arXiv:2609.31099cs.MASep 2026

Manuscript Offprint

arXiv:2609.31099

Collision-free Movement on Grids and Beyond

Hendrik Molter, Meirav Zehavi

Abstract

We study collision-free movement problems on graphs, where the task is to coordinate a set of robots so that they reach a target formation satisfying a desired property while minimizing the total travel distance. This framework extends two classical models: (a) minimizing movement [Demaine et al., TALG '09, '14], which does not enforce collision avoidance, and (b) coordinated motion planning or multi-agent path finding [Eiben et al., SoCG '23, Deligkas et al., ICALP '24, among many others], where each robot is assigned an explicit target position.

We focus on the setting where the target formation of the robots should be connected. We analyze the parameterized complexity of the problem with respect to the number of (main) robots and the total travel length on grid graphs and two natural generalizations thereof: planar graphs and unit disk graphs.

2012 ACM Subject Classification Theory of computation → Parameterized complexity and exact algorithms; Theory of computation → Graph algorithms analysis; Mathematics of computing → Graph algorithms

Keywords and phrases Coordinated Motion Planning, Multi-Agent Path Finding, Planar Graphs, Unit Disk Graphs, Clique Grids, Parameterized Complexity, Approximation, Kernelization

Funding Hendrik Molter: Supported by the Israel Science Foundation, grant nr. 1470/24, by the European Union's Horizon Europe research and innovation programme under grant agreement 949707, by the European Research Council, grant nr. 101039913 (PARAPATH), and by the Deutsche Forschungsgemeinschaft (DFG, German Research Foundation) – 565381415.

Meirav Zehavi: Supported by the Israel Science Foundation, grant nr. 1470/24, and by the European Research Council, grant nr. 101039913 (PARAPATH).

Acknowledgements Main work was done while Hendrik Molter was affiliated with the Ben-Gurion University of the Negev.

Collision-free Movement on Grids and Beyond

1 Introduction

Coordinated motion of robots is a fundamental task in computational geometry and robotics. The environment is frequently modeled by a grid, often consisting also of “obnoxious robots” in addition to the “main robots”. Within the environment, the main robots are set to move so as to perform a predetermined task; the obnoxious robots, on the other hand, are simply meant to model movable obstacles. To date, most efforts were directed at the following:

  1. Given a target position for each main robot, plan a collision-free motion for all robots so that each main robot will reach its target (see, e.g., [10, 16, 21, 36, 39, 41, 42]). This setting, widely known as MAPF (Multi-Agent Path Finding), was part of the 3rd Computational Geometry Challenge of SoCG 2021 [18].

  2. Given a formation for all main robots (where a formation of particular interest is to induce a connected set), plan a motion (collisions allowed) of all robots as to achieve this formation (see, e.g., [3, 11, 12, 26]).

Both objectives have been extensively studied in a variety of discrete and continuous settings, from both a theoretical perspective—particularly in the frameworks of parameterized complexity [10, 12, 16, 17, 21] and approximation algorithms [3, 11, 36]—and a practical perspective [18, 40]. The above leaves open a very obvious and natural question:

What about the task of, given a characterization of a formation for all main robots, planning a collision-free motion of all robots as to achieve this formation?

To the best of our knowledge, the present work is the first to address this problem. As in the classical settings discussed above, two natural optimization goals arise: (i) minimize the total number of moves taken by all robots, i.e., the total energy; (ii) minimize the number of time steps needed, i.e., the makespan. Here, we focus on the first goal, while the desired formation is to establish a connected set. We provide a spectrum of parameterized results for grids and generalizations thereof, with respect to the two most natural parameters in this context: the number of main robots (k), and the total energy to spend (c). Notably, our results delineate the subtle boundaries between various tractable and intractable cases.

Previous works most closely related to ours—i.e., which focus on parameterized complexity, environments modeled by graphs (particularly grids), and total energy minimization, are Eiben et al. [16] and Deligkas et al. [10] for the first task, and Demaine et al. [12] for the second task. Discussion (non-exhaustive) of some other related works can be found at the end of this section.

Eiben et al. [16] studied MAPF on solid grids with both (total) energy and makespan minimization as objectives, and without obnoxious robots. This generalizes the well-known (n2−1)(n^2 - 1)-Puzzle, which was extensively studied before and is known to be NP-hard [13, 38]. They showed (for solid grids only) that both energy and makespan minimization problems are fixed-parameter tractable (FPT) w.r.t. the number of (main) robots kk, the energy minimization problem is FPT w.r.t. the energy cc, and the makespan minimization problem is paraNP-hard w.r.t. the makespan. The follow-up work by Deligkas et al. [10] focused on (total) energy minimization, in the presence of obnoxious robots (thereby closely related to the Rush Hour problem, which was also extensively studied before [20, 22]). Further, they considered general graphs, and showed: FPT w.r.t. the number of obnoxious robots ℓ\ell when k=1k = 1; FPT w.r.t. the total number of robots k+ℓk + \ell plus the treewidth of the input graph; FPT approximation w.r.t. k+ℓk + \ell and additive error; W[1]-hardness w.r.t. cc; FPT w.r.t. cc on planar graphs. In further follow-up, Deligkas et al. [9] show that the problem is W[1]-hard w.r.t. c even if k = 1 and FPT w.r.t. k plus the treedepth of the input graph. It remains open whether the problem is FPT w.r.t. k+ℓk + \ell.

Demaine et al. [12] studied the parameterized complexity of a very general problem addressing movement to specific formations and for several objectives, including both main and obnoxious robots. Here, recall, collisions are allowed (also in the final formation itself). They provided a dichotomy that asserted that, when the family of possible formations, F, is decidable and closed under edge-addition, the problem is FPT w.r.t. k if the edge-minimal formations in F have bounded treewidth, and W[1]-hard otherwise. In particular, this asserts that the problem where we aim to move robots so that the main robots will form a connected set, and with the objective of energy minimization, is FPT w.r.t. k. We remark that this case (of connectivity) has received previous focused attention, particularly from the viewpoint of approximation (see, e.g., [3]). Additionally, Demaine et al. [12] provided W[1]-hardness w.r.t. k for the setting where the formation is a hereditary property that does not contain all cliques or all independent sets.