arXiv:2609.09235cs.SESep 2026

Manuscript Offprint

arXiv:2609.09235

Cost-Aware Post-Hoc Deferral Under Calibration and Shift: An Environmental AI Case Study

Haoran Yu, Lifei Liu, Danping Zhang

Haoran Yu

University of Florida

Gainesville, FL, USA

haoranyu889@gmail.com

Lifei Liu

Wichita State University

Wichita, KS, USA

lliu.lifei@gmail.com

Danping Zhang

Nanchang Hangkong University

Nanchang, China

zhangdanping@nchu.edu.cn

Abstract—Choosing a deferral policy for a frozen classifier requires more than ranking uncertain cases: confidence may be miscalibrated, errors have unequal costs, reviewers can err, and deployment data can leave calibration support. We study these interactions through EcoTrust, a post-hoc framework that compares automatic action with review using a six-group error-risk estimator, class-asymmetric costs, reviewer accuracy, and an optional support gate. On a Columbia River thermal-stress testbed, the learned estimator improves error-ranking area under the receiver operating characteristic curve from 0.869 to 0.889, but Chow's confidence rule has lower in-distribution cost (0.416 versus 0.567 per day). Across 12 off-the-shelf backends, learned risk and a calibration-matched, class-aware confidence estimator each beat raw Chow on six; a paired year-block bootstrap does not resolve their mean cost difference. In transfer to ten river stations, the gate flags every case and becomes an always-review fallback, attaining the lowest cost on eight stations only when review is perfect and unconstrained. These results characterize decision boundaries on one controlled task: richer risk signals do not reliably improve on calibrated confidence, and detected extrapolation does not imply transferable case-level ranking.

Index Terms—learning to defer, cost-sensitive AI, uncertainty, distribution shift, environmental AI

I. INTRODUCTION

Consider a migration-season day at the Columbia River at The Dalles. Water above 18°C can impair Chinook, Coho, and Chum salmon [1], but a frozen classifier can only provide a probability and a binary prediction. The operational question is who should act on that prediction. In our illustrative primary scenario, a missed stress day costs 100 review units, a false alarm costs three, and expert review costs one; reviewing every day is nevertheless incompatible with a limited workload. The same policy must also specify what happens when it is applied to a river outside its calibration support.

Reject-option and deferral research provides several parts of this decision. Chow's rule [2] and selective classification [3] route low-confidence predictions away from automatic action, while learning to defer (L2D) trains a rejector around expert behavior [4]–[6]. Post-hoc L2D estimates the error of a fixed model [7]. Closely related work has asked when confidence-based cascade deferral is sufficient [8], evaluated post-hoc confidence estimators for selective classification [9], and connected post-hoc L2D to density-ratio estimation and Chow-style rules [10]. The unresolved issue here is therefore narrower: whether richer uncertainty signals improve deployment cost over a calibration-matched, class-aware confidence estimator in a human-review setting with asymmetric errors, imperfect review, quotas, and detected extrapolation.

Our goal is an empirical characterization, not a new Bayes decision rule. We ask when a separately learned error-risk model changes the action selected around a frozen predictor, when confidence is sufficient, and when an out-of-support detector should trigger a predetermined fallback. The Columbia River task supplies one controlled setting in which the same predictor and consequence model can be held fixed while calibration, reviewer quality, review rate, and deployment site vary.

This setting raises three evaluation challenges. First, raw confidence and learned risk are not comparable unless both receive the same calibration data and model capacity; otherwise supervised recalibration can be mistaken for value from additional signals. Second, ranking quality alone does not determine deployment value because false negatives, false positives, review cost, reviewer error, and forced review rates interact. Third, a shift detector can identify unsupported inputs without knowing whether the downstream risk ranking remains useful, so a safe fallback must be distinguished from transfer competence.

EcoTrust makes these comparisons explicit (Fig. 1). A cross-fitted meta risk estimator combines six signal groups, and a calibration-matched confidence estimator isolates the effect of using additional signals. A cost-aware rule maps either risk estimate to automatic action or review under class-asymmetric costs and reviewer accuracy. A support gate raises risk outside the training support, while fixed-rate experiments separate fallback behavior from ranking quality. Algorithm 1 summarizes the resulting deployment procedure.

• A cost-aware post-hoc formulation (Secs. III–IV) that states the assumptions linking class-asymmetric errors, reviewer accuracy, review quotas, and a detected-extrapolation fallback.

Figure

Fig. 1. EcoTrust studies per-case deferral for a frozen predictor under asymmetric costs. Six uncertainty signals estimate model error; the decision layer combines adjusted risk with error costs, review cost, and reviewer accuracy. Outside calibration support, a pre-specified risk floor invokes a conservative fallback. An optional budget ranks cases by expected saving.

• A calibration-matched characterization (Secs. VI–IX) showing that better error ranking need not lower cost and that the six-signal estimator does not reliably beat a class-aware confidence recalibrator across the studied backend bank.

• Deployment boundaries under shift (Sec. X) that separate an always-review fallback from transferable risk ranking using ten stations and a reviewer-accuracy by forced-review-rate grid.