arXiv:2610.03277cs.DSOct 2026Cited by 1 paper on PaperVantage

Manuscript Offprint

arXiv:2610.03277

Monge matrix searching for lot sizing with piecewise-concave production costs

Kleitos Papadopoulos

Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.

Abstract

We study single-item lot sizing with piecewise-concave production and holding–backlog costs over T periods. Production has m common positive finite breakpoints, and stock costs and domains have K common finite boundary levels. For fixed m, K, we give an exact deterministic algorithm using Om,K(Tm+2α(T+2))O_{m,K}(T^{m+2}\alpha(T+2)) arithmetic operations and a Las Vegas algorithm using Om,K(Tm+2)O_{m,K}(T^{m+2}) expected operations, where α\alpha is the inverse Ackermann function. The algorithms retain nonlinear concave cost pieces and cover backlogging, common-grid stock limits, and explicit terminal-stock policies. A structural decomposition at stock boundary levels yields breakpoint-only prefix and suffix tables. Batching transitions by a designated production period produces implicit matrices that are Monge double staircases on each production piece. Established matrix searches, merged state orders, and backward evaluation provide the bounds. A simpler rectangle/SMAWK variant requires Om,K(Tm+2log⁡(T+2))O_{m,K}(T^{m+2}\log(T+2)) operations. On 300 no-backlogging benchmark cases, its objectives agree exactly with the predecessor dynamic program and an inventory-state oracle. Geometric-mean paired time ratios are 2.531 for uncapacitated cases and 1.006 for capacitated cases, with ratios above one favoring matrix searching. A 640-case base-model validation suite and a separate 624-case generalized-model suite pass. The timing study does not benchmark the generalized models or the stronger staircase routines. All bounds assume exact arithmetic, constant-time cost queries, and explicit closed-domain concavity conditions.

Keywords: Lot sizing, Dynamic programming, Concave costs, Backlogging, Monge matrices

Email address: kleitospa@gmail.com (Kleitos Papadopoulos)

1. Introduction

Production and procurement decisions often depend on quantity thresholds. A threshold may separate production regimes or mark a minimum order quantity or capacity. Within a regime, total cost can be concave even though the complete production-cost function is not globally concave. Holding and backlog costs can likewise change regime at specified stock levels. We study single-item lot sizing with these piecewise-concave costs, denoted by LS-PC, over a finite horizon. Negative stock represents backlogged demand, and unavailable production or stock ranges are imposed through the cost domains.

Koca et al. (2014) established polynomial solvability of the common-production-breakpoint problem when the number of breakpoints is fixed. Their main algorithm uses the structural result that an optimal zero-inventory regeneration interval contains at most one production quantity outside the breakpoint set, together with a breakpoint-only final interval when positive terminal inventory is necessary. The underlying structure originates in Swoveland (1975). Their additional cases include backlogging and piecewise-concave holding costs, for which regeneration states must record stock boundary levels. The computational difficulty is to combine the breakpoint production schedules before and after the exceptional production period.

For T periods and m common positive finite production breakpoints, the general no-backlogging algorithm of Koca et al. (2014) requires O(T2m+3)O(T^{2m+3}) time. Its common-capacity restriction has an O(T2m+2)O(T^{2m+2}) bound. For related piecewise-linear models, Ou (2017) obtains O(Tm+2log⁡T)O(T^{m+2} \log T) time, and Papadopoulos (2026) obtains O(Tm+2)O(T^{m+2}) deterministic time. These results motivate ordered states, but affine separability does not directly apply to a nonlinear concave production piece. The cited models are not identified with one another in their treatment of backlogging or terminal inventory.

Our contribution is a matrix-searching reduction that retains nonlinear concave production pieces and admits the stock-boundary states required by the generalized model. For a fixed designated production period t, each transition has the form

Mt(i,j)=Ai+Cj+pt(aj−βi).(1.1)M_{t}(i,j)=A_{i}+C_{j}+p_{t}(a_{j}-\beta_{i}). \tag{1.1}

A row represents a breakpoint-only prefix with a prescribed starting stock boundary. A column represents a breakpoint-only suffix ending at a stock boundary, followed by an optimal continuation. The quantity aj−βia_{j} - \beta_{i} is the production needed in period t. Ordering these inventory keys exposes a Monge inequality on each concave production piece. Its defined entries form a double staircase rather than an arbitrary complete matrix. Holding at period t is a column offset, so piecewise-concave stock costs do not create a further row–column interaction.

Let KK be the number of common stock boundary levels, including zero and the initial stock. We combine the reduction with deterministic and randomized staircase-searching algorithms (Klawe & Kleitman, 1990; Chan, 2021). A linear-total-size decomposition, incrementally merged orders, and backward evaluation give Om,K(Tm+2α(T+2))O_{m,K}(T^{m+2}\alpha(T+2)) deterministic time and Om,K(Tm+2)O_{m,K}(T^{m+2}) expected Las Vegas time, with Om,K(Tm+2)O_{m,K}(T^{m+2}) worst-case space. The boundary labels enlarge the states but do not add a power of TT for fixed mm, KK. These are arithmetic and cost-oracle bounds, not bit-complexity claims or claims of fixed-parameter tractability.

The no-backlogging problem with globally concave holding costs is the specialization H={0}\mathcal{H} = \{0\}, with only nonnegative stock allowed. Ordinary backlogging also has K = 1 when stock costs are concave separately on the two half-lines. Additional common holding-cost breakpoints, inventory limits, and backlog limits are included in H\mathcal{H}. The boundary-level structural principle is not new (Swoveland, 1975; Koca et al., 2014); the contribution is its integration with the faster nonlinear Monge batching. Production capacities, minimum quantities, and multiple production regimes are represented by the same production domains. Terminal policies are specified explicitly rather than treated as interchangeable.

We implement a simpler Om,K(Tm+2log⁡(T+2))O_{m,K}(T^{m+2}\log(T+2)) variant using complete-matrix searching by SMAWK (Aggarwal et al., 1987). A 300-case no-backlogging experiment compares its original-model specialization with a new implementation of the original Koca–Yaman–Aktürk interval recurrences, not with naive enumeration of the new matrices. It records complete objective-only solve times. A separate generalized solver is validated on 624 policy-specific cases with signed stock, piecewise-concave stock costs, and other domain restrictions. The original 640-case validation suite is also retained. Only the original model has timing comparisons; the stronger staircase routines are not implemented or benchmarked.

Section 2 defines the unified model and its optimal-solution structure. Section 3 derives the boundary-indexed tables, Monge searches, full algorithm, and correctness and complexity proofs. Section 4 distinguishes the original timing study from the generalized-model validation. Section 5 gives the principal specializations and scope restrictions, and Section 6 concludes.