arXiv:2609.10641cs.DSSep 2026

Manuscript Offprint

arXiv:2609.10641

A Deadline-Driven Algorithm for Polyamorous Scheduling

Arjun Maneesh Agarwal

Open access. PaperVantage converted this article to text, so layout and figures may differ from the original.

Abstract

In Polyamorous Scheduling Problem, we are given an edge-weighted graph and must find a periodic schedule of matchings in this graph which minimizes the maximal weighted waiting time between consecutive occurrences of the same edge. This NP-hard problem generalises Bamboo Garden Trimming and is motivated by the need to find schedules of pairwise meetings in a complex social group.

We present a 4G∗4G^* algorithm for Polyamorous Scheduling, improving the previously known bound of 3+5≈5.2363 + \sqrt{5} \approx 5.236. Our algorithm is inspired by the Deadline-Driven Heuristic which is optimal for Bamboo Garden Trimming (BGT).

1 Background and Motivation

In the Polyamorous Scheduling problem [2], we are given an edge-weighted graph G=(P,E)G = (P, E) on a set of people PP, where each e=uv∈Ee = uv \in E represents a relationship with positive growth rate geg_e. Each edge carries a heat score he(t)h_e(t) at time tt that increases at rate geg_e while ee is not scheduled and resets to 0 whenever ee is scheduled.

A feasible schedule selects, on each day tt, a matching Mt⊆EM_t \subseteq E (no person can be in two meetings on the same day), and the objective is to minimize the supremum heat over an infinite horizon:

heat(schedule)=sup⁡e∈E,t≥0he(t).heat(schedule)=\sup_{e\in E,t\geq0}h_{e}(t).

*Chennai Mathematical Institute. arjuna.ug2024@cmi.ac.in

A natural normalization is that, given the growth rate of vertex v is

Gv=∑e∋vge,G_{v}=\sum_{e\ni v}g_{e},

then we define the growth rate of the graph to be

G∗=max⁡v∈PGv.G^{*}=\max_{v\in P}G_{v}.

It is clear that

OPT≥G∗OPT\geq G^{*}

for all instances. We usually normalize G∗=1G^{*}=1.

The special case where G=(P,E)G = (P, E) is a star is exactly the classical bamboo garden trimming problem (BGT): each edge behaves like a bamboo stalk growing at rate geg_e, and trimming it resets its height.

Kuszmaul (2022)[3] shows that a greedy Deadline-Driven Strategy achieves the optimal worst-case backlog of 2: at every step, trim the bamboo of height at least 1 whose predicted time to reach height 2 (if left untrimmed) is soonest.

The general graph version, OPS, is considerably harder because a day's schedule must be a matching rather than a single choice. Biktairov et al. (2024)'s main algorithm [1], Reduce-Fastest, instead orders edges by decreasing growth rate and greedily matches those whose heat exceeds a threshold xG∗xG^{*}. Setting

x=2+255x=2+\frac{2\sqrt{5}}{5}

gives a

3+53+\sqrt{5}

approximation ratio.

We try to import BGT's deadline-based idea directly into the OPS setting and see if this yields a better bound.