arXiv:2610.06111cs.DSOct 2026

Manuscript Offprint

arXiv:2610.06111

Matching with Multiple Bottlenecks: Parameterized Complexity and Approximation

Jonas Friemel, Tilo Hoitz, Phillip Keldenich, Arne Schmidt

Abstract

We consider a matching problem in which the cost of each edge is a vector with kk components. The cost of a matching is the sum of the bottlenecks over all components, and we ask whether there is a perfect matching of cost at most some value ZZ. This type of matching has applications in heavily synchronized job-shop scheduling problems and in reconfiguration problems, where movement is restricted to a single direction per step. In this paper, we analyze the problem from a parameterized complexity perspective and provide various results including FPT-membership for parameters kk and ZZ combined, as well as W[P]-membership and W[SAT]-hardness for each of the two parameters individually. The reduction also implies para-NP-hardness parameterized by either maximum degree or treewidth. We further show hardness of approximation within a super-logarithmic factor for the optimization variant and provide a k/dk/d-approximation algorithm for any constant d≤kd \leq k as well as an efficient approximation scheme parameterized by kk. With parameter ZZ, we show that no FPT-time F(Z)F(Z)-approximation algorithm is possible for any computable function FF, unless W[1] = FPT.

2012 ACM Subject Classification Theory of computation → W hierarchy; Theory of computation → Problems, reductions and completeness; Theory of computation → Fixed parameter tractability

Keywords and phrases Matching, parameterized complexity, approximation

Funding Jonas Friemel: Funded by the Deutsche Forschungsgemeinschaft (DFG, German Research Foundation) – 530918134 (project SpaceAnts).

Matching with Multiple Bottlenecks: Parameterized Complexity and Approximation

1 Introduction

Imagine inviting a group of friends to test several multi-course menus. Each menu consists of a fixed sequence of courses, and you have prepared one menu for each friend. The only decision left is which friend should receive which menu. There is, however, a deadline: an event that you all want to attend starts soon. Moreover, eating a course takes a different amount of time for different friends, and you can only begin the next course once everyone has finished the current one. How should the menus be assigned to the friends so that the entire dinner is completed as early as possible? See Table 1 for an example.

Table 1 Top: A possible instance of menus and eating times. Each rectangle represents a dish and the fill patterns of the rectangles represent the courses. Bottom: The optimal solution of cost 6. Each course takes 2 time units.

InstanceMenu 1Menu 2Menu 3
Friend 1
Friend 2
Friend 3
SolutionCourse 1Course 2Course 3
Friend 1 (Menu 2)
Friend 2 (Menu 1)
Friend 3 (Menu 3)

This setting can be identified with a version of the job-shop problem. In the job-shop scheduling problem (JSSP), we are given nn jobs, each consisting of mm operations O1,…,OmO_1, \ldots, O_m with varying processing times, and a station with mm machines with varying processing power. The task is to schedule the jobs on the machines to minimize the makespan, i.e., the time when the last operation finishes. In our setting, however, we are given nn synchronized stations, each with a single machine1^1, on which the ii-th operation can only start once all machines have finished the (i−1)(i - 1)-st operation. The task is to distribute the jobs over all nn stations, i.e., we want to find a matching between jobs and stations that minimizes the makespan. We obtain the following matching decision problem (see Figure 1 for an example).

▶ Problem 1 (Sum of Bottleneck Matching Problem, SBMP).

Given:

  • A bipartite graph G=(S∪T,E)G = (S \cup T, E),

  • a vector-valued cost function c:E→N0k,e↦(c1(e),…,ck(e)),k∈Nc: E \to \mathbb{N}_0^k, e \mapsto (c_1(e), \ldots, c_k(e)), k \in \mathbb{N},

  • an integer Z∈NZ \in \mathbb{N}.

Question: Is there a perfect matching M⊆EM \subseteq E such that ∑i=1kmax⁡e∈Mci(e)≤Z\sum_{i=1}^{k} \max_{e \in M} c_i(e) \leq Z?

This problem is a generalization of the matching problem under categorization constraints studied by Richey and Punnen [51]. They provide NP-hardness results even when restricted to outerplanar graphs; however, no parameterized complexity analysis is given.

This matching problem also arises in the context of reconfiguration problems, where movement is restricted to a single direction per step. This is the case for tilt problems [8,12–14],

1^{1} We could also assume m machines in a station with operation i running on machine i only.

Figure

(2, 2, 2)

Figure 1 The menu assignment problem from Table 1 as an SBMP instance, with friend nodes on the left and menu nodes on the right. Bold black edges are a solution for Z = 6.

where a set of passive tiles is globally controlled (e.g., by magnetic or gravitational forces being applied to all tiles simultaneously), or for linear-strength robots that are able to push a whole line of robots in a single move [4–6]. In the latter problems, the authors of these works considered pushing either a single line in each step or multiple different lines with no direction restriction, but an intermediate variant could allow pushing an arbitrary number of lines in a fixed direction per step to avoid complicated collision prevention. The general task in reconfiguration problems is to move these tiles or robots from a given start configuration to a given target configuration. A common technique is to compute a bottleneck matching between start and target positions to obtain a lower bound on the number of parallel controls needed; see, e.g., [25, 26] for coordinated robot motion planning. However, no work has considered adapting this approach to models where different agents cannot move in different directions simultaneously. Therefore, to compute a better lower bound, instead of a single cost value, we could assign to each edge in the start-target graph a tuple of four values for the required up, down, left, and right movement. We then want to find a perfect matching of minimum cost, resulting in the following natural minimization variant of SBMP.

▶ Problem 2 (Minimum Sum of Bottleneck Matching Problem, MIN-SBMP).

Given:

A bipartite graph G=(S∪T,E)G = (S \cup T, E),

a vector-valued cost function c:E→N0k,e↦(c1(e),…,ck(e)),k∈Nc: E \to \mathbb{N}_0^k, e \mapsto (c_1(e), \ldots, c_k(e)), k \in \mathbb{N}.

Wanted: A perfect matching M⊆EM \subseteq E such that ∑i=1kmax⁡e∈Mci(e)\sum_{i=1}^{k} \max_{e \in M} c_i(e) is minimum.

In this paper, we consider both the decision and the optimization versions of this matching problem and show the following results.

Fixed-parameter tractability SBMP can be decided in time O((Z+1)kn2.5)O((Z+1)^{k}n^{2.5}), i.e., it is in FPT when parameterized by k and Z simultaneously (Corollary 14).

W[P]-membership SBMP is in W[P] when parameterized by either Z or k (Theorems 1 and 2), i.e., it can be decided in FPT-time by making at most O(g(Z)log⁡n)O(g(Z) \log n) or O(g(k)log⁡n)O(g(k) \log n) non-deterministic guesses for some function g.

W[SAT]-hardness SBMP is W[SAT]-hard when parameterized by either Z or k, even on planar graphs (Theorems 6 and 9), and we thus cannot hope for an FPT-time algorithm unless FPT = W[SAT].

Matching with Multiple Bottlenecks: Parameterized Complexity and Approximation

para-NP-hardness Unless P = NP, SBMP parameterized by the maximum degree Δ\Delta of the input graph is not in XP, i.e., it cannot be decided in time O(f(Δ)⋅ng(Δ))O(f(\Delta) \cdot n^{g(\Delta)}) for computable functions f and g (Theorem 8). Similarly, unless P = NP, SBMP parameterized by the treewidth tw of the input graph is not in XP (Corollary 7).

Approximability For each constant integer 1≤d≤k1 \leq d \leq k, we provide a polynomial-time k/dk/d-approximation for MIN-SBMP (Theorem 13). Furthermore, we provide an efficient parameterized approximation scheme (EPAS), i.e., a (1+ε)(1 + \varepsilon)-approximation scheme running in FPT-time with parameter k+1/εk + 1/\varepsilon (Theorem 15).

Approximation bounds Unless P = NP, MIN-SBMP is hard to approximate within a factor of k1/(log⁡log⁡k)O(1)k^{1/(\log \log k)^{O(1)}}, even on planar graphs (Corollary 10), and, unless W[1]=FPTW[1] = FPT, there is no FPT-approximation algorithm for MIN-SBMP parameterized by Z (Theorem 16).

References (55)