Manuscript Offprint
arXiv:2610.07772Model-Based Geometry-Aware Generative Optimization for Constrained Locomotion Planning
Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.
Zhilin He , Xinyuan Wang , Changliu Liu
Carnegie Mellon University, University of Michigan, Ann Arbor
{hectorh, cliu6}@andrew.cmu.edu, {wxinyuan}@umich.edu
(A) AR Envs

(B) Pre-Contact Wall Recovery
(C) Side-Passing
(D)
(E)
(F)
Fig. 1: Real-world deployment of 2GO for constrained humanoid locomotion. (A) Four Augmented Reality (AR)-rendered constrained environments (Zone A-D) for real-world humanoid locomotion evaluation. The robot is AR obstacle-aware, although the AR overlay does not show full depth rendering or realistic rigid-body contact. (B) Pre-contact recovery as the humanoid redirects away from an impending wall collision during online accelerated motion. (C) Multimodal side-passing around an obstacle. (D) Traversing a narrow corridor. (E) Passing between suspended ball obstacles. (F) Standing stably at the final target.
Abstract—Constrained Locomotion Planning (CLP) for quadrupeds and humanoids, where robots must satisfy collision avoidance, contact consistency, kinematic feasibility, and support constraints, is challenging under high-dimensional dynamics and highly non-convex environments. Recent Model-Based Diffusion (MBD) approaches recast trajectory optimization as posterior sampling over trajectories, using known dynamics and Monte Carlo rollouts to analytically estimate the denoising score function without demonstration learning. While constrained variants further incorporate feasibility into model-based score rollouts and show promising performance, they are still limited by (1) lacking a task-modulated active constraint geometry that shapes the score direction and reverse stochasticity, and (2) using deterministic DDPM-style reverse transport without adaptive scheduling across different generative transports. Therefore, we introduce Model-Based Geometry-Aware Generative Optimization (2GO) for constrained locomotion, which turns active constraint geometry into executable denoising operators through normal-induced metric shaping, tangent-space stochastic filtering, and CFS-based retraction. 2GO further decouples generative transport from reverse stochasticity through an adaptive diffusion and flow-like schedule. Experiments on constrained quadruped and humanoid locomotion demonstrate strong performance in discrete foothold selection and continuous posture planning, with higher success rates, fewer violations, and improved execution compatibility. Code: https://github.com/hhhhzl/genedynamics
I. INTRODUCTION
Consider a quadruped crossing sparse stepping stones or a humanoid traversing a narrow obstacle field: the planner must decide a sequence of body motions, foothold or contact choices, and posture references while satisfying collision, kinematic, support, and actuation constraints [1]–[3]. The challenge is not merely to find a collision-free path, but to produce a dynamically executable reference that remains consistent with contact transitions, hybrid dynamics, and the tracking limitations of the low-level controller [4], [5].
Recent approaches recast locomotion planning as probabilistic inference, using score-based generative models to sample and denoise trajectory posteriors into clean, multimodal behavior trajectories [6]–[8]. Compared with conventional trajectory optimization and Model Predictive Control (MPC) methods, some of which rely on local linearization, prescribed contact schedules, or good initialization and may struggle with multimodal contact choices and non-smooth feasibility boundaries in high-dimensional locomotion [9]–[11], generative approaches can flexibly synthesize trajectories, condition on goals or rewards, and represent high-dimensional multimodal action distributions. However, learned generative policies often rely heavily on demonstrations, and their learned priors alone do not ensure consistency with robot dynamics, environment geometry, or imposed safety constraints.
Model-based approaches address this limitation by leveraging Monte Carlo rollouts under known dynamics to estimate the denoising score function, thereby eliminating the need for demonstration data [12], [13]. Recent constrained variants and related diffusion planners further incorporate feasibility into the denoising process through Emerging Barrier (EB) or inexact Augmented Lagrangian Method (iALM) priors, Control Barrier Function (CBF)-constrained projections, and adaptive scheduling of feasibility enforcement [14]–[17]. Although these methods move beyond post-hoc projection, existing methods remain limited in (1) explicitly using task-modulated active constraint geometry to shape both denoising refinement and reverse stochasticity, and (2) coordinating deterministic reverse transport with separately controlled stochastic exploration under a unified adaptive schedule. Here, reverse stochasticity refers to perturbations added to the reverse update, distinct from randomness in candidate sampling. Consequently, task-specific feasible geometry remains underused in directing multimodal exploration and balancing it with deterministic refinement as the local constraint geometry becomes better resolved.
We propose a Model-Based Geometry-aware Generative Optimization (2GO) framework (Fig. 2) for Constrained Locomotion Planning (CLP), which builds an active constraint geometry from violation proxies and task context to shape model-based denoising refinement through a metric and stochastic exploration through a regularized tangent filter, complemented by optional Convex Feasible Set (CFS)-based correction [18]. 2GO further extends the deterministic Denoising Diffusion Probabilistic Models (DDPM) [19]-style reverse transport used in MBD with separately controlled reverse stochasticity, where task-modulated scheduling balances stochastic exploration and deterministic refinement towards a clean trajectory. Our Contributions are two-fold:
-
C1: We develop a geometry-aware reverse process with active-set selection, normal-induced metric shaping, and regularized tangent filtering, explicitly shaping both denoising refinement and stochastic exploration, with CFS-based correction for residual constraint violations.
-
C2: We formulate a model-based generative reverse update that decouples the transport family from reverse stochasticity, accommodating DDPM, Denoising Diffusion Implicit Models (DDIM) [20], and flow-like transports under adaptive task-geometry scheduling.
A. Score-Based Generative Models for Robot Motion Planning
Existing approaches on score-based generative models for robot motion planning aim to obtain a feasible trajectory by learning the score function from demonstration data and then sampling from a posterior over trajectory distributions [21]–[23]. Current works further adapt to constrained environments through weighted penalty, or augmented Lagrangian methods [24], [25], and projection to safe sets within the generative reverse process [26]–[28], and real-time control for deployment [6], [7], [29]. While such methods improve safety, they still rely on large-scale demonstrations and do not rigorously enforce dynamics.
Model-Based Diffusion [12] recovers trajectories through model rollouts to enforce dynamics, driving the reversing trajectories toward low-cost solutions without demonstrations. More recent works ensure safety through Control Barrier Function (CBF)-based or CFS-based projections within the model-based rollouts [14]–[16], [30]. However, those methods use projection to satisfy constraints, but do not expose active constraint geometry to the score direction and reverse stochasticity.
B. Optimization-Based and Geometry-Aware Planning
Optimization-based locomotion methods formulate locomotion as optimal control problems and solve them with contact-implicit MPC, whole-body models, or sampling-based MPC for high-dimensional quadrupeds and humanoids [10], [11], [13], [31]. In parallel, geometry-aware motion generation methods such as covariant trajectory optimization [32], Riemannian Motion Policies [33], and geometric fabrics use task-space metrics, natural-gradient-like updates, or manifold structures to shape robot trajectories and motion policies based on obstacles, tasks, and environments [34]–[36].
While these methods exploit models and geometric structure for trajectory optimization and motion-policy generation, we apply geometry-aware shaping to denoising refinement and reverse stochasticity within a model-based generative planner.
III. PRELIMINARIES
A. Problem Statement
Consider a robot with state and control at time . A finite-horizon trajectory is denoted by . The constrained trajectory optimization problem is
(1)
where and encode terminal and intermediate task objectives; denotes dynamics; denotes the inequality constraints; includes task information such as the initial state, goal condition, environment geometry, dynamics, local map, contact hints, or phase information. A model-based generative view converts Eq. (1) into a target distribution [37], [38],
where is the indicator of the feasible trajectory set
and lower-cost feasible trajectories receive higher probability. The distribution Eq. (2) turns constrained trajectory optimization into sampling from low-cost feasible trajectories, approximating by denoising score from dynamics rollouts within model-based generative sampling.
B. Model-Based Generative Trajectory Sampling
Throughout, indexes physical time, indexes reverse refinement, and indexes sampled candidates. The generative process starts from approximately Gaussian noise and iteratively refines it toward clean controls . We use clean coordinates . A Gaussian forward process maps clean controls to noisy controls: , where , , , and for . The forward process induces the noisy marginal
The reverse generative process is driven by the score function of the noisy marginal .

Fig. 2: Overview of the 2GO framework. At each reverse step, 2GO reweights model-based trajectory samples and selects a DDPM-, DDIM-, or flow-like transport. Task-modulated active constraints shape the score through and filter stochasticity through , with optional CFS correction; a reference governor converts the clean trajectory into executable commands. In a two-time-step foothold contact example (bottom right gray panel), the score guides two unconstrained foothold points, and , which are reshaped into and by the -shaped and -filtered exploration, then retracted into the support regions via CFS. The final swing trajectory is shown as a gray line.
Unlike DDPM, which learns a score estimator from data [19], MBD obtains from model evaluations: it samples controls, evaluates their rollouts, and forms a weighted clean estimate. The Gaussian noising identity then converts this estimate into a score estimate. Given , the forward kernel induces the clean-coordinate proposal
We draw a batch of candidates , evaluate rollouts under , and form the importance-weighted clean estimate
This weighted mean supplies the denoising reference in the Monte Carlo score ascent (MCSA) estimator
DDPM. Given the model-based score estimate , a DDPM-style score-form reverse update is
Here controls the reverse stochasticity.
DDIM. DDIM [20] combines the clean estimate with the inferred noise direction. With ,
Here ; yields a deterministic update that retains the inferred residual direction.
Probability flow. For the variance-preserving schedule, the probability-flow velocity is , where and here denotes continuous diffusion time [39]. Flow-like (FL) option integrates this velocity backward:
where . This map integrates a local velocity, whereas DDIM reconstructs the next endpoint from clean and noise estimates.
MBD [12] and its variants [14], [16], [17] fix and adopt a deterministic DDPM-style reverse update. Therefore, we aim to construct an adaptive scheduling mechanism that selects among DDPM-like Eq. (8), DDIM-like Eq. (9), and flow-like Eq. (10) reverse transports, while allowing adaptive as exploration perturbation when needed. DDPM-style steps provide robust stochastic exploration but higher variance, DDIM-style steps offer schedule-consistent low-variance refinement but may commit early to one mode, and flow-like Euler steps are smooth and inexpensive but more sensitive to step size and score error.
IV. METHODOLOGY
We now present our Model-Based Geometry-aware Generative Optimization (2GO) (Fig. 2), which (1) turns task-modulated active constraint geometry into score-direction shaping, tangent stochasticity, and CFS-based retraction, (2) adapts the reverse transport and stochasticity schedule in Section IV-B, and (3) connects the clean plan to the tracking policy through the governor in Section IV-E.
A. Task-modulated Active Constraint Geometry
Task Modulation. At diffusion step k, task modulation emphasizes constraints according to phase or contact structure: support-foot constraints during stance, for example, and target-patch constraints near foot placement. We encode this through task-modulated weights , where contains phase, contact mode, target patch, or local reference information.
Constraint Geometry. For each inequality constraint , we define the task-weighted violation proxy
where assigns zero to a satisfied constraint and retains the positive residual of a violated constraint. The active set at diffusion step is selected as
Here, is the number of constraints, and TopK returns constraint indices. is the maximum number of constraints retained, and is the number selected.
For each selected constraint , define the exact normal in the -dimensional free-control coordinates as
where rolls out from fixed and . Experiments use aggregated one-step action-space approximations (automatic differentiation and kinematic mappings; Appendix A-C); the follower is not differentiated. We normalize the normal as , where avoids division by small gradient norms. Stacking these normalized normals as rows gives
For example, if three constraints have scores and , then . The matrix therefore contains the two rows and .
These constraint normals define the local metric
whose normal-gradient shaping is related to trajectory optimization and geometric motion policies [32]–[34]. Task weights affect through active-set selection; each selected normalized normal enters the metric with unit weight.
The inverse metric attenuates constraint-normal components of the denoising direction. For random exploration, we use a regularized tangent filter
where regularizes a linear system whose dimension equals the number of selected constraints. Woodbury's identity evaluates the metric action through a linear system of the same dimension:
For a singular value of , the metric and tangent gains are and , respectively. Both preserve : with exact normals, these directions leave selected constraint values unchanged to first order.
B. Geometry-Aware Generative Reverse Update
Geometry-shaped Direction. The MCSA clean estimate in Eq. (7) defines a displacement from the current iterate, expressed in clean coordinates :
Here scales this displacement, and geometry and goal derivatives are evaluated at through the rollout. For goal guidance, let for a goal map . The transposed Jacobian maps the normalized goal error back to the planning coordinates:
where is the gain and regularizes normalization. For scheduled feasibility penalty and reference penalty , define . This normalized level reduces goal guidance as feasibility emphasis rises; sets the denoising gain. Applying the inverse metric to the combined displacement and goal drift gives
Here, denotes a shaped displacement. Its equivalent score and clean estimates formulate
The corresponding noise estimate is . These representations connect geometry shaping to MCSA; the reverse update below applies as an additive refinement of the base transport.
Reverse Update and Stochasticity Scheduling. We select the transport and its added exploration separately. Let denote the transport family at reverse step . Candidate diversity is measured by a dispersion proxy , computed here as the exponentially smoothed largest normalized adjacent gap after projecting candidate control segments onto their leading principal direction. To also capture residual feasibility risk, define
where V aggregates each candidate's constraint residuals. At tail level , averages the largest 10% of candidate residuals. Risk and dispersion determine the transport:
where and are scheduled risk and dispersion thresholds. High risk favors the clean-moment branch; resolved risk and route ambiguity favor interpolation and then flow-like refinement. The separate noise gate is
where and are transport-dependent thresholds. The gate retains exploration when diversity or residual risk exceeds its threshold. The effective stochasticity is . where is the nominal exploration scale of the selected transport, expressed in clean coordinates.
We filter Gaussian noise through to attenuate perturbations along the selected constraint normals. Let denote the selected deterministic base transport in clean coordinates:
Here is the fraction of the current iterate retained. The DDPM-style clean-mean update and deterministic DDIM update in Eqs. (8) and (9) give and
The reported FL branch shares the DDIM interpolation; the canonical probability-flow map in Eq. (10) is not separately evaluated. Exploration is added without changing these coefficients. With scheduled step size , the unified update is
The first term transports the iterate, the second applies geometry-shaped refinement, and the third adds exploration filtered by . Setting leaves the selected deterministic update.
C. CFS as Metric-Proximal Constraint Retraction
The geometry-shaped reverse update reduces motion along active normals, but the transported proposal can still leave the local feasible geometry. We therefore use CFS [18] as an approximate metric-proximal retraction. CFS optionally corrects candidates before averaging [17] or retracts the transported proposal using the constraint geometry underlying and , and corrects the controls parameterized by Y, after which the states are recomputed by dynamics rollout from the fixed initial state.
For each active constraint , CFS builds a local half-space around :
(28)
where and is the CFS clearance offset. Post-transport CFS reuses derivatives at ; candidate CFS recomputes them locally. Intersecting these half-spaces with control bounds gives the local convex set:
Given from (27), the ideal CFS retraction is
where weights control coordinates. The selected constraints align this local convex retraction with the geometry used by the metric and tangent filter. For locally conservative linearizations, provides a local inner approximation for the selected constraints. When retraction is enabled, the next reverse iterate is .
Thus, CFS acts within the generative process as an optional constraint-geometric retraction, using the constraint geometry that also shapes denoising refinement and tangent stochasticity.
D. Putting Everything Together: 2GO
2GO combines (1) the model-based MCSA sampler (Section III-B), (2) the task-modulated active constraint geometry (Section IV-A), (3) the geometry-shaped reverse update (Section IV-B), and (4) the CFS retraction (Section IV-C).
At each reverse step , 2GO first draws clean control candidates from the Gaussian proposal (5) and, as in MBD, rolls them out through dynamics, while the reverse update operates in clean coordinates . After optional CFS correction of selected candidates, the batch keeps its original weights to
Algorithm 1 Model-Based Geometry-Aware Generative Optimization (2GO)
1: Input: , dynamics , constraints , task context , diffusion schedule , candidates .
2: Output: Clean trajectory for governed execution.
3: Initialize clean coordinates .
4: for to 1 do
5: Sample candidates from in (5).
6: Evaluate candidates with , and optionally apply CFS.
7: Compute , with original weights via (6)–(7).
8: Compute and select at the rollout of via (11)–(12).
9: Form , , and using (14)–(16).
10: Compute the geometry-shaped direction via (20).
11: Compute , , adapt online, and gate via (23)–(24).
12: Apply transport-aware reverse update (27) with :
.
13: Optionally retract via (30), bounded as .
14: end for
15: Roll out , extract , and pass it through the reference governor for execution.
form and the score-form surrogate (6)–(7). 2GO then selects the active set (12) from the task-weighted violation proxies (11) and forms the shared geometric objects , , and at , which shape the displacement via (20). Finally, risk and dispersion select the transport and gate the stochasticity via (23)–(24); noise enters only through the tangent filter. The reverse step (27) produces ; after optional CFS retraction (30), control bounding and rollout give the next reverse iterate. Algorithm 1 summarizes the full procedure.
E. Governed Deployment
Given the clean trajectory , we extract a compact tracking reference containing the commanded base motion and posture. Following the reference-governor principle [40], [41], a customized adaptation maps to a governed reference for the low-level locomotion policy. The quadruped interface constructs a gait and reachable footholds, while the humanoid interface adjusts commands using tracking-margin-tightened body clearance, command limits, and a posture envelope. These execution constraints differ from the planner's feasible set. Planning bounds and command regularization reduce tracking demands, while the governor and tracker remain outside the planning dynamics. Clearance preservation requires admissible adapted references and tracking errors covered by the reserved margins; the adaptation alone does not guarantee completion of the original task.
V. EXPERIMENTAL ANALYSIS
We evaluate 2GO on CLP to address following questions:
• Q1: Does 2GO improve planning over representative baselines in sparse stepping-stone locomotion involving discrete foothold choices?
• Q2: Can 2GO improve planning and execution in humanoid navigation with continuous body and posture references under geometric obstacle constraints?
• Q3: How do geometry-aware updates and adaptive reverse stochasticity contribute to performance?
Fig. 3: Qualitative stepping-stone results. Top left: A representative 2GO deployment with the safety governor. Top right: 2GO planning samples at , , and of the diffusion reverse process. Bottom: Final clean trajectories and execution tracking of position and velocity for baselines, and ours 2GO. Colored lines show the trajectories of the left rear (LR), left front (LF), right rear (RR), and right front (RF) feet, and the body center; red dots mark constraint violations.
Deployment Via Governor

Generative Reverse Processing at , , and for 2GO
| Env. | MPPI | MBD | MDOC | MD-COAS | 2GO | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| pSSR | pV | pT | eSSR | pSSR | pV | pT | eSSR | pSSR | pV | pT | eSSR | pSSR | pV | pT | eSSR | pSSR | pV | pT | eSSR | |
| S1 | 0.40 | 0.20 | 0.18 | 0.60 | 0.88 | 0.80 | 0.32 | 0.00 | 0.98 | 0.80 | ||||||||||
| S2 | 0.20 | 0.00 | 0.04 | 0.40 | 0.68 | 0.20 | 0.14 | 0.00 | 0.88 | 0.40 | ||||||||||
| ZA | 0.00 | 0.40 | 0.00 | 0.00 | 0.96 | 1.00 | 0.02 | 0.20 | 0.96 | 1.00 | ||||||||||
| ZB | 0.00 | 0.00 | 0.00 | 0.00 | 0.90 | 0.20 | 0.40 | 0.60 | 0.48 | 0.20 | ||||||||||
| ZC | 0.00 | 0.00 | 0.00 | 0.00 | 1.00 | 1.00 | 0.02 | 0.20 | 1.00 | 1.00 | ||||||||||
| ZD | 0.00 | 0.00 | 0.00 | 0.00 | 0.86 | 0.40 | 0.24 | 0.60 | 0.98 | 0.60 | ||||||||||
TABLE I: Planning and execution performance across stepping stones (S1, S2) and corridors (ZA–ZD). pSSR and eSSR ( ) are success fractions defined in the evaluation protocol; pV ( ) is foothold distance (cm) for S1/S2 and sampled obstacle occupancy (%) for ZA–ZD. pT ( ) is planning time (s). Superscripts give population standard deviations across 5 seeds, with each seed generating 10 clean trajectories. Bold and underlining indicate the best and second-best displayed values, including ties.
Baselines. We compare 2GO with (1) MPPI [42], which importance-weights sampled forward rollouts to optimize controls; (2) MBD [12], a model-based diffusion planner; (3) MDOC [16], which adds CBF-based projection to each MBD rollout step; (4) MD-COAS [17], which combines an iALM soft feasibility prior, CFS projection, and adaptive scheduling. The main comparison uses a 48GB NVIDIA RTX A6000 GPU with 9 CPU cores.
Evaluation. Planning Safe-and-Success Rate (pSSR) evaluates all returned candidates, while supplementary execution SSR (eSSR) evaluates one selected, adapted reference per seed across all 5 trials, including failed planning attempts. Both use a 0.20 m fixed-goal tolerance; quadruped planning uses margin-shrunken supports, execution allows 0.05 m swing-end foot error relative to physical supports, and humanoid execution requires no fall and nonnegative body-proxy clearance. Candidate selection and governor/controller adaptation can recover planning-level violations, allowing eSSR to exceed pSSR.
A. Quadruped Stepping-Stone Locomotion
We evaluate quadruped locomotion across stepping stones from to . S1 uses stone radii of 0.076–0.088 m and nominal along-lane gaps of 0.22–0.28 m; S2 uses smaller radii of 0.068–0.080 m and larger gaps of 0.26–0.32 m. The 16-state reference model includes planar body position and velocity, yaw and yaw rate, four two-dimensional foot offsets, and support mode and phase. Its 12 controls adjust planar body motion, yaw, foot offsets, and phase. Bounded Euler updates keep the body near the support-foot midpoint. World-frame foot positions satisfy , where is body position, the yaw rotation, and a foot offset from the nominal body-frame position . Foothold violation is the distance to the union of margin-shrunken stone disks and support rectangles. Diagonal support pairs alternate at phase completion only if swing-foot violation is at most 0.04 m. The governor constructs a walking gait and reachable touchdowns for the follower with auxiliary base stabilization.
The planning results show that 2GO achieves the highest pSSR across both S1 and S2. The reverse snapshots illustrate this refinement: early steps preserve multiple foothold candidates, while late steps concentrate onto contact-consistent routes rather than crossing unsupported regions. MPPI is the fastest baseline and improves pSSR over MBD, but its cost-weighted rollouts still incur high foothold violation and low eSSR, consistent with unresolved discrete support assignments.

Fig. 4: Planning and deployment across the humanoid corridor locomotion benchmark. Per zone (rows): the planned multi-modal whole-body latent trajectories (left), the 2GO adaptive transport schedule within fixed 100 diffusion steps (middle), and the deployed Unitree G1 sport-mode execution as a ghosted motion strip (right).
MBD likewise often selects invalid contacts in goal-directed rollouts even though the follower recovers some execution trials. MDOC and MD-COAS impose stronger corrections, yet their continuous projection geometry remains local around the current sample and can restrict exploration when stones are disconnected. In contrast, 2GO uses task-modulated active foothold geometry, tangent-space exploration, and transport-aware refinement to coordinate refinement and exploration across feasible foothold regions.
B. Humanoid Corridor Navigation
We evaluate humanoid navigation in a 1.6 m-wide corridor containing a thin center wall (Zone A), a U-shaped wall (B), a tapered squeeze (C), and spherical obstacles (D). The 14-state reference model describes planar pose, body height, torso yaw, arm configuration, and motion rates. Its nine controls command body-frame velocity , yaw rate , and posture rates . Position p, yaw , and posture q evolve as
(31)
where rotates body-frame velocities into the world frame. The governor adapts the resulting references to command limits and clearance margins before low-level tracking.
Table I reports corridor results across four isolated zones. Compared with stepping stones, the difficulty shifts from discrete foothold selection to continuous body-wide clearance: reaching the goal may still fail SSR through torso or arm collision. MPPI has the lowest planning time, but its pSSR is zero in all four zones; importance-weighted rollouts retain goal progress without consistently satisfying body-wide clearance. MBD is slower and likewise has zero pSSR and eSSR in all four zones. Although MDOC is competitive in Zone B pSSR, 2GO achieves higher SSR and eSSR in Zone D. MD-COAS recovers safe best trajectories, but has much longer planning time and lower pSSR. In contrast, 2GO reaches full or near-full pSSR in Zones A, C, and D. Its task-modulated collision geometry shapes the reverse direction and tangent exploration for side-passing and posture-adjusted motion.
Real-world deployment. The Unitree G1 demonstrations in Fig. 1 use Augmented Reality (AR) to register virtual obstacles in a common scene frame. Wall (Light Gray) and wall obstacles (Dark Green) are shorten for better virtualization. The hardware interface converts adapted references into body-frame planar velocity, yaw-rate, and height requests for Unitree's built-in locomotion controller; torso and arm variables define joint-position references. State feedback, reference retiming, and clearance adaptation accommodate the planning–tracking mismatch. These qualitative demonstrations complement the simulation evaluation.
C. Discussion
Why Geometric-Aware? Table I shows favorable planning safety and execution compatibility for 2GO. Within each reverse update, 2GO uses shared active geometry to shape the denoising direction, filter noise toward the tangent space, and apply optional CFS correction. This design supports exploration among disconnected foothold regions and clearance-aware refinement in continuous corridors. The results support the combined method across both environments.
Why Adaptive Reverse Stochasticity? Useful stochasticity can change with geometry: ambiguous steps may benefit from exploration, whereas locally resolved steps favor deterministic refinement. The schedule in Fig. 4 is consistent with this pattern during side selection in Zone A, entrance and exit maneuvers in Zone B, and passage through the squeeze and clutter in Zones C and D. These observations illustrate how 2GO balances exploration and deterministic refinement.
VI. Conclusion
We presented 2GO, a model-based geometry-aware generative optimization framework for constrained locomotion. 2GO uses task-modulated active constraint geometry to shape denoising directions, attenuate normal stochasticity, and define local CFS corrections. Its transport interface decouples deterministic updates from stochastic exploration, while a reference governor adapts the planned motion for execution. The results show improved foothold feasibility for quadruped and high planning success in humanoid corridor zones, while execution depends on the reference interface. Future work includes richer whole-body dynamics and receding-horizon deployment.
REFERENCES
[1] M. Posa, C. Cantu, and R. Tedrake, “A direct method for trajectory optimization of rigid bodies through contact,” International Journal of Robotics Research, vol. 33, no. 1, pp. 69–81, 2014.
[2] P. M. Wensing, M. Posa, Y. Hu, A. Escande, N. Mansard, and A. Del Prete, “Optimization-based control for dynamic legged robots,” IEEE Transactions on Robotics, vol. 40, pp. 43–63, 2023.
[3] Z. Gu et al., “Humanoid locomotion and manipulation: Current progress and challenges in control, planning, and learning,” IEEE/ASME Transactions on Mechatronics, vol. 31, no. 2, pp. 2300–2330, 2026.
[4] D. Kim, J. Di Carlo, B. Katz, G. Bledt, and S. Kim, “Highly dynamic quadruped locomotion via whole-body impulse control and model predictive control,” arXiv preprint arXiv:1909.06586, 2019.
[5] J.-P. Sleiman, F. Farshidian, M. V. Minniti, and M. Hutter, “A unified mpc framework for whole-body dynamic locomotion and manipulation,” IEEE Robotics and Automation Letters, vol. 6, no. 3, pp. 4688–4695, 2021.
[6] R. Huang, H. Balim, H. Yang, and Y. Du, “Flexible locomotion learning with diffusion model predictive control,” in International Conference on Robotics and Automation, 2026.
[7] L. Ye et al., “PegasusFlow: Parallel rolling-denoising score sampling for robot diffusion planner flow matching,” in International Conference on Robotics and Automation, 2026.
[8] X. Huang et al., “Diffuseloco: Real-time legged locomotion control with diffusion from offline datasets,” in Conference on Robot Learning, 2025, pp. 1567–1589.
[9] D. Q. Mayne, J. B. Rawlings, C. V. Rao, and P. O. Scokaert, “Constrained model predictive control: Stability and optimality,” Automatica, vol. 36, no. 6, pp. 789–814, 2000.
[10] G. Kim, D. Kang, J.-H. Kim, S. Hong, and H.-W. Park, “Contact-implicit model predictive control: Controlling diverse quadruped motions without pre-planned contact modes or trajectories,” International Journal of Robotics Research, vol. 44, no. 3, pp. 486–510, 2025.
[11] V. Dhédin, H. Zhao, and M. Khadiv, “Simultaneous contact sequence and patch planning for dynamic locomotion,” in International Conference on Humanoid Robotics, 2025, pp. 245–252.
[12] C. Pan, Z. Yi, G. Shi, and G. Qu, “Model-based diffusion for trajectory optimization,” in Advances in Neural Information Processing Systems, 2024, pp. 57914–57943.
[13] H. Xue, C. Pan, Z. Yi, G. Qu, and G. Shi, “Full-order sampling-based mpc for torque-level locomotion control via diffusion-style annealing,” in International Conference on Robotics and Automation, 2025, pp. 4974–4981.
[14] R. Mishra and I. R. Manchester, “EB-MBD: Emerging-barrier model-based diffusion for safe trajectory optimization in highly constrained environments,” in International Conference on Robotics and Automation, 2026.
[15] N. Fishman, L. Klarner, V. De Bortoli, E. Mathieu, and M. Hutchinson, "Diffusion models for constrained domains," Transactions on Machine Learning Research, 2023.
[16] Z. He, Y. Shaoul, and J. Li, “Model-based diffusion optimal control for multi-robot motion planning,” in Robotics: Science and Systems, 2026.
[17] Z. He, B. Li, J. Dou, Y. Zhang, and C. Liu, “Motion planning with model-based diffusion via constraint optimization and adaptive scheduling,” arXiv preprint arXiv:2607.14455, 2026.
[18] C. Liu, C.-Y. Lin, and M. Tomizuka, “The convex feasible set algorithm for real time optimization in motion planning,” SIAM Journal on Control and Optimization, vol. 56, no. 4, pp. 2712–2733, 2018.
[19] J. Ho, A. Jain, and P. Abbeel, “Denoising diffusion probabilistic models,” in Advances in Neural Information Processing Systems, 2020, pp. 6840–6851.
[20] J. Song, C. Meng, and S. Ermon, “Denoising diffusion implicit models,” in International Conference on Learning Representations, 2021.
[21] M. Janner, Y. Du, J. B. Tenenbaum, and S. Levine, “Planning with diffusion for flexible behavior synthesis,” in International Conference on Machine Learning, 2022, pp. 9902–9915.
[22] C. Chi et al., “Diffusion policy: Visuomotor policy learning via action diffusion,” International Journal of Robotics Research, vol. 44, no. 10-11, pp. 1684–1704, 2025.
[23] J. Carvalho, A. T. Le, M. Baierl, D. Koert, and J. Peters, “Motion planning diffusion: Learning and planning of robot motions with diffusion models,” in International Conference on Intelligent Robots and Systems, 2023, pp. 1916–1923.
[24] J. Zhang, L. Zhao, A. Papachristodoulou, and J. Umenberger, “Constrained diffusers for safe planning and control,” in Advances in Neural Information Processing Systems, 2025, pp. 39283–39316.
[25] J. Liang, J. K. Christopher, S. Koenig, and F. Fioretto, “Multi-agent path finding in continuous spaces with projected diffusion models,” arXiv preprint arXiv:2412.17993, 2024.
[26] J. K. Christopher, S. Baek, and N. Fioretto, “Constrained synthesis with projected diffusion models,” in Advances in Neural Information Processing Systems, 2024, pp. 89307–89333.
[27] W. Xiao, T.-H. Wang, C. Gan, R. Hasani, M. Lechner, and D. Rus, "Safediffuser: Safe planning with diffusion probabilistic models," in International Conference on Learning Representations, 2023.
[28] J. Liang, J. K. Christopher, S. Koenig, and F. Fioretto, “Simultaneous multi-robot motion planning with projected diffusion models,” in International Conference on Machine Learning, 2025, pp. 37 162–37 180.
[29] R. Römer, A. von Rohr, and A. P. Schoellig, “Diffusion predictive control with constraints,” in Learning for Dynamics & Control Conference, 2025, pp. 791–803.
[30] X. Cheng, X. Tang, and Y. Yang, “Safe and stable control via lyapunov-guided diffusion models,” in Advances in Neural Information Processing Systems, 2025, pp. 160 909–160 948.
[31] F. Li, A. Abuduweili, Y. Sun, R. Chen, W. Zhao, and C. Liu, “Continual learning and lifting of Koopman dynamics for linear control of legged robots,” in Learning for Dynamics & Control Conference, 2025, pp. 136–148.
[32] N. Ratliff, M. Zucker, J. A. Bagnell, and S. Srinivasa, “CHOMP: Gradient optimization techniques for efficient motion planning,” in International Conference on Robotics and Automation, 2009, pp. 489–494.
[33] C.-A. Cheng et al., “Rmpflow: A geometric framework for generation of multitask motion policies,” IEEE Transactions on Automation Science and Engineering, vol. 18, no. 3, pp. 968–987, 2021.
[34] K. Van Wyk et al., “Geometric fabrics: Generalizing classical mechanics to capture the physics of behavior,” IEEE Robotics and Automation Letters, vol. 7, no. 2, pp. 3202–3209, 2022.
[35] P. T. Kyaw and J. Kelly, “Geometry-aware sampling-based motion planning on riemannian manifolds,” in World Symposium on the Algorithmic Foundations of Robotics, 2026.
[36] S. Bakker, R. Pérez-Dattari, C. Della Santina, W. Böhmer, and J. Alonso-Mora, “TamedPUMA: safe and stable imitation learning with geometric fabrics,” in Learning for Dynamics & Control Conference, 2025, pp. 405–418.
[37] J. Peters, K. Mulling, and Y. Altun, “Relative entropy policy search,” in AAAI Conference on Artificial Intelligence, 2010, pp. 1607–1612.
[38] S. Levine, “Reinforcement learning and control as probabilistic inference: Tutorial and review,” arXiv preprint arXiv:1805.00909, 2018.
[39] Y. Song, J. Sohl-Dickstein, D. P. Kingma, A. Kumar, S. Ermon, and B. Poole, “Score-based generative modeling through stochastic differential equations," in International Conference on Learning Representations, 2021.
[40] E. G. Gilbert, I. Kolmanovsky, and K. T. Tan, “Discrete-time reference governors and the nonlinear control of systems with state and control constraints,” International Journal of Robust and Nonlinear Control, vol. 5, no. 5, pp. 487–504, 1995.
[41] E. Garone, S. Di Cairano, and I. V. Kolmanovsky, “Reference and command governors for systems with constraints: A survey on theory and applications,” Automatica, vol. 75, pp. 306–328, 2017.
[42] G. Williams, A. Aldrich, and E. A. Theodorou, “Model predictive path integral control: From theory to parallel computation,” Journal of Guidance, Control, and Dynamics, vol. 40, no. 2, pp. 344–357, 2017.
Guide to the appendix.
• Appendix A: rollout derivatives, generative identities, local geometry, and conditional feasibility results.
• Appendix B: task models, experimental variants, deployment, evaluation protocol, and per-seed outcomes.
• Appendix C: baseline mechanisms and comparison budgets.
• Appendix D: numerical schedules, objective weights, and parameter settings.
APPENDIX A METHOD AND THEORETICAL DETAILS
A. Rollout Parameterization and Constraint Derivatives
Let be the initial planning state and the stacked free controls used in the main text. For the detailed dynamics, we index physical time from zero: , , and . The trajectory associated with is
The trajectory notation in the main text refers to this rollout-induced representation. Gaussian sampling and Euclidean corrections act in the free control coordinates; the state sequence is regenerated by . Accordingly, a density over dynamically feasible trajectories is understood with respect to the measure induced by the control parameterization.
The task cost and a trajectory constraint pull back to
On a differentiable branch of the dynamics, the state sensitivity satisfies
where . Thus the complete constraint Jacobian includes the influence of a control on all subsequent states. Piecewise models are differentiated on the current contact, clipping, and nearest-geometry branch. The task-local approximation below retains selected one-step effects rather than this complete horizon Jacobian. The low-level tracking policy is outside the planning transition .
B. Clean Estimates and Reverse Transports
For the control-space realization, let denote the noised free-control vector, with clean endpoint . The physical trajectory is obtained separately through . The forward process is for , with . For a fixed noisy coordinate , the Gaussian kernel as a function of is proportional to
For samples from this proposal, target-density weighting approximates the conditional clean mean. With a soft feasibility prior, the weights are
(37)
Here is a clean control candidate, is its rollout task cost augmented by the feasibility penalty, and is the batch minimum. The mean is the uncorrected estimate in Eq. (6), and combines batch cost scaling with the sampling temperature. Subtracting the minimum leaves the normalized weights unchanged. The experimental parameterization samples bounded clean controls and clips them to the action domain; it therefore realizes a bounded finite-bank approximation to the Gaussian construction.
Differentiating the Gaussian forward kernel gives
Replacing the conditional mean by its finite-sample estimate yields MCSA. The geometry-shaped clean estimate determines a mutually consistent score and noise representation:
Substituting recovers Eq. (21); the score is taken with respect to the noisy controls . These are algebraic representations of the shaped estimate. The extra task drift and metric shaping do not imply that is the score of another known density. The reverse maps admit these equivalent representations. In 2GO, the base transport uses the weighted clean estimate, and the metric-shaped displacement is added separately in Eq. (27).
The DDPM-style clean-moment realization is given in Eq. (8). Substituting the score identity above into the cumulative-variance form gives . Dividing by yields the clean-coordinate base transport .
C. General Geometry and Task-Local Approximations
The full active geometry is formed from normalized rows of , with cardinality and . In the locomotion instances, a local matrix instead collects one-step action-space directions. This approximation selects aggregate time rows by their norm, rather than individual constraints by their weighted residual. Up to such rows are retained and regularized by row normalization; the resulting map is applied to each control row along the horizon. The associated linear systems have dimension equal to the number of retained rows. This construction preserves the metric/filter interface while reducing the cost of forming a complete horizon Jacobian.
For stepping stones, foot has world position
With disk centers and radii , define the local radial proxy
The minimum applies to the complete center-radius expression. This radial quantity is negative inside a shrunken disk; it is a directional proxy, whereas actual foothold feasibility is measured by distance to the admissible support union defined in Appendix B. With inserting a two-dimensional vector into foot 's residual-rate coordinates, the row is
We compute by automatic differentiation on the active nearest-stone branch, then apply the explicit lift . This local approximation retains residual-foot directions and omits body and downstream-time sensitivities. The phase weights instantiate the task modulation along the current rollout. Support feet have unit geometry weight; swing feet have weight 0.2 before phase 0.7, then a linear ramp to 1 at touchdown. These geometry weights differ from the phase-dependent rates in the transition model.
For the humanoid, is the minimum proxy clearance of the torso ellipse and two arm tips from corridor boundaries and obstacles. The local row is
The action derivative is computed by automatic differentiation through the one-step planning transition and body-clearance function, holding fixed. It does not differentiate the full horizon or the downstream tracking policy. The diagonal has unit entries except for the longitudinal command, whose weight is 0.1 when and 0.5 otherwise. Both the residual and its derivative are evaluated at the same next state. The raw rows are normalized before stacking ; the hat on the main-text denotes this normalization.
D. Metric and Tangent Maps
Let denote either the full matrix or its local approximation in the corresponding coordinates. For ,
For , Woodbury's identity gives exactly. Positive regularization provides a numerically stable approximation; the experiments use and Cholesky solves. Row normalization limits the influence of differences in derivative scale. With , these maps recover (when ) and , respectively. With , they are the corresponding task-local operators.
Lemma 1 (Row-Space Attenuation). Let be a singular value of . Along its right singular vector, has gain and has gain . Both maps leave unchanged.
Proof. Substitute an SVD into Eqs. (46)–(47). Each nonzero singular direction gives the stated scalar factor; when , the correction term vanishes.
The lemma establishes attenuation with respect to the represented normals. For exact normals, their null space is a local tangent subspace. With local proxies, the same algebra applies to the represented geometry; nonlinear feasibility additionally depends on approximation error and the subsequent correction. In particular, regularized tangent noise can retain a small normal component.
E. Local CFS Correction
For post-transport correction, CFS constructs at a convex local approximation to the selected rollout constraints and retracts the transported proposal . Allowing optional nonnegative slack , the metric-proximal subproblem is
(48)
Here , is the main-text clearance offset, , and penalizes slack. The linearization point stays fixed while the objective minimizes displacement from . With zero slack, an exact solution gives the retraction in Eq. (30), with control bounds included. The corrected trajectory is . A finite sequence of box projections and most-violated-half-space corrections gives an inexact realization. Candidate-point relinearization in the experimental variant is described separately in Appendix B-C.
Proposition 1 (Conditional Local Feasibility). Suppose the selected CFS half-spaces are inner approximations of their nonlinear feasible sets in a neighborhood of . If the returned control remains in that neighborhood, satisfies those half-spaces and the box bounds, and has zero slack, it is feasible for the corresponding selected nonlinear constraints.
Proof. Within the stated neighborhood, membership in each half-space implies membership in its nonlinear feasible set. Intersecting these sets and the box bounds gives the result. □
This local implication separates the geometry of the ideal subproblem from its numerical solution. Approximate solution, nonzero slack, a change in the nearest obstacle, or a change in contact mode requires accounting for the corresponding residual or model error. The proposition does not assert feasibility of omitted constraints or global convergence.
For an inexact correction, write the affine constraint model as . If the returned control satisfies and its local model error is , then
This follows by adding the model error to the affine residual bound. The solve residual includes any allowed slack. A margin therefore suffices for that selected constraint, provided the returned control remains in the neighborhood where the model-error bound holds. These are conditional error bounds, not assumed numerical guarantees of every finite correction.
F. Conditional Transfer to Execution
Let collect the geometric features of the final reference delivered to the tracker, after adaptation, filtering, and saturation, and the corresponding executed features. Assume the tracking interface satisfies over the considered segment, and let each selected body-proxy constraint be -Lipschitz on that neighborhood. Then
whenever holds for this final reference. The feature vector must include every base or posture coordinate entering the chosen clearance model. This is a conditional clearance implication for the selected geometric constraints; recursive feasibility and arrival at the original goal require additional tracking and progress conditions. The empirical margin calibration in Appendix B-D estimates observed clearance degradation; it neither proves the assumed uniform tracking bound nor establishes that its margin covers .
APPENDIX B ENVIRONMENTS AND EVALUATION
In the task models below, denotes the planning state, its control, and the number of control intervals. Thus in Table II is the dimension of the main-text state . Scalar , in the humanoid planar equations denote position components. The task models are followed by the experimental variants and deployment interfaces; the final three subsections define the metrics and report supplementary results.
A. Quadruped Stepping Stones
Hybrid reference transition. The state is , where each is a body-frame foot residual. Footholds are induced by Eq. (40); stone indices are not independent discrete optimization variables. The diagonal support mode follows a fixed alternation, while continuous residual and phase controls determine when admissible landing configurations are reached.
Let be bounded body and yaw commands, and let scale the bounded residual-rate command. It is 0.06 on support legs, 1 on swing legs before , and on swing legs thereafter. The provisional update is
The body command is first restricted to a norm ball of radius 0.22 and the component limits below. Each raw residual-rate vector has norm at most 0.06. Let and let be the midpoint of the two support feet decoded from this provisional state. The final body position is obtained from
where gives symmetric component bounds, followed by the same longitudinal and lateral bounds. Stored velocity coordinates are the bounded finite differences of the provisional body and yaw updates. Pairwise residual adjustments separate feet closer than 0.10 m while retaining the residual bounds.
The admissible support set is the union of margin-shrunken stone disks and support rectangles. Its violation is
With the maximum violation of the current swing pair and , the hybrid reset is
At a successful switch, residuals of the previous support pair reset to zero. This model describes body–foothold references; the deployment gait is constructed by the execution interface below.
The course starts at and ends at . Nominal foot offsets are for front feet, for rear feet, and lateral offsets . Mode supports FL and RR; mode supports FR and RL. The S1 generator draws stone radii from m and nominal lane gaps from m; S2 uses m and m. The run configuration multiplies lane gaps by 0.97 and evaluates foot clearance with a 0.032 m stone-interior margin.
In addition to the bounds in the transition above, stored forward velocity is capped at 0.28, lateral velocity at , and yaw rate at . The phase-rate limit is 0.45 and the kinematic reach bound is 0.35.
The planning cost is a weighted sum of terminal goal and progress, time-guide, lateral and velocity regularization, heading, support-center, terminal-foot, smoothness, foothold, support, geometry, and step-bound terms. Table XVI reports the explicit multipliers.
| Task | H | State and action summary | |||
|---|---|---|---|---|---|
| Stepping stones | 16 | 12 | 16 | 1.0 | |
| Humanoid corridor | 14 | 9 | 50 | 0.25 |
TABLE II: Environment dimensions and 2GO planning discretization. Humanoid baselines use . Humanoid velocity actions are body-frame commands.
B. Humanoid Corridor
Longitudinal and lateral commands are expressed in the body frame. The planar transition is
Writing , the remaining posture transition and stored command coordinates are
The stored planar velocity components are body-frame commands. Actions are clipped before this update. The reference model integrates base and posture commands rather than the joint-level closed-loop dynamics. Bounds are , height rate , torso-yaw rate , and tuck/posture rates . Yaw-rate bounds are in Zone B and elsewhere. Height is restricted to , torso yaw to , tuck to , and arm posture to .
The body proxy has torso ellipse semi-axes (0.20, 0.11), an additional 0.03 crouch allowance, nominal height 0.75, body half-height 0.25, and arm-tip radius 0.05. Arm reach decreases from 0.35 when open to 0.10 when tucked. The geometry-aware reverse step uses the minimum clearance of the torso ellipse and the two arm tips. CFS constructs a denser five-point set containing the torso, both tips, and arm midpoints. Obstacle avoidance is handled by feasibility terms, geometry, and the candidate-correction variant specified below; the humanoid obstacle contribution to the scalar planning cost is zero.
| Zone | Start goal | Constraint geometry |
|---|---|---|
| A | Centered thin wall, . | |
| B | Connected U-wall with top segment . | |
| C | Tapered squeeze over with a 0.60 main gap and quarter-circle entry and exit. | |
| D | Two full-height planning obstacles centered at and , each with radius 0.06. |
TABLE III: Humanoid corridor geometry. All corridors are 4.0 m long.
C. Task Instantiations of the Generative Framework
Both tasks use local geometry, bounded-control sampling, and adaptive noise. The reported quadruped experiments use the geometry-aware update without CFS; the humanoid experiments use a candidate-correction variant. This variant applies CFS before the weighted clean estimate is formed, with post-transport retraction disabled. Only candidate correction is enabled in Algorithm 1.
For candidate correction, 32 trajectories are selected: half from the highest-violation quarter and half uniformly from the candidate bank. One local correction pass produces for selected candidates; the others remain unchanged. The original evaluation weights are retained, giving
This is a finite-bank correction of the weighted clean estimate. Because the points have moved while their weights are retained, it is not an unchanged importance-sampling identity for the original proposal. Correction residuals also contribute to the local geometry with blend coefficient 0.3. The humanoid correction retains at most eight half-spaces and uses with explicit slack disabled. Task settings are listed in Table XV.
For this variant, selected derivatives are recomputed at each candidate being corrected. The half-spaces share the physical constraint model with the reverse geometry but need not equal the compressed . The humanoid safety-point Jacobian is obtained by forward-mode automatic differentiation with fixed. Its transpose maps obstacle normals to control-space half-space normals. Corridor-wall normals are analytic; other obstacle normals use automatic differentiation on their active branches. These local Jacobians omit cross-time effects.
The transport coefficients are those in Eqs. (25)–(26), using for the main-text mean in the humanoid and uncorrected in the quadruped. The same estimate supplies the displacement and the base transport. With no post-transport retraction, the task instances return after the unified reverse update. Numerical schedules are specified in Appendix D.
D. Deployment Interfaces
Interface scope and provenance. We define two customized reference-adaptation schemes following the reference-governor principle [41]. These works motivate reference supervision of an already controlled system; the schemes below are task-specific adaptations of that principle, not direct implementations of a particular cited governor. Recursive-feasibility and convergence guarantees from those formulations are not assumed here. The quadruped scheme constructs a gait and reachable footholds along the planned body route; the humanoid scheme adjusts commands under local clearance and command constraints.
Quadruped execution. The quadruped interface resamples the planned body path, synthesizes a walking gait with leg order FL, RR, FR, RL, holds stance anchors, and projects nominal touchdown targets into the interiors of reachable stones or platforms. It therefore performs gait and foothold construction in addition to temporal smoothing. Support-polygon membership is evaluated as a diagnostic; it is not imposed as an additional optimization constraint in this execution interface.
Execution uses the MuJoCo Go2 model with a contact-dependent gait state machine, task-space foot tracking, and joint-space PD regularization. Foot and joint errors generate actuator torques. A supplementary PD wrench acts directly on the floating base to stabilize its pose and velocity. This assistance is enabled for all compared methods; the quadruped eSSR therefore characterizes this assisted simulation model.
Humanoid reference adaptation. The execution interface lowers the reference pace and holds the terminal reference. Position feedback augments the reference velocity with a bounded planar correction. Numerical settings are listed in Table IV.
The reference governor selects a reference position/yaw increment d by approximately solving the local constrained adaptation
where intersects reference-speed, posture, and corridor-safety boxes with an active linearized body-clearance half-space. The unconstrained preference is . A bounded alternating correction uses box/half-space sweeps, with spatial derivatives approximated by finite differences. The active half-space corrects world-frame lateral position, with planned posture held fixed. If the box intersection is empty, the adapter prioritizes finite safety-box bounds and can relax the nominal speed and posture bounds. The execution interface uses the adapter's translational output, filtered and then converted to the measured body frame; yaw feedforward is computed separately from the retimed reference, rather than taken from the adapter's yaw output. The downstream policy then clips each planar velocity component and yaw rate. Thus the adapter's nominal box and the policy input limits are distinct. Finite correction can leave clearance residuals. Clearance is not rechecked after filtering and saturation; executed body-proxy clearance is evaluated a posteriori.
The humanoid follower uses the SPARK-derived sport-mode policy interface. Learned leg targets and upper-body commands from a separate PD path are merged, followed by joint-limit clipping.
Planning–execution compatibility. Table V distinguishes constraints in the planning model, reference adapter, and tracker. Planning bounds and control-magnitude penalties limit nominal tracking demands; retiming and filtering further moderate the executed commands. The reference-speed box bounds position increments divided by the control period, not changes between successive velocity commands. No explicit locomotion-command slew bound is imposed. The governor and low-level tracker are downstream of the 14-state planning model and are not part of the transition in Eq. (60). These measures do not establish that every planned reference is admissible for execution; the clearance-transfer conditions are stated in Eq. (50).
Calibration and hardware interface. For 2GO, the empirical clearance margin is calibrated as
Here, and are the minimum body-proxy clearances of the selected model trajectory and its ungoverned calibration rollout. Their difference is a trajectory-level statistic, not a pointwise tracking-error bound. The executed body proxy uses measured base pose and pelvis height together with commanded arm and torso posture; it evaluates this geometric representation rather than every measured robot link. Calibrated margins are attached to individual references; the baseline executions use the common fallback margin in Table IV. The stored tightens the execution-side corridor wall box by adding to the modeled torso half-width and sets the clearance target of the local obstacle half-space. It is not added to the planner's CFS margin. The half-space activates below clearance , where is the activation band; its correction target remains . The lookahead distance selects where clearance is queried, while the angular posture margin tightens a separate lateral-speed proxy. Neither is an additional distance margin.
The G1 hardware interface uses Unitree's built-in locomotion controller for planar velocity, yaw-rate, and standing-height requests. Torso and arm coordinates are mapped to waist and arm joint-position references. An external base-pose estimate is transformed into the planning scene frame; this feedback anchors local clearance adaptation and the conversion of planar velocity to the robot frame. Reference retiming and low-pass filtering act upstream of the locomotion commands. The tracking margin is supplied with the reference or set to a fallback value, separately from the simulation-based calibration in Eq. (65). These measures address the reduced planning model's mismatch with the hardware tracker. The qualitative demonstrations do not establish a uniform hardware tracking-error bound.
E. Metric Definitions and Aggregation
Each task and method is evaluated with five seeds. For seed j, let be the number of returned planning candidates and let be the planning success event. We report
where evaluates the selected, adapted execution for that seed. All five executions enter the denominator, including trials whose planner returned no successful candidate.
For stepping stones, P requires terminal task-goal error at most 0.20 m, maximum mean-over-feet foothold violation at
| Component | Value or behavior |
|---|---|
| Quadruped | Interior clearance 0.07, stride 0.22, maximum swing 0.35, touchdown tolerance 0.035, simulation step 0.01; leg order FL, RR, FR, RL; phase length 36 simulation steps. |
| Base assistance | Planar PD gains (140, 24), height gains (260, 34), roll/pitch gains (95, 12), yaw gains (35, 6); direct base wrench scaled by the support-contact count. |
| Evaluation timing | Interface 50 Hz; simulation step 0.002 s; warmup 0.8 s; reference speed factor 0.5; terminal hold 5 s. |
| Reference feedback | Planar gain 1.5, correction cap 0.25 m/s; yaw feedback gain 0; planar low-pass weight 0.3. |
| Adapter speed box | World-x [-0.5, 1.0] and world-y [-0.55, 0.55] m/s; local step 0.02 s. |
| Command slew | No explicit bound on successive locomotion-command differences. |
| Posture proxy | Pelvis-roll proxy gain rad/(m/s), rad, rad; lateral-speed bound . |
| Policy clipping | Body-frame planar velocity components [-0.3, 0.3] m/s and yaw rate [-0.3, 0.3] rad/s, applied at the policy input. |
| Local correction | ; 12 box/half-space correction sweeps. |
| Clearance queries | Activation band , finite-difference step , lookahead 0.15. |
| 2GO margins | Seed-dependent : A [0.0237, 0.1002], B [0.0795, 0.1698], C [0, 0.0752], D [0.0013, 0.0896]. |
| Baseline margin | Common fallback . |
TABLE IV: Simulation execution settings. Distances are in meters; adapter bounds and final policy limits are listed separately.
most 0.05 m, step-bound violation at most 0.03 m, and terminal foot error at most 0.20 m. Its pV is the selected planning candidate's mean foothold distance, converted to centimeters. Execution requires the actual final base position to be within 0.20 m of the fixed task goal (1.25, 0) and the maximum support-region distance of all recorded swing-end foot positions to be at most 0.05 m. The foot statistic includes attempts without detected touchdown; it evaluates geometric placement rather than asserting contact establishment. Execution distances use the physical stones and support platforms without the planning interior margin.
For humanoid planning, P requires nonnegative body-proxy clearance throughout the model rollout and terminal task-goal error at most 0.20 m. The occupancy metric pV samples the base polyline at up to 150 longitudinal locations with eight perimeter points at radius 0.20 m. It is the fraction of these band samples inside obstacle geometry, averaged across candidates and expressed as a percentage. It is distinct from the body-proxy success predicate, so zero violation under one measure need not imply zero under the other.
Humanoid execution success requires no fall, actual final base position within 0.20 m of the fixed scene goal, and nonnegative minimum body-proxy SDF over the evaluated rollout. The proxy uses executed base pose and pelvis height with commanded upper-body posture. It assesses the modeled body geometry rather than full measured-link collision. Warmup precedes the evaluated rollout. Warmup compensation translates the reference but not the scene geometry or task goal; goal error is therefore measured in the original world frame, separately from error to the selected reference endpoint.
The quadruped deployment interface chooses among adapted candidates. Humanoid 2GO additionally screens candidates using ungoverned simulated execution clearance, calibrates the selected reference's margin from that rollout, and then applies the governed execution; the compared humanoid baselines retain their planning selection and use the common fallback margin. Screening uses clearance and non-fall preferences; original-goal completion is assessed in the final execution by above. Calibration precedes the retimed, governed evaluation, so it does not measure tracking error under the complete final command pipeline. Thus eSSR evaluates the reported selection-and-adaptation pipelines, including their differences, rather than an equal-cost downstream test of individual planner outputs. Clearance calibration is part of this pipeline and is not treated as an independent generalization test.
Means and population standard deviations for pV and pT are computed over the five seed-level values. Planning time covers the complete multi-candidate solve, but excludes later execution screening, margin calibration, and deployment. All results use the task-level predicates above. In particular, arrival at a selected reference endpoint is not substituted for reaching the task goal.
F. Paired Candidate-CFS Ablation
We isolate the candidate-correction variant described in Appendix B-C on the challenging Zone B task. Both variants use 1024 samples per reverse update, 100 updates, ten returned candidates, and seeds 0–4. The only algorithmic change is enabling or disabling candidate CFS; post-transport retraction remains disabled. This supplementary study runs on 8 CPU cores. Its timings are reported separately from the GPU main comparison.
Table VI shows that candidate correction increases mean pSSR from 0.30 to 0.56, with a positive paired difference of 0.20–0.30 for every seed. Mean CPU planning time increases from 42.65 to 74.13 s. The band-occupancy diagnostic also increases, from 1.275% to 1.665%, illustrating its distinction from the body-proxy success predicate. This comparison supports a success–computation trade-off for candidate correction in this setting; it does not test final-proposal retraction, establish a uniform reduction of every violation metric, or demonstrate an execution-success gain.
G. Per-Seed Outcomes
The following tables report per-seed planning outcomes for all five methods and six tasks, with execution details where reported. Metrics and aggregation follow Appendix B-E; aggregate eSSR values are reported in Table I. Final goal errors and geometric residuals separate goal completion from clearance preservation.
| Quantity | Planning model | Reference adapter | Tracker / policy |
|---|---|---|---|
| Command magnitude | Humanoid body-frame velocity and posture-rate bounds; control-magnitude penalties. | World-frame position-increment bounds specify reference speeds; safety-box fallback can relax nominal bounds. | Body-frame planar velocity and separately generated yaw-rate commands are clipped at the policy input. |
| Command slew | Control-magnitude penalties do not constrain successive-command differences. | Retiming and low-pass filtering moderate command variation; the reference-speed box is not a slew bound. | Input saturation bounds magnitude; no explicit command-slew limit is imposed. |
| Posture | Bounds on height, torso/arm posture, and their command rates. | Planned posture enters body clearance; a pelvis-roll proxy adds a lateral-speed bound, not a measured-roll constraint. | Upper-body targets follow a separate mapping/PD path; the learned policy produces leg targets, followed by joint-limit clipping. |
| Clearance | Task geometry and planning/CFS margins are evaluated along the model rollout. | The corridor wall box and local lateral body-clearance half-space use ; finite correction can retain residuals. | Filtering and saturation follow adaptation without a final-reference clearance recheck; executed proxy clearance is evaluated afterward. |
| Quadruped footholds and support | Foot-placement geometry, support-offset bounds, and support-proximity cost. | Gait construction, stance anchors, and reachable touchdown projection; support-polygon membership is diagnostic. | Foot tracking and joint PD execute the gait with the common supplementary floating-base wrench. |
TABLE V: Planning and execution constraints. Numerical execution settings are listed in Table IV.
| Seed | pSSR | |||||
|---|---|---|---|---|---|---|
| CFS on | CFS off | CFS on | CFS off | CFS on | CFS off | |
| 0 | 0.60 | 0.30 | 2.01 | 1.25 | 111.15 | 64.33 |
| 1 | 0.70 | 0.40 | 0.50 | 0.67 | 77.40 | 34.31 |
| 2 | 0.40 | 0.20 | 1.93 | 1.76 | 58.54 | 27.84 |
| 3 | 0.60 | 0.30 | 1.44 | 1.17 | 60.49 | 49.19 |
| 4 | 0.50 | 0.30 | 2.45 | 1.53 | 63.07 | 37.58 |
| Mean | ||||||
TABLE VI: Paired ablation of the candidate-correction variant in Zone B. Both variants use 1024 samples, 100 reverse updates, ten returned candidates, and the same five seeds. Post-transport retraction is disabled in both. is band occupancy (%); is CPU planning time (s). The final row gives mean population standard deviation.
| Method | Seed | pSSR | Goal error (m) | Foot distance (m) | Fall | Success | ||
|---|---|---|---|---|---|---|---|---|
| MPPI | 0 | 1.00 | 2.232 | 3.538 | 0.0622 | 0.0521 | — | 0 |
| 1 | 0.00 | 2.236 | 2.750 | 0.0792 | 0.0526 | — | 0 | |
| 2 | 1.00 | 2.300 | 2.626 | 0.1364 | 0.0477 | — | 1 | |
| 3 | 0.00 | 1.932 | 2.652 | 0.0974 | 0.0615 | — | 0 | |
| 4 | 0.00 | 2.314 | 2.761 | 0.0837 | 0.0520 | — | 0 | |
| MBD | 0 | 0.30 | 2.736 | 17.594 | 0.0512 | 0.0454 | — | 1 |
| 1 | 0.30 | 2.972 | 17.730 | 0.0811 | 0.0442 | — | 1 | |
| 2 | 0.20 | 3.782 | 17.730 | 0.1033 | 0.0415 | — | 1 | |
| 3 | 0.10 | 2.964 | 19.236 | 0.1013 | 0.0631 | — | 0 | |
| 4 | 0.00 | 3.276 | 16.957 | 0.0613 | 0.0679 | — | 0 | |
| MDOC | 0 | 1.00 | 0.998 | 18.472 | 0.0480 | 0.0483 | — | 1 |
| 1 | 0.90 | 0.879 | 18.086 | 0.0623 | 0.0494 | — | 1 | |
| 2 | 0.90 | 1.044 | 18.520 | 0.0342 | 0.0422 | — | 1 | |
| 3 | 0.80 | 0.950 | 18.283 | 0.0368 | 0.0467 | — | 1 | |
| 4 | 0.80 | 1.107 | 18.507 | 0.0941 | 0.0545 | — | 0 | |
| MD-COAS | 0 | 0.30 | 0.897 | 308.795 | 0.5688 | 0.0535 | — | 0 |
| 1 | 0.30 | 0.503 | 250.309 | 0.5226 | 0.0539 | — | 0 | |
| 2 | 0.40 | 0.706 | 257.533 | 0.1212 | 0.0539 | — | 0 | |
| 3 | 0.20 | 1.035 | 282.719 | 0.1009 | 0.0599 | — | 0 | |
| 4 | 0.40 | 1.116 | 341.745 | 0.7527 | 0.0600 | — | 0 | |
| 2GO | 0 | 1.00 | 0.340 | 23.016 | 0.0353 | 0.0484 | — | 1 |
| 1 | 1.00 | 0.347 | 20.859 | 0.1109 | 0.0412 | — | 1 | |
| 2 | 1.00 | 0.504 | 21.605 | 0.0895 | 0.0428 | — | 1 | |
| 3 | 0.90 | 0.450 | 22.027 | 0.0416 | 0.0517 | — | 0 | |
| 4 | 1.00 | 0.731 | 20.060 | 0.0786 | 0.0499 | — | 1 |
TABLE VII: Per-seed outcomes for S1. is in cm and in seconds. Goal error is measured from the executed final base position to the fixed task goal. Foot distance is the maximum support-region distance of recorded swing-end foot positions, including unsuccessful touchdown attempts. Success is the binary event contributing to eSSR; all five trials are included.
| Method | Seed | pSSR | pV | pT | Goal error (m) | Foot distance (m) | Fall | Success |
|---|---|---|---|---|---|---|---|---|
| MPPI | 0 | 0.00 | 2.719 | 2.647 | 0.0713 | 0.0533 | — | 0 |
| 1 | 0.00 | 2.559 | 2.693 | 0.0823 | 0.0510 | — | 0 | |
| 2 | 1.00 | 2.445 | 2.231 | 0.0814 | 0.0550 | — | 0 | |
| 3 | 0.00 | 3.133 | 2.794 | 0.1479 | 0.0594 | — | 0 | |
| 4 | 0.00 | 2.873 | 2.263 | 0.1402 | 0.0583 | — | 0 | |
| MBD | 0 | 0.00 | 2.781 | 16.041 | 0.0639 | 0.0489 | — | 1 |
| 1 | 0.10 | 3.256 | 20.040 | 0.0854 | 0.0425 | — | 1 | |
| 2 | 0.00 | 2.784 | 16.968 | 0.1305 | 0.0541 | — | 0 | |
| 3 | 0.10 | 2.757 | 14.175 | 0.1028 | 0.0642 | — | 0 | |
| 4 | 0.00 | 3.472 | 24.538 | 0.1174 | 0.0633 | — | 0 | |
| MDOC | 0 | 0.80 | 1.150 | 20.157 | 0.0572 | 0.0569 | — | 0 |
| 1 | 0.80 | 0.961 | 19.923 | 0.0583 | 0.0588 | — | 0 | |
| 2 | 0.70 | 1.107 | 19.675 | 0.0563 | 0.0488 | — | 1 | |
| 3 | 0.50 | 1.017 | 19.152 | 0.0657 | 0.0587 | — | 0 | |
| 4 | 0.60 | 1.317 | 19.758 | 0.0759 | 0.0565 | — | 0 | |
| MD-COAS | 0 | 0.40 | 1.155 | 63.722 | 0.0791 | 0.0598 | — | 0 |
| 1 | 0.10 | 1.887 | 62.096 | 0.1800 | 0.0560 | — | 0 | |
| 2 | 0.20 | 1.187 | 151.566 | 0.5852 | 0.0549 | — | 0 | |
| 3 | 0.00 | 1.350 | 151.839 | 0.4747 | 0.0558 | — | 0 | |
| 4 | 0.00 | 1.666 | 69.675 | 0.6206 | 0.0493 | — | 0 | |
| 2GO | 0 | 1.00 | 0.432 | 22.597 | 0.0344 | 0.0562 | — | 0 |
| 1 | 0.90 | 0.371 | 22.649 | 0.0632 | 0.0555 | — | 0 | |
| 2 | 0.90 | 0.524 | 26.855 | 0.0791 | 0.0499 | — | 1 | |
| 3 | 0.80 | 0.654 | 25.094 | 0.0817 | 0.0454 | — | 1 | |
| 4 | 0.80 | 1.061 | 18.731 | 0.0418 | 0.0607 | — | 0 |
TABLE VIII: Per-seed outcomes for S2; metric definitions and units follow Table VII.
| Method | Seed | pSSR | pV | pT | Goal error (m) | Min. proxy SDF (m) | Fall | Success |
|---|---|---|---|---|---|---|---|---|
| MPPI | 0 | 0.00 | 0.667 | 1.966 | 0.1618 | 0.0090 | 0 | 1 |
| 1 | 0.00 | 0.750 | 1.163 | 0.1610 | 0.0074 | 0 | 1 | |
| 2 | 0.00 | 1.333 | 1.136 | 0.1909 | -0.0105 | 0 | 0 | |
| 3 | 0.00 | 1.250 | 1.476 | 0.4769 | -0.0395 | 0 | 0 | |
| 4 | 0.00 | 1.750 | 1.244 | 0.2070 | -0.0615 | 0 | 0 | |
| MBD | 0 | 0.00 | 1.067 | 12.037 | 0.1056 | -0.0525 | 0 | 0 |
| 1 | 0.00 | 1.392 | 8.194 | 0.3219 | -0.0239 | 0 | 0 | |
| 2 | 0.00 | 0.950 | 12.514 | 0.0489 | -0.0468 | 0 | 0 | |
| 3 | 0.00 | 0.975 | 8.997 | 0.1487 | -0.0189 | 0 | 0 | |
| 4 | 0.00 | 1.433 | 9.037 | 0.1347 | -0.0261 | 0 | 0 | |
| MDOC | 0 | 1.00 | 0.000 | 20.518 | 0.0662 | 0.0787 | 0 | 1 |
| 1 | 1.00 | 0.000 | 8.574 | 0.0970 | 0.1108 | 0 | 1 | |
| 2 | 0.90 | 0.000 | 8.040 | 0.1016 | 0.0605 | 0 | 1 | |
| 3 | 1.00 | 0.000 | 35.614 | 0.0838 | 0.0918 | 0 | 1 | |
| 4 | 0.90 | 0.000 | 17.433 | 0.0855 | 0.1009 | 0 | 1 | |
| MD-COAS | 0 | 0.10 | 0.050 | 80.036 | 0.2087 | -0.0205 | 0 | 0 |
| 1 | 0.00 | 0.083 | 73.863 | 1.6697 | -0.1153 | 0 | 0 | |
| 2 | 0.00 | 0.042 | 91.687 | 1.6822 | -0.0088 | 0 | 0 | |
| 3 | 0.00 | 0.083 | 41.419 | 0.1430 | 0.0579 | 0 | 1 | |
| 4 | 0.00 | 0.108 | 49.330 | 1.7215 | -0.0035 | 0 | 0 | |
| 2GO | 0 | 1.00 | 0.000 | 27.406 | 0.0544 | 0.1097 | 0 | 1 |
| 1 | 0.80 | 0.000 | 8.907 | 0.0498 | 0.1165 | 0 | 1 | |
| 2 | 1.00 | 0.000 | 9.664 | 0.1032 | 0.1315 | 0 | 1 | |
| 3 | 1.00 | 0.000 | 10.239 | 0.0871 | 0.0815 | 0 | 1 | |
| 4 | 1.00 | 0.000 | 14.187 | 0.1120 | 0.0482 | 0 | 1 |
TABLE IX: Per-seed outcomes for Zone A. pV is in % and pT in seconds. Goal error is measured from the executed final base position to the fixed task goal. Clearance uses the reduced body proxy at the executed base pose and commanded upper-body posture. Success is the binary event contributing to eSSR; all five trials are included.
| Method | Seed | pSSR | pV | Goal error (m) | Min. proxy SDF (m) | Fall | Success | |
|---|---|---|---|---|---|---|---|---|
| MPPI | 0 | 0.00 | 3.333 | 2.087 | 0.2071 | -0.0433 | 0 | 0 |
| 1 | 0.00 | 3.917 | 1.140 | 0.4910 | -0.1241 | 0 | 0 | |
| 2 | 0.00 | 3.917 | 1.177 | 0.4753 | -0.2029 | 0 | 0 | |
| 3 | 0.00 | 2.333 | 1.218 | 0.7573 | -0.0170 | 0 | 0 | |
| 4 | 0.00 | 3.333 | 1.208 | 0.6378 | -0.2059 | 0 | 0 | |
| MBD | 0 | 0.00 | 2.858 | 8.711 | 0.1561 | -0.1236 | 0 | 0 |
| 1 | 0.00 | 2.892 | 4.003 | 0.1242 | -0.1236 | 0 | 0 | |
| 2 | 0.00 | 2.725 | 4.717 | 0.0820 | -0.0283 | 0 | 0 | |
| 3 | 0.00 | 2.883 | 5.147 | 0.1363 | -0.0539 | 0 | 0 | |
| 4 | 0.00 | 2.558 | 8.178 | 0.0982 | -0.2043 | 0 | 0 | |
| MDOC | 0 | 1.00 | 0.058 | 25.296 | 0.0940 | -0.0531 | 0 | 0 |
| 1 | 0.90 | 0.508 | 29.253 | 0.0888 | -0.0327 | 0 | 0 | |
| 2 | 1.00 | 0.058 | 48.188 | 0.0345 | 0.0174 | 0 | 1 | |
| 3 | 0.80 | 1.708 | 48.667 | 0.0365 | -0.0630 | 0 | 0 | |
| 4 | 0.80 | 1.492 | 44.380 | 0.0999 | -0.0209 | 0 | 0 | |
| MD-COAS | 0 | 0.60 | 0.033 | 77.704 | 0.1315 | 0.0607 | 0 | 1 |
| 1 | 0.40 | 0.092 | 97.515 | 0.1068 | -0.0411 | 0 | 0 | |
| 2 | 0.40 | 0.342 | 106.994 | 0.0608 | 0.0353 | 0 | 1 | |
| 3 | 0.30 | 0.325 | 112.412 | 0.1633 | 0.0139 | 0 | 1 | |
| 4 | 0.30 | 0.117 | 104.324 | 0.1977 | -0.0009 | 0 | 0 | |
| 2GO | 0 | 0.50 | 1.700 | 27.204 | 0.0942 | -0.0230 | 0 | 0 |
| 1 | 0.70 | 1.258 | 38.993 | 0.0862 | -0.0047 | 0 | 0 | |
| 2 | 0.40 | 2.075 | 58.904 | 0.0876 | 0.0282 | 0 | 1 | |
| 3 | 0.40 | 2.050 | 8.013 | 0.0779 | -0.0457 | 0 | 0 | |
| 4 | 0.40 | 2.000 | 52.358 | 0.0922 | -0.0226 | 0 | 0 |
TABLE X: Per-seed outcomes for Zone B; metric definitions and units follow Table IX.
| Method | Seed | pSSR | pV | Goal error (m) | Min. proxy SDF (m) | Fall | Success | |
|---|---|---|---|---|---|---|---|---|
| MPPI | 0 | 0.00 | 0.000 | 1.999 | 0.1393 | -0.0753 | 0 | 0 |
| 1 | 0.00 | 1.250 | 1.150 | 0.2134 | -0.0792 | 0 | 0 | |
| 2 | 0.00 | 4.083 | 1.170 | 0.0737 | -0.1283 | 0 | 0 | |
| 3 | 0.00 | 1.417 | 1.235 | 0.2089 | -0.0359 | 0 | 0 | |
| 4 | 0.00 | 1.667 | 1.240 | 0.4041 | -0.0181 | 0 | 0 | |
| MBD | 0 | 0.00 | 1.708 | 4.112 | 0.1093 | -0.0400 | 0 | 0 |
| 1 | 0.00 | 2.783 | 3.711 | 0.3239 | -0.0435 | 0 | 0 | |
| 2 | 0.00 | 3.817 | 5.251 | 0.0461 | -0.0780 | 0 | 0 | |
| 3 | 0.00 | 3.808 | 4.746 | 0.1495 | -0.0439 | 0 | 0 | |
| 4 | 0.00 | 3.458 | 6.579 | 0.1354 | -0.1260 | 0 | 0 | |
| MDOC | 0 | 1.00 | 0.000 | 22.810 | 0.0908 | 0.0661 | 0 | 1 |
| 1 | 1.00 | 0.000 | 8.224 | 0.0790 | 0.0622 | 0 | 1 | |
| 2 | 1.00 | 0.000 | 8.527 | 0.0376 | 0.1145 | 0 | 1 | |
| 3 | 1.00 | 0.000 | 7.508 | 0.0876 | 0.0297 | 0 | 1 | |
| 4 | 1.00 | 0.000 | 7.626 | 0.0809 | 0.0515 | 0 | 1 | |
| MD-COAS | 0 | 0.00 | 0.150 | 112.179 | 0.3606 | -0.0099 | 0 | 0 |
| 1 | 0.00 | 0.167 | 101.997 | 0.1524 | 0.0028 | 0 | 1 | |
| 2 | 0.00 | 0.392 | 104.823 | 0.1498 | -0.0382 | 0 | 0 | |
| 3 | 0.10 | 0.167 | 103.101 | 0.2418 | 0.0088 | 0 | 0 | |
| 4 | 0.00 | 0.217 | 104.388 | 0.4024 | 0.0442 | 0 | 0 | |
| 2GO | 0 | 1.00 | 1.025 | 30.184 | 0.0174 | 0.0338 | 0 | 1 |
| 1 | 1.00 | 1.433 | 9.710 | 0.0532 | 0.0659 | 0 | 1 | |
| 2 | 1.00 | 1.350 | 10.363 | 0.0701 | 0.0184 | 0 | 1 | |
| 3 | 1.00 | 1.275 | 10.401 | 0.0903 | 0.0093 | 0 | 1 | |
| 4 | 1.00 | 1.075 | 10.470 | 0.0256 | 0.0752 | 0 | 1 |
TABLE XI: Per-seed outcomes for Zone C; metric definitions and units follow Table IX.
| Method | Seed | pSSR | pV | Goal error (m) | Min. proxy SDF (m) | Fall | Success | |
|---|---|---|---|---|---|---|---|---|
| MPPI | 0 | 0.00 | 0.250 | 1.997 | 0.1389 | -0.0261 | 0 | 0 |
| 1 | 0.00 | 0.500 | 1.230 | 0.2114 | -0.0297 | 0 | 0 | |
| 2 | 0.00 | 0.917 | 1.117 | 0.0761 | -0.0681 | 0 | 0 | |
| 3 | 0.00 | 0.000 | 1.124 | 0.2080 | -0.0632 | 0 | 0 | |
| 4 | 0.00 | 0.583 | 1.280 | 0.4044 | -0.0273 | 0 | 0 | |
| MBD | 0 | 0.00 | 0.558 | 4.821 | 0.1049 | -0.0354 | 0 | 0 |
| 1 | 0.00 | 0.658 | 4.346 | 0.3199 | -0.0621 | 0 | 0 | |
| 2 | 0.00 | 0.533 | 5.039 | 0.0474 | -0.0590 | 0 | 0 | |
| 3 | 0.00 | 0.542 | 36.510 | 0.1486 | -0.0498 | 0 | 0 | |
| 4 | 0.00 | 0.483 | 3.145 | 0.1347 | -0.0537 | 0 | 0 | |
| MDOC | 0 | 0.80 | 0.108 | 18.507 | 0.0803 | 0.0134 | 0 | 1 |
| 1 | 0.90 | 0.083 | 7.776 | 0.0630 | 0.0084 | 0 | 1 | |
| 2 | 0.80 | 0.108 | 7.789 | 0.0535 | -0.0984 | 0 | 0 | |
| 3 | 0.80 | 0.058 | 8.226 | 0.0307 | -0.0009 | 0 | 0 | |
| 4 | 1.00 | 0.067 | 8.412 | 0.0501 | -0.0319 | 0 | 0 | |
| MD-COAS | 0 | 0.20 | 0.050 | 50.780 | 0.1339 | -0.0390 | 0 | 0 |
| 1 | 0.30 | 0.092 | 30.882 | 0.1772 | 0.0010 | 0 | 1 | |
| 2 | 0.20 | 0.100 | 33.287 | 0.1886 | 0.0508 | 0 | 1 | |
| 3 | 0.30 | 0.025 | 42.675 | 0.1226 | -0.0236 | 0 | 0 | |
| 4 | 0.20 | 0.092 | 39.627 | 0.0942 | 0.0046 | 0 | 1 | |
| 2GO | 0 | 0.90 | 0.000 | 25.237 | 0.0907 | -0.0256 | 0 | 0 |
| 1 | 1.00 | 0.000 | 7.716 | 0.1141 | -0.0235 | 0 | 0 | |
| 2 | 1.00 | 0.000 | 8.049 | 0.0435 | 0.0451 | 0 | 1 | |
| 3 | 1.00 | 0.000 | 8.276 | 0.1829 | 0.0432 | 0 | 1 | |
| 4 | 1.00 | 0.000 | 7.446 | 0.0693 | 0.0450 | 0 | 1 |
TABLE XII: Per-seed outcomes for Zone D; metric definitions and units follow Table IX.
APPENDIX C BASELINE DETAILS
All planners use the same task dynamics and objective formulation for a given environment. The stochastic methods are compared at matched nominal sample and update budgets: 512 samples for the quadruped, 1024 for the humanoid, and 100 optimizer or reverse steps. Diffusion-family methods return ten candidates per seed. Matching these counts does not imply identical wall-clock cost because geometry construction, automatic differentiation, and CFS calls add different overheads.
| Method | Constraint and sampling mechanism |
|---|---|
| MPPI | Gaussian action perturbations with exponential cost weighting; no geometry-aware reverse transport; 100 update iterations. |
| MBD | Model-based denoising with task cost and no explicit local constraint geometry. |
| MDOC | MBD with CBF-style derivative correction using the configured step, gain, and margin; no 2GO metric/tangent split or route/risk gate. |
| MD-COAS | Model-based diffusion with its own active-set correction, scheduled margins, and configured cap on local constraints. |
| 2GO | Reward-weighted reverse transport with task-local metric and tangent maps and the task-specific correction variants in Appendix B-C. |
TABLE XIII: Baseline mechanisms used in the reported comparison.
APPENDIX D HYPERPARAMETERS AND SCHEDULING
A. Risk, Dispersion, and Task Modulation
For each candidate, write for the nonnegative aggregate residual used in Eq. (22). The empirical upper-tail risk at level is
where indexes the largest candidate residuals. This aggregate controls refinement; the task-specific planning violation pV is defined separately in Appendix B-E.
Using the feasibility level and denoising gain defined in Section IV-B, the numerical schedules are
Here is the scheduled clearance margin, distinct from the CFS offset . The main-text dispersion statistic uses the final quarter of the horizon, restricted to the active window, with exponential smoothing of coefficient 0.7. The transport family follows Eq. (23).
The reported experiments share noise thresholds across transport families: and in Eq. (24). Including the additional annealed control-noise scale , the nominal clean-coordinate amplitude is
This scale is also shared across families; the effective amplitude is . A cyclic window of control rows, advanced by stride , localizes the geometric update. Its time indices start at and wrap at the horizon boundary, so the first reverse step starts at control row zero.
B. Numerical Settings and Selection Principles
Geometric margins use the same distance units as the corresponding task constraints; phase weights express the changing role of support and swing feet. The dimensionless gains balance task progress, geometric correction, and exploration. Values below are fixed manually and shared across seeds unless stated otherwise.
| Parameter | Symbol | Value | Parameter | Symbol | Value |
|---|---|---|---|---|---|
| Reverse steps | 100 | Sampling temperature | 0.3 | ||
| Beta endpoints | Returned modes | 10 | |||
| Seeds | — | 0, 1, 2, 3, 4 | Active-row cap | 8 | |
| CVaR tail level | 0.9 | Geometry regularizers | |||
| Base refinement gain | 0.08 | Route EMA coefficient | — | 0.7 | |
| Penalty reference | 500 | — | (1, 0.01) | ||
| Margin-to-risk scale | 0.4 | Penalty attenuation | 0.02 | ||
| Minimum risk gate | Route thresholds | (0.6, 0.2) | |||
| Gain range | (0.5, 1.0) | Powers | (1, 1) |
TABLE XIV: Common 2GO generative and geometry parameters.
| Task | Corrected candidates | |||||||
|---|---|---|---|---|---|---|---|---|
| Stones S1/S2 | 512 | 8/4 | 0.10 | 0.20 | 0.0 | 0.02 | — | 0 |
| Zone A | 1024 | 6/3 | 0.15 | 0.15 | 0.3 | 0.02 | 0.01 | 32 |
| Zone B | 1024 | 6/3 | 0.15 | 0.35 | 0.1 | 0.05 | 0.04 | 32 |
| Zone C | 1024 | 6/3 | 0.15 | 0.15 | 0.3 | 0.02 | 0.01 | 32 |
| Zone D | 1024 | 6/3 | 0.15 | 0.15 | 0.3 | 0.07 | 0.01 | 32 |
TABLE XV: Task-specific parameters for the experimental variants in Appendix B-C. Here is the task-direction gain, the scheduled clearance margin, and the candidate-CFS offset. Post-transport retraction is disabled in these experiments.
| Task | Term | Coefficient |
|---|---|---|
| Stepping stones | Smoothness | 0.92[0.165 body step +0.15 yaw +0.165 foot residual rate +0.042 phase rate]. |
| Stepping stones | Feasibility and shape | 1.12(40) foothold violation; 1.08(14) support violation; 1.0[1.2 geometric shape +0.8 residual shape]; step-bound factors 8 and 4. |
| Stepping stones | Task terms | Terminal goal weight 120, terminal-foot multiplier 0.5, plus progress, time guide, lateral/velocity/yaw/backward, 0.08 heading, 1.05 support-center, and phase-ramped terminal-foot terms. |
| Humanoid | Task terms | 0.2 terminal goal, 1.0 corridor centering, 0.3 each arm tuck, 0.3 torso yaw, 6.0 height, 0.05 velocity, 0.06 control, -0.3 progress, and 5.0 squeeze term. |
| Humanoid | Zone-specific goal | in Zone C and in Zones A, B, and D. Goal deceleration is enabled only in Zone C. |
| Humanoid | Obstacle cost | 0; obstacle feasibility enters through the violation evaluator, local geometry, augmented-Lagrangian schedule, and candidate correction. |
TABLE XVI: Explicit weights used by the task objectives.
| Domain | Method | Samples | Steps | Additional parameters |
|---|---|---|---|---|
| Quadruped | MPPI | 512 | 100 | Action noise 0.20, temperature 1.0. |
| Quadruped | MBD | 512 | 100 | , extra action noise 0.02, 10 returned modes. |
| Quadruped | MDOC | 512 | 100 | , correction step 0.01, gain 0.1, margin 0.01, 10 modes. |
| Quadruped | MD-COAS | 512 | 100 | , at most 12 constraints, constraint margin 0.01, scheduler margin 0.02, 10 modes. |
| Humanoid | MPPI | 1024 | 100 | Action noise 0.15 (0.35 in Zone B), temperature 1.0. |
| Humanoid | MBD | 1024 | 100 | , extra action noise 0.15 (0.35 in Zone B), 10 modes. |
| Humanoid | MDOC | 1024 | 100 | , correction step 0.02, gain 1.2, margin 0.03, 10 modes. |
| Humanoid | MD-COAS | 1024 | 100 | , at most 8 constraints, constraint margin 0.005, 10 modes; scheduler margins are task-specific. |
TABLE XVII: Optimizer parameters used in the baseline comparison.