, 2006.
[9] U. Junker, “QUICKXPLAIN: Preferred explanations and relaxations for over-constrained problems,” in Proceedings of the AAAI Conference on Artificial Intelligence, 2004, pp. 167–172.
[10] A. A. Ciré, E. Çoban, and J. N. Hooker, “Logic-based benders decomposition for planning and scheduling: A computational analysis,” The Knowledge Engineering Review, vol. 31, no. 5, pp. 440–451, 2016.
[11] H. R. Andersen, T. Hadzic, J. N. Hooker, and P. Tiedemann, “A constraint store based on multivalued decision diagrams,” in Principles and Practice of Constraint Programming, 2007, pp. 118–132.
[12] J. Demeulenaere, R. Hartert, C. Lecoutre, G. Perez, L. Perron, J.-C. Régin, and P. Schaus, “Compact-table: Efficiently filtering table constraints with reversible sparse bit-sets,” in Principles and Practice of Constraint Programming, 2016, pp. 207–223.
[13] T. Ajayi, V. A. Chhabria, M. Fogaça, S. Hashemi, A. Hosny, A. B. Kahng, M. Kim, J. Lee, U. Mallappa, M. Neseem, G. Pradipta, S. Reda, M. Saligane, S. S. Sapatnekar, C. Sechen, M. Shalan, W. Swartz, L. Wang, Z. Wang, M. Woo, and B. Xu, “Toward an open-source digital flow: First learnings from the OpenROAD project,” in Proceedings of the Design Automation Conference, 2019, pp. 76:1–76:4.