An FPTAS for Two-Machine Open-Shop Scheduling with a Single Unavailability Interval

Hao Lu, Yuan Yuan, Xingwu Liu, Xin Han, Yong Zhou

Abstract

We consider the two-machine open-shop scheduling problem in which one machine is unavailable during a fixed interval. We study the resumable setting: an operation interrupted by the unavailability interval may resume, without penalty, when the machine becomes available. The objective is to minimize the makespan. Although the problem is NP-hard and several approximation algorithms are known, whether it admits a fully polynomial-time approximation scheme (FPTAS) has remained open for two decades. We resolve this question affirmatively by giving the first FPTAS, thereby strengthening the previously known polynomial-time approximation scheme (PTAS). As an intermediate result, we develop a new pseudo-polynomial dynamic program with seven state dimensions, improving on the ten-dimensional formulation in the literature.

Keywords: Open-shop scheduling, Machine unavailability, Fully polynomial-time approximation scheme, Dynamic programming

1 Introduction

Machine-scheduling models with maintenance or availability constraints have received considerable attention in operations research. We study a two-machine open-shop problem in which one machine is subject to a maintenance period. This problem was introduced by Breit et al. [1].

Maintenance periods (MPs) are commonly classified as either fixed or flexible. In the fixed model, both endpoints of the MP are prescribed. In the flexible model, the MP has a fixed duration, but its starting time may be chosen within a given time window.

An instance of the classical two-machine problem consists of a set N={1,2,…,n}N = \{1, 2, \ldots, n\} of jobs to be processed on machines M1M_1 and M2M_2. Each job i∈Ni \in N comprises two operations, Oi,1O_{i,1} and Oi,2O_{i,2}, with processing times aia_i on M1M_1 and bib_i on M2M_2, respectively. Operations of the same job may not overlap, and each machine can process at most one operation at a time. Apart from an interruption caused by the MP in the resumable model defined below, operations are nonpreemptive. If Oi,1O_{i,1} must precede Oi,2O_{i,2} for every job ii, the environment is a flow shop; if the order of the two operations may be chosen independently for each job, it is an open shop. The classical two-machine open-shop problem, denoted by O2∥Cmax⁡O2\|C_{\max}, can be solved in O(n)O(n) time by the algorithm of Gonzalez and Sahni [2]; alternative linear-time algorithms appear in [3, 4]. The objective is to minimize the makespan, that is, the latest completion time among all operations.

We extend this classical problem by imposing a fixed MP on one of the machines. The MP occupies the interval [s,e][s, e], during which the machine is unavailable.

Three standard models describe how an operation interacts with a fixed MP. In the resumable model, an operation interrupted by the MP resumes without penalty when the machine becomes available [5]. In the non-resumable model, such an operation must restart from the beginning [5]. In the semi-resumable model, it must repeat part of its processing after the MP [6].

The two-machine open-shop problem with a single fixed MP is NP-hard [1], which motivates the study of approximation algorithms. An algorithm is a ρ\rho-approximation, for ρ≥1\rho \geq 1, if it returns a schedule whose makespan is at most ρ\rho times the optimum. A polynomial-time approximation scheme (PTAS) achieves ratio 1+ε1 + \varepsilon for every fixed ε>0\varepsilon > 0 in time polynomial in the input size. If the running time is also polynomial in 1/ε1/\varepsilon, the scheme is a fully polynomial-time approximation scheme (FPTAS).

Both exact and approximation algorithms are known for two-machine open-shop problems with fixed MPs. In the resumable setting, Breit et al. [1] gave a 4/3-approximation algorithm for a single fixed MP. Kubzin et al. [7] subsequently developed two PTASs: one for a single fixed MP on each machine and one for multiple fixed MPs on one machine. Lorigeon et al. [8] gave a pseudo-polynomial dynamic program for a single fixed MP. In the non-resumable setting, Breit et al. [9] obtained a 4/3-approximation algorithm, and Yuan et al. [10] later developed a PTAS.

The corresponding two-machine flow-shop problem with a single fixed MP is NP-hard in the resumable setting [11]. Lee [11] gave approximation algorithms with ratios 3/2 and 4/3 when the MP lies on M1M_{1} and M2M_{2}, respectively, and Ng and Kovalyov [12] subsequently developed an FPTAS. For the non-resumable setting with a single fixed MP on M1M_{1}, Lu et al. [13] recently presented the first FPTAS. The structural similarity between the flow-shop and open-shop variants, together with the pseudo-polynomial algorithm of Lorigeon et al. [8], suggests that the open-shop variant may also admit an FPTAS.

We confirm this conjecture. For the resumable problem, denoted by O2∣r−a(M1)∣Cmax⁡O2 \mid r-a(M_1) \mid C_{\max} [14], we decompose a candidate schedule into three two-machine flow-shop subproblems. Their state information suffices to recover the makespan of the original instance. This decomposition yields a seven-dimensional pseudo-polynomial dynamic program with running time O(nsV5)O(nsV^5), where VV is the total processing time of all jobs. Unlike the earlier formulation, our dynamic program minimizes a(XP)a(XP) evaluated using the original processing times; retaining this value after rounding preserves feasibility with respect to ss. Applying standard scaling and rounding then yields the first FPTAS for the problem, with running time O(n7/ε6)O(n^7/\varepsilon^6).

The remainder of the paper is organized as follows. Section 2 establishes the structural properties used throughout the paper. Section 3 presents the pseudo-polynomial dynamic program, and Section 4 derives the FPTAS. Section 5 concludes the paper.