arXiv:2610.02447cs.DSOct 2026

Manuscript Offprint

arXiv:2610.02447

Job Scheduling with Battery Recharging Constraints

Rudransh Kumar, Nima Nasiri, Jared Paul, Sathish Gopalakrishnan

Open access. PaperVantage converted this article to text, so layout and figures may differ from the original. This text is shared under the same licence.

Abstract

A battery-powered device, such as a delivery drone that works from a depot, must stop to recharge between jobs, and the time spent recharging delays every job that follows. Scheduling models that fix the duration of a recharge do not describe a device whose recharge takes longer when it acquires more energy. We study a single device that executes a batch of non-preemptive jobs with known execution times, energy demands, and optional deadlines. Under partial recharging the device may acquire any amount of energy between jobs; under complete recharging every recharge fills the battery. Four objectives and four relationships between execution time and energy demand give 32 variants. When acquiring q units of energy takes q time units, we show that 14 of the 16 partial-recharging variants are polynomial, and we give a tight 2-approximation for the average completion time, one of the two NP-hard variants. Under complete recharging, the four variants with equal energy demands are polynomial and the other 12 are NP-hard; for makespan we give a 5/4-approximation. When each recharge also incurs a fixed setup time h, the equal-energy variants remain polynomial and the other 24 are strongly NP-hard if h is part of the input. For these we give exact algorithms that are exponential only in the number of jobs, and approximation algorithms for makespan and, when the battery starts empty, for the weighted average completion time. Experiments on synthetic and trace-derived job sets compare the algorithms with exact optima. The model is offline and deterministic, and we have not validated the schedules on hardware.

Keywords: battery recharging, setup time, scheduling, complexity, approximation algorithms, deadlines

1 Introduction

A delivery drone that works from a single depot executes a batch of orders, one round trip per order. The operator fixes the routes before the batch starts, and therefore knows how long each trip takes and how much battery charge it consumes: a heavy order to a distant address needs more time and more charge than a light order to a nearby one. Some orders carry a promised delivery time. The drone has one battery, which may be only partly charged when the batch starts, and the depot has a charging pad. The drone can recharge between trips, but it cannot deliver while it recharges.

The operator must choose the order of the trips and decide when, and for how long, to recharge. These two decisions interact. A trip that fits within the remaining charge can start immediately; a trip that needs more charge waits for the charger, and so does every trip that follows it. Suppose that the battery is empty, that trip A takes one minute and needs ten minutes of charging, and that trip B takes two minutes and needs one minute of charging. If A runs

*Corresponding author: sathish@ece.ubc.ca first, then the two deliveries complete at minutes 11 and 14. If B runs first, then they complete at minutes 3 and 14. Running the shorter trip first, which minimizes the average completion time when no recharging is involved, is therefore not optimal here. The choice is harder when the battery starts with some charge, because the operator must also decide which trips should consume that charge.

The charging arrangement determines which recharges are possible. Some operators allow the drone to acquire only the energy that the next trip needs. Others require the drone to charge to a fixed level whenever it docks; that level may be the full capacity or a lower target such as 80%. We call the first policy partial recharging and the second complete recharging. Complete recharging removes the choice of amount but not the choice of when to dock, and we will show that this remaining choice determines the total recharging time of the batch.

Starting a recharge may itself take time. The drone must land on the pad and establish a connection, and this preparation takes the same time whether the drone then recharges to a small extent or to a more substantial extent. We call it the setup time. Setup time is a larger fraction of the schedule when trips are short; one operator reports an average delivery time under five minutes in initial tests [1]. Consider two trips that each take one minute and each consume the charge acquired in one minute, an empty battery that holds two such units of charge, and a setup time of three minutes. Charging one unit before each trip completes the deliveries at minutes 5 and 10. Charging two units before the first trip completes them at minutes 6 and 7: the first delivery is one minute later, but the drone avoids the second setup, and the average completion time falls from 7.5 to 6.5 minutes. With setup time, the operator must therefore also decide which trips share a recharge.

The same decisions arise for a warehouse robot that executes pick-and-deliver tasks. The time and energy of a task depend on the load and the distance, and the robot can visit a charger between tasks. A batch of orders with promised dispatch times matches the description above once routing has fixed the time and energy demand of each task.

Payload tasks on a satellite and reports from a sensor node also compete for stored energy and may have deadlines. Orbital charging windows and intermittent energy harvesting impose constraints that we do not consider, so our results apply to these settings only when the operator can start a recharge between any two jobs.

We ask which versions of this scheduling problem can be solved exactly in polynomial time, which are NP-hard, and how closely the hard versions can be approximated. Related models either fix the duration of each recharge [2] or treat the battery as a budget within a routing problem (Section 11). In the problem that we study, the duration of a recharge depends on the energy acquired, and the scheduler chooses both the job order and the recharges. Setup times have also been studied for a processor that switches between job families, where they model cold start delays [3]. In that setting the job sequence determines when a setup occurs; here the scheduler incurs a setup whenever it chooses to recharge.

References (36)